Amendment 0002 - LD24 Service Bridge and Tainter Gate Rehab Plans_Sheet SB-304 Revisions.pdf
PDF 347 KB Posted
- Attached to
- L24 Pier Rehab and column Repair
- Solicitation number
- W912P923R0023
About this file
This document is an engineering drawing amendment providing details for the temporary bridge support installation and removal procedures for repair work on Lock and Dam No. 24's Service Bridge and Tainter Gate in Pike County, Missouri. The repair work is being conducted under Solicitation No. W912P923R0023 issued by the Department of the Army Corps of Engineers Engineering District St. Louis for pier rehabilitation and column repair on L24. The engineering drawing specifies the existing bridge girder and Tainter gate dimensions, and provides a plan and elevation views detailing the suggested procedures for installing and removing the temporary support structure during the concrete repair work, including jacking, aligning and securing the bridge girder shoes, removing the existing concrete, installing new concrete with anchor bolts, and finally removing the temporary structure.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
7'-0"83'-0"7'-0"
90'-0"
10'-2 1/2"
TO BE REPAIRED
CONCRETE COLUMNS
AND REINSTALLED)
(TO BE REMOVED
CURTAIN WALL
DOWNSTREAM
UPSTREAM AND
TO BE REPLACED
CONCRETE BEAMS
A1
SCALE: 3/16" = 1'-0"
ELEVATION OF BRIDGE GIRDER (LOOKING UPSTREAM)
DS: AEC_Screen_FullSize.dscriptPD: AEC_pdf.pltcfg
2023/07/14
2023/07/14
S M
H
F O
R T
E M
P O
R A
R Y
B R
ID
G
E S
U P
P O
R T
IN
S
T A
L L
A T
IO
N
A N
D R
E M
O V
A L
P R
O C
E D
U R
E S
D A
M N
O S
E R
V
IC
E B
R
ID
G E
SB-304
C L
U
J A
D
J L
L
A N
S I
D
P
IK
E C
O U
N T
Y
M
IS
S O
U R
I
U P
P E
R M
IS
S
IS
S
IP
P
I
S E
R V
IC
E
B R
ID
G
E A
N D
T A
IN
T
E R
G A
T E
R E
H A
B
L O
C K
A N
D D
A M
N O
W
P
-2
-R -0
J U
N E
S T
L
O U
IS
M
O
S P
R U
C E
S T
S T
L
O U
IS
D
IS
T
R
IC
A N
S
E C
O U
N T
Y
M
IS
S O
U R
I
U P
P E
R M
IS
S
IS
S
IP
P
I
S E
R V
IC
E
B R
ID
G
E A
N D
T A
IN
T
E R
G A
T E
R E
H A
B
L O
C K
A N
D D
A M
N O
W
P
-2
-R -0
J U
N E
L
O U
IS
M
O
S P
R U
C E
S T
S T
L
O U
IS
D
IS
T
R
S
E C
O U
N T
Y
M
IS
S O
U R
I
U P
P E
R M
IS
S
IS
S
IP
P
I
S E
R V
IC
E
B R
ID
G
E A
N D
T A
IN
T
E R
G A
T E
R E
H A
B
L O
C K
A N
D D
A M
N O
W
P
-2
-R -0
J U
N E
L
O U
IS
M
O
S P
R U
C E
S T
S T
L
O U
IS
D
IS
T
R
S
E C
O U
N T
Y
M
IS
S O
U R
I
U P
P E
R M
IS
S
IS
S
IP
P
I
S E
R V
IC
E
B R
ID
G
E A
N D
T A
IN
T
E R
G A
T E
R E
H A
B
L O
C K
A N
D D
A M
N O
W
P
-2
-R -0
J U
N E
L
O U
IS
M
O
S P
R U
C E
S T
S T
L
O U
IS
D
IS
T
R
O
L
IC
IT
A
T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S I Z
E
S U
B M
IT
T
E D
B Y
D A
T E
C O
N T
R A
C T
N O
C
H E
C K
E D
B Y
D R
A W
N B
Y
IS
S
U E
D A
T E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
(FIXED END)
C/L GRIDER SUPPORT
FLOW
(FIXED END)
C/L GIRDER SUPPORT
(EXPANSION END)
C/L GIRDER SUPPORT
(EXPANSION END)
C/L GIRDER SUPPORT
BRIDGE GIRDER
EXISTING
OF THE PIER BEING REHABILITED)
/LDETAIL IS SYMMETRICAL ABOUT THE C
C/L PIER (SUPPORT CABLE
EL 471.00
EL 466.83
EL 483.00
EL 471.00
EL 456.00
SILL EL. 424.0
EL 456.00
EL. 454.00
EL. 456.00
EL. 471.00
EL. 483.00
B/GATE EL 459.80
(IN SLUNG POSITION)
APPROXIMATE WEIGHT=168,000 lbs
2-BRIDGE GIRDERS AND STEEL DECK
UPPER SHOE
LOWER SHOE
TEMPORARY SUPPORT STRUCTURE (SB-301)
WATER EL. VARIES
EXISTING CONCRETE PIER EXISTING CONCRETE PIER
ON UPSTREAM FACE OF GATE
CHAIN CONNECTION IS
TAINTER GATE
EL 467.72
CHAIN PIN
EXISTING CONCRETE PIER
COLUMN (TYP.)
EXISTING CONC.
BRIDGE GIRDER
EXISTING
BRIDGE GIRDER
EXISTING
STEEL RAIL STEEL DECK
END ELEVATION
(SUPPORT STRUCTURE NOT SHOWN)
8'0 4' 16'
BE AVAILABLE TO THE CONTRACTOR FOR USE
GOVERNMENT OWNED SUPPORT CABLE WILL NOT
AND SUPPLIED BY THE CONTRACTOR, EXISTING
OTHER MEANS OF SUPPORT MUST BE DESIGNED
REPAIRED (SEE SB-303). SUPPORT CABLE OR
GIRDER OPPOSITE FROM THE PIER BEING
GATE SUPPORT ATTACHED AT END OF BRIDGE
1 1
SUPPORT PLAN
AND INCLUDED IN CONTRACTOR'S TAINTER GATE
MUST BE ANALYZED FOR CONSTRUCTION LOADS
CONTRACTOR. IF USED, EXISTING CONNECTIONS
EXISTING CABLE CONNECTIONS MAY BE USED BY
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
REINSTALL UPSTREAM AND DOWNSTREAM PRECAST CURTAIN WALLS. 9.
REMOVE TEMPORARY SUPPORT STRUCTURE AND JACKS.8.
BRIDGE GIRDER SUPPORTED ON NEW CONCRETE, REMOVE GIRDER SUPPORT BOLTS AND RELEASE JACKS.7.
LOWER JACK, ALIGN AND FIT UPPER SHOE INTO LOWER SHOE AND REINSTALL BEARING PIN.6.
BRIDGE GIRDER AND TEMPORARY STRUCTURE SUPPORTED ON JACKS, LOOSEN, AND REMOVE BOLTS FROM TEMPORARY CONNECTION.5.
ALIGN LOWER SHOE OVER GROUT PAD AND ANCHOR BOLT SLEEVES EMBEDDED IN NEW CONCRETE. INSERT ANCHORS AND BOLT SHOE IN POSITION.4.
REPOSITION JACKS UNDER TEMPORARY STRUCTURE AND LOOSEN COLUMN BOLTS. JACK TO ALLOW ALIGNMENT OF SHOES.3.
BRIDGE GIRDER STILL SUPPORTED BY TEMPORARY SUPPORT STRUCTURE.2.
CONCRETE REPAIR COMPLETED (SEE NOTE 2).1.
REMOVAL OF TEMPORARY SUPPORT STRUCTURE*
SEE SB-303 FOR PLAN NOTES.1.
PLAN NOTES
OFFICER.
SUPPORT STRUCTURE. THE CONTRACTOR SHALL BE SOLEY RESPONSIBLE FOR THE ACTUAL PROCEDURE USED, WHICH SHALL BE APPROVED BY THE CONTRACTING
THESE ARE SUGGESTED GUIDELINES FOR GENERAL PROCEDURES TO BE USED BY THE CONTRACTOR FOR THE INSTALLATION AND REMOVAL OF THE TEMPORARY *
11. REMOVE EXISTING CONCRETE BRIDGE SUPPORT STRUCTURE AND REPLACE WITH NEW CONCRETE.
BURN OFF ANCHOR BOLTS. REMOVE LOWER SHOE AND STORE FOR LATER INSTALLATION.10.
CHIP CONCRETE UNDER LOWER SHOE TO EXPOSE FOUR ANCHOR BOLTS.9.
GROUT THE BASE PLATES AND BOLT COLUMNS IN PLACE. WHEN COMPLETED, LOWER JACKS AND REMOVE.8.
OF COLUMN BASE PLATES.
BRIDGE GIRDER SUPPORTED ON JACKS. REMOVE PINS FROM SHOE AND STORE PINS FOR REUSE. ONCE REMOVED, JACK ADDITIONAL 1/4" + TO ALLOW GROUTING 7.
JACK UP TEMPORARY SUPPORT AND BRIDGE GIRDER TO BREAK BEARING OF UPPER SHOE ON PIN.6.
POSITION JACKS UNDER TEMPORARY SUPPORT.5.
TORQUE BOLTS IN CONNECTION. FULLY TORQUED AT FIXED END, ALLOW FOR MOVEMENT AT EXPANSION END.4.
FIELD WELD CONNECTION TO FACE OF BRIDGE GIRDER.3.
ALIGN TEMPORARY SUPPORT CONNECTION WITH FACE OF BRIDGE GIRDER BY ADJUSTING WITH SLOTTED HOLES IN THE CONNECTION.2.
PLACE AND ALIGN TEMPORARY SUPPORT STRUCTURE. PLACE COLUMNS WITH LEVELING NUTS.1.
INSTALLATION OF TEMPORARY SUPPORT STRUCTURE*
FOR INFORMATION ONLY