About this file

This solicitation is for a logistics readiness squadron campus project at Offutt Air Force Base in Nebraska. The project involves demolishing existing substandard warehouse space and facilities in the construction area and building a new consolidated warehouse facility. The new facility will include logistics and administration areas, shipping and receiving operations areas, open storage areas, and loading/unloading aprons. Supporting facilities include underground utilities, electric service, paving, sanitary sewer system, storm drainage, information systems, fire suppression systems, landscaping, and site improvements. Construction includes reinforced concrete footings, floor slab, supporting structure, and egress. The project also includes the safe removal of multiple facilities. Sustainable design principles will be integrated according to applicable laws and executive orders. The solicitation was issued by the Department of the Army Corps of Engineers Omaha District.

View the file

Other files for this federal contract opportunity

Other files attached to Logistics Readiness Squadron Campus, Offutt AFB, Nebraska, newest first.
File Type Posted
Am_0006-Drawings.PDF PDF
Am_0006.pdf PDF
Am_0005.pdf PDF
Am_0004.pdf PDF
Am_0004 - D.pdf PDF
Am_0003 - D .PDF PDF
Am_0003.pdf PDF
OF63 LRS CAMPUS OFFUTT AFB AM 0002.PDF PDF
Am_0002.pdf PDF
Am_0001.pdf PDF
LRS Campus Drawings Part 1 of 2.pdf PDF
W9128F-21-R-0026_SPECS.pdf PDF
LRS Campus Drawings Part 2 of 2.pdf.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg10:13:53 AM 8/10/2021

...\OF\OF63\40000 Design Products\CAD_BIM\_Sheets\INDEX - 1 OF 2

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R

M

A H

A

N E

F

IL

E N

A M

E

SHEET SEQUENCE NUMBER

w/ Level 2 Designator

DISCIPLINE DESIGNATOR

M - 2 0 1

2. DISCIPLINE DESIGNATORS:1. SHEET IDENTIFICATION NUMBERS:

R

T

E

M

D

P

F

Q

I

A

S

L

C

B

V

H

G

RESOURCE

TELECOMMUNICATIONS

ELECTRICAL

MECHANICAL

PROCESS

PLUMBING

FIRE PROTECTION

EQUIPMENT

INTERIORS

ARCHITECTURAL

STRUCTURAL

LANDSCAPE

CIVIL

GEOTECHNICAL

SURVEY / MAPPING

HAZARDOUS MATERIALS

GENERAL

INDEX LEGEND:

SHEET TYPE DESIGNATOR

3. SHEET TYPE DESIGNATORS:

3D REPRESENTATIONS

USER DEFINED

USER DEFINED

SCHEDULES & DIAGRAMS

DETAILS

LARGE-SCALE VIEWS

SECTIONS

ELEVATIONS

PLANS

GENERAL

INDEX

C

A P

IT

O L A

V E

F

IL

E N

U M

B E

R

O F

G -0

.d g n

G-002

Designator)

RELEASE 6.0 for Level 2

(see A/E/C CADD STANDARD

/2

/2

M S

M

IT

H

H O

F F

M A

N

M

H O

F F

M A

N

M S

M

IT

H

L O

G

IS

T

IC

S R

E A

D

IN

E S

S S

Q U

A D

R O

N C

A M

P U

S

O M

A H

A D

IS

T R

IC

T

O F F

U T

T A

F B

N E

B R

A S

K A

O F F

U T

T F

L O

O D R

E C

O V

E R

Y

A N

S I

D

IN

D

E X O

F

W F -2

-R -0

A F -2

-0

-0

-2

A M

G

E N

E R

A L R

E V

IS

IO

N S

F A

IR

C H

IL

D

D R

IV

E

L A

W S

O N

BU

TLER

BLVD

APOLLO ROAD

LOOKING GLASS AVE.

M

IN

U T E

M

N

C

IR

C L E

S

B L

V D

BU

TLER

BLVD.

S A C

B L

V D

APPROACH/DEPARTURE ZONE

LA

TER

LEA

R A N

LIN

LA

TER

A L

C

LEA

R A N C E

LIN

E

C

LEA

R

Z O

N E

APPROACH/DEPARTURE ZONE

O L

O L

O L

O L

OL

O L

OL

OL

O L

E

E

E

E

E

A R

Z

O N

E

Q S D

Q S D

HOT CARGO

HOLDING PAD/

L

IM

A

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

OL

O L

O L

O L

OL

OL

E

E

E

EE

E

E

E

E E

E

O L

O L

E

C

LEA

R

Z O

N E

APPROACH/DEPARTURE ZONES

C

LEA

R

Z O

N E

E

E

BUTLE

BLVD.

E

E

E

C

LEA

R

Z O

N E

O L

E

X

O O

O

X

C L E

A R

Z

O N

E

C L E

A R

Z

O N

E

C L E

A R

Z

O N

E

E

E

E

E

GATE

GATE

GATE

GATE

GATE

GATE

C

LEA

R

Z O

N E

GATE

,0

C L E

A R

Z

O N

E

A P P R O

A C

D

P A R T U

Z

N E

L

IM

IT

L

IN

L

O L

O

O

O

O

O

S A

W Y

T

W U

R T S

M

IT

BONNER LANE

L A

N G

L

Y

IV

E

L A

N G

L

Y

IV

E

EAKER DRIVE

E A

K

IV

E

LANGLEY DRIVE

M

ALM

STRO

M

C

O O O O O O

L

O L

O O O O O O O O

O O O O

O OO O

O OO O

O O

O O

E

EE

E

EE

O OO O

O

O O

O O

GATE

L

X X

O O

O O

O

O O

O

,0

E

E

E

E

EE

X X X X X X

X X

X X X X

O O

O O O O O O O O

O O

O O

O

O

O O

O O

O O

O O

O O

O O

X X X X

O

O O

O O

O O

O O

O O

O O

X X

O

O O

O O

O O

O O

O O

O

O

O O

O O

O O

O O

O O O O

O O

O OO O

O O

O

O

O

O

O

O

O

O

O O

O O

O

O O

O O

O

O

O

O

XX

XX

O

O

O

X X

X X

X XX X

X X

X X X X

X X X X

X X X X

X XX X

X X

X X X X

X X

X X

X XX X

X X

X X X X

X

X XX XX X X X X

X X

X X

X X X X

X XX X

X X

X X

X X

X X

X X X XX X X XX X X X

X X X X

X X

X X

O O

2'

O OO

O

C O F F

M A N

CIR

CLE

F A

IR

C H

IL

O

O O

O O O O

ARM DEARM

HOT REFUEL/

STRATTON AVE

APOLLO DRIVE

CHECKPOINT

TACAN

CELL NO.1

CELL NO.2

CELL NO.3

O O

O O

O

O

O O

O O

O O

O O

O O O O

O O O O

O O

O O

O

O

O O

O O

CONTRACTOR ACCESS ROUTE

CONTRACTOR ENTRY POINT

PARKING AREA

TRAILER & POV

CONTRACTOR

ACCESS ROUTE

CONTRACTOR

PROJECT AREA

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

A

B

C

D

E

F

G

1 98765432

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg2:32:57 PM 8/9/2021

...\OF\OF63\40000 Design Products\CAD_BIM\_Sheets\LOCATION PLAN

A H

A

N E

C

A P

IT

O L A

V E

F

IL

E N

U M

B E

R

F

IL

E N

A M

E

PROJECT LOCATION

N

BUTLER BLVD

O M

A H

A D

IS

T R

IC

T

O F

G -0

.d g n

L O

G

IS

T

IC

S R

E A

D

IN

E S

S S

Q U

A D

R O

N C

A M

P U

S

O F F

U T

T F

L O

O D R

E C

O V

E R

Y

O F F

U T

T A

F B

N E

B R

A S

K A

C O

M S

A T D

R

L O

C A

T

IO

N P

L A

N

G-007

D F

E C

H N

E R

D F

E C

H N

E R

W

C

D A

V E

N P

O R

T

A N

S I

D

OFFUTT AFB

/2

/2

W

C

D A

V E

N P

O R

T

W F -2

-R -0

A F -2

-0

RECON

RD

A M G

E N

E R

A L R

E V

IS

IO

N S

-0

-2

W

ST

W W W

W W W

EMERGENCY SHUT OFF

CB

EMERGENCY SHUT OFF

EMERGENCY SHUT OFF

TK REFRENCE POINT

2K CONTAINMENT

B U

IL

D

IN

G

B U

IL

D

IN

G

B U

IL

D

IN

G

8' METAL FENCE

LIFT GATE

APOLLO ROAD

M

IN

U T E

M

C L E

CB

CB

CB

E

E

E

E

PB

PBPB

PB

PB

PB

PB

CP

PB

PB

S

T

T

S

M

G

D T

M

D

D

M

G

T

D

G

M

M

CP

G

CB

DD

D

T

CI

MW

D

G

PB

MW

33'

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

A

B

C

D

E

F

G

1 98765432

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

LRS BUILDING

FFE = 975'

KEYPLAN SCALE: 1" = 500'

N

DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg2:04:50 PM 8/10/2021

...\OF\OF63\40000 Design Products\CAD_BIM\_Sheets\BORING LOCATION PLAN

B -1

.d g n

G

IS

T

IC

S R

E A

D

IN

E S

S S

Q U

A D

R O

N C

A M

P U

S

O F F

U T

T F

L O

O D R

E C

O V

E R

Y

O F F

U T

T A

F B

N E

B R

A S

K A

/2

/2

A H

A

N E

C

A P

IT

O L A

V E

O M

A H

A D

IS

T R

IC

T

F

IL

E N

U M

B E

R

F

IL

E N

A M

E

30' 60'0

SCALE: 1" = 30'-0"

B-101

A N

S I

D

K

H A

L L

C F

R

IT

Z S

C H

B O

R

IN

G L

O C

A T

IO

N P

L A

N

R S

IS

K

R S

IS

K

OF20-01

OF20-03

OF20-02 OF20-06

OF20-04

OF20-05

N

LEGEND:

APPROXIMATE BORING LOCATION

BORING INFORMATION:

BORING ID NORTHING EASTING ELEVATION (FT)

THICKNESS (FT)

CONCRETE

OF20-01

OF20-02

OF20-03

OF20-04

OF20-05

OF20-06

492236.32

492126.92

492220.79

491985.41

492032.34

492126.06

2765410.97

2765495.91

2765609.96

2765561.99

2765380.02

2765653.07

969.0

969.0

969.0

967.5

970.0

968.5

0.8

0.7

0.6

N/A

0.6

0.7

GENERAL NOTES:

2. SEE SHEET B-301 FOR BORING LOGS

1. COORDINATE SYSTEM: NEBRASKA (2600), DATUM: NAVD88, NAD83.

W F -2

-R -0

A F -2

-0

A M G

E N

E R

A L R

E V

IS

IO

N S

-0

-2

APOLLO ROAD

M

IN

U T E

M

C L E

12" CMP = 962.808

12" RCP E = 967.052

24" RCP E = 965.48

18" HDPE S = 966.24

18" HDPE N = 965.58

RIM = 969.94

12" CMP = 962.818

12" CMP N = 962.885

12" CMP = 962.897

6" IRON = 963.809

12" CMP E = 963.272

TOP OF IRON PIPE = 965.560

TOP OF IRON PIPE = 966.669

18" CMP W = 965.449

18" RCP SE = 965.369

RIM = 971.491

12" RCP N = 967.12

18" RCP W = 966.15

18" HDPE SW = 965.90

RIM = 969.64

15" RCP NW = 965.89

18" HDPE NE = 965.83

18" HDPE S = 965.76

RIM = 969.37

18" RCP NE = 966.713

18" RCP N =965.029

18" CMP NW =964.944

18" RCP E = 967.08

RIM = 971.21

MAHNHOLE = 958.57

TOP OF PIPE THROUGH

FLOOR = 957.32

RIM = 970.219

LINE

NATURAL GAS

ABANDONED

NATURAL GAS LINE

ABANDONED

NATURAL GAS LINE

ABANDONED

LINE

NATURAL GAS

ABANDONED

LINE

NATURAL GAS

ABANDONED

18" CMP SW = 966.110

18" RCP SE = 966.160

RIM = 971.460

18" RCP S = 964.468

18" RCP NW = 964.253

24" RCP NE = 964.017

RIM = 969.063

12" RCP W = 962.109

EMERGENCY SHUT OFF

EQUIPMENT

ELECTRICAL

PEDESTAL, AND

POWER POLE, COMM

6" PVC SW = 963.930

8" PVC NE = 963.880

RIM = 969.530

TRENCH

EMERGENCY SHUT OFF

FUEL SYSTEM

POST

BUILDING 482

FUEL

F.F.E. = 967.393

12" CMP W = 962.882

12" RCP E = 962.668

RIM = 966.89

EMERGENCY SHUT OFF

FUEL SYSTEM

967.833

F.F.E. =

6" PVC S = 962.925

8" PVC SSW = 962.591

6" CLAY SE = 962.10

6" CLAY SW = 962.238

6" PVC NW = 962.100

RIM = 968.391

TK REFRENCE POINT

2K CONTAINMENT

CUSTOM METAL RAMP

969.317

F.F.E. =

969.713

F.F.E. =

970.315

F.F.E. =

TOP OF 6" IRON FUEL LINE

970.382

F.F.E. =

970.438

F.F.E. =

FUEL

970.534

F.F.E. =

FUEL SW 6205

5' TALL

9" DIAMETER

4.5' TALL

9" DIAMETER

LIFT GATE

(TYPICAL)

K-RAIL

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

A

B

C

D

E

F

G

1 98765432

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

W

EP

EP

EP

EP

E

E

E

E

PB

PBPB

PB

PB

PB

PB

CP

PB

PB

S

T

T

S

M

G

D T

M

D

D

M

G

T

D

G

M

M

CP

G

ST

CB

DD

D

T

CI

MW

D

G

W W W

W W W

W

CO

CP

W

CB

PB

EV

EV

G

MW

F

MW

T

F

MW

MW

PB

PB

T

M

W

CB

T

EV

M

EV

T

M M

G

G

G

G

G

MW

3-4"

BUTLER BOULEVARD

' M

E T A L F

E N

C E

F

BUILDING 543

B U

IL

D

IN

G

B U

IL

D

IN

G

B U

IL

D

IN

G

B U

IL

D

IN

G

B U

IL

D

IN

G

B U

IL

D

IN

G

M

M

M

M E

T A

L F

E N

C E

G G

G

G

G

C O

M S

A T D

R

IV

E

C O

M S

A T D

R

IV

E

G

D

T

M

OF 20-02

OF 20-05

OF 20-04

OF 20-06

OF 20-01

OF 20-03

W E

IG

H S

T A T

IO

N

MW

MW

M E

T A

L F

E N

C E

8' METAL FENCE

8' METAL FENCE

8' METAL FENCE

M E

T A

L F

E N

C E

8' METAL FENCE

8' METAL FENCE

M E

T A

L F

E N

C E

CO

MW

GG

T

G

16"

15"

T

EV

40"

KEYPLAN SCALE: 1" = 500'

CP

AC

12"

12"

U

EV

UG COMM LINE

COMM MANHOLE

UG POWER LINE

ELECTRIC PULL BOX

YARD HYDRANT

FIRE HYDRANT

WATER LINE

WATER VALVE

GUY WIRE

COMM PEDESTAL

CLEAN OUT

LIGHT POLE

ELECTRICAL PANEL

POWER POLE

BOLLARD

FENCE

COMM VAULT

BUSH

CONIFEROUS TREE WITH SIZE

DECIDUOUS TREE WITH SIZE

GAS METER (FUEL)

OVERHEAD POWER LINE

UG GAS LINE

GAS VALVE (FUEL)

SECURITY CAMERA

TEST STATION

ELECTRIC TRANSFORMER

SIGN

CULVERT PIPE

STORM DRAIN PIPE

STORM SEWER MANHOLE

SANITARY SEWER (FORCE MAIN)

SANITARY SEWER (GRAVITY)

SANITARY SEWER MANHOLE

CONTOURS

TOPO LEGEND

ELECTRICAL EQUIPMENT

IRRIGATION DEVICE

WATER DEVICE

HVAC UNIT

ELECTRIC VAULT

ELECTRIC MANHOLE

MONITORING WELL

DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg10:44:18 AM 8/10/2021

...\OF\OF63\40000 Design Products\CAD_BIM\_Sheets\OF63VF101

V F .d

G

IS

T

IC

S R

E A

D

IN

E S

S S

Q U

A D

R O

N C

A M

P U

S

O F F

U T

T F

L O

O D R

E C

O V

E R

Y

O F F

U T

T A

F B

N E

B R

A S

K A

/2

/2

A H

A

N E

C

A P

IT

O L A

V E

O M

A H

A D

IS

T R

IC

T

F

IL

E N

U M

B E

R

F

IL

E N

A M

E

30' 60'0

SCALE: 1" = 30'-0"

N

E X

IS

T

IN

G C

O N

D

IT

IO

N S P

L A

N

VF101

D F

E C

H N

E R

D F

E C

H N

E R

A N

S I

D

W

C

D A

V E

N P

O R

T

FOR THE BORING NUMBER

"OF" IS NOMENCLATURE

GEOTECHNICAL BORING

W

C

D A

V E

N P

O R

T

W F -2

-R -0

EP

A F -2

-0

A

M G

E N

E R

A L R

E V

IS

IO

N S

-0

-2

W

G

CO

M

G

CB

B U

IL

D

IN

G

B U

IL

D

IN

G

B U

IL

D

IN

G

8' METAL FENCE

LIFT GATE

APOLLO ROAD

M

IN

U T E

M

C L E

CB

CB

CB

S

S

D

D

D

D

CB

DD

D

CI

MW

D

MW

33'

TRUCK SCALE

FENCE

EXISTING

TIE INTO

TO REMAIN

LOADING RAMP

DETAILS ON SHEET CS503

MANUAL FE-6 SLIDE GATE

DETAILS ON SHEET CS504

FE-6 SLIDE GATE

DETAILS ON SHEET CS504

FE-6 SLIDE GATE

HANDICAP RAMP

STAIR DETAILS FOUND ON CS501

STAIR DETAILS FOUND ON CS501

REPLACE EXISTING CONCRETE

FOR MECHANICAL ROOM

VEHICLE ACCESS RAMP

FENCE

EXISTING

TIE INTO

POV PARKING

SEE SHEET CS505

FENCE DITCH CROSSING

DETAILS ON CS502

SECURITY FENCE

FE-6 CHAIN-LINK

DETAILS ON CS502

SECURITY FENCE

FE-6 CHAIN-LINK

INTEGRAL CURB

INTEGRAL CURB

NEW RIM ELEVATION = 969.85'

PAVEMENT ELEVATION

MANHOLE RAISED 1.5' TO MEET NEW

LOADING DOCK RAMP

INTEGRAL CURB

LOADING DOCKLOADING DOCK

IN PLACE

MANHOLE REMAINS

DETAILS ON CS502

FE-6 CHAIN-LINK SECURITY FENCE

EXISTING FENCE

TIE INTO

ELECTRICAL SHEETS

MORE INFORMATION ON

ELECTRICAL EQUIPMENT

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

A

B

C

D

E

F

G

1 98765432

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

N 492,230.33

E 2,765,677.90

N 492,228.14

E 2,765,619.89

N 492,056.50

E 2,765,666.66

N 491,848.97

E 2,765,570.18N 491,861.15

E 2,765,389.62

N 491,966.84

E 2,765,356.28

N 492,110.40

E 2,765,612.12

N 492,101.43

E 2,765,626.48

N 491,953.92

E 2,765,467.08 N 491,953.92

E 2,765,507.08

N 492,242.68

E 2,765,399.57

N 491,898.89

E 2,765,543.85

N 491,977.89

E 2,765,661.47

N 491,966.88

E 2,765,638.13

N 492,124.94

E 2,765,391.80

N 492,152.34

E 2,765,381.58

N 491,856.97

E 2,765,467.08

R

N 492,234.13

E 2,765,620.29

N 492,295.34

E 2,765,576.01

N 492,307.86

E 2,765,682.62

N 492,264.42

E 2,765,680.62

N 492,263.79

E 2,765,688.79

N 491,850.18

E 2,765,573.22

R

N 491,970.12

E 2,765,588.91

R

R

N 491,989.05

E 2,765,604.20

N 491,979.74

E 2,765,587.34

N 491,989.05

E 2,765,633.57

N 492,017.09

E 2,765,663.59

R

R 25'

R

R

R = 10'

R

N 492,029.62

E 2,765,361.36

N 492,058.46

E 2,765,375.39

N 492,083.30

E 2,765,353.25

N 492,006.87

E 2,765,346.70

N 492,268.74

E 2,765,612.38

N 491,826.36

E 2,765,436.01

N 491,900.29

E 2,765,537.08

N 491,859.82

E 2,765,423.25

N 491,964.54

E 2,765,430.16

N 491,966.74

E 2,765,396.69

N 492,087.05

E 2,765,389.30

KEYPLAN SCALE: 1" = 500'

DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg10:18:56 AM 8/10/2021

...\OF\OF63\40000 Design Products\CAD_BIM\_Sheets\CS101

-2

-0

C S .d

G

IS

T

IC

S R

E A

D

IN

E S

S S

Q U

A D

R O

N C

A M

P U

S

O F F

U T

T F

L O

O D R

E C

O V

E R

Y

O F F

U T

T A

F B

N E

B R

A S

K A

/2

/2

A H

A

N E

C

A P

IT

O L A

V E

O M

A H

A D

IS

T R

IC

T

F

IL

E N

U M

B E

R

F

IL

E N

A M

E

30' 60'0

SCALE: 1" = 30'-0"

N

S

IT

E P

L A

N

CS101

D F

E C

H N

E R

D F

E C

H N

E R

A N

S I

D

W

C

D A

V E

N P

O R

T

W

C

D A

V E

N P

O R

T

LEGEND

SEE SHEET CP502 FOR TYPICAL SECTION

CONCRETE PAVEMENT

SEE SPEC 32 92 19 FOR DETAILS

SEEDED AREAS

W F -2

-R -0

A

M G

E N

E R

A L R

E V

IS

IO

N S

-0

-2

BARBED WIRE

3 STRANDS OF

ROLLER ASSEMBLY

LOWER GUIDE

IRON ROLLERS

MALLEABLE

4" O.D. POST

ASSEMBLY

GUIDE ROLLER

GATE FRAME

4" O.D. POST

GATE FRAME

ASSEMBLY

TRUCK ROLLER

BARBED WIRE

3 STRANDS OF

ROLLER ASSEMBLY

UPPER TRUCK

GATE

4" O.D. POST4" O.D. POST

GATE

IRON ROLLERS

MALLEABLE

WIRE

STRANDS OF BARBED

OUTIGGER WITH 3

GATE

CONCRETE BASE

TENSION WIRE

BOTTOM RAIL OR

(3/8" MIN. DIA.)

TRUSS ROD

CATCH

LOCKING

MECHANICAL

ELECTRO-

BRACE RAIL

(TYP.)

TIE WIRES

LINE POST

TENSION WIRE

TOP RAIL OR

BARBED-WIRE

3-STRANDS OF

POST (1 OF 3)

4" DIA. GATE

BARBED-WIRE

3-STRANDS OF

UPPER CORNERS

WELDED AT

TRUSS RODS

TRUSS ROD

3/8" DIA.

BAR & BANDS

STRETCHER

4" DIA. POST

4" DIA. POST

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

A

B

C

D

E

F

G

1 98765432

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg11:12:34 AM 8/10/2021

...\OF\OF63\40000 Design Products\CAD_BIM\_Sheets\OF63CS503

C S .d

G

IS

T

IC

S R

E A

D

IN

E S

S S

Q U

A D

R O

N C

A M

P U

S

O F F

U T

T F

L O

O D R

E C

O V

E R

Y

O F F

U T

T A

F B

N E

B R

A S

K

A H

A

N E

C

A P

IT

O L A

V E

O M

A H

A D

IS

T R

IC

T

F

IL

E N

U M

B E

R

F

IL

E N

A M

E

NO SCALE

PLAN

NO SCALE

ELEVATION

1 1

GATE POST SPACING

10'-0" MAXIMUM

DIA.

16" MIN.

M

IN

BACK FRAME GATE FRAME

GATE OPENING

SECURE SIDE

UNSECURE SIDE

NO SCALE

LOWER GUIDE ROLLER ASSEMBLY

NO SCALE

UPPER TRUCK ROLLER ASSEMBLY

X X

XX

X X

X X X X X X X

XXXXXXX

X X X X X X X

X X X X X X X

XXXXXXX

X X X X X X X

X X X X

XXXX

X X X X

X X

XX

X X X X X X X X X

XXXXXXX

X X X X X X X X X X X X

XXXXX

X X X X X

X X

XX

X X X X X X X X

XXXXXX

X X X X X X X X X X

XXXX

X X X X

X X

XX

X X X X X

XXX

X X X

X X

XX

X X

XX

X

X X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X X

X

X X

X

X X

X

X X

X X

X X X X X

XXXXX

X X X X X

XX

X X

XX

XX

X X

XX

X X

XX

X X X X X

XXX

X X XX

X

X X X X

XXX

X X X

X X X X XX X X XX

X X X X X X X X X X X X X

X X

X X

X X

X X

X X

X

X X

X X

X X

X X

X X

X X

X X

X

NOTES:

TO LIMIT OTHER TYPES OF GATE SECTIONS AND METHODS OF INSTALLATION.

4. DETAILS SHOWN ARE TO CLARIFY REQUIREMENTS AND ARE NOT INTENDED

3. ROLLERS SHALL BE EITHER INTERNAL OR EXTERNAL.

2. GATE FRAMES SHALL BE EITHER ZINC-COATED STEEL OR ALUMINUM ALLOY.

1. CANTILEVERED SLIDE GATES SHALL CONFORM TO ASTM F1184.

5" MAX. CLEAR

F E

N C

E H

E

IG

H T

GATE OPENING

W

C

D A

V E

N P

O R

T

F E -6 S

L

ID

E G

A T

E D

E T

A

IL

S

CS503

D F

E C

H N

E R

D F

E C

H N

E R

A N

S I

D

/2

/2

W

C

D A

V E

N P

O R

T

W F -2

-R -0

A F -2

-0

10'-0" MAXIMUM

A

M G

E N

E R

A L R

E V

IS

IO

N S

-0

-2

CONCRETE

TOPSOIL

COMPACTED

GRADE

1/2"X 2" BARS

AT 6" CENTERS

1/2"X 2-1/2" BARS

RAIL

FENCE BOTTOM

1/2" X 2-1/2" BAR

CONCRETE

8 - #4 BARS

@ 12" C.C.

#4 BAR TIES

FENCE POST

VERTICAL BARS

BARS WELDED TO

1/2" X 2" HORIZONTAL

BARS AT 6" CENTERS

1/2" X 2-1/2" VERTICAL

VERTICAL BARS

WELDED TO

1/2" X 2-1/2" BAR

FENCE POST

CONCRETE BASE

GRATE

DITCH MANPROOFING

CONCRETE BASE

GRADE

RAIL (TYP.)

BOTTOM

LINE POST

LINE POST

END

DOUBLE RAIL

THREADS

BOLT W/PEEN

" CARRIAGE8

LINE POST

FABRIC

RAIL

BOTTOM

GRATE

MANPROOFING

BRACE RAIL

TOP RAIL OR TENSION WIRE

(3/8" MIN. DIA.)

TRUSS ROD

(TYP.)

TIE WIRES

OF FABRIC

BOTTOM

(9 GAGE, 2" MESH)

CHAIN-LINK FABRIC

WIRE

TENSION

(TYP.)

TIE WIRES

FENCE DITCH CROSSING

THROUGH FENCE DITCH CROSSING

DRAINAGE DITCH SLOPE MAINTAINED

LOWEST POINT OF DRAINAGE DITCH

LINE POST SHALL BE LOCATED AT

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

A

B

C

D

E

F

G

1 98765432

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg11:17:58 AM 8/10/2021

...\OF\OF63\40000 Design Products\CAD_BIM\_Sheets\OF63CS505

C S .d

G

IS

T

IC

S R

E A

D

IN

E S

S S

Q U

A D

R O

N C

A M

P U

S

O F F

U T

T F

L O

O D R

E C

O V

E R

Y

O F F

U T

T A

F B

N E

B R

A S

A H

A

N E

C

A P

IT

O L A

V E

O M

A H

A D

IS

T R

IC

T

F

IL

E N

U M

B E

R

F

IL

E N

A M

NO SCALE

10" MIN. DIA.

NOTES:

X X X X X X

XX

X XXXXXXXXXXX

X

X X X X X X

X X X X XXXXX

X X X X X X X

XXXXXX

X X X X X X

X X X X

XXXX

X X X X X X X

XXX

X X X

X X X X X

XXXXX

X X X X X

X

X

X

X

X

X X

X X

X X

X

XXX

X

X

X

SECURE SIDE

NO SCALE

BOTTOM RAIL DETAILS

X

X

X X

X

X

X

X

X

X

X

H H

M

IN

14" MIN. DIA.

10'-0" MAX.

CHAIN-LINK FENCE DITCH CROSSING DETAIL

10'-0" MAX.

5"

MAX.

NO SCALE

DITCH MANPROOFING GRATE DETAILS

ELEVATION

DIA.

14" MIN.

10"

MIN.

M

IN

M

IN

M A

X

M A

X

M A

X

3" MAX.

SECTION

3. REINFORCING STEEL FY = 60 KSI.

OFFICER AND SHALL BE SUBJECT TO APPROVAL.

2. MANPROOFING GRATE SHALL BE INSPECTED BY THE CONTRACTING

BE GALVANIZED WITH 2.0 OZ. ZINC/SQ. FT.

1. ALL BARS SHALL BE STRUCTURAL GRADE STEEL AND SHALL

W

C

D A

V E

N P

O R

T

W

C

D A

V E

N P

O R

T

F E

N C

E D

IT

C H C

R O

S S

IN

G

CS505

D F

E C

H N

E R

D F

E C

H N

E R

A N

S I

D

/2

/2

W F -2

-R -0

F A

B R

IC

W

ID

T

H

7.0%

DRAINAGE

D R

A

IN

A G

E

.5

DRAINAGE

7.0%

PLAN VIEW

DRAIN

AGE0.5

A F -2

-0

A M G

E N

E R

A L R

E V

IS

IO

N S

-0

-2

HINGE

POST

GATE

HINGE

RAIL AS SPECIFIED

TOP TENSION WIRE OR

BRACE RAIL (TYP.)

GRADE LINE

OR RAIL AS SPECIFIED

BOTTOM TENSION WIRE

TRUSS ROD (TYP.)

LATCH

AND GUTTER

EXIST. CURB

FULL DEPTH

SAWCUT CURB

GATE

3" MIN.

GUTTER

SAWCUT

SAND/GRAVEL

1" I.D. STEEL PIPE

PAVEMENT

BITUMINOUS

SURFACE

PAVED

PAVEMENT

P.C. CONC.

AND GUTTER

NEW CURB

NEW GATE

WASHER

POST FOUND.

NEW GATE

EXIST. CURB

HINGE

STANDARD

POST

GATE

GATE FRAME

CHAIN-LINK FABRIC OF BARBED-WIRE

3 VERTICAL STRANDS

BARBED WIRE

3 STRANDS OF

BARBED-WIRE

3-STRANDS OF

BARBED-WIRE

3 STRANDS OF

BARBED WIRE

3-STRANDS OF

BARBED WIRE

3-STRANDS OF

LINE POST

ASSEMBLY

LATCH

GATE FRAME

DROP ROD

FABRIC

CHAIN-LINK

RAIL AS SPECIFIED

TOP TENSION WIRE OR

HINGE

OR RAIL AS SPECIFIED

BOTTOM TENSION WIRE

RAIL (TYP.)

BRACE

LINE POST

(TYP.)

TRUSS ROD

(TYP.)

BRACE RAIL

LINE

GRADE

" DIA. DROP ROD2

JOINT

" EXP.2

" EXP. JOINT2

" TRUSS RODS8

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

A

B

C

D

E

F

G

1 98765432

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg9:18:38 PM 8/9/2021

...\OF\OF63\40000 Design Products\CAD_BIM\_Sheets\OF63CS506

C S .d

G

IS

T

IC

S R

E A

D

IN

E S

S S

Q U

A D

R O

N C

A M

P U

S

O F F

U T

T F

L O

O D R

E C

O V

E R

Y

O F F

U T

T A

F B

N E

B R

A S

A H

A

N E

C

A P

IT

O L A

V E

O M

A H

A D

IS

T R

IC

T

F

IL

E N

U M

B E

R

F

IL

E N

A M

M N

E W D

R A

W

IN

G A

D D

E D

-0

-2

F E

N C

E F

A B

R

IC

GATE OPENING

4'-0"

M

IN

M A

X

6" D

IA

10"

6" DIA. P.C. CONC.

NO SCALE

PERSONNEL GATE

TYPE FE6 FENCE

OFFSET HINGE STANDARD HINGE

LATCH ASSEMBLY

DROP ROD ASSEMBLY

GATE POST SCHEDULE

6' OR LESS

MORE THAN 13' TO 18'

MORE THAN 6' TO 13'

MORE THAN 18'

2.875" O.D.

2.5" SQ.

4.0" O.D.

6.625" O.D.

8.625" O.D.

NOTES:

NO SCALE

SWING GATE DETAILS

GATE KEEPER

(TO HOLD GATE OPEN)

PLAN

A

SECTION A

DROP ROD FOUNDATION

SECTION

GATE POST DETAIL

AT CURB AND GUTTER

F E

N C

E F

A B

R

IC

GATE LEAF

M

IN

M A

X

NO SCALE

DOUBLE SWING GATE (TYPE FE6 FENCE)

ELEVATION

X X

XX

X X X X X X X X X

XXXXXXX

X X X X X X X X X X X X X X

XXXXXXX

X X X X X X X

X X X X X X X

XXXXXXX

X X X X X X X

X X X X X X X

XXXXXXX

X X X X X X X

X X X X

XXXX

X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

XX

X

X X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X X

X

X X

X

X X

X

X X

X X

X X X X X

XXXXX

X X X X X

PLAN

DIRECTION OF GATE SWING (TYP.)

X X

XX

X X X X X X X

XXXXX

X X X X X

GATE OPENING

(NOMINAL)

GATE LEAF WIDTH

(NOMINAL)

OUTSIDE DIMENSION

2'-10" FOR POSTS 4" O.D. & LESS

" O.D.8

53'-4" FOR POSTS 6

" O.D.8

53'-10" FOR POSTS 8 4" O.D. & LESS

16" DIA. MIN. FOR GATE POSTS

OVER 4" O.D.

24" DIA. MIN. FOR GATE POSTS

FE5-48-SO-HD-6

EXAMPLES: FE6-84-DO-RA-24

OPENING - FEET (CLEAR OPENING BETWEEN GATE POSTS)

- HO (OFFSET)

HINGE - RA (STANDARD)

- DO (DOUBLE)

TYPE OPENING - SO (SINGLE)

FENCE HEIGHT - INCHES

FENCE TYPE - FE5, FE6, ETC.

4. GATES SHALL BE DESIGNATED AS FOLLOWS:

CONSTRUCTION OF ALL GATES SUPPLIED.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER RIGID

USED IN LIEU OF TRUSS RODS TO BRACE ALL WELDED GATE FRAMES.

AT CONSTRACTOR'S OPTION, A WELDED HORIZONTAL BRACE MAY BE

CONSTRUCTION OR SHALL BE ASSEMBLED USING HEAVY FITTINGS.

OR 2.00" NOMINAL (SQUARE). GATE FRAMES SHALL BE WELDED

3. ALL GATE FRAMES SHALL BE A MINIMUM OF 1.90" NOMINAL (ROUND)

LATCH ASSEMBLY AND GATE KEEPERS EXCEPT AS NOTED.

2. SWING GATES SHALL BE CONSTRUCTED WITH DROP RODS, PADLOCKS,

INTENDED TO LIMIT METHOD OF INSTALLATION TO ONE MANUFACTURER.

1. DETAILS SHOWN ARE TO CLARIFY REQUIREMENTS AND ARE NOT

A F -2

-0

W

C

D A

V E

N P

O R

T

W

C

D A

V E

N P

O R

T

F E -6 S

W

IN

G G

A T

E D

E T

A

IL

S

CS506

D F

E C

H N

E R

D F

E C

H N

E R

A N

S I

D

/2

/2

W F -2

-R -0

LRS BUILDING

FFE = 975'

CB

B U

IL

D

IN

G

B U

IL

D

IN

G

B U

IL

D

IN

G

8' METAL FENCE

LIFT GATE

970970

APOLLO ROAD

M

IN

U T E

M

C L E

CB

CB

CB

S

S

D

D

D

D

CB

DD

D

CI

MW

D

MW

ELEVATION =971'

SHEET S-304

SEE STRUCTURAL DRAWINGS

RETAINING WALL

18" RCP

REPLACE 10' OF

18" RCP

REPLACE 10' OF

ELEVATION =971'

ELEVATION =971'

ELEVATION =970.50'

18" RCP S = 966.4'

GRASS SWALE

12" RCP N = 965.90

TOP GRATE = 969.00

TYPE A AREA INLET

12" RCP E = 965.55

12" RCP S = 965.70

TOP GRATE = 969.80

TYPE A AREA INLET

18" RCP N = 965.029

18" RCP S = 965.04

12" RCP W = 965.10

TOP GRATE = 968.50

TYPE A AREA INLET

LANDING = 975'

MECHANICAL ROOM

ELEVATION OF

NEW RIM ELEVATION = 969.85'

MANHOLE RAISED 1.5'

LENGTH = 39.2'

12" CLASS III RCP

STORM DRAIN 1

LENGTH = 84.3'

12" CLASS III RCP

STORM DRAIN 1

LENGTH = 14.0'

18" RCP NEW RIM ELEVATION = 969.85'

MANHOLE RAISED 1.5'

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

A

B

C

D

E

F

G

1 98765432

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

.0

D

R A

IN

A G

E

D R

A

IN

A G

E

.5

B

C G

C G

B

A

CG301CG101

CG301CG101

A

C G

C G

CB

CB

CB

KEYPLAN SCALE: 1" = 500'

N

DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg11:39:15 AM 8/10/2021

...\OF\OF63\40000 Design Products\CAD_BIM\_Sheets\OF63CG101

C G

.d

G

IS

T

IC

S R

E A

D

IN

E S

S S

Q U

A D

R O

N C

A M

P U

S

O F F

U T

T F

L O

O D R

E C

O V

E R

Y

O F F

U T

T A

F B

N E

B R

A S

A H

A

N E

C

A P

IT

O L A

V E

O M

A H

A D

IS

T R

IC

T

F

IL

E N

U M

B E

R

F

IL

E N

A M

E

30' 60'0

SCALE: 1" = 30'-0"

N

W

C

D A

V E

N P

O R

T

G R

A D

IN

G P

L A

N

CG101

D F

E C

H N

E R

D F

E C

H N

E R

A N

S I

D

/2

/2

LEGEND

EXISTING MAJOR CONTOUR

EXISTING MINOR CONTOUR

NEW MAJOR CONTOUR

NEW MINOR CONTOUR

NEW CULVERT PIPE

NEW STORM DRAIN PIPE

NEW STORM DRAIN MANHOLE

EXISTING/CONCURRENT MAJOR CONTOUR

EXISTING/CONCURRENT MINOR CONTOUR

NEW "TYPE A" STORM DRAIN AREA INLET

SECTIONS. SEE SHEET CP101 FOR SPOT ELEVATIONS.

8. SEE SHEET CG201 FOR CULVERT PROFILE. SEE SHEET CG301 FOR SITE

FOR A MINIMUM OF 10 FEET.

BUILDING SHALL HAVE A 5% SLOPE RUNNING AWAY FROM THE BUILDING

FROM THE BUILDING FOR A MINIMUM OF 20 FEET. ALL SOILS ABUTTING

7. PAVEMENT ABUTTING BUILDING SHALL HAVE A 1% SLOPE RUNNING AWAY

ARE PRESENT.

CONTRACTOR. THE ENGINEER MUST BE NOTIFIED IF ANY DISCREPENCIES

6. ALL TOPOGRAPHIC INFORMATION SHOWN MUST BE VERIFIED BY THE

SURFACED SHALL BE TOPSOILED (4 INCHES) AND SEEDED.

5. ALL AREAS DISTURBED BY CONSTRUCTION AND NOT OTHERWISE

TO A DEPTH OF 4 INCHES.

4. EXISTING TOPSOIL WITHIN AREAS TO BE GRADED SHALL BE STRIPPED

LEVEL DATUM NAVD 88.

3. ALL NEW AND EXISTING SPOT ELAVATIONS REFER TO MEAN SEA

INDICATED. COUNTOUR INTERVAL IS 1-FOOT.

2. NEW CONTOURS SHOWN ARE FINISHED GRADE UNLESS OTHERWISE

INDICATED, THE CONTOUR INTERVAL IS 1-FOOT.

1. EXISTING CONTOURS ARE SHOWN AS SURVEYED. UNLESS OTHERWISE

GENERAL NOTES:

W

C

D A

V E

N P

O R

T

W F -2

-R -0

A F -2

-0

A M G

E N

E R

A L R

E V

IS

IO

N S

-0

-2

STAIRS

SIDEWALKAREA INLET

PROPOSED GRADE

EXISTING GROUND

AREA INLET

I.E. = 965.90'

12" RCP

I.E. = 965.55'

18" RCP

I.E. = 965.10'

18" RCP

AREA INLET

SIDEWALK

I.E. = 965.70'

12" RCP

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

A

B

C

D

E

F

G

1 98765432

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

985985

985985

-0+20 -0+10 0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+80 0+90 1+00 1+10 1+20 1+30 1+40 1+50 1+60

E L E

V A

T

IO

N I

N F

E E

T A

B O

V E M

S L

E L E

V A

T

IO

N I

N F

E E

T A

B O

V E M

S L

STATION

STORM DRAIN 1 PROFILE

DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg11:43:55 AM 8/10/2021

...\OF\OF63\40000 Design Products\CAD_BIM\_Sheets\OF63CG201

C G

.d

G

IS

T

IC

S R

E A

D

IN

E S

S S

Q U

A D

R O

N C

A M

P U

S

O F F

U T

T F

L O

O D R

E C

O V

E R

Y

O F F

U T

T A

F B

N E

B R

A S

A H

A

N E

C

A P

IT

O L A

V E

O M

A H

A D

IS

T R

IC

T

F

IL

E N

U M

B E

R

F

IL

E N

A M

E

W

C

D A

V E

N P

O R

T

W

C

D A

V E

N P

O R

T

S T

O R

M D

R A

IN

P

R O

F

IL

E

CG201

D F

E C

H N

E R

D F

E C

H N

E R

A N

S I

D

/2

/2

W F -2

-R -0

A F -2

-0

A

M G

E N

E R

A L R

E V

IS

IO

N S

-0

-2

W W W

W W W

CB

B U

IL

D

IN

G

B U

IL

D

IN

G

B U

IL

D

IN

G

OF 20-02

OF 20-05

OF 20-04

OF 20-06

OF 20-01

OF 20-03

FUEL

8' METAL FENCE

FUEL SW 6205

LIFT GATE

APOLLO ROAD

M

IN

U T E

M

C L E

S

T

T

S

T

T

CB

T

CI

MW

MW

SURCHARGE SLOPE = 1H:1V

INTO EXISTING CURB

TIE SURCHARGE

CENTERLINE

INFORMATION.

FOR ADDITIONAL

SEE GENERAL NOTE 4

SETTLEMENT PLATES.

MONUMENT

2' X 2' SURVEY

INFORMATION.

FOR ADDITIONAL

SEE GENERAL NOTE 4

SETTLEMENT PLATES.

MONUMENT

2' X 2' SURVEY

EDGE OF SURCHARGE

SURCHARGE

EDGE OF

240.8'

SURCHARGE SLOPE = 1H:1V

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

A

B

C

D

E

F

G

1 98765432

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

N 492,264.09

E 2,765,642.26

N 492,266.46

E 2,765,626.63

N 492,238.05

E 2,765,658.03

N 492,097.99

E 2,765,648.22

N 492,075.34

E 2,765,630.30N 492,091.60

E 2,765,378.52

N 492,098.66

E 2,765,364.92

N 492,117.50

E 2,765,358.77

N 492,275.21

E 2,765,391.88

N 492,250.88

E 2,765,368.31

KEYPLAN SCALE: 1" = 500'

N

DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg11:51:37 AM 8/10/2021

...\OF\OF63\40000 Design Products\CAD_BIM\_Sheets\OF63CG101

C G

.d

G

IS

T

IC

S R

E A

D

IN

E S

S S

Q U

A D

R O

N C

A M

P U

S

O F F

U T

T F

L O

O D R

E C

O V

E R

Y

O F F

U T

T A

F B

N E

B R

A S

A H

A

N E

C

A P

IT

O L A

V E

O M

A H

A D

IS

T R

IC

T

F

IL

E N

U M

B E

R

F

IL

E N

A M

E

30' 60'0

SCALE: 1" = 30'-0"

N

LEGEND

EXISTING MAJOR CONTOUR

EXISTING MINOR CONTOUR

NEW MAJOR CONTOUR

NEW MINOR CONTOUR

EXISTING/CONCURRENT MAJOR CONTOUR

EXISTING/CONCURRENT MINOR CONTOUR

EDGE OF SURCHARGE

W

C

D A

V E

N P

O R

T

S U

R C

H A

R G

E G

R A

D

IN

G P

L A

N

CG401

D F

E C

H N

E R

D F

E C

H N

E R

A N

S I

D

/2

/2

SURCHARGE CENTERLINE

W

C

D A

V E

N P

O R

T

W F -2

-R -0

A F -2

-0

OVEREXCAVATION DETAILS.

SEE STRUCTURAL DRAWING S-004 FOR FOUNDATION 6.

INFORMATION.

SEE SPECIFICATION 31 00 00 FOR SUBMITTALS AND ADDITIONAL 5.

WEST EDGES OF SURCHARGE ALONG THE SURCHARGE CENTERLINE.

PLACEMENT. THE PLATES SHOULD BE PLACED 45' FROM THE EAST AND

MUST BE INSTALLED INSIDE BUILDING FOOTPRINT PRIOR TO SURCHARGE

2 SURVEY MONUMENTS, CONSISTING OF 2' X 2' SETTLEMENT PLATES, 4.

MUST HAVE A MINIMUM SATURATED UNIT WEIGHT OF 100 PCF.

PLACE SURCHARGE FILL IN LIFTS 12 INCHES THICK. SURCHARGE FILL 3.

TOP OF SURCHARGE.

SLOPE OF 1H:1V FROM THE TOP OF PRELOAD/PERMENANT FILL TO THE

BUILDING PERIMETER. SIDESLOPES OF SURCHARGE SHOULD HAVE A

THE TOP HEIGHT OF THE SURCHARGE AT LEAST 10 FEET BEYOND

FEET ABOVE THE FINISHED FLOOR ELEVATION OF THE BUILDING. EXTEND

AFTER PRELOADING, PLACE ADDITIONAL SURCHARGE AT LEAST 7 2.

DISTANCE EXTENDING 20 FEET BEYOND BUILDING PERIMETER.

STRUCTURAL FILL UP TO THE FINISHED SUBGRADE ELEVATION TO A

PRELOAD BUILDING FOOTPRINT BY PLACING ALL PERMANENT 1.

GENERAL NOTES:

A

M G

E N

E R

A L R

E V

IS

IO

N S

-0

-2

BUILDING 543

B U

IL

D

IN

G

B U

IL

D

IN

G

B U

IL

D

IN

G

969.317

F.F.E. =

969.713

F.F.E. =

970.315

F.F.E. =

970.382

F.F.E. =

W E

IG

H S

T A T

IO

N

970.534

F.F.E. =

8' METAL FENCE

APOLLO ROAD

M

IN

U T E

M

C L E

CB

CI

MW

CP

MW

REMOVE FENCE

REMOVE FENCE

REMOVE FENCE

REMOVE PAVEMENT

REMOVE PAVEMENTREMOVE PAVEMENT

REMOVE FENCE

REMOVE TRUCK SCALE

PAVEMENT

REMOVE

AND CURB AND GUTTER

REMOVE PAVEMENT

REMOVE BUILDING 586

REMOVE BUILDING 545

REMOVE BUILDING 553

BUILDING 543

REMOVE

REMOVE FENCE

REMOVE FENCE

REMOVE FENCE

REMOVE FENCE

CULVERTS

OF 2 CONNECTED 18"

REMOVE INLET AND FIRST 10'

AND 12" CULVERT

REMOVE FLUME

AND 12" CULVERT

REMOVE FLUME

COORDINATE RELOCATION WITH OFFUTT PERSONNEL

SALVAGE AND RELOCATE CUSTOM METAL RAMP

12" RCP E = 967.052

EQUIPMENT

ELECTRICAL

PEDESTAL, AND

POWER POLE, COMM

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

A

B

C

D

E

F

G

1 98765432

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

N 491,966.64

E 2,765,357.10

N 492,083.30

E 2,765,352.25

N 492,006.87

E 2,765,345.70

N 492,295.22

E 2,765,576.07

N 492,271.29

E 2,765,574.51

N 492,307.86

E 2,765,682.62

N 492,264.41

E 2,765,680.71

N 491,825.53

E 2,765,436.04

N 491,847.16

E 2,765,570.72

N 491,859.82

E 2,765,423.25

N 491,964.54

E 2,765,430.16

N 491,966.74

E 2,765,396.69

N 491,848.85

E 2,765,572.12

N 491,852.06

E 2,765,510.40

KEYPLAN SCALE: 1" = 500'

N

DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg11:06:08 AM 8/10/2021

...\OF\OF63\40000 Design Products\CAD_BIM\_Sheets\OF63CD101

C D

.d

G

IS

T

IC

S R

E A

D

IN

E S

S S

Q U

A D

R O

N C

A M

P U

S

O F F

U T

T F

L O

O D R

E C

O V

E R

Y

O F F

U T

T A

F B

N E

B R

A S

A H

A

N E

C

A P

IT

O L A

V E

O M

A H

A D

IS

T R

IC

T

F

IL

E N

U M

B E

R

F

IL

E N

A M

E

30' 60'0

SCALE: 1" = 30'-0"

N

W

C

D A

V E

N P

O R

T

/2

/2

D E

M O

L

IT

IO

N P

L A

N

CD101

D F

E C

H N

E R

D F

E C

H N

E R

A N

S I

D

LEGEND

PAVEMENT REMOVAL

BUILDING AND OTHER SITE FEATURE REMOVAL

W

C

D A

V E

N P

O R

T

W F -2

-R -0

A F -2

-0

A M G

E N

E R

A L R

E V

IS

IO

N S

-0

-2

OFFUTT PERSONNEL.

RELOCATED PRIOR TO CONSTRUCTION. COORDINATE RELOCATION WITH

2. ANY CONCRETE BARRIERS FOUND WITHIN THE PROJECT LIMITS SHALL BE

1. REMOVE ALL BOLLARDS LOCATED WITHIN PAVEMENT REMOVAL AREA

GENERAL NOTES:

LINE

NATURAL GAS

ABANDONED

NATURAL GAS LINE

ABANDONED

NATURAL GAS LINE

ABANDONED

LINE

NATURAL GAS

ABANDONED

LINE

NATURAL GAS

ABANDONED

W W W

W W W

EMERGENCY SHUT OFF

CB

EMERGENCY SHUT OFF

EMERGENCY SHUT OFF

TK REFRENCE POINT

2K CONTAINMENT

' M

E T A L F

E N

C E

BUILDING 543

B U

IL

D

IN

G

B U

IL

D

IN

G

B U

IL

D

IN

G

B U

IL

D

IN

G

B U

IL

D

IN

G

B U

IL

D

IN

G

M E

T A

L F

E N

C E

969.317

F.F.E. =

969.713

F.F.E. =

OF 20-02

OF 20-05

OF 20-04

OF 20-06

OF 20-01

OF 20-03

970.315

F.F.E. =

970.382

F.F.E. =

W E

IG

H S

T A T

IO

N

970.534

F.F.E. =

8' METAL FENCE

8' METAL FENCE

8' METAL FENCE

M E

T A

L F

E N

C E

8' METAL FENCE

8' METAL FENCE

M E

T A

L F

E N

C E

LIFT GATE

W

APOLLO ROAD

M

IN

U T E

M

C L E

E

E

E

E

PB

PBPB

PB

PB

PB

PB

CP

PB

PB

S

T

T

S

M

G

D T

M

D

D

M

G

T

D

G

M

M

CP

G

CB

DD

D

T

CI

MW

D

G

CO

CP

PB

MW

CO

LINE AND CAP AT CONNECTION

ACTIVE NATURAL GAS LINE. REMOVE

AND CAP AT ROADWAY."

GAS LINE. REMOVE LINE

ABANDONED NATURAL

CONNECTION

LINE AND CAP AT

GAS LINE. REMOVE

ABANDONED NATURAL

AND EQUIPMENT

REMOVE GAS METER

EQUIPMENT

METER AND

REMOVE GAS

VALVE

SERVICE LINE AND

REMOVE WATER

LINE AND CLEANOUT

SEWER SERVICE

REMOVE SANITARY

TO SHUTOFF VALVE

CAP AT CONNECTION

SERVICE LINE AND

REMOVE WATER

MANHOLE

PLUG AND CAP AT CONNECTION TO

REMOVE SANITARY SEWER SERVICE LINE

MANHOLE

PLUG AND CAP AT CONNECTION TO

REMOVE SANITARY SEWER SERVICE LINE

BE RAISED

RIM ELEVATION WILL

MANHOLE TO REMAIN

SANITARY SEWER

CULVERTS

OF 2 CONNECTED 18"

REMOVE INLET AND FIRST 10'

AND 12" CULVERT

REMOVE FLUME

AND 12" CULVERT

REMOVE FLUME

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

A

B

C

D

E

F

G

1 98765432

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

W

W

M

W

KEYPLAN SCALE: 1" = 500'

N

DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg11:25:38 AM 8/10/2021

...\OF\OF63\40000 Design Products\CAD_BIM\_Sheets\OF63CD201

C D

.d

G

IS

T

IC

S R

E A

D

IN

E S

S S

Q U

A D

R O

N C

A M

P U

S

O F F

U T

T F

L O

O D R

E C

O V

E R

Y

O F F

U T

T A

F B

N E

B R

A S

A H

A

N E

C

A P

IT

O L A

V E

O M

A H

A D

IS

T R

IC

T

F

IL

E N

U M

B E

R

F

IL

E N

A M

E

30' 60'0

SCALE: 1" = 30'-0"

N

W

C

D A

V E

N P

O R

T

/2

/2

CD201

D F

E C

H N

E R

D F

E C

H N

E R

A N

S I

D

LEGEND

U T

IL

IT

Y D

E M

O L

IT

IO

N P

L A

N

UTILITY REMOVAL

W

C

D A

V E

N P

O R

T

W F -2

-R -0

A F -2

-0

INFORMATION

SEE SHEETS CS101, CG101, AND CU-101 FOR ADDITIONAL 2.

CAN BE FOUND ON ED101 AND XED101.

ELECTRICAL DEMOLITION AND REMOVAL INFORMATION 1.

GENERAL NOTES:

A

M G

E N

E R

A L R

E V

IS

IO

N S

-0

-2

B U

IL

D

IN

G

B U

IL

D

IN

G

B U

IL

D

IN

G

8' METAL FENCE

LIFT GATE

APOLLO ROAD

M

IN

U T E

M

C L E

S

S

MW

CP

MW

33'

CURB & GUTTER

TIE INTO EXISTING

INTEGRAL CURB (TYP)

INTEGRAL CURB (TYP)

INTEGRAL CURB (TYP)

INTEGRAL CURB (TYP)

INTEGRAL CURB (TYP)

INTEGRAL CURB (TYP)

FLUSH WITH TRUCK SCALE

PAVEMENT SHOULD BE

TRUCK SCALE

FLUSH WITH TRUCK SCALE

PAVEMENT SHOULD BE

TRUCK SCALE

RIM ELEVATION = 969.53

SANITARY SEWER MANHOLE

PAVING ABUTS EXISTING

RIM ELEVATION = 969.85'

MANHOLE RAISED TO RIM

PAVING EXTENDED TO

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

A

B

C

D

E

F

G

1 98765432

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

LRS BUILDING

FFE = 975'

GL 966.53'

966.76'

GL 966.79'

966.86'

BC 967.04'

BC 967.28'

GL 967.50'

BC 968.00'

968.00' 968.00'

968.00'

GL 968.28'

968.50'

GL 968.60'

GL 968.64'

GL 968.74'

GL 968.86'

GL 968.86'

GL 969.01'

GL 969.02'

GL 969.05'

971.00'

BC 969.10'

GL 969.10'

BC 969.14'

BC 969.24'

GL 969.30'

GL 969.31'

969.35'

BC 969.36'

BC 969.36'

BC 969.51'

BC 969.52'

BC 969.55'

BC 969.60'

971.00'

BC 969.79'

BC 969.82'

969.98'

970.10'

GL 970.14'

970.50'

BC 970.64'

970.74'

970.74'

970.74'

970.80'

970.83'

970.85'

971.00'971.00'971.00'

971.10'

971.10'

971.20'

972.75'

972.75'

974.18'

974.76'

974.76'

975.00'

KEYPLAN SCALE: 1" = 500'

N

DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg10:32:24 AM 8/10/2021

...\OF\OF63\40000 Design Products\CAD_BIM\_Sheets\OF63CP101

C P .d

G

IS

T

IC

S R

E A

D

IN

E S

S S

Q U

A D

R O

N C

A M

P U

S

O F F

U T

T F

L O

O D R

E C

O V

E R

Y

O F F

U T

T A

F B

N E

B R

A S

A H

A

N E

C

A P

IT

O L A

V E

O M

A H

A D

IS

T R

IC

T

F

IL

E N

U M

B E

R

F

IL

E N

A M

E

30' 60'0

SCALE: 1" = 30'-0"

N

A N

S I

D

SEE SHEET CP502 FOR DETAILS

CONCRETE SIDEWALK

LEGEND

SEE SHEET CP502 FOR TYPICAL SECTION

CONCRETE PAVEMENT

/2

/2

W

C

D A

V E

N P

O R

T

P A

V

IN

G P

L A

N

CP101

D F

E C

H N

E R

D F

E C

H N

E R

1. LOADING DOCK AND RAMP DETAILS FOUND IN THE STRUCTURAL DRAWINGS

NOTES:

SEE SHEET CP502 FOR DETAIL

INTEGRAL CURB

SPOT ELEVATION

W

C

D A

V E

N P

O R

T

971.00'

GL 971.00' GUTTER LINE OF INTEGRAL CURB ELEVATION

BACK OF CURB ELEVATIONBC 971.00'

W F -2

-R -0

A F -2

-0

A

M G

E N

E R

A L R

E V

IS

IO

N S

-0

-2

B U

IL

D

IN

G

B U

IL

D

IN

G

B U

IL

D

IN

G

970970

8' METAL FENCE

LIFT GATE

APOLLO ROAD

M

IN

U T E

M

C L E

D

D

D

D

CB

DD

D

CI

MW

D

CB

CB

CB

MW

DETAILS ON SHEET CE501

AND TRUCK WASH AREA

STONE CONTRUCTION ENTRANCE

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

A

B

C

D

E

F

G

1 98765432

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

LRS BUILDING

FFE = 975'

AIP

CIP

AIP

AIP

CB

CB

CB

KEYPLAN SCALE: 1" = 500'

N

DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg11:29:01 AM 8/10/2021

...\OF\OF63\40000 Design Products\CAD_BIM\_Sheets\OF63CE101

C E .d

G

IS

T

IC

S R

E A

D

IN

E S

S S

Q U

A D

R O

N C

A M

P U

S

O F F

U T

T F

L O

O D R

E C

O V

E R

Y

O F F

U T

T A

F B

N E

B R

A S

A H

A

N E

C

A P

IT

O L A

V E

O M

A H

A D

IS

T R

IC

T

F

IL

E N

U M

B E

R

F

IL

E N

A M

E

30' 60'0

SCALE: 1" = 30'-0"

N

LEGEND

SILT FENCE

EXISTING MAJOR CONTOUR

EXISTING MINOR CONTOUR

NEW STORM DRAIN INLET

NEW CULVERT PIPE

NEW STORM DRAIN PIPE

NEW STORM DRAIN MANHOLE

CIP CULVERT INLET PROTECTION

5890 NEW MAJOR CONTOUR

NEW MINOR CONTOUR

FIELD MIX SEEDING (TYP.)

AIP AREA INLET PROTECTION

W

C

D A

V E

N P

O R

T

E R

O S

IO

N C

O N

T R

O L P

L A

N

CE101

D F

E C

H N

E R

D F

E C

H N

E R

A N

S I

D

/2

/2

W F -2

-R -0

D F

E C

H N

E R

A F -2

-0

SHALL BE SEEDED WITH FIELD MIX.

1. ALL UNPAVED AREAS DISTURBED BY CONSTRUCTION ACTIVITIES

NOTES:

A

M G

E N

E R

A L R

E V

IS

IO

N S

-0

-2

12" RCP E = 967.052

ST

LINE

NATURAL GAS

ABANDONED

NATURAL GAS LINE

ABANDONED

NATURAL GAS LINE

ABANDONED

LINE

NATURAL GAS

ABANDONED

LINE

NATURAL GAS

ABANDONED

W W W

W W W

EQUIPMENT

ELECTRICAL

PEDESTAL, AND

POWER POLE, COMM

6" PVC SW = 963.930

8" PVC NE = 963.880

RIM = 969.530

6" PVC S = 962.925

8" PVC SSW = 962.591

6" CLAY SE = 962.10

6" CLAY SW = 962.238

6" PVC NW = 962.100

RIM = 968.391

970.438

F.F.E. =

8' METAL FENCE

EP

EP

EP

EP

E

E

E

E

PB

PBPB

PB

PB

PB

PB

CP

PB

PB

S

T

T

S

D T

D

D

G

T

D

G

M

G

CB

DD

D

T

CI

CI

D

G

PB

EV

EV

EV

EV

EV

APOLLO ROAD

M

IN

U T E

M

C L E

LRS BUILDING

FFE = 975'

CBCB

CBCB

CBCB

NEW FH

WITH GATE VALVE TYP.

3" WATER SERVICE LINE

NEW FH

SEE SHEET M-401 FOR CONTINUATION

NEW GAS SERVICE TO METER

MATCHING PIPE SIZE

ACTIVE GAS LINE WITH

CONNECT TO EXISTING

8" TEE & GATE VALVE TYP.

WATER LINE WITH

CONNECT TO EXIST.

8" TEE & GATE VALVE TYP.

WATER LINE WITH

CONNECT TO EXIST.

FOR CONTINUATION

SEE SHEET P-101

INV. EL. = 967.74

RIM = 974.74

NEW CLEAN OUTS

INV. OUT (8" SE) = 963.91

INV. IN (4" N) = 964.16

RIM = 972.34

NEW SSMH

FOR CONTINUATION

SEE SHEET P-101

NEW 3" DW

FOR CONTINUATION

SEE SHEET FX100

NEW 8" FW

WITH NEW PIV TYP.

SERVICE LINE

8" FIRE WATER

INV. IN (NEW 8" NW) = 962.25

INV. IN (6" S) =962.925

INV. IN (8" SSW) = 962.591

INV. IN (6" SE) = 962.10

INV. IN (6" SW) = 962.238

INV. IN (6" NW) = 962.100

RIM (NEW) = 969.85

FLUSH WITH FINISH GRADE

RISE EXIST. MH RIM TO

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

A

B

C

D

E

F

G

1 98765432

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

S

S

8" SS

W

W

W

W

8" W

8" W

3"DW

8"FW

W 0+00

W 9+36

W

W

W

W

W

W 4+00

W 3+00

W 1+00

SS 2+79 SS 2+79

W 2+00

KEYPLAN SCALE: 1" = 500'

N

DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg7:42:47 AM 8/10/2021

...\OF\OF63\40000 Design Products\CAD_BIM\_Sheets\UTILITY PLAN

C U

.d g n

C

D A

V E

N P

O R

T

U T

IL

IT

Y P

L A

N

CU101

Q L E

Q

G

IS

T

IC

S R

E A

D

IN

E S

S S

Q U

A D

R O

N C

A M

P U

S

O F F

U T

T F

L O

O D R

E C

O V

E R

Y

O F F

U T

T A

F B

N E

B R

A S

K A

W F -2

-R -0

A H

A

N E

C

A P

IT

O L A

V E

O M

A H

A D

IS

T R

IC

T

F

IL

E N

U M

B E

R

F

IL

E N

A M

E

30' 60'0

N

SCALE: 1" = 30'

/2

/2

A N

S I

D

FOR REDUCTION OF 3”PVC PIPE TO 2”COPPER PIPE.

3. REDUCER AND TRANSITION FITTING NEEDED OUTSIDE THE BUILDING

AND FREE OF OBSTRUCTIONS AND WILL ADEQUATELY CONVEY FLOW.

CONTRACTOR MUST VERIFY EXISTING UTILITIES AND STRUCTURES ARE CLEAR

WHEN CONNECTING NEW UTILITIES TO EXSITING UTILITIES/STRUCTURES, 2.

INSIDE PIPE DIAMETER REQUIREMENTS.

ALL PIPES INSTALL ON THIS PLAN SHALL MEET THE SPECIFICATIONS AND

THE INSIDE PIPE DIAMETER. HENCE, CONTRACTOR SHALL MAKE SURE

1. THE PIPE SIZES FOR WATER AND SEWER ON THIS PLAN ARE BASED ON

GENERAL NOTES:

D S

T O

N E

R

A F -2

-0

A M

G

E N

E R

A L R

E V

IS

IO

N /0

/2

EXIST. GRADE

FINISH GRADE

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

A

B

C

D

E

F

G

1 98765432

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

LINE SURFACE OFFSET

AllFieldbooks 0.000

3-16-2021 Surface 0.000

Scaled 6.0000 Times Ver.

Scaled 1.0000 Times Hor.

985 985

985 985

-0+50 0+00 0+50 1+00 1+50 2+00 2+50 3+00

E L E

V A

T

IO

N I

N F

E E

T A

B O

V E M

S L

E L E

V A

T

IO

N I

N F

E E

T A

B O

V E M

S L

STATION

SANITARY SEWER

N E

W G

A S S

U P

P L

Y L

IN

E

P V I S

T A .6

N E

W F

IR

E W

A T

E R

P V I S

T A .0

N E

W

D O

M E

S T

IC

W

A T

E R

P V I S

T A .2

IN

V

O U

T S

E

.9

IN

V

IN

N

.1

R

IM

.3

N E

W S

S M

H

P V I S

T A .8

IN

V E

L

.7

R

IM

.7

N E

W C

L E

A N O

U T

P V I S

T A .4

8" SAN. SEWER @ 0.80 %

4" S

AN. S

EWER @

5.0 0 %

IN

V

IN

N E

W

N W

.2

IN

V

IN

S .9

IN

V

IN

S

S W

.5

IN

V

IN

S

E

.1

IN

V

IN

S

W

.2

IN

V

IN

N W

.1

R

IM

N E

W

.8

F L

U S

H W

IT

H F

IN

IS

H G

R A

D E

R

IS

E E

X

IS

T

M H R

IM

P V I S

T A

DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg7:52:38 AM 8/10/2021

...\OF\OF63\40000 Design Products\CAD_BIM\_Sheets\SANITARY SEWER PROFILE

C U

.d g n

C

D A

V E

N P

O R

T

Q L E

Q

G

IS

T

IC

S R

E A

D

IN

E S

S S

Q U

A D

R O

N C

A M

P U

S

O F F

U T

T F

L O

O D R

E C

O V

E R

Y

O F F

U T

T A

F B

N E

B R

A S

A H

A

N E

C

A P

IT

O L A

V E

O M

A H

A D

IS

T R

IC

T

F

IL

E N

U M

B E

R

F

IL

E N

A M

E

30' 60'0

SCALE: 1" = 30'

D S

T O

N E

R

2. SEE SPECIFICATION 31 00 00, 33 11 00 & 33 30 00 FOR SPECIFIC REQUIREMENTS.

THE CONTRACTING OFFICER PRIOR TO PERFORM THE INSTALLATION.

TO CONSTRUCTION. ANY VARIATION AND INTERRUPTION ON THE EXISTING UTILITIES SHALL NOTIFY

1. CONTRACTOR SHALL VERIFY THE HORIZONTAL AND VERTICAL LOCATION OF ALL UTILITIES PRIOR

GENERAL NOTES:

S A

N

IT

A R

Y S

E W

E R P

R O

F

IL

E

CU202

/2

/2

A N

S I

D

W F -2

-R -0

A F -2

-0

A M

G

E N

E R

A L R

E V

IS

IO

N /0

/2

UNDISTURBED SOIL

UNDISTURBED SOIL

COMPACTED NON-

EXPANSIVE COHESIVE

BACKFILL.

SEE SECTION 31 00 00

FOR EXCAVATION

AND COMPACTION

REQUIREMENTS

COMPACTED

NON-

EXPANSIVE,

COHESIVE

MATERIAL SLOPE PER

EM 385-1-1

COMPACTED GRAVEL

UNDISTURBED SOIL

UNDISTURBED SOIL

SLOPE PER

EM 385-1-1

6"

TEN FEET BEYOND EDGE OF FOOTING

1'

6" 2'

0"

3'

6"

M

IN

6" FLOOR SLAB

6" CAPILLARY BARRIER

20 MIL VAPOR BARRIER

6' -6

" A

PP

R O

X 6"

SOUTH EXTERIOR

WALL FOOTING

CMU WALL

NORTH EXTERIOR

WALL FOOTING

CMU WALL

COMPACTED NON-

EXPANSIVE COHESIVE

MATERIAL.

SEE SECTION 31 00 00

FOR EXCAVATION

AND COMPACTION

REQUIREMENTS

COMPACTED

NON-

EXPANSIVE,

COHESIVE

MATERIAL

2'

0" 3'

6"

1'

6"

M

IN

10 FEET BEYOND EDGE OF FOOTING

GRANULAR BASE

SEE SETION 31 00 00 FOR

MATERIAL AND COMPACTION

REQUIREMENTS

GRANULAR BASE

SEE SETION 31 00 00 FOR

MATERIAL AND COMPACTION

REQUIREMENTS

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

S-004

G

EN

ER

AL

S

TR

U C

TU

R

AL

N

O

TE

S

LO

G

IS

TI

C S

R

EA

D

IN

ES

S

SQ

U

AD

R

O N

C

AM

PU

S

O M

AH

A

D

IS

TR

IC

T

C

AP

IT

O L

AV

E.

O M

AH

A, N E

K.

K

AL

AF

U T/

J . F

AR

AG

J.

F

AR

AG

W . B

O

EC

K

W . B

O

EC

K

/2

7/

W

F-

-R

-0

W

-X X-

X-

XX

XX

AF

2-

-0

FI

LE

N U

M

BE

R

FI

LE

N

AM

E:

O

FF

U

TT

F

LO

O D

R

EC

O

VE

R Y

O

FF

U

TT

A

FB

, N

EB

R

AS

KA

O F6

3_

LR

S-

ST

R U

C T.

rv t

AM

G

EN

ER

A L R

EV

IS

IO

N

S

-0 9-

1/2" = 1'-0"1 TYP FOUNDATION OVEREXCAVATION SECTION

FOUNDATION AND SLAB NOTES:

1. SEE SPECIFICATION SECTION 31 00 00 FOR ADDITIONAL EARTHWORK REQUIREMENTS.

2. GRADE-RAISE FILL PLACEMENT OF APPROXIMATELY 4 TO 5 FEET IS REQUIRED WITHIN THE BUILDING FOOTPRINT AS SHOWN TO MITIGATE FUTURE FLOOD DAMAGE AND TO PROVIDE ADEQUATE LOADING

DOCK HEIGHT.

3. WHEN WORKING NEAR EXISTING OR NEW CONSTRUCTION, THE CONTRACTOR SHALL EXERCISE

EXTREME CAUTION TO NOT UNDERMINE, DISTURB, DAMAGE, OR CAUSE CONSIDERABLE MOVEMENT, CRACKING, OR SETTLEMENT OF THE ADJACENT CONSTRUCTION IN ANY WAY.

4. THE CONTRACTOR SHALL HIRE A GEOTECHNICAL ENGINEER, REGISTERED AND LICENSED IN THE STATE WHERE THE WORK WILL BE ACCOMPLISHED, TO INSPECT ALL FOUNDATION SUBGRADE AND

ENSURE IT MEETS THE STATED ALLOWABLE SOIL BEARING CAPACITY. SUBGRADES SHALL BE

INSPECTED AND APPROVED BY THE CONTRACTOR'S GEOTECHNICAL ENGINEER AND INSPECTED BY THE CONTRACTING OFFICER PRIOR TO PLACING CONCRETE. ANY SUBGRADE NOT MEETING THE STATED

CAPACITY SHALL BE BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER.

5. ALL EXCAVATION SHALL BE PERFORMED SO THAT THE SITE AND AREA IMMEDIATELY SURROUNDING THE SITE WHICH AFFECTS CONSTRUCTION OPERATIONS WILL BE CONTINUALLY AND EFFECTIVELY DRAINED. THE CONTRACTOR SHALL PROVIDE DRAINAGE AND DE-WATERING AS REQUIRED TO ENSURE THAT ALL FOOTING EXCAVATIONS ARE ACCOMPLISHED WITH SUBGRADE SOIL REMAINING DRY AND

FIRM UNTIL AFTER FOOTINGS ARE PLACED AND BACKFILLED. REMOVAL OF SURFACE WATER,

GROUNDWATER AND ANY PERCHED WATER CONDITIONS THAT MIGHT BE ENCOUNTERED DURING

EXCAVATIONS SHALL BE ACCOMPLISHED BY APPROVED MEANS.

6. DO NOT PLACE FOUNDATION CONCRETE ON FROZEN OR SATURATED SUBGRADE.

7. ENSURE THAT EARTH-FORMED FOOTINGS CONFORM TO THE SHAPE, LINES, AND THICKNESS

INDICATED ON THE FOUNDATION PLAN, SECTIONS, AND FOOTING SCHEDULES. EXCAVATION WIDTHS

SHALL BE A MINIMUM OF 4" GREATER THAN DIMENSIONS INDICATED.

8. DO NOT INSTALL FOUNDATIONS UNTIL FOUNDATION WORK HAS BEEN COORDINATED WITH ADJACENT

UNDERGROUND UTILITIES.

9. SLOPE OR BRACE ALL TEMPORARY EXCAVATIONS PER OSHA AND EM 385-1-1 REQUIREMENTS.

FOUNDATION WORK GUIDELINES:

1. THE GUIDELINES PROVIDED ON THIS SHEET ARE INTENDED TO BE USED FOR A BASIC

UNDERSTANDING OF THE UNIQUE SITE WORK REQUIRED FOR THIS PROJECT. REFER TO SPECIFICATION SECTION 31 00 00 FOR A COMPLETE DESCRRIPTION OF REQUIREMENTS AND ANY OTHER ADDITIONAL

WORK ITEMS FOR FOUNDATION WORK.

2. WHERE A TOP OF FOOTING ELEVATION IS NOT SHOWN ON PLANS, ALL FOUNDATION WORK SHALL BE

CONSTRUCTED TO BEAR AT A MINIMUM OF 3'-6" BELOW GRADE.

3. EXCAVATE A MINIMUM OF 3 1/2 FEET OR TO THE BOTTOM OF EXISTING FILL MATERIAL UNDERNEATH THE ENTIRE BUILDING FOOTPRINT AND EXTEND EXCAVATION AT LEAST 10 FEET BEYOND THE BUILDING

PERIMETER

4. PLACE A GRANULAR WORKING BASE OF 18" MIN AT THE BOTTOM OF EXCAVATED BUILDING

FOOTPRINT IN ORDER TO PROVIDE A STABLE LAYER TO SUPPORT STRUCTURAL FILL PLACEMENT AND

COMPACTION.

5. PLACE AND COMPACT NON-EXPANSIVE, COHESIVE FILL TO FINISHED GRADE ACCORDING TO

REQUIREMENTS IN SECTION 31 00 00 AFTER PLACEMENT OF GRANULAR WORK BASE.

6. REFER TO SHEETS CG401 AND SECTION 31 00 00 FOR SURCHARGE REQUIREMENTS. FOUNDATIONS

SHALL NOT BE PLACED UNTIL AFTER SURCHARGE LOADING IS COMPLETE. EXCAVATION AND

BACKFILLING SHALL BE PERFORMED PRIOR TO SURCHARGE LOADING.

7. SLOPE FINAL SURROUNDING GRADES AWAY FROM THE BUILDING EXTERIOR FOR A MINIMUM

DISTANCE OF 10 FEET AT A SLOPE OF NOT LESS THAN 5% FOR UNPAVED AREAS, AND NOT LESS THAN

2% FOR PAVED AREAS.

0 2'1' 4'

3 4 5 6 7 8 9 10

B

C

LIGHT GAUGE Z- PURLINS - TYP

AS PER PEMB MANUFACTURER

2" STANDING SEAM WITH

6" INSULATION AND

SHEATHING ROOF AS PER

PEMB MANUFACTURER

2" STANDING SEAM WITH

6" INSULATION AND

SHEATHING ROOF AS PER

PEMB MANUFACTURER

SL

O

PE

:1

SL

O

PE

:1

/2

/2

1' - 6" 25' - 10" 25' - 10" 25' - 10" 25' - 10" 25' - 10" 25' - 10"

S-305

S-305

PORTAL FRAME THIS BAYPORTAL FRAME THIS BAY

2' - 1"

1/

2"

1/ 2"

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

S-103

R O

O F

FR

AM

IN

G

P

LA

N

W

AR

EH

O

U

SE

LO

G

IS

TI

C S

R

EA

D

IN

ES

S

SQ

U

AD

R

O N

C

AM

PU

S

O M

AH

A

D

IS

TR

IC

T

C

AP

IT

O L

AV

E.

O M

AH

A, N E

K.

K

AL

AF

U T

/ J . F

AR

AG

J.

F

AR

AG

W . B

O

EC

K

W . B

O

EC

K

/2

7/

W

F-

-R

-0

W

-X X-

X-

XX

XX

AF

2-

-0

FI

LE

N U

M

BE

R

FI

LE

N

AM

E:

O

FF

U

TT

F

LO

O D

R

EC

O

VE

R Y

O

FF

U

TT

A

FB

, N

EB

R

AS

KA

O F6

3_

LR

S-

ST

R U

C T.

rv t

1/8" = 1'-0"1 ROOF FRAMING PLAN - WAREHOUSE

AM

G

EN

ER

A L R

EV

IS

IO

N

S

-0 9-

0 4' 8' 16'

NOTES:

1. THE CONTRACTOR IS RESPONSIBLE FOR

DESIGNING ROOF FRAMING MEMBERS OF

THE PEMB FOR SUPPORTING MECHANICAL UNITS.

PEMB DESIGN SUBMITTAL SHALL INCLUDE

LOADS FROM SUSPENDING

MECHANICAL UNITS. SEE MECHANICAL SHEETS FOR

EQUIPMENT DETAILS.

2. THE CONTRACTOR SHALL DESIGN A PERMANENT FALL

PROTECTION SYSTEM IN ACCORDANCE WITH SPECIFICATION

SECTION 01 35 26. SUBMIT LOCATION OF ROOF ANCHORS

IN SHOP DRAWINGS FOR GOVERNMENT APPROVAL.

T.O.SLAB

100' - 0"

6" REINFORCED

SLAB-ON-GRADE,

#5 BARS @ 12"

E.W., TYP

6" CAPILLARY WATER

BARRIER WITH VAPOR

BARRIER BELOW

1/2" EXPANSION JOINT

WITH SEALANT

PERIMETER INSULATION. EXTEND FULL

HEIGHT OF STEM WALL AND 4' WIDE

UNDERNEATH SLAB AROUND BUILDING

PERIMETER. SEE ARCH FOR R-VALUE.

#5 @ 12" O.C.E.W.

EACH FACE

8" STEM

W/ #5 @ 12" O.C.E.W.

EACH FACE

PROVIDE CONTINUOUS

FLASHING ADHERED TO

CMU WITH DRIP

(NOT SHOWN)

T.O.I.F.

97' - 6"

SLOPE AWAY

FROM BUILDING

SEE CIVIL SHEETS

#5 @ 48" O.C.

EMBED IN STEM WALL 24" #5 - 16'-0" @ 48" O.C.

2'-6" MIN LAP

6"

1'

0"

4' - 0"

T.O.SLAB

100' - 0"

8" STEM

W/ #5 @ 12" O.C.E.W.

EACH FACE

#5 @ 12" O.C.E.W.

EACH FACE

6" CAPILLARY WATER

BARRIER WITH VAPOR

BARRIER BELOW

4' - 0"

1'

0"

1/2" EXPANSION

JOINT WITH SEALANT

EACH SIDE, TYP

6" REINFORCED

SLAB-ON-GRADE,

#5 BARS @ 12"

E.W., TYP

T.O.I.F.

97' - 6"

#5 @ 48" O.C.

EMBED IN STEM WALL 24"

#5 - 16'-0" @ 48" O.C.

2'-6" MIN LAP

NOTE: THIS FOOTING SECTION APPLIES TO ALL INTERIOR FOOTINGS

INCL. WOODSHOP

TIE INTERIOR FOOTINGS INTO EXTERIOR WALL FOOTINGS WITH

DEVELOPED HOOKS

T.O.SLAB

100' - 0"

3 4

ADMIN. BLDG. WAREHOUSE

TIE STRIP

FOOTING INTO

INT. FOOTING.

SEE TYP. INT

FOOTING

SECTION FOR

DETAILS

PROVIDE 1" EXPANSION

JOINT WITH SEALANT

BETWEEN WAREHOUSE

AND ADMIN AREA1/2" EXPANSION JOINT

WITH SEALANT, TYP

6" CONCRETE

SLAB-ON-GRADE

#5 BARS @ 12"

E.W., TYP

#8 @ 12" O.C.E.W.

EACH FACE

6" REINFORCED

SLAB-ON-GRADE,

#5 BARS @ 12"

E.W., TYP

T.O.I.F.

97' - 6"

STRIP

FOOTING

REBAR

SPLICED WITH

COLUMN

FOOTING

#5 @ 48" O.C.

EMBED IN STEM WALL 24"

#5 - 16'-0" @ 48" O.C.

2'-6" MIN LAP

NOTE: TIE STRIP FOOTING INTO TYPE F1 FOOTING PIER AT INTERSECTION

(8) #8 BENT BARS IN PEDESTAL

#5 TIE BARS @ 12" O.C.

1/2" EXPANSION JOINT WITH SEALANT

2" NONSHRINK GROUT

3" CONCRETE FILL TO BE PLACED

AFTER COLUMN INSTALLATION

BASE PLATE W/ ANCHOR BOLTS AND

LEVELING NUTS PER DESIGNER

PEMB FRAME PER MANUFACTURER

1'

6"

8' - 0"

T.O.SLAB

100' - 0"

5' - 0"

1'

0"

CAPILLARY WATER

BARRIER

1/2" EXPANSION JOINT

WITH SEALANT

PERIMETER INSULATION.

EXTEND FULL HEIGHT OF STEM

WALL AND 4' WIDE UNDERNEATH

SLAB AROUND BUILDING

PERIMETER. SEE ARCH FOR R-

VALUE.

#5 @ 12" O.C.E.W. EACH FACE

10" STEM

W/ #5 @ 12" O.C.E.W.

EACH FACE

PROVIDE CONTINUOUS

FLASHING ADHERED TO

CMU WITH DRIP

(NOT SHOWN)

6" REINFORCED

SLAB-ON-GRADE,

#5 BARS @ 12"

E.W., TYP

T.O.F.

93' - 6"

#5 @ 48" O.C.

EMBED IN STEM WALL 24"

#5 - 16'-0" @ 48" O.C.

2'-6" MIN LAP

CHAMFER 1" TO

CMU FACE. EXTEND

DRIP EDGE OVER CHAMFER

6" CAPILLARY

WATER

BARRIER WITH

VAPOR BARRIER

BELOW

CONCRETE

PAVEMENT. SEE

CIVIL SHEETS FOR

DETAILS.

T.O.SLAB

100' - 0"

PEMB FRAME PER

MANUFACTURER.

EXTEND AND

ATTACH TO BASE

PLATE.

BASE PLATE W/ANCHOR

BOLTS AND LEVELING

NUTS PER DESIGNER

3" CONCRETE FILL TO BE

PLACED AFTER COLUMN

INSTALLATION

2" NONSHRINK GROUT

8'-0" SQUARE FOR (4) INTERIOR FOOTINGS

10'-0" SQUARE FOR (8) EXTERIOR FOOTINGS

1'

6"

#8 @ 12" O.C.E.W. EACH

FACE

(8) #8 BENT BARS IN

PEDESTAL

#5 TIE BARS @ 12" O.C.

STEM REINF. NOT

SHOWN. SEE

SECTION 1 THIS

SHEET FOR STEM

REINFORCEMENT

(2) #5 TIE BARS WITHIN

ANCHORAGE

T.O.F.

93' - 6"

T.O.I.F.

97' - 6"

1 1/2"

T.O.SLAB

100' - 0"

1/2" EXPANSION JOINT

WITH SEALANT

10" STEM

W/ #5 @ 12" O.C.E.W.

EACH FACE

6" REINFORCED

SLAB-ON-GRADE,

#5 BARS @ 12"

E.W., TYP

PROVIDE CONTINUOUS

FLASHING ADHERED TO

CMU WITH DRIP

(NOT SHOWN)

5' - 0"

1'

0"

T.O.F.

93' - 6"

T.O.I.F.

97' - 6"

6" CAPILLARY WATER

BARRIER WITH VAPOR

BARRIER BELOW

PERIMETER INSULATION. EXTEND FULL

HEIGHT OF STEM WALL AND 4' WIDE

UNDERNEATH SLAB AROUND BUILDING

PERIMETER. SEE ARCH FOR R-VALUE.

#5 @ 12" O.C.E.W.

EACH FACE

SLOPE AWAY

FROM BUILDING

SEE CIVIL SHEETS

#5 @ 48" O.C.

EMBED IN STEM WALL 24"

#5 - 16'-0" @ 48" O.C.

2'-6" MIN LAP

CHAMFER 1" TO CMU

FACE. EXTEND DRIP

EDGE OVER CHAMFER

T.O.SLAB

100' - 0"

PEMB FRAME PER

MANUFACTURER.

EXTEND AND

ATTACH

TO BASEPLATE.

STEM REINF. NOT

SHOWN. SEE SECTION

2 THIS SHEET FOR STEM

REINFORCEMENT

BASE PLATE W/ANCHOR

BOLTS AND LEVELING

NUTS PER DESIGNER

3" CONCRETE FILL TO BE

PLACED AFTER COLUMN

INSTALLATION

2" NONSHRINK GROUT

8'-0" SQUARE FOR (4) INTERIOR FOOTINGS

10'-0" SQUARE FOR (6) EXTERIOR FOOTINGS

1'

6"

T.O.I.F.

97' - 6"

#8 @ 12" O.C.E.W.

EACH FACE

1/2" EXPANSION JOINT WITH SEALANT

1 1/2"

6"

1 1

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

S-301

FO

U

N D

AT

IO

N S

EC

TI

O N

S

LO

G

IS

TI

C S

R

EA

D

IN

ES

S

SQ

U

AD

R

O N

C

AM

PU

S

O M

AH

A

D

IS

TR

IC

T

C

AP

IT

O L

AV

E.

O M

AH

A, N E

K.

K

AL

AF

U T

K.

K

AL

AF

U T

W . B

O

EC

K

W . B

O

EC

K

/2

7/

W

F-

-R

-0

W

-X X-

X-

XX

XX

AF

2-

-0

FI

LE

N U

M

BE

R

FI

LE

N

AM

E:

O

FF

U

TT

F

LO

O D

R

EC

O

VE

R Y

O

FF

U

TT

A

FB

, N

EB

R

AS

KA

O F6

3_

LR

S-

ST

R U

C T.

rv t

3/4" = 1'-0"1 NORTH/WEST EXT. WALL FOOTING

3/4" = 1'-0"2 TYP INT. CMU WALL FOOTING

3/4" = 1'-0"3 WAREHOUSE PARTITION FOOTING

3/4" = 1'-0"4 EAST EXT. WALL FOOTING

1/2" = 1'-0"6 TYPE F1 SPREAD FOOTING

3/4" = 1'-0"5 SOUTH EXT. WALL FOOTING

1/2" = 1'-0"7 TYPE F2 SPREAD FOOTING

0 0.5' 1' 2' 3' 0 0.5' 1' 2' 3' 0 0.5' 1' 2' 3'

0 0.5' 1' 2' 3'

0 0.5' 1' 2' 3' 0 1' 2' 4' 0 1' 2' 4'

AM

G

EN

ER

A L R

EV

IS

IO

N

S

-0 9-

1/2" EXPANSION JOINT WITH SEALANT

FIRST FLOOR

A

8" CMU WALL, CMU-3, SEE

STRUCTURAL FOR

REINFORCING AND BRACING

REQUIRMENTS

1" AIR GAP

1" METAL LINER PANEL,

AS SCHEDULED, OVER 6"

STEEL STUDS, R-18

CONCRETE SLAB ON GRADE

10" CAST-IN-PLACE

CONCRETE FOUNDATION,

SEE STRUCTURAL

PRE-ENGINEERED

METAL BUILDING

RIGID FRAME, SEE

STRUCTUAL

CAPPILARY

WATER BARRIER

VAPOR BARRIER

RIGID INSULATION UNDER SLAB-ON-

GRADE - EXTENDS 4' FROM FOUNDATION

PER ASHRAE REQUIREMENT; R - 15

RIGID PEREMTER INSULATION; R - 7.5

9 1/2"

FIRST FLOOR

100' - 0"

C

CONCRETE SLAB

ON GRADE

8" CMU WALL, CMU-1, SEE

STRUCTURAL FOR

REINFORCING AND BRACING

REQUIRMENTS

1" AIR GAP

1" METAL LINER PANEL, AS SCHEDULED,

OVER 6" STEEL STUDS, R-18

PRE-ENGINEERED METAL

BUILDING RIGID FRAME, SEE

STRUCTUAL

10" CAST-IN-PLACE CONCRETE FOUNDATION,

SEE STRUCTURAL

RIGID PERIMETER

INSULATION; R-7.5

RIGID INSULATION UNDER

SLAB-ON-GRADE - EXTENDS 4'

FROM FOUNDATION PER

ASHRAE REQUIREMENT; R - 15

VAPOR BARRIER

CAPPILARY WATER BARRIER

9 1/2"

FIRST FLOOR

100' - 0"

CONCRETE FOUNDATION,

SEE STRUCTURAL

CONCRETE SLAB ON GRADE

INTERIOR METAL RUNNER

8" CMU WALL, SEE

STRUCTURAL FOR

REINFORCING

AND BRACING

REQUIREMENTS

1" AIR GAP

FIRST FLOOR

100' - 0"

8" CMU WALL, SEE

STRUCTURAL FOR

REINFORCING AND

BRACING

REQUIREMENTS

INTERIOR METAL

RUNNER

1" AIR GAP

CONCRETE FOUNDATION,

SEE STRUCTURAL

1" METAL LINER PANEL,

AS SCHEDULED,

OVER INSULATED STEEL

STUD, R-18

RIGID INSUALTION; R-15

RIGID PERIMETER INSULATION; R-7.5

VAPOR BARRIER

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

A-500

W

AL

L

BA

SE

D

ET

AI

LS

O

FF

U

TT

A

FB

, N

EB

R

AS

KA

O

M

AH

A D

IS

TR

IC

T

C

AP

IT

O

L

AV

E.

O

M

AH

A, N

E

A.

P

AR

KE

R

A.

L

U

KE

N S

B.

G

O R

U P

B.

G

O R

U P

/2

7/

W

F-

-R

-0

W

8-

XX

-X

-X

XX

X

AF

2-

-0

FI

LE

N U

M

BE

R

FI

LE

N

AM

E:

O

FF

U

TT

F

LO

O D

R

EC

O

VE

R Y

LO

G

IS

TI

C S

R

EA

D

IN

ES

S

SQ

U

AD

R

O N

C

AM

PU

S

O F6

3_

LR

S-

AR

C H

.rv t

1 1/2" = 1'-0"1 HIGH BAY WALL BASE DETAIL @ GRADE

1 1/2" = 1'-0"2 HIGH BAY WALL BASE @ DOCK

AM

G

EN

ER

A L R

EV

IS

IO

N

S

-0 9-

1 1/2" = 1'-0"3 WALL BASE @ EXPANSION JOINT

1 1/2" = 1'-0"4 HIGH BAY WALL BASE DETAIL @ RETAINING WALL

0 1'6"3" 1' 6"

FIRST FLOOR

8" CMU WALL - SEE

STRUCTURAL FOR

REINFORCEMENT AND

BRACING

REQUIREMENTS

6" STL STUDS @ 16" OC W/ 5/8"

GWB

CAPPILARY

WATER BARRIER

RIGID INSULATION UNDER SLAB-ON-

GRADE - EXTENDS 4' FROM

FOUNDATION PER ASHRAE

REQUIREMENT; R - 15

PERIMETER RIGID INSULATION PER

ASHRAE REQUIREMENT; R - 7.5

1" AIR GAP

CONCRETE SLAB-ON-GRADE - SEE

STRUCTURAL

INTERIOR METAL RUNNER

INSULATION, R-17

VAPOR BARRIER

CONTINUOUS SEALANT JOINT (TYP.)

WALL BASE, SEE SCHEDULE (TYP.)

SEE CIVIL

SHEETS FOR

GRADING PLAN

(TYP.) FIRST FLOOR

100' - 0"

C

FIRST FLOOR

100' - 0"

6" STL STUDS @ 16'

OC W/ 5/8" GWB

1" AIR GAP

8" CMU WALL - SEE

STRUCTURAL FOR

REINFORCEMENT AND

BRACING REQUIREMENTS

3/8" MORTAR

10" CAST-IN-PLACE

CONCRETE

FOUNDATION

PERIMETER RIGID

INSULATION PER

ASHRAE

REQUIREMENT, R -

7.5

RIGID INSULATION UNDER SLAB-ON-

GRADE - EXTENDS 4' FROM FOUNDATION

PER ASHRAE REQUIREMENT; R - 15

CAPILLARY WATER BARRIER

CONCRETE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .