Attachment L-B - Cost Exhibit Rev. 1

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit A CPAF

FOA & PSA CLINs CLINs Format
ELEMENT OF COSTFY 2019FY 2020FY 2021TOTAL
Man HoursRateDollarsMan HoursRateDollarsMan HoursRateDollarsMan HoursDollars
DIRECT LABOR
Direct Labor Rate 10$0.00$0.000$0.00$0.000$0.00$0.000$0.00
Direct Labor Rate 20$0.00$0.000$0.00$0.000$0.00$0.000$0.00
Direct Labor Rate 30$0.00$0.000$0.00$0.000$0.00$0.000$0.00
Total Direct Labor0$0.000$0.000$0.000$0.00
INDIRECT COSTS
Labor Overhead 10%$0.000%$0.000%$0.00$0.00
Labor Overhead 20%$0.000%$0.000%$0.00$0.00
Labor Overhead 30%$0.000%$0.000%$0.00$0.00
Total Indirect$0.00$0.00$0.00$0.00
MATERIAL
Direct Material$0.00$0.00$0.00$0.00
Major Subcontrator 1 ($700K or greater)0$0.00$0.000$0.00$0.000$0.00$0.000$0.00
Major Subcontrator 2 ($700K or greater)0$0.00$0.000$0.00$0.000$0.00$0.000$0.00
Major Subcontrator 3 ($700K or greater)0$0.00$0.000$0.00$0.000$0.00$0.000$0.00
Subcontracts (less than $700K)$0.00$0.00$0.00$0.00
Total Material0$0.000$0.000$0.000$0.00
OTHER COSTS
Other Direct Costs$0.00$0.00$0.00$0.00
Travel$0.00$0.00$0.00$0.00
Total Other Costs$0.00$0.00$0.00$0.00
SubTotal Costs$0.00$0.00$0.00$0.00
G&A0%$0.000%$0.000%$0.00$0.00
Total Fee Bearing Cost$0.00$0.00$0.00$0.00
FCCCM0%$0.000%$0.000%$0.00$0.00
Total Estimated Cost$0.00$0.00$0.00$0.00
Award Fee0%$0.000%$0.000%$0.00$0.00
Base Fee0%$0.000%$0.000%$0.00$0.00
Award Fee$0.00
Total Fee0%$0.000%$0.000%$0.00$0.00
GRAND TOTAL$0.00$0.00$0.00$0.00
Total0000
NOTES:
This Exhibit A is for the Cost Plus Base and Award Fee Line Items for the FOA and PSA CLINs (CLINs 0001, 0002, 0003, ,0101, 0102, 0103). A separate Exhibit B is included in this file as a separate tab for the Cost Plus Fixed Fee Emergent Work CLINs.
The Offeror is required to completed this Cost Exhibit for EACH CLIN included in the solicitation. The Offeror shall NOT refer to any other portion of the cost proposal to meet this solicitation requirement.
The Offeror may revise this Exhibit as needed to reflect the Offeror's pricing methodology. However, all information contained herein (ie, Element of Cost, Man Hour, Rate, Dollar amount etc) must be included.
The Offeror must submit this document in unprotected Excel format, with all formulas visible and all fields editable. All cells containing derived data shall be presented together with the formulas used to derive the data.
All Elements of Cost, Man Hours, Rates, Dollars, etc. included in this Exhibit must be the same as those included and addresssed in other areas of the Offerors proposal.
All costs, rates, methodologies must be fully supported in the proposal in accordance with solicitation requirements.
Fiscal Year (FY) as used herein is the Government FY, defined as 01 October through 30 September. In the event the Offeror uses a different FY (i.e. Calendar Year of Contractor FY), the Offeror shall adjust as necessary and provide explanation of any changes made.
For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,
For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,
the number of man hours per year and the labor rate used to price the effort must be included.
The values provided herein must match the values included in other areas of the Cost proposal, and must match those values proposed in Section B of the solicitation

&R&"Arial,Bold"Attachment L-B - Exhibit A (CPAF LOE CLINs)&"Arial,Regular"

Exhibit B CPFF

Emergent Work CLINs
ELEMENT OF COSTFY 2019FY 2020FY 2021TOTAL
Man HoursRateDollarsMan HoursRateDollarsMan HoursRateDollarsMan HoursDollars
DIRECT LABOR
Direct Labor Rate 10$0.00$0.000$0.00$0.000$0.00$0.000$0.00
Direct Labor Rate 20$0.00$0.000$0.00$0.000$0.00$0.000$0.00
Direct Labor Rate 30$0.00$0.000$0.00$0.000$0.00$0.000$0.00
Total Direct Labor0$0.000$0.000$0.000$0.00
INDIRECT COSTS
Labor Overhead 10%$0.000%$0.000%$0.00$0.00
Labor Overhead 20%$0.000%$0.000%$0.00$0.00
Labor Overhead 30%$0.000%$0.000%$0.00$0.00
Total Indirect$0.00$0.00$0.00$0.00
MATERIAL
Direct Material$0.00$0.00$0.00$0.00
Major Subcontrator 1 ($700K or greater)0$0.00$0.000$0.00$0.000$0.00$0.000$0.00
Major Subcontrator 2 ($700K or greater)0$0.00$0.000$0.00$0.000$0.00$0.000$0.00
Major Subcontrator 3 ($700K or greater)0$0.00$0.000$0.00$0.000$0.00$0.000$0.00
Subcontracts (less than $700K)$0.00$0.00$0.000$0.00
Total Material0$0.000$0.000$0.000$0.00
OTHER COSTS
Other Direct Costs$0.00$0.00$0.00$0.00
Travel$0.00$0.00$0.00$0.00
Total Other Costs$0.00$0.00$0.00$0.00
SubTotal Costs$0.00$0.00$0.00$0.00
G&A0%$0.000%$0.000%$0.00$0.00
Total Fee Bearing Cost$0.00$0.00$0.00$0.00
FCCCM0%$0.000.0000%$0.000%$0.00$0.00
Total Estimated Cost$0.00$0.00$0.00$0.00
Fixed Fee0%$0.000%$0.000%$0.00$0.00
Award Fee$0.00
GRAND TOTAL$0.00$0.00$0.00$0.00
Total Manhours0
NOTES:
This Exhibit B is for the Cost Plus Fixed Fee Emergent Work CLINs. (CLINs 0004 and 0005) A separate Exhibit A is included in this file as a separate tab for the Cost Plus Base and Award Fee Line Items for the FOA and PSA CLINs.
The Offeror is required to completed this Cost Exhibit for EACH CLIN included in the solicitation. The Offeror shall NOT refer to any other portion of the cost proposal to meet this solicitation requirement.
The Offeror may revise this Exhibit as needed to reflect the Offeror's pricing methodology. However, all information contained herein (ie, Element of Cost, Man Hour, Rate, Dollar amount etc) must be included.
The Offeror must submit this document in unprotected Excel format, with all formulas visible and all fields editable. All cells containing derived data shall be presented together with the formulas used to derive the data.
All Elements of Cost, Man Hours, Rates, Dollars, etc. included in this Exhibit must be the same as those included and addresssed in other areas of the Offerors proposal.
All costs, rates, methodologies must be fully supported in the proposal in accordance with solicitation requirements.
Fiscal Year (FY) as used herein is the Government FY, defined as 01 October through 30 September. In the event the Offeror uses a different FY (i.e. Calendar Year or Contractor FY), the Offeror shall adjust as necessary and provide explanation of any changes made.
For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,
For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,For each Major Subcontractor, the Offeror is required to identifiy the Major Subcontractor by Name in the Element of Cost Column. If the Major Subcontractor is to provide a portion of the required Man Hours,

This is the start of the file's text. The full file is on GovTribe.