Am_0004 - D.pdf
PDF 165 KB Posted
- Attached to
- Logistics Readiness Squadron Campus, Offutt AFB, Nebraska Federal contract opportunity
- Solicitation number
- W9128F21R0026
About this file
This document package includes construction drawings and specifications for a federal solicitation. The project involves demolishing two existing substandard warehouse facilities totaling 2,248 square meters and constructing a new consolidated warehouse facility at Offutt Air Force Base in Nebraska. The new facility will include logistics and administration areas, shipping and receiving operations areas, open storage areas, and loading/unloading aprons. Supporting infrastructure includes underground utilities, electric service, paving, sanitary sewer system, storm drainage, information systems, fire suppression systems, landscaping, site development, intrusion detection, and site improvements. Heating and air conditioning will be provided by self-contained systems. Reinforced concrete, supporting structures, and egress will be constructed. The overall project also includes safely removing multiple additional facilities. Sustainable design principles will be integrated according to applicable executive orders and laws. The soliciting agency is the U.S. Army Corps of Engineers Omaha District.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Am_0006-Drawings.PDF | ||
| Am_0006.pdf | ||
| Am_0005.pdf | ||
| Am_0004.pdf | ||
| Am_0003 - D .PDF | ||
| Am_0003.pdf | ||
| OF63 LRS CAMPUS OFFUTT AFB AM 0002.PDF | ||
| Am_0002.pdf | ||
| Am_0001-Drawings.pdf | ||
| Am_0001.pdf | ||
| LRS Campus Drawings Part 1 of 2.pdf | ||
| W9128F-21-R-0026_SPECS.pdf | ||
| LRS Campus Drawings Part 2 of 2.pdf.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STANDING SEAM, ON RIGID
INSULATION, ON VAPOR BARRIER,
ON 1/2" COVER BOARD ON
METAL DECK
LIGHTNING PROTECTION AIR
TERMINAL WHERE OCCURS, SEE
ELEC DWGS FOR LAYOUT
RIDGE CAP
Z-SHAPED PANEL CLOSURE W/
CONTINUOUS SEALANT AT JOINT
STEEL SUBPURLIN
SPRAY FOAM INSULATION, R-VALUE TO
MATCH ADJACENT RIGID INSULATION
4" RIGID INSULATION, R-35 MIN
STRUCTURAL STANDING
SEAM METAL ROOF PANEL
VAPOR BARRIER
5/8" ROOF BOARD
METAL ROOF DECK, SEE
STRUCTURAL
STANDING SEAM MTL
ROOFING ON MIN.
R-35 RIGID INSUL ON
VAPOR BARRIER ON
1/2" COVER BOARD
ON METAL DECK
PREFINISHED MTL
EAVE GUTTER W/
HEAVY DUTY
GUTTER HANGER @
EVERY PANEL
SEAM , TYP.
FASTENERS PER
MFR. INSTRUCTIONS
EAVE TRIM AND
CONT. 16 GA SUB
FLASHING
VAPOR BARRIER
4"MTL INSULATED
WALL PANEL
EAVE STRUT
MTL DECKING
3" SPF INSULATION
FOR CONTINUOUS
THERMAL AND
VAPOR BARRIER
SEALANT
MTL CHANNEL FOR
INSULATION, FASTEN
TO DECK OR STRUCT
STANDING SEAM MTL
ROOFING ON MIN. R-35
RIGID INSUL ON
VAPOR BARRIER ON
1/2" COVER BOARD ON
METAL DECK
PURLIN
FASCIA:
PREFINISHED 24 GA.
SHEET MTL
MTL PLATE
4" INSULATED MTL
WALL PANEL
3" SPF
INSULATION FOR
CONTINUOUS
THERMAL AND
VAPOR BARRIER
RAKE SUPPORT
T.O. CMU
116' - 0"
T.O. INT CMU
114' - 0"
SNOW/ICE
GUARDS
PREFABRICATED
ROOF AWNING,
GUTTER, AND
DOWNSPOUT, USE
MFR. STANDARD
DETAILS
GENERAL ROOF NOTES:
1. DIMENSIONS ARE TO CENTER LINE OF COLUMNS, FACE OF STEEL STUDS, AND
FACE OF CMU WALLS.
2. ALL DIMENSIONS ARE NOMINAL, U.N.O.
3. SEE ELECTRICAL DRAWINGS FOR LOCATIONS OF LIGHTNING PROTECTION TERMINALS.
4. DO NOT SCALE FROM DRAWINGS.
5. REFER TO CIVIL SITE PLAN FOR BUILDING LOCATION.
6. COORDINATE ALL ROOF PENETRATIONS WITH STANDING SEAM LOCATIONS, SO TO NOT
INTERRUPT SEAM.
7. ALL ROOFING, FLASHING, & ACCESSORIES TO BE INSTALLED IN ACCORDANCE
SMACNA GUIDELINES.
8. ALL FINISHES TO BE FACTORY PRE-FINISHED.
9. ALL JOINTS, OPENINGS, & PENETRATIONS TO RECEIVE TAPE, FLASHING, CAULK, & GASKETS.
10. ALL PENETRATIONS THROUGH ROOF SHALL BE INTEGRATED INTO THE CONTINUOUS
AIR BARRIER SYSTEM.
11. REFER TO STRUCTURAL DRAWINGS FOR FRAMING INFORMATION.
12. SEE WALLS SECTIONS AND DETAILS FOR MORE INFORMATION ON WALL, ROOF AND PARAPET
CONSTRUCTION REQUIREMENTS.
14. COORDINATE ALL ROOFING PENETRATIONS WITH ROOFING INSTALLER.
16. WHERE TUBULAR DAYLIGHTING DEVICES ARE SHOWN , TUBE SECTIONS SHALL BE OF
SUFFICIENT LENGTH SUCH THAT DIFFUSERS ARE LOCATED AT THE SAME ELEVATION
AS FINISHED CEILING OR BOTTOM OF THE LIGHT FIXTURES.
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
A-530
H
IG
H B
AY
R
O O
F D
ET
AI
LS
O
FF
U
TT
A
FB
, N
EB
R
AS
KA
O
M
AH
A D
IS
TR
IC
T
C
AP
IT
O
L
AV
E.
O
M
AH
A, N
E
A.
P
AR
KE
R
A.
P
AR
KE
R
B.
G
O R
U P
B.
G
O R
U P
/2
7/
W
F-
-R
-0
W
8-
XX
-X
-X
XX
X
AF
2-
-0
FI
LE
N U
M
BE
R
FI
LE
N
AM
E:
O
FF
U
TT
F
LO
O D
R
EC
O
VE
R Y
LO
G
IS
TI
C S
R
EA
D
IN
ES
S
SQ
U
AD
R
O N
C
AM
PU
S
O F6
3_
LR
S-
AR
C H
.rv t
1 1/2" = 1'-0"2 STANDING SEAM MTL ROOF RIDGE (TYP)
1 1/2" = 1'-0"1 STANDING SEAM MTL ROOF SECTION (TYP)
3" = 1'-0"3 STANDING SEAM MTL ROOF SLOPED EDGE
3" = 1'-0"4 STANDING SEAM MTL ROOF RAKE EDGE
1 1/2" = 1'-0"5 DOCK CANOPY SLOPED EDGE
AM
G
EN
ER
A L R
EV
IS
IO
N
S
-0 3-
0 6"3" 9"
0 1'6"3" 1' 6"
| Sheets |
| A-530 - HIGH BAY ROOF DETAILS |
File details come from the government source that posted it. Updated .