LHA 7 and LPD 28 Fitting Out Availability (FOA) and Post Shakedown Availability (PSA)

Award Notice Posted

Solicitation number
N00024-17-R-2472
Agency
Awarded
to National Steel And Shipbuilding Company
Set-aside
No set-aside

Opportunity facts

Contract number
N00024-18-C-2404 Federal contract award
NAICS code
336611 Ship Building and Repairing
PSC
Not on record
Place of performance
San Diego, California 92136, United States

Notice details come from SAM.gov. Updated .

Notice text

7 versions

Update #7 · Latest ·

The Naval Sea Systems Command (NAVSEA) has awarded a contract to General Dynamics National Steel and Shipbuilding (NASSCO), Harbor Drive & 28th Street San Diego, California 92113, for the procurement of the LHA 7 Fitting Out Availability (FOA) and Post Shakedown Availability (PSA). This contract was competitively awarded via a full and open competition under solicitation N00024-17-R-2472.

Update #6 ·

The purpose of this posting is to issue an amendment to solicitation N00024-17-R-2472 to extend the deadline for proposal submissions.  The revised deadline for proposal submissions, as specified in Amendment 0004, is 29 September 2017 @ 2:00PM EST.

Update #5 ·

The purpose of this posting is to issue an amendment to solicitation N00024-17-R-2472 to remove the requirement for LPD 28 FOA/PSA.  The requirement for the LHA 7 FOA/PSA remains unchanged.  This posting provides Amendment 0003 to N00024-17-R-2472, a Conformed Copy of N00024-17-R-2472 through Amendment 0003, and all revised exhibits and attachments which include: Exhibit A (CDRLs), Attachment L-B Cost Exhibit, Attachment J-1 CDRLs, and Attachment J-2 DD-254. 


It should be noted that the Government's requirement change occurred after the proposal submission deadline, but prior to proposal evaluation commencing.  Any proposal that was submitted in response to Amendment 0002, with a proposal submission deadline of 28 Aug 2017, was not opened, has not been evaluated, and will not be evaluated.


The revised deadline for proposal submissions, as specified in Amendment 0003, is 27 September 2017 @ 2:00PM EST.

Update #4 ·


The purpose of this posting is to provide an additional point of contact for any offerors planning on hand carrying proposal submissions.  As stated in the RFP, it is recommended that proposals be mailed in accordance with RFP instructions.  However, in the event an offeror plans on hand carrying proposals, the Government is adding an additional point of contact (POC).



In addition to Michael Brown and LTJG Carolynne Garcia, offerors should contact Tyler Rehwoldt to facilitate any in-person proposal drop off.  The contact information for each POC is provided below:


 


Tyler Rehwoldt:


(202) 781-5146


tyler.rehwoldt@navy.mil


 


Michael Brown:


(202)781-5250


michael.l.brown2@navy.mil


 


LTJG Carolynne Garcia:


(202) 781-1772


Carolynne.Garcia@navy.mil


Update #3 ·

The purpose of this posting is to issue Amendment 0001 and Amendment 0002 to solicitation N00024-17-2472.  A conformed copy of the solicitation through Amendment 0002 is also being posted to FBO with this posting.

As stated in Amendment 0001 and the Government Responses to Bidder Questions, the Government has added Annex 1 to Attachment L-C.  The documents contained in Annex 1 are not being posted to FBO.  The documents contained in Annex 1 can be obtained by emailing Carolynne Garcia at carolynne.garcia@navy.mil and Michael Brown at michael.l.brown2 @navy.mil.  Instructions for accessing the documents will be provided upon request. A Common Access Card (CAC) will be required in order to access the documents.

Update #2 ·

The purpose of this amendment is to issue the formal solicitation for the LHA 7 and LPD 28 Fitting Out Availability (FOA) and Post Shakedown Availability (PSA).

Update #1 ·

The Naval Sea Systems Command intends to issue solicitation N00024-17-R-2472 for the accomplishment of Fitting Out Availability (FOA) for LHA 7 (TRIPOLI) with an option for Post Shakedown Availability (PSA).  The solicitation also contains options for the accomplishment of FOA and PSA for LPD 28 (FORT LAUDERDALE).  For LHA 7, efforts will include an FOA of up to eight (8) weeks in FY19 to complete system installations and capabilities that were not part of the basic construction and that are necessary to support ship Post Delivery Test & Trial (PDT&T).  PSA of up to 20 weeks will follow in FY20.   For LPD 28, efforts will include an FOA of up to six (6) weeks in FY22 followed by a PSA of up to 18 weeks in FY23.  FOA/PSA efforts include all manpower, support services, material, and associated technical data and documents required to prepare for and accomplish these availabilities.  The work to be accomplished will include correction of Government responsible deficiencies, installation of approved engineering changes (that were not incorporated during the construction period) and new work identified between ship delivery and the start of FOA/PSA.  Efforts will include engineering and management support of FOA/PSA, testing and post repair sea trials, and other emergent work.  The proposed contract will include scope to allow for emergent availabilities to correct Government responsible deficiencies identified after delivery that must be corrected to support test & trials prior to the start of the FOA/PSA.  During FOA/PSA, the ships will be made available for completion of selected fleet funded repairs and changes.  Work on these two vessels will take place in the homeport of San Diego, CA and will be performed at Naval Base San Diego.  The solicitation will not include requirements for drydocking.

Files

Show all 11

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors