L24 Pier Rehab and column Repair
Closed Solicitation Posted
This opportunity was awarded. See its 2 award notices in the notice history.
- Solicitation number
- W912P923R0023
- Agency
-
ENDIST St Louis
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Y1KA Construction Of Dams
- Place of performance
- Clarksville, Missouri 63336, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Federal Contract Opportunity involves the rehabilitation of Lock and Dam 24, including the repair of seven piers and fifteen tainter gates. The contractor will also install Government Furnished Equipment as part of the project. The contract is an Indefinite Delivery, Indefinite Quantity (IDIQ) with an ordering period of five years, estimated to be worth between $25,000,000 - $100,000,000, and is expected to be awarded on 27-Jun-2023 with a performance period of 2190 calendar days.
Products and Services to be provided:
- Repair of seven piers and fifteen tainter gates at Lock and Dam 24.
- Installation of Government Furnished Equipment.
- Temporary support and demolition of existing concrete bridge support columns.
- Replacement of service bridge concrete support columns.
- Various tainter gate repairs, including installation of chain guide assemblies and connections, pocket wheels, chains, and existing side seal removal and reinstallation.
Notice text
5 versions
Update #5 · Latest ·
Amendment 0003
The purpose of this amendment is to remove clause 252.226-7002 Representation for Demonstration Project for Contractors Employing Persons w ith Disabilities. No other changes
Amendment 0002
The purpose of this amendment is to implenment changes as set forth in the Bidder Inquiry responses posted 17 July
2023, add Illinois Wage Rates, include the Small Business Commitment Template document, add updated Plans
Sheet SB-303 and Plans Sheet SB-304 (Attached), add updated Specifications (Attached) and provide the List of
Question and Answers from ProjNet (attached).
**Updated Description
LD24 Pier Rehab/Structural Column Repair
“Several major components at the LD24 facilities are in need of repair and rehabilitation. Work is anticipated to be accomplished with traditional river marine construction equipment, such as floating plant and barge mounted crane, staged at the gate bays of the dam in which the work is being done. The work will be performed in each bay behind provided bulkheads, which will be installed and removed by the Contractor.”
***(Attachment 4 is available to be sent via DoD SAFE upon request via email to angie.l.grimes@usace.army.mil and whitney.r.dee@usace.army.mil)
AMENDMENT 0001 - add Attachment 5 Plans
Update #4 ·
Amendment 0002
The purpose of this amendment is to implenment changes as set forth in the Bidder Inquiry responses posted 17 July
2023, add Illinois Wage Rates, include the Small Business Commitment Template document, add updated Plans
Sheet SB-303 and Plans Sheet SB-304 (Attached), add updated Specifications (Attached) and provide the List of
Question and Answers from ProjNet (attached).
**Updated Description
LD24 Pier Rehab/Structural Column Repair
“Several major components at the LD24 facilities are in need of repair and rehabilitation. Work is anticipated to be accomplished with traditional river marine construction equipment, such as floating plant and barge mounted crane, staged at the gate bays of the dam in which the work is being done. The work will be performed in each bay behind provided bulkheads, which will be installed and removed by the Contractor.”
***(Attachment 4 is available to be sent via DoD SAFE upon request via email to angie.l.grimes@usace.army.mil and whitney.r.dee@usace.army.mil)
AMENDMENT 0001 - add Attachment 5 Plans
Update #3 ·
**Updated Description
LD24 Pier Rehab/Structural Column Repair
“Several major components at the LD24 facilities are in need of repair and rehabilitation. Work is anticipated to be accomplished with traditional river marine construction equipment, such as floating plant and barge mounted crane, staged at the gate bays of the dam in which the work is being done. The work will be performed in each bay behind provided bulkheads, which will be installed and removed by the Contractor.”
***(Attachment 4 is available to be sent via DoD SAFE upon request via email to angie.l.grimes@usace.army.mil and whitney.r.dee@usace.army.mil)
AMENDMENT 0001 - add Attachment 5 Plans
Update #2 ·
LD24 Pier Rehab/Structural Column Repair
Several major components at the LD24 facilities are in need of repair and rehabilitation. Work is anticipated to be accomplished with traditional river marine construction equipment, such as floating plant and barge mounted crane, staged at the gate bays of the dam in which the work is being done. The work will be performed in each bay behind provided bulkheads, which will be installed and removed by the Government.
***(Attachment 4 is available to be sent via DoD SAFE upon request via email to angie.l.grimes@usace.army.mil and whitney.r.dee@usace.army.mil)
AMENDMENT 0001 - add Attachment 5 Plans
Update #1 ·
LD24 Pier Rehab/Structural Column Repair
Several major components at the LD24 facilities are in need of repair and rehabilitation. Work is anticipated to be accomplished with traditional river marine construction equipment, such as floating plant and barge mounted crane, staged at the gate bays of the dam in which the work is being done. The work will be performed in each bay behind provided bulkheads, which will be installed and removed by the Government.
***(Attachment 4 is available to be sent via DoD SAFE upon request via email to angie.l.grimes@usace.army.mil and whitney.r.dee@usace.army.mil)
Files
Show all 18
Notice history
| Notice | Type | Posted |
|---|---|---|
| L24 Pier Rehab and column Repair | Special Notice | |
| L24 Pier Rehab and column Repair | Award Notice | |
| L24 Pier Rehab and Column Repair | Award Notice | |
| This notice | Solicitation | |
| L24 Pier Rehab and column Repair | Pre-Solicitation | |
| L24 Pier Rehab and column Repair | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Lock and DAM 25 new 1, 200 FT lock navigation and ecosystem sustainability program (NESP) | ENDIST St Louis | No set-aside | |
| Thomas J O Brien Lock and Dam Major Rehabilitation - Construction, Chicago, Cook County, Illinois | ENDIST Chicago | No set-aside | |
| LLA Navigation Lock Switchgear | ENDIST Walla Walla | Total Small Business | |
| FY27 Texas City Ship Channel Main Channel and Turning Basin | ENDIST Galveston | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity