Am_0003.pdf

PDF 2 MB Posted

Attached to
Logistics Readiness Squadron Campus, Offutt AFB, Nebraska Federal contract opportunity
Solicitation number
W9128F21R0026
Issued by
Department of the Army Corps of Engineers Engineering District Omaha

About this file

This federal contract solicitation seeks proposals for the construction of a Logistics Readiness Squadron Campus at Offutt Air Force Base in Nebraska. The project includes demolishing existing substandard warehouse space totaling 2,248 square meters and constructing a new consolidated warehouse facility with logistics and administration areas, shipping and receiving operations areas, open storage areas, and loading and unloading aprons. Supporting facilities include underground utilities, electric service, paving, sanitary sewer system, storm drainage, information systems, fire suppression systems, landscaping, site development, intrusion detection systems, and site improvements. Heating and air conditioning will be provided by self-contained systems. Construction will include reinforced concrete footings, floor slab, supporting structure, and egress. Sustainable design principles are to be integrated according to applicable laws and executive orders. Proposals are due by September 9, 2021 at 2:00 PM local time. The solicitation is restricted to small business interests.

View the file

Other files for this federal contract opportunity

Other files attached to Logistics Readiness Squadron Campus, Offutt AFB, Nebraska, newest first.
File Type Posted
Am_0006-Drawings.PDF PDF
Am_0006.pdf PDF
Am_0005.pdf PDF
Am_0004.pdf PDF
Am_0004 - D.pdf PDF
Am_0003 - D .PDF PDF
OF63 LRS CAMPUS OFFUTT AFB AM 0002.PDF PDF
Am_0002.pdf PDF
Am_0001-Drawings.pdf PDF
Am_0001.pdf PDF
LRS Campus Drawings Part 1 of 2.pdf PDF
W9128F-21-R-0026_SPECS.pdf PDF
LRS Campus Drawings Part 2 of 2.pdf.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

Amendment No. 0003 W9128F

LRS CAMPUS AT OFFUTT AFB, NEBRASKA

See attached documentation for content of the changes to RFP

Date for receipt of proposals is 9 SEP 2021 at 1400 hours

Government Point of Contact: Dawn Barnett, Contract Specialist (402) 995-2646

U.S ARMY CORPS OF ENGINEERS, OMAHA DISTRICT

CONTRACTING OFFICE

1616 CAPITOL AVE.

OMAHA, NE 68102-4901

See Item 6

W9128F-21-R-0026

08/31/2021

08/02/2021

08/31/2021

Am #0003 - 2 (Continuation SF 30)

31 AUG 2021

Solicitation No. W9128F21R0026

Date of Issue: 2 AUG 2021 Date of Receiving Proposals: 9 SEP 2021

SUBJECT: Amendment No. 0003 to Request for Proposal Solicitation Package for Construction of

LRS CAMPUS AT OFFUTT AFB, NEBRASKA

TO: Prospective Offerors and Others Concerned

1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).

a. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages or sections as noted below. The substituted pages or sections are revised and reissued with this amendment. In the sections below changes have been marked with asterisk for convenience.

Pages or Sections Deleted Pages or Sections Substituted or Added 00 10 00 00 10 00* Register Register

01 33 39.00 10 01 33 39.00 10 01 78 39.00 24 01 78 39.00 24

08 71 00 08 71 00* 11 13 19.13 11 13 19.13* 13 48 00.00 13 48 00.00* 13 48 00 13 48 00* 26 20 00 26 20 00* 26 51 00 26 51 00* 26 56 00 26 56 00* 27 10 00 27 10 00* 33 71 02 33 71 02* 33 82 00 33 82 00* Appendix A Appendix A*

b. Drawings (Reissued). The following drawings are revised with latest revision date (indicated in title block) and reissued with this amendment.

(1) Sheet OF63 CS101, Site Plan

(2) Sheet OF63 CS502, FE-6 Fence Details

(3) Sheet OF63 XE101, Electrical site Plan By OPPD

(4) Sheet OF63 ES501, Electrical Pole Detail

(5) Sheet OF63 ES503, Electrical Details

(6) Sheet OF63 ES504, Electrical Details

(7) Sheet OF63 A-113, Shipping/Receiving Area Floor Plan

(8) Sheet OF63 A-500, Wall Base Details

Am #0003 - 3

(9) Sheet OF63 A-510, Wall Details

(10) Sheet OF63 A-601, Wall Types

(11) Sheet OF63 I-111, Administrative Area Furniture Place

(12) Sheet OF63 I-113, Shipping/ Receiving Area Furniture

(13) Sheet OF63 E-401, Areas Exempt From Section26 05 48.00 10

(14) Sheet OF63 EG001, Grounding / Lighting Protection

(15) Sheet OF63 EG101, Grounding Plan

(16) Sheet OF63 EL601, Luminaire Aiming Schedule

(17) Sheet OF63 EP103, Power Plan - Shipping

(18) Sheet OF63 EP600, One-Line Diagram Notes

(19) Sheet OF63 EP611, Equipment Connection Schedule

(20) Sheet OF63 EP621, Panel Schedules

(21) Sheet OF63 EP624, Panel Schedules

(22) Sheet OF63 EP626, Panel Schedules

(23) Sheet OF63 EP627, Panel Schedules

(24) Sheet OF63 EY501, Special Systems Details

(25) Sheet OF63 TN101, Telecommunication Plan

(26) Sheet OF63 TN103, Telecommunication Plan

(27) Sheet OF63 TN532, Telecommunication Details

Am #0003 - 4

2. This amendment is a part of the proposing papers and its receipt shall be acknowledged on the SF30. All other conditions and requirements of the request for proposal remain unchanged.

3. Electronic Proposal/Email. See Section 00 22 00 for how to submit electronic proposals.

4. Electronic Offers will be received until 2:00 p.m., local time at place of receiving proposals, 9 SEP 2021, as stated in the Request for Proposal.

Attachments:

Spec Pages listed in 1.a. above Drawings listed in 1.b.. above (provided under separate cover)

U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901

31 AUG 2021

JAC/2100

00 10 00 - 1

SOLICITATION, OFFER

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

W9128F-21-R-0026

2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED

2 AUG 21

PAGES OF PAGES

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

6. PROJECT NO.

7. ISSUED BY CODE CT 8. ADDRESS OFFER TO

U.S.ARMY CORPS OF ENGINEERS, OMAHA

Contracting Division (CENWO-CT) 1616 Capitol Ave Omaha, Nebraska 68102-4901

See Block 7

9. FOR INFORMATION

EMAIL:

A. NAME

Dawn Barnett

B. EMAIL ADDRESS

dawn.s.barnett@usace.army.mil

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):

The offeror hereby agrees to do all work described in the documents entitled:

LRS CAMPUS, SGBP212904/1080936 (FY20)

OFFUTT AFB, NEBRASKA

RETURN WITH OFFER: INFORMATION REQUIRED BY SECTION 00 10 00 (SF1442), SECTION 00 22 00, AND SECTION 00 45 00.

THIS SOLICITATION IS RESTRICTED 100% TO SMALL BUSINESS INTERESTS

11. The Contractor shall begin performance within 10 calendar days and complete it within ** calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. **See CLIN Schedule

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

YES NO

12B. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8 by 1400 (hour) local time 9 SEP 2021. If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is is not required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than 90 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442(REV. 4-85)

Prescribed by GSA FAR(48 CFR) 53.236-1(e)

Am _0003

00 10 00 - 2

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

DUNS Number:

16. REMITTANCE ADDRESS (Include only if different than Item 14)

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within 90 calendar days after the date offers are due.

AMOUNTS

SEE ATTACHED CLIN PRICING SCHEDULE

Contractor’s Fax No. CAGE CODE Contractor’s E-Mail address

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER

(Type or print)

20B. SIGNATURE 20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

U.S. Army Engineer District, Omaha 1616 Capitol Ave.

Omaha, Nebraska 68102-4901

USAED Omaha c/o USACE Finance Center 5722 Integrity Drive Millington, TN 38054-5005

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (contractor is required to sign this document and return _______ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award,

(b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation, is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED

TO SIGN (Type or print)

31A. NAME OF CONTRACTING OFFICER (Type or print)

30B. SIGNATURE 30C. DATE 31B. UNITED STATES OF AMERICA

BY

31C. AWARD DATE

STANDARD FORM 1442 BACK (REV. 4-85)

CLIN SCHEDULE 00 10 00-3 W9128F-21-R-0026

CONTRACT LINE ITEM PRICING SCHEDULE

ITEM

NO.

DESCRIPTION QTY UNIT UNIT

PRICE

AMOUNT

BASIC ITEMS

All work complete to Construct the Logistic Readiness Squadron Campus, up to five feet outside the buildings, excluding items listed below.

Job

XXX

All work complete to Construct Sitework and Utilities, from five feet outside buildings to the boundary of construction, excluding items listed below.

All work complete to Demolish Buildings 486, 514, 543, 545, 553, and 586.

0004 All work complete to contract with OPPD for Construction of Electrical Site Work as shown on the project drawings.

LS

$ 210,000.00

TOTAL BASIC AMOUNT $________________________

OPTION ITEMS

[Option]

All work complete to Procure and Install Furniture, Fixtures, and Equipment Package. (O&M)

TOTAL AMOUNT (BASIC PLUS OPTIONS) $________________________

OFFEROR'S NAME: ____________________________

Proposed Contract Duration in Calendar Days After the Notice to Proceed is Received (See Notes No. 1 and 3 below) ____________ DAYS

NOTES:

1. See SECTION 00 21 00, INSTRUCTIONS TO OFFERORS for evaluation of options. The Government reserves the right to exercise Option Items any time during the original contract duration.

2. Prices must be entered for all items of the schedule. Total amounts submitted without prices being entered on individual items will be rejected. Additions will be subject to verification by the Government. In case of variation between the Job (lump-sum) prices and the total amount, the lump-sum prices will be considered the price submitted.

CLIN SCHEDULE 00 10 00-4 W9128F-21-R-0026

4.3. The Offeror shall propose a total integrated contract duration in number of calendar days after the Notice to

Proceed (NTP) is received by the Contractor. The total number of proposed calendar days for construction through completion, ready for turnover shall not exceed the benchmark duration of 540 calendar days. The proposed duration shall become the required contract duration, unless increased in accordance with Note 1 above. The Government may issue the NTP via e-mail or Facsimile (FAX) or by other means. Day number 1 is the day after the date of receipt of the NTP. See Section 00 72 00’s COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK paragraph.

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 92 PAGES

OFR - Logistics Readiness Squadron, Offutt AFB, NE

01 30 00.24 SD-02 Shop Drawings

1.25 G ROEquipment Room Drawings

01 32 01.00 10 SD-01 Preconstruction Submittals

1.3 G ROProject Scheduler Qualifications

3.4.1 G ROPreliminary Project Schedule

3.4.2 G ROInitial Project Schedule

3.6.2 G ROPeriodic Schedule Update

01 33 00 SD-01 Preconstruction Submittals

1.8 G ROSubmittal Register

01 33 29 SD-01 Preconstruction Submittals

1.5.3.1 G DOPreliminary High Performance

and Sustainable Building Checklist

1.4.1 G DOSustainability Action Plan

1.5.3.1 G DOPreliminary Sustainability

eNotebook SD-11 Closeout Submittals

1.5.3.1 G DOFinal High Performance and

Sustainable Building Checklist

1.5.3.1 G DOFinal Sustainability eNotebook

1.5.3.1 G DOAmended Final Sustainability

eNotebook

1.5.3.1 G DOAmended Final High

Performance and Sustainable Building Checklist

01 33 39.00 10 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 92 PAGES

01 33 39.00 10 1.4.1 G AOAdvanced Modeling Project Execution Plan (PxP)

1.4.2 G AOPxP Demonstration

01 35 26 SD-01 Preconstruction Submittals

1.7 G ROAccident Prevention Plan (APP)

SD-06 Test Reports

1.4Monthly Exposure Reports 1.12Notifications and Reports

1.12.2 G ROAccident Reports

1.12.3LHE Inspection Reports

G RODive Operations Plan SD-07 Certificates

1.6.1.4Crane Operators/Riggers

1.7.2.2 G ROStandard Lift Plan

1.7.2.3 G ROCritical Lift Plan

1.8Activity Hazard Analysis (AHA) 1.9.1Confined Space Entry Permit 1.9.1Hot Work Permit 1.12.4Certificate of Compliance 1.14License Certificates

G ROPortable Gauge Operations Planning Worksheet

01 41 26.02 24 SD-05 Design Data 3.2.1Notice of Intent 3.2.2Notice of Start-up of Construction

Activity

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 92 PAGES

01 41 26.02 24 3.2.3Storm Water Pollution Prevention Plan

3.2.5Notice of Completion of Construction Activity

SD-06 Test Reports 3.2.4Records

01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 G ROContractor Quality Control (CQC)

Plan

3.2.2 G DOAdditional Requirements for

Design Quality Control (DQC) Plan SD-05 Design Data

3.2.2Discipline-Specific Checklists SD-06 Test Reports

3.9Verification Statement 01 57 20.00 10 SD-01 Preconstruction Submittals

1.7 G AOEnvironmental Protection Plan

01 57 23 SD-07 Certificates

2.1.3Mill Certificate or Affidavit 01 74 19 SD-01 Preconstruction Submittals

1.5 G ROWaste Management Plan

SD-11 Closeout Submittals

1.6 G RORecords

01 78 23 SD-10 Operation and Maintenance

Data

1.3 G ROO&M Database

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 92 PAGES

01 78 23 3.1.1 G ROTraining Plan

3.1.3 G ROTraining Outline

3.1.2 G ROTraining Content

SD-11 Closeout Submittals

3.1.4 G ROTraining Video Recording

3.1.6 G ROValidation of Training Completion

01 78 24.00 10 SD-01 Preconstruction Submittals 1.4.1Facility Data Project Execution

Plan SD-10 Operation and Maintenance Data

3.1 G ROFacility Data Workbook, Construction Progress

3.1 G ROFacility Document Set, Construction Progress

SD-11 Closeout Submittals

3.2 G ROFacility Data Workbook, Construction Final

1.4.3 G ROFacility Document Set, Construction Final

3.2 G ROFacility Document Set, Construction Final 01 78 36.00 24 SD-11 Closeout Submittals

1.2.5Equipment Warranty Booklet 01 78 39.00 24 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 92 PAGES

01 78 39.00 24 1.7.2 G DO50 Percent Preliminary As-Built Drawings

1.7.3 G DO100 Percent Preliminary As-Built

Drawings

SD-11 Closeout Submittals

1.7.4 G DOFinal As-Built Drawings

01 91 00.15 10 SD-01 Preconstruction Submittals

1.7 G ROCommissioning Firm

1.7.1 G ROLead Commissioning Specialist

1.7.2 G ROTechnical Commissioning

Specialists

1.7 G ROCommissioning Firm's Contract

SD-06 Test Reports

3.1.3 G DODesign Review Report

3.1.2.1 G DOInterim Construction Phase

Commissioning Plan

3.1.2.2 G DOFinal Construction Phase

Commissioning Plan

3.1.5.2 G DOPre-Functional Checklists

1.9Issues Log

3.2 G DOCommissioning Report

3.3.1 G DOPost-Construction Trend Log

Report SD-07 Certificates

1.10 G ROCertificate of Readiness

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 92 PAGES

01 91 00.15 10 SD-10 Operation and Maintenance Data

3.1.6 G ROTraining Plan

3.1.6 G ROTraining Attendance Rosters

3.1.7 G ROSystems Manual

3.1.7 G ROSystems Manual

SD-11 Closeout Submittals 3.2Final Commissioning Report 3.1.2.2Final Construction Phase

Commissioning Plan 02 41 00 SD-01 Preconstruction Submittals

1.2.2 G RODemolition Plan

1.10Existing Conditions

SD-07 Certificates

1.7 G RONotification

Notification of Demolition and Renovation Form

SD-11 Closeout Submittals 3.3.4Receipts

03 30 00 SD-01 Preconstruction Submittals 1.7.3.1Concrete Curing Plan

1.7.5 G DOQuality Control Plan

1.7.6 G DOQuality Control Personnel

Certifications 1.7.6Quality Control Organizational

Chart

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 92 PAGES

03 30 00 1.7.8 G DOLaboratory Accreditation 1.7.2.1Form Removal Schedule

SD-02 Shop Drawings 1.7.2.1Formwork

1.7.2.2 G DOReinforcing Steel

SD-03 Product Data

2.4.5 G DOJoint Sealants

2.4.3.1.2.3G DOJoint Filler

2.4.4 G DOJoint Filler

2.1Formwork Materials 2.3.1Cementitious Materials

2.4.6 G DOVapor Retarder and Vapor

Barrier 2.4.1Concrete Curing Materials

1.6.1 G DOReinforcement

2.6 G DOReinforcement

2.4.3.1.1General-Use Hardener/Sealer

2.3.4 G DOAdmixtures

2.6.2 G DOMechanical Reinforcing Bar

Connectors 2.2.2Biodegradable Form Release

Agent 1.7.3.2Pumping Concrete 1.7.3.4Finishing Plan

2.4.2 G DONonshrink Grout

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 92 PAGES

03 30 00 Slab Finish Sample Surface Finish Samples

SD-05 Design Data

1.7.1.2 G DOConcrete Mix Design

1.7.1.1Formwork Calculations

SD-06 Test Reports

1.7.1.2 G DOConcrete Mix Design

1.7.4.1Fly Ash 1.7.4.1Pozzolan 1.7.4.2Slag Cement 1.7.4.3Aggregates

3.14.2.3 G DOCompressive Strength Tests

3.14.2.6Chloride Ion Concentration 3.14.2.4Air Content 3.14.2.1Slump Tests 2.3.2Water

SD-07 Certificates 2.6.1Reinforcing Bars 1.10Welder Qualifications 1.7.3.3Silica Fume Manufacturer's

Representative 1.7.3.5VOC Content for Form Release

Agents, Curing Compounds, and Concrete Penetrating Sealers

1.7.3.6Safety Data Sheets

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 92 PAGES

03 30 00 1.7.6.2Field Testing Technician and Testing Agency

SD-08 Manufacturer’s Instructions 2.4.5Joint Sealants 2.4.1Curing Compound

04 20 00 SD-02 Shop Drawings

3.3.3.1 G DOCut CMU

3.4.1.1 G DODetail Drawings

SD-03 Product Data

1.5.1 G ROHot Weather Procedures

1.5.2 G ROCold Weather Procedures

2.2.2.2.1 G ROCement

2.4.1.1 G ROCementitious Materials

SD-04 Samples

1.3.1.1 G ROMock-Up Panel

2.4.1.4 G ROAdmixtures for Masonry Mortar

2.6.2 G ROAnchors, Ties, and Bar

Positioners

2.6.3 G ROJoint Reinforcement

SD-05 Design Data

2.1.2 G ROMasonry Compressive Strength

2.2.2.4Fire-Rated Concrete Masonry

Units

3.2.5 G ROBracing Calculations

SD-06 Test Reports 3.6.1.1Field Testing of Mortar

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 92 PAGES

04 20 00 3.6.1.2Field Testing of Grout 3.6.1.3Prism Tests 3.6.1.4Single-Wythe Masonry Wall

Water Penetration Test SD-07 Certificates

G ROSpecial Masonry Inspector Qualifications

2.4.1.1Cementitious Materials 2.4.1.4Admixtures for Masonry Mortar 2.4.2.2Admixtures for Grout 2.6.2Anchors, Ties, and Bar

Positioners 2.6.3Joint Reinforcement

SD-08 Manufacturer’s Instructions 2.4.1.4Admixtures for Masonry Mortar 2.4.2.2Admixtures for Grout

SD-10 Operation and Maintenance Data

3.8Take-Back Program 05 05 23.16 SD-01 Preconstruction Submittals

3.2 G DOWelding Quality Assurance Plan

SD-03 Product Data

1.3 G DOWelding Procedure Qualifications

1.3.4Welder, Welding Operator, and

Tacker Qualification 1.3.2Previous Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 92 PAGES

05 05 23.16 1.3.3 G DOPre-Qualified Procedures 2.2Welding Electrodes and Rods

SD-06 Test Reports 3.3Nondestructive Testing

Weld Inspection Log SD-07 Certificates

1.3.1Certified Welding Procedure Specifications (WPS)

1.3.1Certified Procedure Qualification Records (PQR)

1.3.1Certified Welder Performance Qualifications (WPQ)

1.3.5Certified Welding Inspector 1.3.5Nondestructive Testing

Personnel 05 12 00 SD-01 Preconstruction Submittals

1.4.1.1 G DOErection and Erection Bracing

Drawings

SD-02 Shop Drawings

1.4.2 G DOFabrication Drawings

SD-03 Product Data 2.5.2Shop Primer 2.4.1Welding Electrodes and Rods

Direct Tension Indicator Washers 2.4.2Non-Shrink Grout 2.3.3Tension Control Bolts

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 92 PAGES

05 12 00 SD-05 Design Data

1.4.3 G DODesign Calculations for Steel

Connections

1.4.2 G DOShoring and Temporary Bracing

SD-06 Test Reports 2.5.2Class B Coating 2.3Bolts, Nuts, and Washers 3.6.1.2Weld Inspection Reports

Direct Tension Indicator Washer Inspection Reports

3.6.2.1Bolt Testing Reports 3.6.3Embrittlement Test Reports

SD-07 Certificates 2.2Steel 2.3Bolts, Nuts, and Washers

Galvanizing Pins and Rollers

1.3AISC Structural Steel Fabricator Quality Certification

1.3AISC Structural Steel Erector Quality Certification

1.4.4.1Welding Procedures and Qualifications

2.4.1Welding Electrodes and Rods 3.6.1.1Certified Welding Inspector 3.6.1.2NDT Technician

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 92 PAGES

05 12 00 3.4Welding Procedure Specifications

(WPS)

05 21 00 SD-01 Preconstruction Submittals 1.3.2Welder Qualification

SD-02 Shop Drawings

1.3.1 G ROSteel Joist Framing

SD-05 Design Data

2.2 G RODesign Calculations

SD-06 Test Reports 3.4Erection Inspection 3.4Welding Inspections

SD-07 Certificates 1.3.2Certification of Compliance

05 30 00 SD-02 Shop Drawings

1.3.5 G DOFabrication Drawings

SD-03 Product Data 2.2Accessories 2.1Deck Units 2.1.4Galvanizing Repair Paint 2.2.16Mechanical Fasteners 2.1.4Touch-Up Paint 1.3.3Welding Equipment 1.3.3Welding Rods and Accessories

SD-04 Samples 2.1.1Metal Roof Deck Units 2.2.4Flexible Closure Strips

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 92 PAGES

05 30 00 SD-05 Design Data

2.1 G DODeck Units

SD-07 Certificates 1.3.2Powder-Actuated Tool Operator 1.3.3Welder Qualifications 1.3.3Welding Procedures 1.3.4.1Fire Safety 1.3.4.2Wind Storm Resistance 1.3.1Manufacturer's Certificate

05 40 00 SD-02 Shop Drawings

1.6.1 G DOFraming Components

SD-03 Product Data 2.1Studs, Joists

SD-05 Design Data

1.6.2 G DOMetal Framing Calculations

SD-07 Certificates 1.4Load-Bearing Cold-Formed Metal

Framing 3.2.1Welds

05 50 13 SD-02 Shop Drawings

2.8 G DOStructural Steel Door Frames

2.4 G DOCover Plates and Frames

G DOExpansion Joint Covers

2.5 G DOBollards/Pipe Guards

G DOWindow and Door Guards

2.6 G DOAngles and Plates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 92 PAGES

05 50 13 SD-03 Product Data 2.3Corner Guards

2.4 G DOCover Plates and Frames

2.8 G DOStructural Steel Door Frames

G DOWindow and Door Guards

2.1 G DOCertified Mill

05 51 00 SD-02 Shop Drawings

1.6.1 G DOMetal Stairs

SD-03 Product Data

1.6 G DOStair System

SD-05 Design Data 1.6Design Calculations

SD-07 Certificates

1.5 G ROWelding Procedures

SD-08 Manufacturer’s Instructions

1.6.1 G ROMetal Stairs

05 52 00 SD-02 Shop Drawings

1.6 G DOLife Safety Guards And Railings

2.1.1 G DOLife Safety Guards And Railings

2.1.2 G DOLife Safety Guards And Railings

G DOService Guardrails SD-03 Product Data

G DORailings and Handrails 2.2Structural Steel Plates, Shapes, and Bars 2.3Structural Steel Tubing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 92 PAGES

05 52 00 Protective Coating Steel Railings and Handrails

SD-05 Design Data

1.6 G DODesign Calculations

SD-07 Certificates

1.5 G ROWelding Procedures

1.5Welder Qualification

SD-08 Manufacturer’s Instructions Steel Railings and Handrails

06 10 00 SD-07 Certificates 1.7Preservative Treatment

06 41 16.00 10 SD-02 Shop Drawings

1.5.2 G DOShop Drawings

2.11 G DOShop Drawings

3.1Installation

SD-03 Product Data 2.1Wood Materials

2.9 G DOWood Finishes

2.11.7.3 G DOFinish Schedule

1.5.3Certification

SD-04 Samples

2.3 G DOPlastic Laminates

2.6 G DOCabinet Hardware

SD-07 Certificates 1.5Quality Assurance 2.9Laminate Clad Casework

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 92 PAGES

06 41 16.00 10 3.1Laminate Clad Casework SD-11 Closeout Submittals

1.3LEED Documentation 06 61 16 SD-02 Shop Drawings

1.4.2 G DODetail Fabrication Drawings

3.1 G DOInstallation

SD-03 Product Data

2.1.1 G DOSolid Polymer

2.2.2Indoor air quality for solid surface seam and sealant products SD-04 Samples

2.1 G DOMaterial

2.3.5 G DOCounter Tops

SD-06 Test Reports 2.1.1Test Report Results

SD-07 Certificates 1.4.1Qualifications 2.1.1Indoor Air Quality for solid surface fabrication products SD-10 Operation and Maintenance Data

2.1.1 G ROSolid Polymer

07 05 23 SD-01 Preconstruction Submittals

1.4 G ROWork Plan

SD-03 Product Data

2.2 G ROThermal Imaging Camera

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 92 PAGES

07 05 23 SD-05 Design Data

3.2 G ROEnvelope Surface Area

Calculations SD-07 Certificates

1.6.2.1Pressure Test Agency 1.6.2.2Thermographer Qualifications 1.6.3Test Instruments 1.6.3Date Of Last Calibration

SD-06 Test Reports

3.5 G ROPressure Test Procedures

1.6.4 G ROAir Leakage Test Report

3.5.7 G ROAir Leakage Test Report

1.6.4 G RODiagnostic Test Report

3.6.5 G RODiagnostic Test Report

07 13 53 SD-03 Product Data

1.3 G DOManufacturer's Standard Details

2.2 G DOElastomeric Waterproofing Sheet

Material

2.6 G DOProtection Board

1.4 G DOPrimers, Adhesives, and Mastics

2.2 G DOPrimers, Adhesives, and Mastics

SD-06 Test Reports

2.2 G DOElastomeric Waterproofing Sheet

Material

3.6 G DOField Quality Control

3.7 G DOProtective Covering

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 92 PAGES

07 13 53 SD-07 Certificates 2.2Elastomeric Waterproofing Sheet

Material

1.4 G DOPrimers, Adhesives, and Mastics

2.2 G DOPrimers, Adhesives, and Mastics

1.4 G DOProtective Coverings

1.8 G DOSpecial Warranties

1.8 G DOSpecial Warranties

2.1.1 G DOCertificates Of Compliance

2.1.2 G DOCertificates Of Compliance

SD-08 Manufacturer’s Instructions

1.4 G DOPrimers, Adhesives, and Mastics

2.2 G DOPrimers, Adhesives, and Mastics

SD-11 Closeout Submittals

2.1.1 G DOCertificates Of Compliance

2.1.2 G DOCertificates Of Compliance

07 21 13 SD-03 Product Data 1.3Manufacturer's Standard Details

2.1 G DOBlock or Board Insulation

2.2Vapor Retarder 2.3Pressure Sensitive Tape 1.4Protection Board or Coatings 2.5Accessories

SD-08 Manufacturer’s Instructions 2.1Block or Board Insulation 2.5.1Adhesive

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 92 PAGES

07 21 16 SD-03 Product Data 2.1Blanket Insulation

Recycled Content for Insulation Materials

2.3Pressure Sensitive Tape 2.4Accessories

SD-07 Certificates 2.1.4Indoor Air Quality for Insulation

Materials 2.4.1Indoor Air Quality for Adhesives

SD-08 Manufacturer’s Instructions 3.3.1Insulation

07 22 00 SD-02 Shop Drawings

1.3 G DOInsulation Board Layout

1.3Verification of Existing Conditions

SD-03 Product Data

2.1 G DOInsulation

1.4 G DOCover Board

2.4 G DOFasteners

Sheathing Paper 2.3Moisture Control 2.1.2Recycled Content For Insulation

SD-06 Test Reports

1.8.1 G DOFlame Spread Rating

SD-07 Certificates

1.6 G ROInstaller Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 92 PAGES

07 22 00 1.6Certificates Of Compliance For Felt Materials

2.1.3Indoor Air Quality For Insulation SD-08 Manufacturer’s Instructions Fastener

07 27 10.00 10 SD-02 Shop Drawings

2.1 G DOAir Barrier System Shop

Drawings SD-03 Product Data

2.1 G DOAir Barrier System Product Data

SD-04 Samples Mock-Up

2.1Material Samples For Air Barrier System

SD-05 Design Data

1.8 G DODesign Data And Calculations

For The Air Barrier System SD-06 Test Reports

1.8 G RODesign Review Report

3.1.2 G ROTesting and Inspection

SD-07 Certificates

1.7 G ROAir Barrier Inspector

07 27 19.01 SD-01 Preconstruction Submittals

1.8.1 G ROQualifications of Manufacturer

1.8.2 G ROQualifications of Installer

SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 92 PAGES

07 27 19.01 1.4Self-adhering Air Barrier SD-03 Product Data

1.4 G DOSelf-adhering Air Barrier

2.2Primers, Adhesives, and Mastics 1.4.2Safety Data Sheets

SD-04 Samples 1.4Self-adhering Air Barrier

SD-06 Test Reports

1.6 G ROField Peel Adhesion Test

1.4.4 G ROFlame Propagation of Wall

Assemblies

1.4.4 G ROFlame Spread and Smoke

Developed Index Ratings

3.4.1 G ROSite Inspections and Testing

SD-07 Certificates

1.4 G ROSelf-adhering Air Barrier

SD-08 Manufacturer’s Instructions

1.4 G ROSelf-adhering Air Barrier

2.2 G ROPrimers, Adhesives, and Mastics

07 27 36 SD-01 Preconstruction Submittals

1.9.1 G ROQualification of Manufacturer

1.9.2 G ROQualification of Installer

1.10 G ROQuality Control Plan

1.10 G ROSafety Plan

1.8.1 G ROFire Prevention Plan

1.8.2 G RORespirator Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 92 PAGES

07 27 36 SD-02 Shop Drawings 1.5Spray Foam Air Barrier

1.10 G DOFoam Air Barrier System

1.5.1Fire-Rated Assemblies

SD-03 Product Data

1.13 G DOClosed Cell

2.1.2 G DOClosed Cell

1.13 G DOOpen Cell

2.2Transition Membrane 2.3Primers, Adhesives, and Mastics 2.5Sealants

1.5.2 G ROSafety Data Sheets

2.1.1Ignition Barrier Coatings 2.1.6Accessories 2.1.2Recycled Content for Closed Cell

Spray Foam Air Barrier SD-04 Samples

1.5Spray Foam Air Barrier SD-06 Test Reports

1.5.3Field Peel Adhesion Test 1.7Air Barrier Test

1.5.3 G DOFire-Ratings Of Thermal Barrier

Materials

1.5.3 G DOFlame Spread And Smoke

Developed Index Ratings Of SPF Products

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 92 PAGES

07 27 36 1.5.3 G DOFlame Propagation Of Wall Assemblies

3.4.1 G ROSite Inspections

SD-07 Certificates

1.13 G ROClosed cell

2.1.2 G ROClosed cell

1.13 G ROOpen cell

2.2Transition Membrane 2.1.5Indoor Air Quality for Spray Foam

Air Barrier SD-08 Manufacturer’s Instructions

1.6.1SPF Handling, Storage, and Spray Procedures

3.2.1Substrate Preparation 1.5.1Thermal Barrier 1.13Thermal Barrier 2.2Transition Membrane 2.3Primers, Adhesives, and Mastics

SD-09 Manufacturer’s Field Reports

1.10Core Samples 3.3.3Daily Work Record

07 53 23 SD-02 Shop Drawings Roof Plan Drawing; G, DO Wind Load Calculations; G, DO

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 92 PAGES

07 53 23 1.3.1Boundaries of Enhanced Perimeter

1.3.1Corner Attachments of Roof System Components

Slopes and Drain Locations; G, DO

SD-03 Product Data 2.2Cement

2.1.1 G DOEPDM Sheet

2.1.3Seam Tape 2.1.5Bonding Adhesive 2.1.4Lap Splice Adhesive 2.1.7Water Cutoff Mastic/Water Block 2.1.6Lap Cleaner, Lap Sealant, and

Edge Treatment 3.3Flashings 2.1.8Flashing Accessories 2.1.8.1Flashing Tape

Fasteners and Plates Roof Insulation; G, DO

1.8 G ROWarranty

SD-05 Design Data

1.4.4 G DOWind Uplift Calculations

SD-07 Certificates

1.4.1Qualification of Manufacturer 1.4.2Qualification of Applicator

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 92 PAGES

07 53 23 1.4.4 G DOWind Uplift Resistance 1.4.3Fire Resistance

SD-08 Manufacturer’s Instructions

3.2 G ROApplication

3.2.3 G ROApplication Method

3.3.2 G ROMembrane Flashing

2.1.3Seam Tape 3.2.4Tape Seams / Lap Splices 3.2.5Adhesive Seams / Lap Splices 3.2.6Perimeter Attachment 3.2.4Primer 3.2.7Fasteners

1.6 G ROCold Weather

SD-11 Closeout Submittals 1.8Warranty 3.9Information Card 3.8Instructions To Government

Personnel 07 60 00 SD-02 Shop Drawings

2.2.1Exposed Sheet Metal

3.1.17 G DOGutters

3.1.18 G DODownspouts

3.1.24 G DOExpansion Joints

2.2.1 G DOGravel Stops and fascia

3.1.19 G DOFlashing for Roof Drains

3.1.11 G DOBase Flashing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 92 PAGES

07 60 00 3.1.12 G DOCounterflashing

3.1.25 G DOFlashing at Roof Penetrations

and Equipment Supports

3.1.20 G DOScuppers

3.1.28 G DOCopings

3.1.16Drip Edges

3.1.21 G DOConductor Heads

3.1.22Eave Flashing 2.1Recycled Content

SD-04 Samples 1.4.2Finish Samples

SD-08 Manufacturer’s Instructions

1.4.3 G ROInstructions for Installation

SD-10 Operation and Maintenance Data

1.4.3 G ROCleaning and Maintenance

07 84 00 SD-02 Shop Drawings

2.1 G DOFirestopping System

SD-03 Product Data

2.2 G DOFirestopping Materials

SD-06 Test Reports

3.3Inspection SD-07 Certificates

2.2Firestopping Materials

1.5.1 G DOInstaller Qualifications

07 92 00 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 92 PAGES

07 92 00 2.1 G ROSealants 2.2Primers 2.3Bond Breakers 2.4Backstops

08 11 13 SD-02 Shop Drawings

2.1 G DODoors

2.1 G DODoors

2.5 G DOFrames

2.5 G DOFrames

2.3Accessories

SD-03 Product Data

2.1 G DODoors

2.1Recycled Content for Steel Door

Product

2.5 G DOFrames

2.5Recycled Content for Steel

Frame Product 2.3Accessories

SD-04 Samples

2.9.3 G DOFactory-applied Enamel Finish

08 11 16 SD-02 Shop Drawings

1.5.1 G DODoor and Frame Assembly

SD-03 Product Data

1.5.1 G DODoor and Frame Assembly

2.2.3Recycled Content of Aluminum

Material

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 92 PAGES

08 11 16 SD-04 Samples 1.5.2Finish Samples

SD-05 Design Data G DODesign Analysis

1.2.1 G DOCalculations

1.2.2 G DOAir Infiltration

1.2.3 G DOWater Penetration

1.2.4 G RONFRC Project Label Certificates

for Fenestration SD-08 Manufacturer’s Instructions

1.5.1 G RODoor and Frame Assembly

1.5.3 G ROAdjustments, Cleaning, and

Maintenance

1.2.4 G RONFRC Project Label Certificates

for Fenestration 08 14 00 SD-02 Shop Drawings

2.1 G DODoors

SD-03 Product Data

2.1 G DODoors

Recycled Content for Door Cores

2.2Accessories 1.5Warranty

2.1.2 G DOSound Transmission Class

Rating SD-04 Samples

2.1Doors

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 92 PAGES

08 14 00 2.3.6.3 G DODoor Finish Colors SD-06 Test Reports

2.4Cycle-Slam 2.4Hinge Loading Resistance

SD-07 Certificates 1.3.1Certificates of Grade

Certified Sustainably Harvested Stile and Rail Wood Doors

Certified Sustainably Harvested Flush Wood Doors

Indoor Air Quality for Particleboard and Agrifiber Door Cores

SD-11 Closeout Submittals 1.5Warranty

08 31 00 SD-02 Shop Drawings 1.3Access Doors And Panels

SD-03 Product Data

1.3 G DOAccess Doors And Panels

1.3.2 G ROHardware

2.2.8Accessories 2.1Recycled Content

SD-04 Samples

2.5 G DOFinishes

08 36 13 SD-02 Shop Drawings

2.2 G DODoors

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .