Amendment 0002 - W912P923R0023.pdf

PDF 1 MB Posted

Attached to
L24 Pier Rehab and column Repair
Solicitation number
W912P923R0023
Issued by

About this file

This document is an amendment to a federal solicitation for pier rehabilitation and column repair work at Lock and Dam 24. The solicitation is issued by the U.S. Army Corps of Engineers St. Louis District and seeks bids for repairing and replacing bridge support columns, spans, gates, and other structures at the lock and dam over a five-year ordering period. The amendment provides responses to bidder inquiries, updated plans and specifications, wage determinations, and the list of questions and answers from the proposal system. Pricing is requested through multiple bid schedules for mobilization, column replacement, span work, gate repairs, debris removal, and general items for each annual ordering period.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See page 2.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 87

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 19-Jul-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P923R0023

X 9B. DATED (SEE ITEM 11)

27-Jun-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19-Jul-2023

CODE

CONTRACTING DIVISION

US ARMY ENGR DIST ST LOUIS

1222 SPRUCE STREET, RM 4.207

ST LOUIS MO 63103-2833

W912P9 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

Whitney Dee, Contracting Officer 314-331-8621 whitney.r.dee@usace.army.mil

W912P923R0023

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0002

The purpose of this amendment is to implenment changes as set forth in the Bidder Inquiry responses posted 17 July 2023, add Illinois Wage Rates, include the Small Business Commitment Template document, add updated Plans Sheet SB-303 and Plans Sheet SB-304 (Attached), add updated Specifications (Attached) and provide the List of Question and Answers from ProjNet (attached).

SECTION 00 00 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

The following have been modified:

BIDDING SCHEDULE

BIDDING SCHEDULE

EXHIBIT A

ORDERING PERIOD 1

(30 September 2023- 29 September 2024)

The Ordering Period 1 Bid Schedule is the work for the project. Additional Ordering Periods are included to allow for pricing adjustments as the IDIQ progresses through the five-year ordering period.

Item Estimated Unit Estimated No. Description Quantity Unit Price Amount

A001 Mobilization and Demobilization 1 JOB _ ___ ________

A002 Interim Mobilization 4 EA ____ _______

A003 Interim Demobilization 4 EA ____ _______

A004 LOCK & DAM 24 – Items for each Bridge Column Replacement

A004AA Temporary Supporting of Bridge, Demolition of Existing Concrete Bridge Support Columns – Pier 3

1 EA ____ _______

A004AB Replacement of Service Bridge

Concrete Support Columns – Pier 3

A004AC Temporary Supporting of Bridge, Bridge Support Columns – Pier 7

A004AD Replacement of Service Bridge

Concrete Support Columns – Pier 7

A004AE Temporary Supporting of Bridge, Bridge Support Columns – Pier 10

A004AF Replacement of Service Bridge

Concrete Support Columns – Pier 10

A004AG Temporary Supporting of Bridge, Bridge Support Columns – Pier 11

A004AH Replacement of Service Bridge

Concrete Support Columns – Pier 11

A004AI Temporary Supporting of Bridge, Bridge Support Columns – Pier 12

A004AJ Replacement of Service Bridge

Concrete Support Columns – Pier 12

A004AK Temporary Supporting of Bridge, Bridge Support Columns – Pier 14

A004AL Replacement of Service Bridge

Concrete Support Columns – Pier 14

A004AM Temporary Supporting of Bridge, Bridge Support Columns – Pier 15

A004AN Replacement of Service Bridge

Concrete Support Columns – Pier 15

1 EA ____ _______

A004AO Field Demonstration of Service Bridge Concrete Support Columns

A005 LOCK & DAM 24 – Items for each Span, Spans 1-15

A005AA

Blasting, Cleaning and Painting– Service Bridge Deck and Superstructure, Tainter Gate Exterior and Interior LD24 - Spans 1-15

15 EA _ ___ ________

A005AB

Bearing Shoe Bolt Replacement, Service Bridge LD24 – Spans 1-15

A005AC

Crane Rail Clip Replacement and Crane Rail Alignment Service Bridge

A005AD

Walkway Grating Replacement Service Bridge

A005AE

Tainter Gate Repairs, Installation of Chain Guide Assemblies and Connections, Pocket Wheels, Chains, Existing Side Seal Removal and Reinstallation LD24 - Gates 1-15

A005AF

Tainter Gate Repairs, Skin Plate Crack Repairs LD24 – Gates 1-15

20 EA _ ___ ________

A005AG

Bolted Cover Plate Installation

A005AH

Tainter Gate Repairs, End Shield Repair

10 EA _ ___ ________

A005AI

Tainter Gate Repairs, Bottom Strut Repair LD24 – Gate 3

1 EA _ ___ ________

A005AJ

Tainter Gate Repairs, Upper Skin Plate Damage Repair

A005AK

Debris Deflector Installation

A005AL

Tainter Gate Repairs, Interior Gate Member Replacement LD24 - Gates 1-15 MK. SG-548-1 (3/8" Gusset Plate)

A005AM

Gate Member Replacement LD24 - Gates 1-15 MK. SG-548-2 (3/8" Gusset Plate)

A005AN

Gate Member Replacement LD24 - Gates 1-15 MK. SG-548-3 (3/8" Gusset Plate)

A005AO

Gate Member Replacement LD24 - Gates 1-15 MK. SG-548-4 (3/8" Gusset Plate)

A005AP

Gate Member Replacement LD24 - Gates 1-15 MK. SG-548-5 (3/8" Gusset Plate)

A005AQ

Gate Member Replacement LD24 - Gates 1-15 MK. SG-548-6 (3/8" Gusset Plate)

A005AR

Gate Member Replacement LD24 - Gates 1-15 MK. SG-548-7 (MC6x15.1)

A005AS

Gate Member Replacement LD24 - Gates 1-15 SG-548-8 (MC6x15.1)

A005AT

Gate Member Replacement LD24 - Gates 1-15 SG-548-9 (L4x4x3/8)

A005AU

Gate Member Replacement LD24 - Gates 1-15 SG-548-10 (L4x4x3/8)

A005AV

Gate Member Replacement LD24 - Gates 1-15 SG-548-11 (L5x3-1/2x3/8)

A005AW

Gate Member Replacement LD24 - Gates 1-15 SG-548-12 (L5x3-1/2x3/8)

A005AX

Gate Member Replacement LD24 - Gates 1-15 SG-548-13 (L5x3-1/2x3/8)

A005AY

Gate Member Replacement LD24 - Gates 1-15 SG-548-14 (L5x3-1/2x3/8)

A005AZ

Gate Member Replacement LD24 - Gates 1-15 MK. SG-548-15 (L6x4x3/8)

A005BA

Tainter Gate Debris Removal,

a. First 150 cubic yards 150 CY _ ___ ________

b. All over 150 cubic yards 150 CY _ ___ ________

A006 LOCK & DAM 24 – Items Each for Span 16

A006AA

Service Bridge Deck and Superstructure LD24 – Span 16

A006AB

Service Bridge

A006AC

Crane Rail Alignment Service Bridge

A006AD

Service Bridge LD24 - Span 16

ABBREVIATIONS

JOB Job EA Each CY Cubic Yard

A007 GENERAL ITEMS

A007AA Service Bridge Gusset Replacement 60 EA _ ___ ________

A007AB Service Bridge Rivet Replacement

a. First 100 each 100 EA _ ___ ________

b. All over 100 each 100 EA ____ _______

A007AC

Tainter Gate Rivet Replacement LD24 - Gates 1-16

a. First 1000 each 1000 EA _ ___ ________

b. All over 1000 each 4000 EA _ ___ ________

GRAND

TOTAL

EXHIBIT B

ORDERING PERIOD 2

(30 September 2024 - 29 September 2025)

B001 Mobilization and Demobilization 1 JOB _ ___ ________

B002 Interim Mobilization 4 EA ____ _______

B003 Interim Demobilization 4 EA ____ _______

B004 LOCK & DAM 24 – Items for each Bridge Column Replacement

B004AA Temporary Supporting of Bridge, B004AB Replacement of Service Bridge

B004AC Temporary Supporting of Bridge, B004AD Replacement of Service Bridge

B004AE Temporary Supporting of Bridge, B004AF Replacement of Service Bridge

B004AG Temporary Supporting of Bridge, B004AH Replacement of Service Bridge

B004AI Temporary Supporting of Bridge, B004AJ Replacement of Service Bridge

B004AK Temporary Supporting of Bridge, B004AL Replacement of Service Bridge

B004AM Temporary Supporting of Bridge, B004AN Replacement of Service Bridge

1 EA ____ _______

B004AO Field Demonstration of Service

B005 LOCK & DAM 24 – Items for each Span, Spans 1-15

B005AA

Service Bridge Deck and Superstructure, Tainter Gate Exterior and Interior

B005AB

Service Bridge

B005AC

Crane Rail Alignment Service Bridge

B005AD

Service Bridge

B005AE

of Chain Guide Assemblies and Connections, Pocket Wheels, Chains, Existing Side Seal Removal and Reinstallation

B005AF

Crack Repairs

B005AG

Bolted Cover Plate Installation

B005AH

Repair

B005AI

Repair

B005AJ

Plate Damage Repair

B005AK

Debris Deflector Installation

B005AL

Gate Member Replacement LD24 - Gates 1-15

B005AM

Gate Member Replacement LD24 - Gates 1-15

B005AN

Gate Member Replacement LD24 - Gates 1-15

B005AO

Gate Member Replacement LD24 - Gates 1-15

B005AP

Gate Member Replacement LD24 - Gates 1-15

B005AQ

Gate Member Replacement LD24 - Gates 1-15

B005AR

Gate Member Replacement LD24 - Gates 1-15

B005AS

Gate Member Replacement LD24 - Gates 1-15

B005AT

Gate Member Replacement LD24 - Gates 1-15

B005AU

Gate Member Replacement LD24 - Gates 1-15

B005AV

Gate Member Replacement LD24 - Gates 1-15

B005AW

Gate Member Replacement LD24 - Gates 1-15

B005AX

Gate Member Replacement LD24 - Gates 1-15

B005AY

Gate Member Replacement LD24 - Gates 1-15

A005AZ

Gate Member Replacement LD24 - Gates 1-15

B005BA

c. First 150 cubic yards 150 CY _ ___ ________

d. All over 150 cubic yards 150 CY _ ___ ________

B006 LOCK & DAM 24 – Items Each for Span 16

B006AA

Service Bridge Deck and Superstructure

B006AB

Service Bridge

B006AC

Crane Rail Alignment Service Bridge

B006AD

Service Bridge

EA Each

B007 GENERAL ITEMS

B007AA Service Bridge Gusset Replacement 60 EA _ ___ ________

B007AB Service Bridge Rivet Replacement

c. First 100 each 100 EA _ ___ ________

d. All over 100 each 100 EA ____ _______

B007AC

c. First 1000 each 1000 EA _ ___ ________

d. All over 1000 each 4000 EA _ ___ ________

CY Cubic Yard

EXHIBIT C

ORDERING PERIOD 3

(30 September 2025- 29 September 2026)

C001 Mobilization and Demobilization 1 JOB _ ___ ________

C002 Interim Mobilization 4 EA ____ _______

C003 Interim Demobilization 4 EA ____ _______

C004 LOCK & DAM 24 – Items for each Bridge Column Replacement

C004AA Temporary Supporting of Bridge, C004AB Replacement of Service Bridge

C004AC Temporary Supporting of Bridge, C004AD Replacement of Service Bridge

C004AE Temporary Supporting of Bridge, C004AF Replacement of Service Bridge

C004AG Temporary Supporting of Bridge, C004AH Replacement of Service Bridge

C004AI Temporary Supporting of Bridge, C004AJ Replacement of Service Bridge

C004AK Temporary Supporting of Bridge, C004AL Replacement of Service Bridge

C004AM Temporary Supporting of Bridge, C004AN Replacement of Service Bridge

1 EA ____ _______

C004AO Field Demonstration of Service

C005 LOCK & DAM 24 – Items for each Span, Spans 1-15

C005AA

Service Bridge Deck and Superstructure, Tainter Gate Exterior and Interior

C005AB

Service Bridge

C005AC

Crane Rail Alignment Service Bridge

C005AD

Service Bridge

C005AE

of Chain Guide Assemblies and Connections, Pocket Wheels, Chains, Existing Side Seal Removal and Reinstallation

C005AF

Crack Repairs

C005AG

Bolted Cover Plate Installation

C005AH

Repair

C005AI

Repair

C005AJ

Plate Damage Repair

C005AK

Debris Deflector Installation

C005AL

Gate Member Replacement LD24 - Gates 1-15

C005AM

Gate Member Replacement LD24 - Gates 1-15

C005AN

Gate Member Replacement LD24 - Gates 1-15

C005AO

Gate Member Replacement LD24 - Gates 1-15

C005AP

Gate Member Replacement LD24 - Gates 1-15

C005AQ

Gate Member Replacement LD24 - Gates 1-15

C005AR

Gate Member Replacement LD24 - Gates 1-15

C005AS

Gate Member Replacement LD24 - Gates 1-15

C005AT

Gate Member Replacement LD24 - Gates 1-15

C005AU

Gate Member Replacement LD24 - Gates 1-15

C005AV

Gate Member Replacement LD24 - Gates 1-15

C005AW

Gate Member Replacement LD24 - Gates 1-15

C005AX

Gate Member Replacement LD24 - Gates 1-15

C005AY

Gate Member Replacement LD24 - Gates 1-15

C005AZ

Gate Member Replacement LD24 - Gates 1-15

C005BA

e. First 150 cubic yards 150 CY _ ___ ________

f. All over 150 cubic yards 150 CY _ ___ ________

C006 LOCK & DAM 24 – Items Each for Span 16

C006AA

Service Bridge Deck and Superstructure

C006AB

Service Bridge

C006AC

Crane Rail Alignment Service Bridge

C006AD

Service Bridge

EA Each

C007 GENERAL ITEMS

C007AA Service Bridge Gusset Replacement 60 EA _ ___ ________

C007AB Service Bridge Rivet Replacement

e. First 100 each 100 EA _ ___ ________

f. All over 100 each 100 EA ____ _______

C007AC

e. First 1000 each 1000 EA _ ___ ________

f. All over 1000 each 4000 EA _ ___ ________

EXHIBIT D

ORDERING PERIOD 4

(30 September 2026- 29 September 2027)

D001 Mobilization and Demobilization 1 JOB _ ___ ________

D002 Interim Mobilization 4 EA ____ _______

D003 Interim Demobilization 4 EA ____ _______

D004 LOCK & DAM 24 – Items for each Bridge Column Replacement

D004AA Temporary Supporting of Bridge, D004AB Replacement of Service Bridge

D004AC Temporary Supporting of Bridge, D004AD Replacement of Service Bridge

D004AE Temporary Supporting of Bridge, D004AF Replacement of Service Bridge

D004AG Temporary Supporting of Bridge, D004AH Replacement of Service Bridge

D004AI Temporary Supporting of Bridge, D004AJ Replacement of Service Bridge

D004AK Temporary Supporting of Bridge, D004AL Replacement of Service Bridge

D004AM Temporary Supporting of Bridge, D004AN Replacement of Service Bridge

1 EA ____ _______

D004AO Field Demonstration of Service

D005 LOCK & DAM 24 – Items for each Span, Spans 1-15

D005AA

Service Bridge Deck and Superstructure, Tainter Gate Exterior and Interior

D005AB

Service Bridge

D005AC

Crane Rail Alignment Service Bridge

D005AD

Service Bridge

D005AE

of Chain Guide Assemblies and Connections, Pocket Wheels, Chains, Existing Side Seal Removal and Reinstallation

D005AF

Crack Repairs

D005AG

Bolted Cover Plate Installation

D005AH

Repair

D005AI

Repair

D005AJ

Plate Damage Repair

D005AK

Debris Deflector Installation

D005AL

Gate Member Replacement LD24 - Gates 1-15

D005AM

Gate Member Replacement LD24 - Gates 1-15

D005AN

Gate Member Replacement LD24 - Gates 1-15

D005AO

Gate Member Replacement LD24 - Gates 1-15

D005AP

Gate Member Replacement LD24 - Gates 1-15

D005AQ

Gate Member Replacement LD24 - Gates 1-15

D005AR

Gate Member Replacement LD24 - Gates 1-15

D005AS

Gate Member Replacement LD24 - Gates 1-15

D005AT

Gate Member Replacement LD24 - Gates 1-15

D005AU

Gate Member Replacement LD24 - Gates 1-15

D005AV

Gate Member Replacement LD24 - Gates 1-15

D005AW

Gate Member Replacement LD24 - Gates 1-15

D005AX

Gate Member Replacement LD24 - Gates 1-15

D005AY

Gate Member Replacement LD24 - Gates 1-15

D005AZ

Gate Member Replacement LD24 - Gates 1-15

D005BA

g. First 150 cubic yards 150 CY _ ___ ________

h. All over 150 cubic yards 150 CY _ ___ ________

D006 LOCK & DAM 24 – Items Each for Span 16

D006AA

Service Bridge Deck and Superstructure

D006AB

Service Bridge

D006AC

Crane Rail Alignment Service Bridge

D006AD

Service Bridge

EA Each

D007 GENERAL ITEMS

D007AA Service Bridge Gusset Replacement 60 EA _ ___ ________

D007AB Service Bridge Rivet Replacement

g. First 100 each 100 EA _ ___ ________

h. All over 100 each 100 EA ____ _______

D007AC

g. First 1000 each 1000 EA _ ___ ________

h. All over 1000 each 4000 EA _ ___ ________

EXHIBIT E

ORDERING PERIOD 5

(30 September 2027- 29 September 2028)

E001 Mobilization and Demobilization 1 JOB _ ___ ________

E002 Interim Mobilization 4 EA ____ _______

E003 Interim Demobilization 4 EA ____ _______

E004 LOCK & DAM 24 – Items for each Bridge Column Replacement

E004AA Temporary Supporting of Bridge, E004AB Replacement of Service Bridge

E004AC Temporary Supporting of Bridge, E004AD Replacement of Service Bridge

E004AE Temporary Supporting of Bridge, E004AF Replacement of Service Bridge

E004AG Temporary Supporting of Bridge, E004AH Replacement of Service Bridge

E004AI Temporary Supporting of Bridge, E004AJ Replacement of Service Bridge

E004AK Temporary Supporting of Bridge, E004AL Replacement of Service Bridge

E004AM Temporary Supporting of Bridge, E004AN Replacement of Service Bridge

1 EA ____ _______

E004AO Field Demonstration of Service

E005 LOCK & DAM 24 – Items for each Span, Spans 1-15

E005AA

Service Bridge Deck and Superstructure, Tainter Gate Exterior and Interior

E005AB

Service Bridge

E005AC

Crane Rail Alignment Service Bridge

E005AD

Service Bridge

E005AE

of Chain Guide Assemblies and Connections, Pocket Wheels, Chains, Existing Side Seal Removal and Reinstallation

E005AF

Crack Repairs

E005AG

Bolted Cover Plate Installation

E005AH

Repair

E005AI

Repair

E005AJ

Plate Damage Repair

E005AK

Debris Deflector Installation

E005AL

Gate Member Replacement LD24 - Gates 1-15

E005AM

Gate Member Replacement LD24 - Gates 1-15

E005AN

Gate Member Replacement LD24 - Gates 1-15

E005AO

Gate Member Replacement LD24 - Gates 1-15

E005AP

Gate Member Replacement LD24 - Gates 1-15

E005AQ

Gate Member Replacement LD24 - Gates 1-15

E005AR

Gate Member Replacement LD24 - Gates 1-15

E005AS

Gate Member Replacement LD24 - Gates 1-15

E005AT

Gate Member Replacement LD24 - Gates 1-15

E005AU

Gate Member Replacement LD24 - Gates 1-15

E005AV

Gate Member Replacement LD24 - Gates 1-15

E005AW

Gate Member Replacement LD24 - Gates 1-15

E005AX

Gate Member Replacement LD24 - Gates 1-15

E005AY

Gate Member Replacement LD24 - Gates 1-15

E005AZ

Gate Member Replacement LD24 - Gates 1-15

E005BA

i. First 150 cubic yards 150 CY _ ___ ________

j. All over 150 cubic yards 150 CY _ ___ ________

E006 LOCK & DAM 24 – Items Each for Span 16

E006AA

Service Bridge Deck and Superstructure

E006AB

Service Bridge

E006AC

Crane Rail Alignment Service Bridge

E006AD

Service Bridge

EA Each

E007 GENERAL ITEMS

E007AA Service Bridge Gusset Replacement 60 EA _ ___ ________

E007AB Service Bridge Rivet Replacement

i. First 100 each 100 EA _ ___ ________

j. All over 100 each 100 EA ____ _______

E007AC

i. First 1000 each 1000 EA _ ___ ________

j. All over 1000 each 4000 EA _ ___ ________

BIDDING SCHEDULE NOTES

1. All quantities shown on the BIDDING SCHEDULE are estimated quantities except when the unit is shown as job "JOB".

2. When bids are solicited on a unit price basis, bidders shall insert in the spaces provided therefore in the SCHEDULE both the "unit price" and the "estimated amount" resulting from applying the said unit price to the estimated quantity shown. In event the bidder quotes only a total price ("estimated amount") in its bid and fails to quote the unit price, the Government will determine such unit price by dividing the total price quoted by the quantity of the item set out in the SCHEDULE. The bidder agrees that the unit price so determined shall be used for the purpose of bid evaluation, award and all payments to the Contractor including final payment.

3. All extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the bid and the extension will be corrected accordingly.

4. If a modification to a bid based on unit prices is submitted, which provides for a total adjustment to the total estimated cost, the application of the total adjustment to each unit price in the bid schedule must be stated. If it is not stated, the bidder agrees that the total adjustment shall be applied on a pro rata basis to every unit price in the bid schedule.

5. Bidders are required to bid on all items listed on the Bidding Schedule in addition to inserting a total quoted bid in the appropriate space provided. Failure to do so will be considered good cause to disqualify the bid.

ORDERING PROCEDURES

1. The Government may issue a Task Order for specific quantities of the pre-priced items from the set price schedule of the contract without issuing a Request for Proposal.

2. The Government may send an email Request for Proposal for a Task Order, which will request proposed quantities of the pre-priced items from the set price schedule of the contract. The Contractor will have 14 calendar days, unless otherwise specified in the RFP, to provide a proposal of quantities to perform the Task Order work.

3. The Base Contract includes the Specifications and Drawings/Plans, which apply to all task orders issued.

SECTION 00 10 00 - SOLICITATION

The contractor period of performance end date has decreased by 365 days from 2190 days to 1825 days.

SECTION 00 70 00 - CONDITIONS OF THE CONTRACT

52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.

The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-

(c) The amount of the bid guarantee shall be 20% percent of the bid price or $3,000,000.00, whichever is less.-

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of provision)

SECTION 01 00 00 - GENERAL REQUIREMENTS

The following have been added by full text:

ILLINOIS WAGE DETERMINATION

"General Decision Number: IL20230017 06/02/2023

Superseded General Decision Number: IL20220017

State: Illinois

Construction Types: Heavy and Highway

Counties: Bond, Calhoun, Clinton, Greene, Jersey, Macoupin, Madison, Monroe, Montgomery, St Clair and Washington Counties in Illinois.

MACOUPIN (upper 1/2) & MONTGOMERY (upper 1/2, INCLUDING

WAGGONER, STANDARD CITY, & NORTH THEREOF) COUNTIES:

HEAVY CONSTRUCTION PROJECTS (including Sewer & Water Line

Construction & Drainage Projects) & HIGHWAY CONSTRUCTION PROJECTS (excluding tunnels, building structures in rest area projects, and railroad construction; bascule, suspension & spandrel arch bridges; bridges designed for commercial navigation; bridges involving marine construction, other major bridges).

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).

|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $16.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2023. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.15 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2023. |

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/06/2023 1 01/20/2023 2 03/03/2023 3 03/17/2023 4 04/07/2023 5 06/02/2023

CARP0270-015 05/01/2017

Rates Fringes

CARPENTER........................$ 32.15 25.97

PILEDRIVERMAN....................$ 33.15 25.97

CARP0270-023 05/15/2020

GREENE COUNTY

Rates Fringes

CARPENTER........................$ 35.05 28.57

PILEDRIVERMAN....................$ 35.05 28.57

CARP0500-001 05/01/2021

CLINTON, MONROE, and WASHINGTON COUNTIES

Rates Fringes

Carpenter & Piledrivermen........$ 41.36 18.90

CARP0500-003 05/01/2021

ST. CLAIR COUNTY

Rates Fringes

Carpenter and Piledriver.........$ 41.36 18.90

CARP0664-003 05/01/2021

MADISON COUNTY

Rates Fringes

Carpenter and Piledriver.........$ 41.36 18.90

CARP0664-006 05/01/2021

BOND, CALHOUN, and JERSEY COUNTIES

Rates Fringes

CARPENTER........................$ 41.36 18.90

ELEC0146-012 06/01/2022

MONTGGOMERY COUNTY (East of Butler Grove, Grisham, Hillsboro & Raymond Twps)

Rates Fringes

ELECTRICIAN......................$ 41.00 20.68

ELEC0193-003 06/01/2022

MACOUPIN (Barr, Girard, Nilwood, North & South Otter, North & South Palmyra aand Virden Twps), AND MONTGOMERY (Bois D' Arc, Harvel and Pitman Twps) COUNTIES

ELECTRICIAN......................$ 39.36 5%+18.95

ELEC0193-011 04/03/2023

MACOUPIN (Townships of Scottville, North Palmyra, North Otter, Virden, Girard, Barr, South Palmyra, South Otter, and Nilwood) and MONTGOMERY (Townships of Bois D'Arc, Pitman, and Harvel)

COUNTIES

Line Construction Groundman - Equipment Operator (Class I, all crawler type equipment larger than D-4, 15 ton crane or larger)............$ 54.21 29.5%+7.00 Groundman - Truck Driver (with winch, may operate diggers, 5th wheel type trucks, crawler-type equipment, D-4 and smaller, backhoe 3/4 yard and under, rubber tire and crawler w/end loader, and may drive bucket truck and live boom type line trucks).$ 41.10 29.5%+7.00 Groundman - Truck Driver (without winch).............$ 38.71 29.5%+7.00 Groundman (Class A).........$ 36.82 29.5%+7.00 Lineman & Substation Tech...$ 60.34 29.5%+7.00

* ELEC0309-002 12/05/2022

BOND (Westside), CLINTON, GREENE (ALL WORK PERFORMED ON THE

ILLINOIS POWER COMPANY PROPERTY), JERSEY (ALL WORK PERFORMED ON

THE ILLINOIS POWER COMPANY PROPERTY), MACOUPIN (EXCEPT North 1/3 & Southwest Corner), MADISON (EXCEPT East ALTON, ALTON, WOOD RIVER & HARTFORD), MONROE, MONTGOMERY (East of ROUNDTREE, IRVING & East FORK TWP.), RANDOLPH (PORTION OF RED BUD TOWNSHIP), ST. CLAIR, and WASHINGTON (OKAWVILLE & VENEDY

TWPS.) COUNTIES

Rates Fringes

LINE CONSTRUCTION

Cable Splicer; Lineman Welder......................$ 63.79 42.15% Groundman Equipment Operator....................$ 52.84 42.15% Groundman Truck Driver......$ 43.13 42.15% Groundman...................$ 39.45 42.15% Lineman.....................$ 60.75 42.15%

ELEC0309-003 08/30/2021

BOND (Western Half), CLINTON (EXCLUDES HUEY, HOFFMAN, & VIC.), MACOUPIN (EXCLUDES BRIGHTON TWP., ATHENVILLE, SCOTTVILLE, GIRARD & AREA N. THEREOF), MADISON (EXCLUDES ALTON, E. ALTON, HARTFORD & WOOD RIVER), MONROE, MONTGOMERY (WEST OF BUTLER

GROVE, GRISHAM, HILLSBOROUGH & RAYMOND TWPS), ST. CLAIR and

WASHINGTON (VENEDY TWP) COUNTIES

ELECTRICIAN......................$ 43.09 57.96%

ELEC0649-002 01/06/2020

CALHOUN, GREENE, JERSEY, MACOUPIN (SOUTHWEST CORNER), AND

MADISON (E. ALTON, ALTON, WOOD RIVER & HARTFORD) COUNTIES

Rates Fringes

Line Construction

BLASTER.....................$ 53.45 29%+9.25

EQUIPMENT OPERATOR..........$ 45.78 29%+9.25

GROUNDMAN - TRUCK DRIVER

W/WINCH.....................$ 34.18 29%+9.25

GROUNDMAN - TRUCK DRIVER

WO/WINCH....................$ 30.18 29%+9.25

GROUNDMAN...................$ 29.38 29%+9.25

LINEMAN; AND LINEMAN HOLE

BORING MACHINE OPERATOR.....$ 53.45 29%+9.25

ELEC0649-008 01/03/2022

CALHOUN, GREEN, JERSEY, MACOUPIN (SOUTHWEST CORNER), AND

MADISON (ALTON, E. ALTON, HARTFORD & WOOD RIVER) COUNTIES

Rates Fringes

ELECTRICIAN......................$ 46.34 25.30

ELEC0702-002 01/02/2023

ALEXANDER, CLAY, CRAWFORD, EDWARDS, EFFINGHAM, FRANKLIN,

FAYETTE (Excludes portion North Avena), GALLATIN, HAMILTON, HARDIN, JACKSON, JASPER, JEFFERSON, JOHNSON, LAWRENCE, MARION, MASSAC, PERRY, POPE, PULASKI, RANDOLPH (Except Red Bud Twps), RICHLAND, SALINE, UNION, WABASH, WAYNE, WHITE, AND WILLIAMSON

COUNTIES;

CLARK, COLES (Southern Half), CUMBERLAND, MOULTRIE (Whitley TWP), and SHELBY (Except West of Holland, Prairie, Richland, & Windsor TWPS) COUNTIES;

BOND (Eastern Half), and WASHINGTON (OKAWVILLE & VENDY TWPS)

COUNTIES

Rates Fringes

Line Construction Groundman - Class A.........$ 35.64 29%+8.35 Groundman - Equipment Operator Class II (all other equipment)............$ 43.40 29%+8.35 Heavy - Equipment Operator Class I (all crawler type equipment D-4 and larger)...$ 48.67 29%+8.35 Lineman.....................$ 61.16 29%+8.35

ELEC0702-017 01/01/2023

BOND (Eastern Half), CLINTON (Huey, Hoffman, & Vicinity), AND WASHINGTON (Except Venedy TWP) COUNTIES

ELECTRICIAN......................$ 47.90 27.76

ENGI0520-005 08/01/2022

Rates Fringes

POWER EQUIPMENT OPERATOR

Group 01....................$ 42.45 34.95 Group 02....................$ 41.32 34.95 Group 03....................$ 36.84 34.95 Group 04....................$ 43.45 34.95 Group 05....................$ 44.45 34.95 Group 06....................$ 45.00 34.95 Group 07....................$ 45.30 34.95 Group 08....................$ 45.60 34.95 Group 09....................$ 46.25 34.95 Group 10....................$ 46.75 34.95 Group 11....................$ 44.45 34.95 Group 12....................$ 45.45 34.95

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Cranes, Draglines, Shovels, Skimmer Scoops, Clamshells or Derrick Boats, Pile Drivers, Crane-Type

Backhoes, Asphalt Plant Operators, Concrete Plant Operators, Dredges, Asphalt Spreading Machines, Screws on Asphalt Spreading Machines, All Locomotives, Cable Ways or Tower Machines, Hoists, Hydraulic Backhoes, Ditching Machines, or Backfiller, Cherrypickers, overhead Cranes, Roller, Steam or Gas, Concrete Pavers, Excavator Concrete Breakers, Concrete Pumps, Bulk Cement Plants, Cement Pumps, DerrickType Drills, Boat Operators, Motor Graders or Pushcats, Scoops or Toumapulls, Bulldozers, Endloaders or Fork Lifts, Power Blade or Elevating Graders, Winch Cats, Boom or Winch Trucks or Boom Tractors, Pipe Wrapping or Painting Machines, Asphalt Plant Engineer, Journeyman Lubricating Engineer, Drills (other than derrick type), Mud Jacks, or Well Drilling Machines, Boring Machines or Track Jacks, Mixers, Conveyors (two), Air Compressors (two) Water Pumps, regardless of size (two), Welding Machines (two), Siphons or Jets (two), Winch Head or Apparatuses (two), Light Plants (two), Waterblasters (two), all Tractors, regardless of size (straight tractor only), Fireman on Stationary Boilers, Automatic Elevators, Form Grading Machines, Finishing Machines, Power Sub-Grader or Ribbon Machines, Longitudinal Floats, Distributor Operators on Trucks, Winch Heads or Apparatuses (one), Mobil Track air and heaters (two to five), Heavy Equipment Greaser, Relief Operator, Assistant Master Mechanic and Heavy Duty Mechanic, concrete saws of all types and sizes with their attachments, gobhoppers, excavators all sizes, the repair, greasing, and fueling of all diesel hammers, the operation, set-up and cleaning ofbidwells, concrete placement booms, the alterations, repair of all barges, water blasters of all sizes and their clutches, mobile lifts, hydraulic jacks where used for hoisting, diesel or gas powered flashing sings used for traffic control, micro pavers, log skiders, iceolators used on and off of pipeline, condor cranes, drill rigs of all sizes, bow boats, survey boats, ross carriers, bob-cats and all their attachments, skid steer loaders and all their attachments, creter crane, direct drive electric motors the bolting and unbolting the adjusting and shimming, (dewateringjobs, whirley crane, conveyor belts) etc., batch plants (all sizes), roto mills, conveyors systems of any size and any configuration, hydroseeders and strawblowers all sizes, operation, repair, service of all vibratory hammers, all power pacs and their controls regardless of location, curtains or brush burning machines, stump cutter machines, grout machines regardless of size, Nail launchers when mounted on a machine or self-propelled, con-cover machines, Goldhofer and similar S.P.M.T. (self-propelled modular transpmiers) heavy transport units and all Operators (except those listed below).

Group 2: Assistant Operators

GROUP 3: Air Compressor One; Water Pump regardless of size One; Welding Machine One; 1-Bag Mixer One; Conveyor One;

Siphon or Jet; Light Plant One; Heater One; Immobile Track Air One

GROUP 4: Firemen on Whirlies and Asphalt Spreader Oiler;

Heavy Equipment Oilers; Truck Cranes; Monigans; Large over 65 tons capacity; Concrete Plant OIler and Black Top Plant Oiler

GROUP 5: Oilers

GROUP 6: Operators on equipment with Booms, including Jibs, 100 ft and over, but less than 150 ft

GROUP 7: Operators on equipment with Booms, including Jibs, 150 ft and over, but less than 200 ft

GROUP 8: Operators on equipment with Boomns, including Jibs, 200 ft and over; Tower Cranes, and Whirley Cranes

GROUP 9: Certified crane Operators, Below 17.5 tons, when requested by the Contractor or required by the Owner.

GROUP 10: Certified crane Operators 17.5 tons and above, when requested by the Contractor or required by the Owner.

GROUP 11: Master Mechanic

GROUP 12: Licensed Boat Pilot

ENGI0520-012 08/01/2022

INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES &

HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK

POWER EQUIPMENT OPERATOR

Group 01....................$ 42.45 34.95 Group 02....................$ 41.32 34.95 Group 03....................$ 36.84 34.95 Group 04....................$ 43.45 34.95 Group 05....................$ 44.45 34.95 Group 06....................$ 45.00 34.95 Group 07....................$ 45.30 34.95 Group 08....................$ 45.60 34.95 Group 09....................$ 46.25 34.95 Group 10....................$ 46.75 34.95 Group 11....................$ 44.45 34.95 Group 12....................$ 45.45 34.95

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Cranes, Draglines, Shovels, Skimmer Scoops, Clamshells or Derrick Boats, Pile Drivers, Crane-Type Backhoes, Asphalt Plant Operators, Concrete Plant Operators, Dredges, Asphalt Spreading Machines, Screws on Asphalt Spreading Machines, All Locomotives, Cable Ways or Tower Machines, Hoists, Hydraulic Backhoes, Ditching Machines, or Backfiller, Cherrypickers, overhead Cranes, Roller, Steam or Gas, Concrete Pavers, Excavator Concrete Breakers, Concrete Pumps, Bulk Cement Plants, Cement Pumps, Derrick-Type Drills, Boat Operators, Motor Graders or Pushcats, Scoops or Tournapulls, Bulldozers, Endloaders or Fork Lifts, Power Blade or Elevating Graders, Winch Cats, Boom or Winch Trucks or Boom Tractors, Pipe Wrapping or Painting Machines, Asphalt Plant Engineer, Journeyman Lubricating Engineer, Drills (other than derrick type), Mud Jacks, or Well Drilling Machines, Boring Machines or Track Jacks, Mixers, Conveyors (two), Air Compressors (two) Water Pumps, regardless of size (two), Welding Machines (two), Siphons or Jets (two), Winch Head or Apparatuses (two), Light Plants (two), Waterblasters (two), all Tractors, regardless of size (straight tractor only), Fireman on Stationary Boilers, Automatic Elevators, Form Grading Machines, Finishing Machines, Power Sub-Grader or Ribbon Machines, Longitudinal Floats, Distributor Operators on Trucks, Winch Heads or Apparatuses (one), Mobil Track air and heaters (two to five), Heavy Equipment Greaser, Relief Operator, Assistant Master Mechanic and Heavy Duty Mechanic, concrete saws of all types and sizes with their attachments, gob-hoppers, excavators all sizes, the repair, greasing, and fueling of all diesel hammers, the operation, set-up and cleaning of bidwells, concrete placement booms, the alterations, repair of all barges, water blasters of all sizes and their clutches, mobile lifts, hydraulic jacks where used for hoisting, diesel or gas powered flashing signs used for traffic control, micro pavers, log skiders, iceolators used on and off of pipeline, condor cranes, drill rigs of all sizes, bow boats, survey boats, ross carriers, bob-cats and all their attachments, skid steer loaders and all their attachments, creter crane, direct drive electric motors the bolting and unbolting the adjusting and shimming, (dewateringjobs, whirley crane, conveyor belts) etc., batch plants (all sizes), roto mills, conveyors systems of any size and any configuration, hydroseeders and straw-blowers all sizes, operation, repair, service of all vibratory hammers, all power pacs and their controls regardless of location, curtains or brush burning machines, stump cutter machines, grout machines regardless of size, Nail Launchers when mounted on a machine or self-propelled, con-cover machines, Goldhofer and similar S.P.M.T. (self-propelled modular transporters) heavy transport units and all Operators (except those listed below).

GROUP 2: Assistant Operators

GROUP 3: Air Compressors (one), Water Pumps, regardless of size (one), Water-blasters (one), Welding Machine (one), Mixers (one bag), Conveyor (one), Siphon or Jet (one), Light Plant (one), Heater (one), Immobile Track Air (one), and Self-Propelled Walk Behind Rollers.

GROUP 4: Fireman on Whirlies and Heavy Equipment Oilers, Truck Cranes, Dredges, Monigans, Large Cranes - (Over 65-ton rated capacity) Concrete Plant Oiler, Blacktop Plant oiler and Creter Crane Oiler (when required), barge tenders, oilers on drill rigs used for caisson or for pile driving.

GROUP 5: Oilers

GROUP 6: Operators on equipment with Booms, including Jibs, 100 ft and over, but less than 150 ft

GROUP 7: Operators on equipment with Booms, including Jibs, 150 ft and over, but less than 200 ft

GROUP 8: Operators on equipment with Boomns, including Jibs, 200 ft and over; Tower Cranes, and Whirley Cranes

GROUP 9: Certified crane Operators, Below 17.5 Tons, when requested by the Contractor or required by the Owner

GROUP 10: Ce1iified crane Operators 17.5 Tons and above, when requested by the Contractor or required by the Owner

GROUP 11: Master Mechanic

GROUP 12: Licensed Boat Pilot

* IRON0046-006 05/01/2023

GREENE (NORTHERN HALF), MACOUPIN (NORTH OF SUMMERVILLE), AND

MONTGOMERY (NORTH OF LITCHFIELD & HILLSBORO) COUNTIES

IRONWORKER.......................$ 36.84 31.64

IRON0392-003 08/01/2022

BOND, CALHOUN, CLINTON, GREENE (SOUTHERN HALF), JERSEY,

MACOUPIN (SUMMERVILLE & SOUTH THEREOF), MADISON, MONROE,

MONTGOMERY (LITCHFIELD, HILLSBORO, & SOUTH THEREOF), ST. CLAIR,

and WASHINGTON COUNTIES

IRONWORKER.......................$ 38.80 29.53

IRON0396-006 01/02/2012

BRIDGES, LOCKS, and DAMS ON THE MISSISSIPPI RIVER

Rates Fringes

IRONWORKER.......................$ 31.98 19.11

LABO0044-001 08/01/2022

MADISON COUNTY (Southwest)

Rates Fringes

LABORER

Group 1.....................$ 29.35 31.38 Group 2.....................$ 29.85 31.38 Group 3.....................$ 30.85 31.38

LABORER CLASSIFICATIONS:

GROUP 1 - General Laborer

GROUP 2 - Asbestos Abatement Worker and Hazardous Waste Worker; Lead Base Paint Worker; Mason and Plasterer Tender

GROUP 3 - Dynamite Man and Powder Man

LABO0044-002 08/01/2022

MADISON COUNTY (GLEN CARBON)

Rates Fringes

LABORER

GROUP 1....................$ 29.35 31.38

GROUP 2....................$ 29.85 31.38

GROUP 3....................$ 30.85 31.38

LABORERS CLASSIFICATIONS

GROUP 1 - General Laborers.

GROUP 2 - Brick Mason and Plasterer Tenders; Asbestos Abatement Worker, Hazardous Waste Worker

GROUP 3 - Dynamite and Powder Men.

LABO0100-001 08/01/2022

ST CLAIR COUNTY (East St. Louis,Alcoa, Brooklyn,Cahokia, Caseyville,Centreville, Dupo, Fairmont City, French Village, Midway, Maplewood, National City)

LABORERS

Group 1.....................$ 33.43 27.30 Group 2.....................$ 33.93 27.30 Group 3.....................$ 34.93 27.30

LABORER CLASSIFICATIONS:

GROUP 1 - General Laborer

GROUP 2 - Asbestos Abatement Worker and Hazardous Waste Worker; Lead Base Paint Worker, Hod Carrier

GROUP 3 - Dynamite Man

LABO0196-001 08/01/2022

MONROE COUNTY

Rates Fringes

LABORERS

Group 1.....................$ 30.31 30.42 Group 2.....................$ 30.81 30.42 Group 3.....................$ 31.81 30.42

LABORER CLASSIFICATIONS:

GROUP 1 - General Laborer

GROUP 2 - Asbestos Abatement Worker and Hazardous Waste Worker; Lead Base Paint Worker

GROUP 3 - Dynamite Man and Powder Man

LABO0218-001 08/01/2022

BOND (Greeneville), CALHOUN (Hardin), GREENE (Roadhouse), JERSEY (Jerseyville), and MADISON (Alton) COUNTIES

Group 1.....................$ 32.84 27.89 Group 2.....................$ 33.34 27.89 Group 3.....................$ 34.34 27.89

LABORER CLASSIFICATIONS:

GROUP 1 - General Laborer

GROUP 2 - Asbestos Abatement Worker and Hazardous Waste Worker; Lead Base Paint Worker

GROUP 3 - Dynamite Man and Powder Man

LABO0218-004 08/01/2022

JERSEY COUNTY (Jerseyville)

Rates Fringes

LABORER

GROUP 1....................$ 32.84 27.89

GROUP 2....................$ 33.34 27.89

GROUP 3....................$ 34.34 27.89

LABORER CLASSIFICATIONS

GROUP 1 - General Laborers.

GROUP 2 - Brick Mason and Plasterer Tenders.

GROUP 3 - Dynamite and Powder Men.

LABO0218-005 08/01/2022

GREENE COUNTY (Roadhouse)

Rates Fringes

LABORER

GROUP 1....................$ 32.84 27.89

GROUP 2....................$ 33.34 27.89

GROUP 3....................$ 34.34 27.89

LABORER CLASSFICATIONS

GROUP 1 - General Laborers.

GROUP 2 - Brick Mason and Plasterer Tenders.

GROUP 3 - Dynamite and Powder Men.

LABO0218-006 08/01/2022

CALHOUN COUNTY (Hardin)

Rates Fringes

LABORER

GROUP 1....................$ 32.84 27.89

GROUP 2....................$ 33.34 27.89

GROUP 3....................$ 34.34 27.89

LABORERS CLASSIFICATIONS

GROUP 1 - General Laborers.

GROUP 2 - Brick Mason and Plasterer Tenders.

GROUP 3 - Dynamite and Powder Men.

LABO0338-002 08/01/2021

MADISON COUNTY (Wood River)

Rates Fringes

LABORERS

Group 1.....................$ 30.75 28.14 Group 2.....................$ 31.25 28.14 Group 3.....................$ 32.25 28.14

LABORER CLASSIFICATIONS:

GROUP 1 - General Laborer

GROUP 2 - Asbestos Abatement Worker and Hazardous Waste Worker; Lead Base Paint Worker

GROUP 3 - Dynamite Man and Powder Man

LABO0397-001 08/01/2022

MADISON COUNTY (Southeast)

LABORERS

Group 1.....................$ 33.43 27.30 Group 2.....................$ 33.93 27.30 Group 3.....................$ 34.93 27.30

LABORER CLASSIFICATIONS:

GROUP 1 - General Laborer

GROUP 2 - Asbestos Abatement Worker and Hazardous Waste Worker; Lead Base Paint Worker

GROUP 3 - Dynamite Man

LABO0397-002 08/01/2022

MADISON COUNTY (GRANITE CITY and Vicinity)

Rates Fringes

LABORERS

Group 1.....................$ 33.58 27.30 Group 2.....................$ 34.08 27.30 Group 3.....................$ 35.08 27.30

LABORER CLASSIFICATIONS:

GROUP 1 - General Laborer

GROUP 2 - Asbestos Abatement Worker and Hazardous Waste Worker; Lead Base Paint Worker

GROUP 3 - Dynamite Man

LABO0397-003 08/01/2022

MADISON COUNTY (Edwardsville, Marine, and Livingston)

Rates Fringes

LABORER

GROUP 1....................$ 33.58 27.30

GROUP 2....................$ 34.08 27.30

GROUP 3....................$ 35.08 27.30

LABOREER CLASSIFICATIONS

GROUP 1 - General Laborers.

GROUP 3 - Brick Mason and Plasterer Tenders.

GROUP 4 - Dynamite and Powder Men.

LABO0459-001 08/01/2022

ST. CLAIR COUNTY (South)

Rates Fringes

LABORERS

Group 1.....................$ 31.64 29.09 Group 2.....................$ 32.14 29.09

Group 3.....................$ 33.14 29.09

LABORER CLASSIFICATIONS:

GROUP 1 - General Laborer

GROUP 2 - Asbestos Abatement Worker and Hazardous Waste Worker; Lead Base Paint Worker

GROUP 3 - Dynamite Man

LABO0459-004 08/01/2022

ST. CLAIR COUNTY (Belleville)

Rates Fringes

Hod Carrier......................$ 31.64 29.09

LABO0581-002 08/01/2022

CLINTON COUNTY (Carlyle)

Rates Fringes

LABORERS

Group 1.....................$ 29.09 31.64 Group 2.....................$ 29.59 31.64 Group 3.....................$ 30.59 31.64

LABORER CLASSIFICATIONS:

GROUP 1 - General Laborer

GROUP 2 - Asbestos Abatement Worker and Hazardous Waste Worker; Lead Base Paint Worker

GROUP 3 - Dynamite and Powder Man

LABO0622-002 08/01/2022

BOND COUNTY (Greenville)

Rates Fringes

LABORERS

Group 1.....................$ 28.09 32.64 Group 2.....................$ 28.59 32.64 Group 3.....................$ 29.59 32.64

LABORER CLASSIFICATIONS:

GROUP 1 - General Laborer

GROUP 2 - Asbestos Abatement Worker and Hazardous Waste Worker; Lead Base Paint Worker

GROUP 3 - Dynamite Man

LABO0622-003 08/01/2022

BOND COUNTY (Except the Northside)

Rates Fringes

GROUP 1.....................$ 28.09 32.64

GROUP 2.....................$ 28.59 32.64

GROUP 3.....................$ 29.59 32.64

LABORER CLASSIFICATIONS

GROUP 1 - General Laborer

GROUP 2 - Asbestos Abatement Worker and Hazardous Waste Worker; Lead Base Paint Worker

GROUP 3 - Dynamite Man

LABO0670-001 08/01/2021

ST CLAIR (O'Fallon, Scott Air Force Base, Shiloh, Lebanon & Vincinity), CLINTON (Trenton & Vicinity), and MADISON (Troy)

COUNTIES

Group 1.....................$ 28.84 30.05 Group 2.....................$ 29.34 30.05 Group 3.....................$ 30.34 30.05

LABORER CLASSIFICATIONS:

GROUP 1 - General Laborer

GROUP 2 - Asbestos Abatement Worker and Hazardous Waste Worker; Lead Base Paint Worker

Group 3 - Dynamite Man

LABO0670-004 08/01/2021

MADISON COUNTY (St. Jacob)

Rates Fringes

LABORER

GROUP 1....................$ 28.84 30.05

GROUP 2....................$ 29.34 30.05

GROUP 3....................$ 30.34 30.05

LABORER CLASSIFICATIONS

GROUP 1 - General Laborers.

GROUP 2 - Brick Mason and Plasterer Tenders.

GROUP 3 - Dynamite and Powder Men.

LABO0674-001 08/01/2002

MADISON COUNTY (St. Jacob)

Rates Fringes

LABORER

GROUP 1....................$ 29.45 1.60

GROUP 2....................$ 29.70 1.60

GROUP 3....................$ 29.95 1.60

GROUP 4....................$ 29.45 1.60

LABORER CLASSIFICATIONS

GROUP 1 - General Laborers.

GROUP 2 - Work in Septic tanks, cess pools, or dry wells (old or new); All feeders, mixers and nozzle men on gunnite or sandblasting work; When handling creosoted material; Raking or luting asphalt; Burning or cutting with torch; Working on Bottom of Sewer Trenches on Final Grading, Laying or Caulking of performed sectional Sewer Pipe; High time (20 feet or over) where exposed to an open fall; Operator of motor buggies; Any work performed in or on all types of cased wells; Cooking, mixing and applying of mastic such as sulfa-seal and/or other coal derivatives

GROUP 3 - Brick Mason and Plasterer Tenders.

GROUP 4 - Dynamite and Powder Men.

LABO0742-001 08/01/2022

ST. CLAIR (Mascoutah) and CLINTON (New Baden) COUNTIES

Rates Fringes

LABORERS

Group 1.....................$ 29.26 31.47 Group 2.....................$ 29.76 31.47 Group 3.....................$ 30.76 31.47

LABORER CLASSIFICATIONS:

GROUP 1 - General Laborer

GROUP 2 - Asbestos Abatement Worker and Hazardous Waste Worker; Lead Base Paint Worker

GROUP 3 - Dynamite Man

LABO0968-001 08/01/1997

CALHOUN COUNTY (Hardin)

Rates Fringes

LABORER

GROUP 1....................$ 25.80 .60

GROUP 2....................$ 26.05 .60

GROUP 3....................$ 26.30 .60

GROUP 4....................$ 27.325 .60

LABORERS CLASSIFICATIONS

GROUP 1 - General Laborers.

GROUP 2 - Work in Septic tanks, cess pools, or dry wells (old or new); All feeders, mixers and nozzle men on gunnite or sandblasting work; When handling creosoted material;

Ranking or luting asphalt; Burning or cutting with torch;

Working on Bottom of Sewer Trenches on Final Grading, Laying or Caulking or performed sectional Sewer Pipe; High time (20 feet or over) where exposed to an open fall;

Operator of motor buggies; Any work performed in or on all types of cased wells; Cooking, mixing and applying of mastic such as sulfa-seal and/or other coal derivatives

GROUP 3 - Brick Mason and Plasterer Tenders.

GROUP 4 - Dynamite and Powder Men.

LABO1084-001 08/01/2022

BOND (Sorento) and MONTGOMERY COUNTIES

Rates Fringes

LABORERS

Group 1.....................$ 29.41 31.32 Group 2.....................$ 29.91 31.32 Group 3.....................$ 30.91 31.32

LABORER CLASSIFICATIONS:

GROUP 1 - General Laborer

GROUP 2 - Asbestos Abatement Worker and Hazardous Waste Worker; Lead Base Paint Worker

GROUP 3 - Dynamite Man

PAIN0058-002 05/01/2017

Rates Fringes

PAINTER (Bridge).................$ 32.45 17.12

Epoxy or Toxic-Lead-Based Paint Work-$1.00 Premimum

PLAS0090-001 08/01/2018

BOND, CALHOUN, CLINTON (WESTERN HALF EAST TO BUT NOT INCLUDE

CARYLE), GREENE, JERSEY, MACOUPIN, MADISON, MONROE, MONTGOMERY,

and ST. CLAIR COUNTIES

CEMENT MASON/CONCRETE FINISHER...$ 34.50 24.75

PLAS0090-005 08/01/2018

Clinton County

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 34.50 24.75

PLAS0143-007 04/01/2016

WASHINGTON COUNTY

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 36.43 20.87

TEAM0050-006 05/01/2020

BOND. CLINTON, MONROE, ST CLAIR,…

This is the start of the file's text. The full file is on GovTribe.