This document is an amendment to a federal solicitation for pier rehabilitation and column repair work at Lock and Dam 24. The solicitation is issued by the U.S. Army Corps of Engineers St. Louis District and seeks bids for repairing and replacing bridge support columns, spans, gates, and other structures at the lock and dam over a five-year ordering period. The amendment provides responses to bidder inquiries, updated plans and specifications, wage determinations, and the list of questions and answers from the proposal system. Pricing is requested through multiple bid schedules for mobilization, column replacement, span work, gate repairs, debris removal, and general items for each annual ordering period.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See page 2.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 87
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 19-Jul-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P923R0023
X 9B. DATED (SEE ITEM 11)
27-Jun-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
19-Jul-2023
CODE
CONTRACTING DIVISION
US ARMY ENGR DIST ST LOUIS
1222 SPRUCE STREET, RM 4.207
ST LOUIS MO 63103-2833
W912P9 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
Whitney Dee, Contracting Officer 314-331-8621 whitney.r.dee@usace.army.mil
W912P923R0023
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0002
The purpose of this amendment is to implenment changes as set forth in the Bidder Inquiry responses posted 17 July 2023, add Illinois Wage Rates, include the Small Business Commitment Template document, add updated Plans Sheet SB-303 and Plans Sheet SB-304 (Attached), add updated Specifications (Attached) and provide the List of Question and Answers from ProjNet (attached).
SECTION 00 00 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
The following have been modified:
BIDDING SCHEDULE
BIDDING SCHEDULE
EXHIBIT A
ORDERING PERIOD 1
(30 September 2023- 29 September 2024)
The Ordering Period 1 Bid Schedule is the work for the project. Additional Ordering Periods are included to allow for pricing adjustments as the IDIQ progresses through the five-year ordering period.
Item Estimated Unit Estimated No. Description Quantity Unit Price Amount
A001 Mobilization and Demobilization 1 JOB _ ___ ________
A002 Interim Mobilization 4 EA ____ _______
A003 Interim Demobilization 4 EA ____ _______
A004 LOCK & DAM 24 – Items for each Bridge Column Replacement
A004AA Temporary Supporting of Bridge, Demolition of Existing Concrete Bridge Support Columns – Pier 3
1 EA ____ _______
A004AB Replacement of Service Bridge
Concrete Support Columns – Pier 3
A004AC Temporary Supporting of Bridge, Bridge Support Columns – Pier 7
A004AD Replacement of Service Bridge
Concrete Support Columns – Pier 7
A004AE Temporary Supporting of Bridge, Bridge Support Columns – Pier 10
A004AF Replacement of Service Bridge
Concrete Support Columns – Pier 10
A004AG Temporary Supporting of Bridge, Bridge Support Columns – Pier 11
A004AH Replacement of Service Bridge
Concrete Support Columns – Pier 11
A004AI Temporary Supporting of Bridge, Bridge Support Columns – Pier 12
A004AJ Replacement of Service Bridge
Concrete Support Columns – Pier 12
A004AK Temporary Supporting of Bridge, Bridge Support Columns – Pier 14
A004AL Replacement of Service Bridge
Concrete Support Columns – Pier 14
A004AM Temporary Supporting of Bridge, Bridge Support Columns – Pier 15
A004AN Replacement of Service Bridge
Concrete Support Columns – Pier 15
1 EA ____ _______
A004AO Field Demonstration of Service Bridge Concrete Support Columns
A005 LOCK & DAM 24 – Items for each Span, Spans 1-15
A005AA
Blasting, Cleaning and Painting– Service Bridge Deck and Superstructure, Tainter Gate Exterior and Interior LD24 - Spans 1-15
15 EA _ ___ ________
A005AB
Bearing Shoe Bolt Replacement, Service Bridge LD24 – Spans 1-15
A005AC
Crane Rail Clip Replacement and Crane Rail Alignment Service Bridge
A005AD
Walkway Grating Replacement Service Bridge
A005AE
Tainter Gate Repairs, Installation of Chain Guide Assemblies and Connections, Pocket Wheels, Chains, Existing Side Seal Removal and Reinstallation LD24 - Gates 1-15
A005AF
Tainter Gate Repairs, Skin Plate Crack Repairs LD24 – Gates 1-15
20 EA _ ___ ________
A005AG
Bolted Cover Plate Installation
A005AH
Tainter Gate Repairs, End Shield Repair
10 EA _ ___ ________
A005AI
Tainter Gate Repairs, Bottom Strut Repair LD24 – Gate 3
1 EA _ ___ ________
A005AJ
Tainter Gate Repairs, Upper Skin Plate Damage Repair
A005AK
Debris Deflector Installation
A005AL
Tainter Gate Repairs, Interior Gate Member Replacement LD24 - Gates 1-15 MK. SG-548-1 (3/8" Gusset Plate)
A005AM
Gate Member Replacement LD24 - Gates 1-15 MK. SG-548-2 (3/8" Gusset Plate)
A005AN
Gate Member Replacement LD24 - Gates 1-15 MK. SG-548-3 (3/8" Gusset Plate)
A005AO
Gate Member Replacement LD24 - Gates 1-15 MK. SG-548-4 (3/8" Gusset Plate)
A005AP
Gate Member Replacement LD24 - Gates 1-15 MK. SG-548-5 (3/8" Gusset Plate)
A005AQ
Gate Member Replacement LD24 - Gates 1-15 MK. SG-548-6 (3/8" Gusset Plate)
A005AR
Gate Member Replacement LD24 - Gates 1-15 MK. SG-548-7 (MC6x15.1)
A005AS
Gate Member Replacement LD24 - Gates 1-15 SG-548-8 (MC6x15.1)
A005AT
Gate Member Replacement LD24 - Gates 1-15 SG-548-9 (L4x4x3/8)
A005AU
Gate Member Replacement LD24 - Gates 1-15 SG-548-10 (L4x4x3/8)
A005AV
Gate Member Replacement LD24 - Gates 1-15 SG-548-11 (L5x3-1/2x3/8)
A005AW
Gate Member Replacement LD24 - Gates 1-15 SG-548-12 (L5x3-1/2x3/8)
A005AX
Gate Member Replacement LD24 - Gates 1-15 SG-548-13 (L5x3-1/2x3/8)
A005AY
Gate Member Replacement LD24 - Gates 1-15 SG-548-14 (L5x3-1/2x3/8)
A005AZ
Gate Member Replacement LD24 - Gates 1-15 MK. SG-548-15 (L6x4x3/8)
A005BA
Tainter Gate Debris Removal,
a. First 150 cubic yards 150 CY _ ___ ________
b. All over 150 cubic yards 150 CY _ ___ ________
A006 LOCK & DAM 24 – Items Each for Span 16
A006AA
Service Bridge Deck and Superstructure LD24 – Span 16
A006AB
Service Bridge
A006AC
Crane Rail Alignment Service Bridge
A006AD
Service Bridge LD24 - Span 16
ABBREVIATIONS
JOB Job EA Each CY Cubic Yard
A007 GENERAL ITEMS
A007AA Service Bridge Gusset Replacement 60 EA _ ___ ________
A007AB Service Bridge Rivet Replacement
a. First 100 each 100 EA _ ___ ________
b. All over 100 each 100 EA ____ _______
A007AC
Tainter Gate Rivet Replacement LD24 - Gates 1-16
a. First 1000 each 1000 EA _ ___ ________
b. All over 1000 each 4000 EA _ ___ ________
GRAND
TOTAL
EXHIBIT B
ORDERING PERIOD 2
(30 September 2024 - 29 September 2025)
B001 Mobilization and Demobilization 1 JOB _ ___ ________
B002 Interim Mobilization 4 EA ____ _______
B003 Interim Demobilization 4 EA ____ _______
B004 LOCK & DAM 24 – Items for each Bridge Column Replacement
B004AA Temporary Supporting of Bridge, B004AB Replacement of Service Bridge
B004AC Temporary Supporting of Bridge, B004AD Replacement of Service Bridge
B004AE Temporary Supporting of Bridge, B004AF Replacement of Service Bridge
B004AG Temporary Supporting of Bridge, B004AH Replacement of Service Bridge
B004AI Temporary Supporting of Bridge, B004AJ Replacement of Service Bridge
B004AK Temporary Supporting of Bridge, B004AL Replacement of Service Bridge
B004AM Temporary Supporting of Bridge, B004AN Replacement of Service Bridge
1 EA ____ _______
B004AO Field Demonstration of Service
B005 LOCK & DAM 24 – Items for each Span, Spans 1-15
B005AA
Service Bridge Deck and Superstructure, Tainter Gate Exterior and Interior
B005AB
Service Bridge
B005AC
Crane Rail Alignment Service Bridge
B005AD
Service Bridge
B005AE
of Chain Guide Assemblies and Connections, Pocket Wheels, Chains, Existing Side Seal Removal and Reinstallation
B005AF
Crack Repairs
B005AG
Bolted Cover Plate Installation
B005AH
Repair
B005AI
Repair
B005AJ
Plate Damage Repair
B005AK
Debris Deflector Installation
B005AL
Gate Member Replacement LD24 - Gates 1-15
B005AM
Gate Member Replacement LD24 - Gates 1-15
B005AN
Gate Member Replacement LD24 - Gates 1-15
B005AO
Gate Member Replacement LD24 - Gates 1-15
B005AP
Gate Member Replacement LD24 - Gates 1-15
B005AQ
Gate Member Replacement LD24 - Gates 1-15
B005AR
Gate Member Replacement LD24 - Gates 1-15
B005AS
Gate Member Replacement LD24 - Gates 1-15
B005AT
Gate Member Replacement LD24 - Gates 1-15
B005AU
Gate Member Replacement LD24 - Gates 1-15
B005AV
Gate Member Replacement LD24 - Gates 1-15
B005AW
Gate Member Replacement LD24 - Gates 1-15
B005AX
Gate Member Replacement LD24 - Gates 1-15
B005AY
Gate Member Replacement LD24 - Gates 1-15
A005AZ
Gate Member Replacement LD24 - Gates 1-15
B005BA
c. First 150 cubic yards 150 CY _ ___ ________
d. All over 150 cubic yards 150 CY _ ___ ________
B006 LOCK & DAM 24 – Items Each for Span 16
B006AA
Service Bridge Deck and Superstructure
B006AB
Service Bridge
B006AC
Crane Rail Alignment Service Bridge
B006AD
Service Bridge
EA Each
B007 GENERAL ITEMS
B007AA Service Bridge Gusset Replacement 60 EA _ ___ ________
B007AB Service Bridge Rivet Replacement
c. First 100 each 100 EA _ ___ ________
d. All over 100 each 100 EA ____ _______
B007AC
c. First 1000 each 1000 EA _ ___ ________
d. All over 1000 each 4000 EA _ ___ ________
CY Cubic Yard
EXHIBIT C
ORDERING PERIOD 3
(30 September 2025- 29 September 2026)
C001 Mobilization and Demobilization 1 JOB _ ___ ________
C002 Interim Mobilization 4 EA ____ _______
C003 Interim Demobilization 4 EA ____ _______
C004 LOCK & DAM 24 – Items for each Bridge Column Replacement
C004AA Temporary Supporting of Bridge, C004AB Replacement of Service Bridge
C004AC Temporary Supporting of Bridge, C004AD Replacement of Service Bridge
C004AE Temporary Supporting of Bridge, C004AF Replacement of Service Bridge
C004AG Temporary Supporting of Bridge, C004AH Replacement of Service Bridge
C004AI Temporary Supporting of Bridge, C004AJ Replacement of Service Bridge
C004AK Temporary Supporting of Bridge, C004AL Replacement of Service Bridge
C004AM Temporary Supporting of Bridge, C004AN Replacement of Service Bridge
1 EA ____ _______
C004AO Field Demonstration of Service
C005 LOCK & DAM 24 – Items for each Span, Spans 1-15
C005AA
Service Bridge Deck and Superstructure, Tainter Gate Exterior and Interior
C005AB
Service Bridge
C005AC
Crane Rail Alignment Service Bridge
C005AD
Service Bridge
C005AE
of Chain Guide Assemblies and Connections, Pocket Wheels, Chains, Existing Side Seal Removal and Reinstallation
C005AF
Crack Repairs
C005AG
Bolted Cover Plate Installation
C005AH
Repair
C005AI
Repair
C005AJ
Plate Damage Repair
C005AK
Debris Deflector Installation
C005AL
Gate Member Replacement LD24 - Gates 1-15
C005AM
Gate Member Replacement LD24 - Gates 1-15
C005AN
Gate Member Replacement LD24 - Gates 1-15
C005AO
Gate Member Replacement LD24 - Gates 1-15
C005AP
Gate Member Replacement LD24 - Gates 1-15
C005AQ
Gate Member Replacement LD24 - Gates 1-15
C005AR
Gate Member Replacement LD24 - Gates 1-15
C005AS
Gate Member Replacement LD24 - Gates 1-15
C005AT
Gate Member Replacement LD24 - Gates 1-15
C005AU
Gate Member Replacement LD24 - Gates 1-15
C005AV
Gate Member Replacement LD24 - Gates 1-15
C005AW
Gate Member Replacement LD24 - Gates 1-15
C005AX
Gate Member Replacement LD24 - Gates 1-15
C005AY
Gate Member Replacement LD24 - Gates 1-15
C005AZ
Gate Member Replacement LD24 - Gates 1-15
C005BA
e. First 150 cubic yards 150 CY _ ___ ________
f. All over 150 cubic yards 150 CY _ ___ ________
C006 LOCK & DAM 24 – Items Each for Span 16
C006AA
Service Bridge Deck and Superstructure
C006AB
Service Bridge
C006AC
Crane Rail Alignment Service Bridge
C006AD
Service Bridge
EA Each
C007 GENERAL ITEMS
C007AA Service Bridge Gusset Replacement 60 EA _ ___ ________
C007AB Service Bridge Rivet Replacement
e. First 100 each 100 EA _ ___ ________
f. All over 100 each 100 EA ____ _______
C007AC
e. First 1000 each 1000 EA _ ___ ________
f. All over 1000 each 4000 EA _ ___ ________
EXHIBIT D
ORDERING PERIOD 4
(30 September 2026- 29 September 2027)
D001 Mobilization and Demobilization 1 JOB _ ___ ________
D002 Interim Mobilization 4 EA ____ _______
D003 Interim Demobilization 4 EA ____ _______
D004 LOCK & DAM 24 – Items for each Bridge Column Replacement
D004AA Temporary Supporting of Bridge, D004AB Replacement of Service Bridge
D004AC Temporary Supporting of Bridge, D004AD Replacement of Service Bridge
D004AE Temporary Supporting of Bridge, D004AF Replacement of Service Bridge
D004AG Temporary Supporting of Bridge, D004AH Replacement of Service Bridge
D004AI Temporary Supporting of Bridge, D004AJ Replacement of Service Bridge
D004AK Temporary Supporting of Bridge, D004AL Replacement of Service Bridge
D004AM Temporary Supporting of Bridge, D004AN Replacement of Service Bridge
1 EA ____ _______
D004AO Field Demonstration of Service
D005 LOCK & DAM 24 – Items for each Span, Spans 1-15
D005AA
Service Bridge Deck and Superstructure, Tainter Gate Exterior and Interior
D005AB
Service Bridge
D005AC
Crane Rail Alignment Service Bridge
D005AD
Service Bridge
D005AE
of Chain Guide Assemblies and Connections, Pocket Wheels, Chains, Existing Side Seal Removal and Reinstallation
D005AF
Crack Repairs
D005AG
Bolted Cover Plate Installation
D005AH
Repair
D005AI
Repair
D005AJ
Plate Damage Repair
D005AK
Debris Deflector Installation
D005AL
Gate Member Replacement LD24 - Gates 1-15
D005AM
Gate Member Replacement LD24 - Gates 1-15
D005AN
Gate Member Replacement LD24 - Gates 1-15
D005AO
Gate Member Replacement LD24 - Gates 1-15
D005AP
Gate Member Replacement LD24 - Gates 1-15
D005AQ
Gate Member Replacement LD24 - Gates 1-15
D005AR
Gate Member Replacement LD24 - Gates 1-15
D005AS
Gate Member Replacement LD24 - Gates 1-15
D005AT
Gate Member Replacement LD24 - Gates 1-15
D005AU
Gate Member Replacement LD24 - Gates 1-15
D005AV
Gate Member Replacement LD24 - Gates 1-15
D005AW
Gate Member Replacement LD24 - Gates 1-15
D005AX
Gate Member Replacement LD24 - Gates 1-15
D005AY
Gate Member Replacement LD24 - Gates 1-15
D005AZ
Gate Member Replacement LD24 - Gates 1-15
D005BA
g. First 150 cubic yards 150 CY _ ___ ________
h. All over 150 cubic yards 150 CY _ ___ ________
D006 LOCK & DAM 24 – Items Each for Span 16
D006AA
Service Bridge Deck and Superstructure
D006AB
Service Bridge
D006AC
Crane Rail Alignment Service Bridge
D006AD
Service Bridge
EA Each
D007 GENERAL ITEMS
D007AA Service Bridge Gusset Replacement 60 EA _ ___ ________
D007AB Service Bridge Rivet Replacement
g. First 100 each 100 EA _ ___ ________
h. All over 100 each 100 EA ____ _______
D007AC
g. First 1000 each 1000 EA _ ___ ________
h. All over 1000 each 4000 EA _ ___ ________
EXHIBIT E
ORDERING PERIOD 5
(30 September 2027- 29 September 2028)
E001 Mobilization and Demobilization 1 JOB _ ___ ________
E002 Interim Mobilization 4 EA ____ _______
E003 Interim Demobilization 4 EA ____ _______
E004 LOCK & DAM 24 – Items for each Bridge Column Replacement
E004AA Temporary Supporting of Bridge, E004AB Replacement of Service Bridge
E004AC Temporary Supporting of Bridge, E004AD Replacement of Service Bridge
E004AE Temporary Supporting of Bridge, E004AF Replacement of Service Bridge
E004AG Temporary Supporting of Bridge, E004AH Replacement of Service Bridge
E004AI Temporary Supporting of Bridge, E004AJ Replacement of Service Bridge
E004AK Temporary Supporting of Bridge, E004AL Replacement of Service Bridge
E004AM Temporary Supporting of Bridge, E004AN Replacement of Service Bridge
1 EA ____ _______
E004AO Field Demonstration of Service
E005 LOCK & DAM 24 – Items for each Span, Spans 1-15
E005AA
Service Bridge Deck and Superstructure, Tainter Gate Exterior and Interior
E005AB
Service Bridge
E005AC
Crane Rail Alignment Service Bridge
E005AD
Service Bridge
E005AE
of Chain Guide Assemblies and Connections, Pocket Wheels, Chains, Existing Side Seal Removal and Reinstallation
E005AF
Crack Repairs
E005AG
Bolted Cover Plate Installation
E005AH
Repair
E005AI
Repair
E005AJ
Plate Damage Repair
E005AK
Debris Deflector Installation
E005AL
Gate Member Replacement LD24 - Gates 1-15
E005AM
Gate Member Replacement LD24 - Gates 1-15
E005AN
Gate Member Replacement LD24 - Gates 1-15
E005AO
Gate Member Replacement LD24 - Gates 1-15
E005AP
Gate Member Replacement LD24 - Gates 1-15
E005AQ
Gate Member Replacement LD24 - Gates 1-15
E005AR
Gate Member Replacement LD24 - Gates 1-15
E005AS
Gate Member Replacement LD24 - Gates 1-15
E005AT
Gate Member Replacement LD24 - Gates 1-15
E005AU
Gate Member Replacement LD24 - Gates 1-15
E005AV
Gate Member Replacement LD24 - Gates 1-15
E005AW
Gate Member Replacement LD24 - Gates 1-15
E005AX
Gate Member Replacement LD24 - Gates 1-15
E005AY
Gate Member Replacement LD24 - Gates 1-15
E005AZ
Gate Member Replacement LD24 - Gates 1-15
E005BA
i. First 150 cubic yards 150 CY _ ___ ________
j. All over 150 cubic yards 150 CY _ ___ ________
E006 LOCK & DAM 24 – Items Each for Span 16
E006AA
Service Bridge Deck and Superstructure
E006AB
Service Bridge
E006AC
Crane Rail Alignment Service Bridge
E006AD
Service Bridge
EA Each
E007 GENERAL ITEMS
E007AA Service Bridge Gusset Replacement 60 EA _ ___ ________
E007AB Service Bridge Rivet Replacement
i. First 100 each 100 EA _ ___ ________
j. All over 100 each 100 EA ____ _______
E007AC
i. First 1000 each 1000 EA _ ___ ________
j. All over 1000 each 4000 EA _ ___ ________
BIDDING SCHEDULE NOTES
1. All quantities shown on the BIDDING SCHEDULE are estimated quantities except when the unit is shown as job "JOB".
2. When bids are solicited on a unit price basis, bidders shall insert in the spaces provided therefore in the SCHEDULE both the "unit price" and the "estimated amount" resulting from applying the said unit price to the estimated quantity shown. In event the bidder quotes only a total price ("estimated amount") in its bid and fails to quote the unit price, the Government will determine such unit price by dividing the total price quoted by the quantity of the item set out in the SCHEDULE. The bidder agrees that the unit price so determined shall be used for the purpose of bid evaluation, award and all payments to the Contractor including final payment.
3. All extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the bid and the extension will be corrected accordingly.
4. If a modification to a bid based on unit prices is submitted, which provides for a total adjustment to the total estimated cost, the application of the total adjustment to each unit price in the bid schedule must be stated. If it is not stated, the bidder agrees that the total adjustment shall be applied on a pro rata basis to every unit price in the bid schedule.
5. Bidders are required to bid on all items listed on the Bidding Schedule in addition to inserting a total quoted bid in the appropriate space provided. Failure to do so will be considered good cause to disqualify the bid.
ORDERING PROCEDURES
1. The Government may issue a Task Order for specific quantities of the pre-priced items from the set price schedule of the contract without issuing a Request for Proposal.
2. The Government may send an email Request for Proposal for a Task Order, which will request proposed quantities of the pre-priced items from the set price schedule of the contract. The Contractor will have 14 calendar days, unless otherwise specified in the RFP, to provide a proposal of quantities to perform the Task Order work.
3. The Base Contract includes the Specifications and Drawings/Plans, which apply to all task orders issued.
SECTION 00 10 00 - SOLICITATION
The contractor period of performance end date has decreased by 365 days from 2190 days to 1825 days.
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.
The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-
(c) The amount of the bid guarantee shall be 20% percent of the bid price or $3,000,000.00, whichever is less.-
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
(End of provision)
SECTION 01 00 00 - GENERAL REQUIREMENTS
The following have been added by full text:
ILLINOIS WAGE DETERMINATION
"General Decision Number: IL20230017 06/02/2023
Superseded General Decision Number: IL20220017
State: Illinois
Construction Types: Heavy and Highway
Counties: Bond, Calhoun, Clinton, Greene, Jersey, Macoupin, Madison, Monroe, Montgomery, St Clair and Washington Counties in Illinois.
MACOUPIN (upper 1/2) & MONTGOMERY (upper 1/2, INCLUDING
WAGGONER, STANDARD CITY, & NORTH THEREOF) COUNTIES:
HEAVY CONSTRUCTION PROJECTS (including Sewer & Water Line
Construction & Drainage Projects) & HIGHWAY CONSTRUCTION PROJECTS (excluding tunnels, building structures in rest area projects, and railroad construction; bascule, suspension & spandrel arch bridges; bridges designed for commercial navigation; bridges involving marine construction, other major bridges).
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).
|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $16.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2023. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.15 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2023. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/06/2023 1 01/20/2023 2 03/03/2023 3 03/17/2023 4 04/07/2023 5 06/02/2023
CARP0270-015 05/01/2017
Rates Fringes
CARPENTER........................$ 32.15 25.97
PILEDRIVERMAN....................$ 33.15 25.97
CARP0270-023 05/15/2020
GREENE COUNTY
Rates Fringes
CARPENTER........................$ 35.05 28.57
PILEDRIVERMAN....................$ 35.05 28.57
CARP0500-001 05/01/2021
CLINTON, MONROE, and WASHINGTON COUNTIES
Rates Fringes
Carpenter & Piledrivermen........$ 41.36 18.90
CARP0500-003 05/01/2021
ST. CLAIR COUNTY
Rates Fringes
Carpenter and Piledriver.........$ 41.36 18.90
CARP0664-003 05/01/2021
MADISON COUNTY
Rates Fringes
Carpenter and Piledriver.........$ 41.36 18.90
CARP0664-006 05/01/2021
BOND, CALHOUN, and JERSEY COUNTIES
Rates Fringes
CARPENTER........................$ 41.36 18.90
ELEC0146-012 06/01/2022
MONTGGOMERY COUNTY (East of Butler Grove, Grisham, Hillsboro & Raymond Twps)
Rates Fringes
ELECTRICIAN......................$ 41.00 20.68
ELEC0193-003 06/01/2022
MACOUPIN (Barr, Girard, Nilwood, North & South Otter, North & South Palmyra aand Virden Twps), AND MONTGOMERY (Bois D' Arc, Harvel and Pitman Twps) COUNTIES
ELECTRICIAN......................$ 39.36 5%+18.95
ELEC0193-011 04/03/2023
MACOUPIN (Townships of Scottville, North Palmyra, North Otter, Virden, Girard, Barr, South Palmyra, South Otter, and Nilwood) and MONTGOMERY (Townships of Bois D'Arc, Pitman, and Harvel)
COUNTIES
Line Construction Groundman - Equipment Operator (Class I, all crawler type equipment larger than D-4, 15 ton crane or larger)............$ 54.21 29.5%+7.00 Groundman - Truck Driver (with winch, may operate diggers, 5th wheel type trucks, crawler-type equipment, D-4 and smaller, backhoe 3/4 yard and under, rubber tire and crawler w/end loader, and may drive bucket truck and live boom type line trucks).$ 41.10 29.5%+7.00 Groundman - Truck Driver (without winch).............$ 38.71 29.5%+7.00 Groundman (Class A).........$ 36.82 29.5%+7.00 Lineman & Substation Tech...$ 60.34 29.5%+7.00
* ELEC0309-002 12/05/2022
BOND (Westside), CLINTON, GREENE (ALL WORK PERFORMED ON THE
ILLINOIS POWER COMPANY PROPERTY), JERSEY (ALL WORK PERFORMED ON
THE ILLINOIS POWER COMPANY PROPERTY), MACOUPIN (EXCEPT North 1/3 & Southwest Corner), MADISON (EXCEPT East ALTON, ALTON, WOOD RIVER & HARTFORD), MONROE, MONTGOMERY (East of ROUNDTREE, IRVING & East FORK TWP.), RANDOLPH (PORTION OF RED BUD TOWNSHIP), ST. CLAIR, and WASHINGTON (OKAWVILLE & VENEDY
TWPS.) COUNTIES
Rates Fringes
LINE CONSTRUCTION
Cable Splicer; Lineman Welder......................$ 63.79 42.15% Groundman Equipment Operator....................$ 52.84 42.15% Groundman Truck Driver......$ 43.13 42.15% Groundman...................$ 39.45 42.15% Lineman.....................$ 60.75 42.15%
ELEC0309-003 08/30/2021
BOND (Western Half), CLINTON (EXCLUDES HUEY, HOFFMAN, & VIC.), MACOUPIN (EXCLUDES BRIGHTON TWP., ATHENVILLE, SCOTTVILLE, GIRARD & AREA N. THEREOF), MADISON (EXCLUDES ALTON, E. ALTON, HARTFORD & WOOD RIVER), MONROE, MONTGOMERY (WEST OF BUTLER
GROVE, GRISHAM, HILLSBOROUGH & RAYMOND TWPS), ST. CLAIR and
WASHINGTON (VENEDY TWP) COUNTIES
ELECTRICIAN......................$ 43.09 57.96%
ELEC0649-002 01/06/2020
CALHOUN, GREENE, JERSEY, MACOUPIN (SOUTHWEST CORNER), AND
MADISON (E. ALTON, ALTON, WOOD RIVER & HARTFORD) COUNTIES
Rates Fringes
Line Construction
BLASTER.....................$ 53.45 29%+9.25
EQUIPMENT OPERATOR..........$ 45.78 29%+9.25
GROUNDMAN - TRUCK DRIVER
W/WINCH.....................$ 34.18 29%+9.25
GROUNDMAN - TRUCK DRIVER
WO/WINCH....................$ 30.18 29%+9.25
GROUNDMAN...................$ 29.38 29%+9.25
LINEMAN; AND LINEMAN HOLE
BORING MACHINE OPERATOR.....$ 53.45 29%+9.25
ELEC0649-008 01/03/2022
CALHOUN, GREEN, JERSEY, MACOUPIN (SOUTHWEST CORNER), AND
MADISON (ALTON, E. ALTON, HARTFORD & WOOD RIVER) COUNTIES
Rates Fringes
ELECTRICIAN......................$ 46.34 25.30
ELEC0702-002 01/02/2023
ALEXANDER, CLAY, CRAWFORD, EDWARDS, EFFINGHAM, FRANKLIN,
FAYETTE (Excludes portion North Avena), GALLATIN, HAMILTON, HARDIN, JACKSON, JASPER, JEFFERSON, JOHNSON, LAWRENCE, MARION, MASSAC, PERRY, POPE, PULASKI, RANDOLPH (Except Red Bud Twps), RICHLAND, SALINE, UNION, WABASH, WAYNE, WHITE, AND WILLIAMSON
COUNTIES;
CLARK, COLES (Southern Half), CUMBERLAND, MOULTRIE (Whitley TWP), and SHELBY (Except West of Holland, Prairie, Richland, & Windsor TWPS) COUNTIES;
BOND (Eastern Half), and WASHINGTON (OKAWVILLE & VENDY TWPS)
COUNTIES
Rates Fringes
Line Construction Groundman - Class A.........$ 35.64 29%+8.35 Groundman - Equipment Operator Class II (all other equipment)............$ 43.40 29%+8.35 Heavy - Equipment Operator Class I (all crawler type equipment D-4 and larger)...$ 48.67 29%+8.35 Lineman.....................$ 61.16 29%+8.35
ELEC0702-017 01/01/2023
BOND (Eastern Half), CLINTON (Huey, Hoffman, & Vicinity), AND WASHINGTON (Except Venedy TWP) COUNTIES
ELECTRICIAN......................$ 47.90 27.76
ENGI0520-005 08/01/2022
Rates Fringes
POWER EQUIPMENT OPERATOR
Group 01....................$ 42.45 34.95 Group 02....................$ 41.32 34.95 Group 03....................$ 36.84 34.95 Group 04....................$ 43.45 34.95 Group 05....................$ 44.45 34.95 Group 06....................$ 45.00 34.95 Group 07....................$ 45.30 34.95 Group 08....................$ 45.60 34.95 Group 09....................$ 46.25 34.95 Group 10....................$ 46.75 34.95 Group 11....................$ 44.45 34.95 Group 12....................$ 45.45 34.95
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Cranes, Draglines, Shovels, Skimmer Scoops, Clamshells or Derrick Boats, Pile Drivers, Crane-Type
Backhoes, Asphalt Plant Operators, Concrete Plant Operators, Dredges, Asphalt Spreading Machines, Screws on Asphalt Spreading Machines, All Locomotives, Cable Ways or Tower Machines, Hoists, Hydraulic Backhoes, Ditching Machines, or Backfiller, Cherrypickers, overhead Cranes, Roller, Steam or Gas, Concrete Pavers, Excavator Concrete Breakers, Concrete Pumps, Bulk Cement Plants, Cement Pumps, DerrickType Drills, Boat Operators, Motor Graders or Pushcats, Scoops or Toumapulls, Bulldozers, Endloaders or Fork Lifts, Power Blade or Elevating Graders, Winch Cats, Boom or Winch Trucks or Boom Tractors, Pipe Wrapping or Painting Machines, Asphalt Plant Engineer, Journeyman Lubricating Engineer, Drills (other than derrick type), Mud Jacks, or Well Drilling Machines, Boring Machines or Track Jacks, Mixers, Conveyors (two), Air Compressors (two) Water Pumps, regardless of size (two), Welding Machines (two), Siphons or Jets (two), Winch Head or Apparatuses (two), Light Plants (two), Waterblasters (two), all Tractors, regardless of size (straight tractor only), Fireman on Stationary Boilers, Automatic Elevators, Form Grading Machines, Finishing Machines, Power Sub-Grader or Ribbon Machines, Longitudinal Floats, Distributor Operators on Trucks, Winch Heads or Apparatuses (one), Mobil Track air and heaters (two to five), Heavy Equipment Greaser, Relief Operator, Assistant Master Mechanic and Heavy Duty Mechanic, concrete saws of all types and sizes with their attachments, gobhoppers, excavators all sizes, the repair, greasing, and fueling of all diesel hammers, the operation, set-up and cleaning ofbidwells, concrete placement booms, the alterations, repair of all barges, water blasters of all sizes and their clutches, mobile lifts, hydraulic jacks where used for hoisting, diesel or gas powered flashing sings used for traffic control, micro pavers, log skiders, iceolators used on and off of pipeline, condor cranes, drill rigs of all sizes, bow boats, survey boats, ross carriers, bob-cats and all their attachments, skid steer loaders and all their attachments, creter crane, direct drive electric motors the bolting and unbolting the adjusting and shimming, (dewateringjobs, whirley crane, conveyor belts) etc., batch plants (all sizes), roto mills, conveyors systems of any size and any configuration, hydroseeders and strawblowers all sizes, operation, repair, service of all vibratory hammers, all power pacs and their controls regardless of location, curtains or brush burning machines, stump cutter machines, grout machines regardless of size, Nail launchers when mounted on a machine or self-propelled, con-cover machines, Goldhofer and similar S.P.M.T. (self-propelled modular transpmiers) heavy transport units and all Operators (except those listed below).
Group 2: Assistant Operators
GROUP 3: Air Compressor One; Water Pump regardless of size One; Welding Machine One; 1-Bag Mixer One; Conveyor One;
Siphon or Jet; Light Plant One; Heater One; Immobile Track Air One
GROUP 4: Firemen on Whirlies and Asphalt Spreader Oiler;
Heavy Equipment Oilers; Truck Cranes; Monigans; Large over 65 tons capacity; Concrete Plant OIler and Black Top Plant Oiler
GROUP 5: Oilers
GROUP 6: Operators on equipment with Booms, including Jibs, 100 ft and over, but less than 150 ft
GROUP 7: Operators on equipment with Booms, including Jibs, 150 ft and over, but less than 200 ft
GROUP 8: Operators on equipment with Boomns, including Jibs, 200 ft and over; Tower Cranes, and Whirley Cranes
GROUP 9: Certified crane Operators, Below 17.5 tons, when requested by the Contractor or required by the Owner.
GROUP 10: Certified crane Operators 17.5 tons and above, when requested by the Contractor or required by the Owner.
GROUP 11: Master Mechanic
GROUP 12: Licensed Boat Pilot
ENGI0520-012 08/01/2022
INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES &
HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK
POWER EQUIPMENT OPERATOR
Group 01....................$ 42.45 34.95 Group 02....................$ 41.32 34.95 Group 03....................$ 36.84 34.95 Group 04....................$ 43.45 34.95 Group 05....................$ 44.45 34.95 Group 06....................$ 45.00 34.95 Group 07....................$ 45.30 34.95 Group 08....................$ 45.60 34.95 Group 09....................$ 46.25 34.95 Group 10....................$ 46.75 34.95 Group 11....................$ 44.45 34.95 Group 12....................$ 45.45 34.95
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Cranes, Draglines, Shovels, Skimmer Scoops, Clamshells or Derrick Boats, Pile Drivers, Crane-Type Backhoes, Asphalt Plant Operators, Concrete Plant Operators, Dredges, Asphalt Spreading Machines, Screws on Asphalt Spreading Machines, All Locomotives, Cable Ways or Tower Machines, Hoists, Hydraulic Backhoes, Ditching Machines, or Backfiller, Cherrypickers, overhead Cranes, Roller, Steam or Gas, Concrete Pavers, Excavator Concrete Breakers, Concrete Pumps, Bulk Cement Plants, Cement Pumps, Derrick-Type Drills, Boat Operators, Motor Graders or Pushcats, Scoops or Tournapulls, Bulldozers, Endloaders or Fork Lifts, Power Blade or Elevating Graders, Winch Cats, Boom or Winch Trucks or Boom Tractors, Pipe Wrapping or Painting Machines, Asphalt Plant Engineer, Journeyman Lubricating Engineer, Drills (other than derrick type), Mud Jacks, or Well Drilling Machines, Boring Machines or Track Jacks, Mixers, Conveyors (two), Air Compressors (two) Water Pumps, regardless of size (two), Welding Machines (two), Siphons or Jets (two), Winch Head or Apparatuses (two), Light Plants (two), Waterblasters (two), all Tractors, regardless of size (straight tractor only), Fireman on Stationary Boilers, Automatic Elevators, Form Grading Machines, Finishing Machines, Power Sub-Grader or Ribbon Machines, Longitudinal Floats, Distributor Operators on Trucks, Winch Heads or Apparatuses (one), Mobil Track air and heaters (two to five), Heavy Equipment Greaser, Relief Operator, Assistant Master Mechanic and Heavy Duty Mechanic, concrete saws of all types and sizes with their attachments, gob-hoppers, excavators all sizes, the repair, greasing, and fueling of all diesel hammers, the operation, set-up and cleaning of bidwells, concrete placement booms, the alterations, repair of all barges, water blasters of all sizes and their clutches, mobile lifts, hydraulic jacks where used for hoisting, diesel or gas powered flashing signs used for traffic control, micro pavers, log skiders, iceolators used on and off of pipeline, condor cranes, drill rigs of all sizes, bow boats, survey boats, ross carriers, bob-cats and all their attachments, skid steer loaders and all their attachments, creter crane, direct drive electric motors the bolting and unbolting the adjusting and shimming, (dewateringjobs, whirley crane, conveyor belts) etc., batch plants (all sizes), roto mills, conveyors systems of any size and any configuration, hydroseeders and straw-blowers all sizes, operation, repair, service of all vibratory hammers, all power pacs and their controls regardless of location, curtains or brush burning machines, stump cutter machines, grout machines regardless of size, Nail Launchers when mounted on a machine or self-propelled, con-cover machines, Goldhofer and similar S.P.M.T. (self-propelled modular transporters) heavy transport units and all Operators (except those listed below).
GROUP 2: Assistant Operators
GROUP 3: Air Compressors (one), Water Pumps, regardless of size (one), Water-blasters (one), Welding Machine (one), Mixers (one bag), Conveyor (one), Siphon or Jet (one), Light Plant (one), Heater (one), Immobile Track Air (one), and Self-Propelled Walk Behind Rollers.
GROUP 4: Fireman on Whirlies and Heavy Equipment Oilers, Truck Cranes, Dredges, Monigans, Large Cranes - (Over 65-ton rated capacity) Concrete Plant Oiler, Blacktop Plant oiler and Creter Crane Oiler (when required), barge tenders, oilers on drill rigs used for caisson or for pile driving.
GROUP 5: Oilers
GROUP 6: Operators on equipment with Booms, including Jibs, 100 ft and over, but less than 150 ft
GROUP 7: Operators on equipment with Booms, including Jibs, 150 ft and over, but less than 200 ft
GROUP 8: Operators on equipment with Boomns, including Jibs, 200 ft and over; Tower Cranes, and Whirley Cranes
GROUP 9: Certified crane Operators, Below 17.5 Tons, when requested by the Contractor or required by the Owner
GROUP 10: Ce1iified crane Operators 17.5 Tons and above, when requested by the Contractor or required by the Owner
GROUP 11: Master Mechanic
GROUP 12: Licensed Boat Pilot
* IRON0046-006 05/01/2023
GREENE (NORTHERN HALF), MACOUPIN (NORTH OF SUMMERVILLE), AND
MONTGOMERY (NORTH OF LITCHFIELD & HILLSBORO) COUNTIES
IRONWORKER.......................$ 36.84 31.64
IRON0392-003 08/01/2022
BOND, CALHOUN, CLINTON, GREENE (SOUTHERN HALF), JERSEY,
MACOUPIN (SUMMERVILLE & SOUTH THEREOF), MADISON, MONROE,
MONTGOMERY (LITCHFIELD, HILLSBORO, & SOUTH THEREOF), ST. CLAIR,
and WASHINGTON COUNTIES
IRONWORKER.......................$ 38.80 29.53
IRON0396-006 01/02/2012
BRIDGES, LOCKS, and DAMS ON THE MISSISSIPPI RIVER
Rates Fringes
IRONWORKER.......................$ 31.98 19.11
LABO0044-001 08/01/2022
MADISON COUNTY (Southwest)
Rates Fringes
LABORER
Group 1.....................$ 29.35 31.38 Group 2.....................$ 29.85 31.38 Group 3.....................$ 30.85 31.38
LABORER CLASSIFICATIONS:
GROUP 1 - General Laborer
GROUP 2 - Asbestos Abatement Worker and Hazardous Waste Worker; Lead Base Paint Worker; Mason and Plasterer Tender
GROUP 3 - Dynamite Man and Powder Man
LABO0044-002 08/01/2022
MADISON COUNTY (GLEN CARBON)
Rates Fringes
LABORER
GROUP 1....................$ 29.35 31.38
GROUP 2....................$ 29.85 31.38
GROUP 3....................$ 30.85 31.38
LABORERS CLASSIFICATIONS
GROUP 1 - General Laborers.
GROUP 2 - Brick Mason and Plasterer Tenders; Asbestos Abatement Worker, Hazardous Waste Worker
GROUP 3 - Dynamite and Powder Men.
LABO0100-001 08/01/2022
ST CLAIR COUNTY (East St. Louis,Alcoa, Brooklyn,Cahokia, Caseyville,Centreville, Dupo, Fairmont City, French Village, Midway, Maplewood, National City)
LABORERS
Group 1.....................$ 33.43 27.30 Group 2.....................$ 33.93 27.30 Group 3.....................$ 34.93 27.30
LABORER CLASSIFICATIONS:
GROUP 1 - General Laborer
GROUP 2 - Asbestos Abatement Worker and Hazardous Waste Worker; Lead Base Paint Worker, Hod Carrier
GROUP 3 - Dynamite Man
LABO0196-001 08/01/2022
MONROE COUNTY
Rates Fringes
LABORERS
Group 1.....................$ 30.31 30.42 Group 2.....................$ 30.81 30.42 Group 3.....................$ 31.81 30.42
LABORER CLASSIFICATIONS:
GROUP 1 - General Laborer
GROUP 2 - Asbestos Abatement Worker and Hazardous Waste Worker; Lead Base Paint Worker
GROUP 3 - Dynamite Man and Powder Man
LABO0218-001 08/01/2022
BOND (Greeneville), CALHOUN (Hardin), GREENE (Roadhouse), JERSEY (Jerseyville), and MADISON (Alton) COUNTIES
Group 1.....................$ 32.84 27.89 Group 2.....................$ 33.34 27.89 Group 3.....................$ 34.34 27.89
LABORER CLASSIFICATIONS:
GROUP 1 - General Laborer
GROUP 2 - Asbestos Abatement Worker and Hazardous Waste Worker; Lead Base Paint Worker
GROUP 3 - Dynamite Man and Powder Man
LABO0218-004 08/01/2022
JERSEY COUNTY (Jerseyville)
Rates Fringes
LABORER
GROUP 1....................$ 32.84 27.89
GROUP 2....................$ 33.34 27.89
GROUP 3....................$ 34.34 27.89
LABORER CLASSIFICATIONS
GROUP 1 - General Laborers.
GROUP 2 - Brick Mason and Plasterer Tenders.
GROUP 3 - Dynamite and Powder Men.
LABO0218-005 08/01/2022
GREENE COUNTY (Roadhouse)
Rates Fringes
LABORER
GROUP 1....................$ 32.84 27.89
GROUP 2....................$ 33.34 27.89
GROUP 3....................$ 34.34 27.89
LABORER CLASSFICATIONS
GROUP 1 - General Laborers.
GROUP 2 - Brick Mason and Plasterer Tenders.
GROUP 3 - Dynamite and Powder Men.
LABO0218-006 08/01/2022
CALHOUN COUNTY (Hardin)
Rates Fringes
LABORER
GROUP 1....................$ 32.84 27.89
GROUP 2....................$ 33.34 27.89
GROUP 3....................$ 34.34 27.89
LABORERS CLASSIFICATIONS
GROUP 1 - General Laborers.
GROUP 2 - Brick Mason and Plasterer Tenders.
GROUP 3 - Dynamite and Powder Men.
LABO0338-002 08/01/2021
MADISON COUNTY (Wood River)
Rates Fringes
LABORERS
Group 1.....................$ 30.75 28.14 Group 2.....................$ 31.25 28.14 Group 3.....................$ 32.25 28.14
LABORER CLASSIFICATIONS:
GROUP 1 - General Laborer
GROUP 2 - Asbestos Abatement Worker and Hazardous Waste Worker; Lead Base Paint Worker
GROUP 3 - Dynamite Man and Powder Man
LABO0397-001 08/01/2022
MADISON COUNTY (Southeast)
LABORERS
Group 1.....................$ 33.43 27.30 Group 2.....................$ 33.93 27.30 Group 3.....................$ 34.93 27.30
LABORER CLASSIFICATIONS:
GROUP 1 - General Laborer
GROUP 2 - Asbestos Abatement Worker and Hazardous Waste Worker; Lead Base Paint Worker
GROUP 3 - Dynamite Man
LABO0397-002 08/01/2022
MADISON COUNTY (GRANITE CITY and Vicinity)
Rates Fringes
LABORERS
Group 1.....................$ 33.58 27.30 Group 2.....................$ 34.08 27.30 Group 3.....................$ 35.08 27.30
LABORER CLASSIFICATIONS:
GROUP 1 - General Laborer
GROUP 2 - Asbestos Abatement Worker and Hazardous Waste Worker; Lead Base Paint Worker
GROUP 3 - Dynamite Man
LABO0397-003 08/01/2022
MADISON COUNTY (Edwardsville, Marine, and Livingston)
Rates Fringes
LABORER
GROUP 1....................$ 33.58 27.30
GROUP 2....................$ 34.08 27.30
GROUP 3....................$ 35.08 27.30
LABOREER CLASSIFICATIONS
GROUP 1 - General Laborers.
GROUP 3 - Brick Mason and Plasterer Tenders.
GROUP 4 - Dynamite and Powder Men.
LABO0459-001 08/01/2022
ST. CLAIR COUNTY (South)
Rates Fringes
LABORERS
Group 1.....................$ 31.64 29.09 Group 2.....................$ 32.14 29.09
Group 3.....................$ 33.14 29.09
LABORER CLASSIFICATIONS:
GROUP 1 - General Laborer
GROUP 2 - Asbestos Abatement Worker and Hazardous Waste Worker; Lead Base Paint Worker
GROUP 3 - Dynamite Man
LABO0459-004 08/01/2022
ST. CLAIR COUNTY (Belleville)
Rates Fringes
Hod Carrier......................$ 31.64 29.09
LABO0581-002 08/01/2022
CLINTON COUNTY (Carlyle)
Rates Fringes
LABORERS
Group 1.....................$ 29.09 31.64 Group 2.....................$ 29.59 31.64 Group 3.....................$ 30.59 31.64
LABORER CLASSIFICATIONS:
GROUP 1 - General Laborer
GROUP 2 - Asbestos Abatement Worker and Hazardous Waste Worker; Lead Base Paint Worker
GROUP 3 - Dynamite and Powder Man
LABO0622-002 08/01/2022
BOND COUNTY (Greenville)
Rates Fringes
LABORERS
Group 1.....................$ 28.09 32.64 Group 2.....................$ 28.59 32.64 Group 3.....................$ 29.59 32.64
LABORER CLASSIFICATIONS:
GROUP 1 - General Laborer
GROUP 2 - Asbestos Abatement Worker and Hazardous Waste Worker; Lead Base Paint Worker
GROUP 3 - Dynamite Man
LABO0622-003 08/01/2022
BOND COUNTY (Except the Northside)
Rates Fringes
GROUP 1.....................$ 28.09 32.64
GROUP 2.....................$ 28.59 32.64
GROUP 3.....................$ 29.59 32.64
LABORER CLASSIFICATIONS
GROUP 1 - General Laborer
GROUP 2 - Asbestos Abatement Worker and Hazardous Waste Worker; Lead Base Paint Worker
GROUP 3 - Dynamite Man
LABO0670-001 08/01/2021
ST CLAIR (O'Fallon, Scott Air Force Base, Shiloh, Lebanon & Vincinity), CLINTON (Trenton & Vicinity), and MADISON (Troy)
COUNTIES
Group 1.....................$ 28.84 30.05 Group 2.....................$ 29.34 30.05 Group 3.....................$ 30.34 30.05
LABORER CLASSIFICATIONS:
GROUP 1 - General Laborer
GROUP 2 - Asbestos Abatement Worker and Hazardous Waste Worker; Lead Base Paint Worker
Group 3 - Dynamite Man
LABO0670-004 08/01/2021
MADISON COUNTY (St. Jacob)
Rates Fringes
LABORER
GROUP 1....................$ 28.84 30.05
GROUP 2....................$ 29.34 30.05
GROUP 3....................$ 30.34 30.05
LABORER CLASSIFICATIONS
GROUP 1 - General Laborers.
GROUP 2 - Brick Mason and Plasterer Tenders.
GROUP 3 - Dynamite and Powder Men.
LABO0674-001 08/01/2002
MADISON COUNTY (St. Jacob)
Rates Fringes
LABORER
GROUP 1....................$ 29.45 1.60
GROUP 2....................$ 29.70 1.60
GROUP 3....................$ 29.95 1.60
GROUP 4....................$ 29.45 1.60
LABORER CLASSIFICATIONS
GROUP 1 - General Laborers.
GROUP 2 - Work in Septic tanks, cess pools, or dry wells (old or new); All feeders, mixers and nozzle men on gunnite or sandblasting work; When handling creosoted material; Raking or luting asphalt; Burning or cutting with torch; Working on Bottom of Sewer Trenches on Final Grading, Laying or Caulking of performed sectional Sewer Pipe; High time (20 feet or over) where exposed to an open fall; Operator of motor buggies; Any work performed in or on all types of cased wells; Cooking, mixing and applying of mastic such as sulfa-seal and/or other coal derivatives
GROUP 3 - Brick Mason and Plasterer Tenders.
GROUP 4 - Dynamite and Powder Men.
LABO0742-001 08/01/2022
ST. CLAIR (Mascoutah) and CLINTON (New Baden) COUNTIES
Rates Fringes
LABORERS
Group 1.....................$ 29.26 31.47 Group 2.....................$ 29.76 31.47 Group 3.....................$ 30.76 31.47
LABORER CLASSIFICATIONS:
GROUP 1 - General Laborer
GROUP 2 - Asbestos Abatement Worker and Hazardous Waste Worker; Lead Base Paint Worker
GROUP 3 - Dynamite Man
LABO0968-001 08/01/1997
CALHOUN COUNTY (Hardin)
Rates Fringes
LABORER
GROUP 1....................$ 25.80 .60
GROUP 2....................$ 26.05 .60
GROUP 3....................$ 26.30 .60
GROUP 4....................$ 27.325 .60
LABORERS CLASSIFICATIONS
GROUP 1 - General Laborers.
GROUP 2 - Work in Septic tanks, cess pools, or dry wells (old or new); All feeders, mixers and nozzle men on gunnite or sandblasting work; When handling creosoted material;
Ranking or luting asphalt; Burning or cutting with torch;
Working on Bottom of Sewer Trenches on Final Grading, Laying or Caulking or performed sectional Sewer Pipe; High time (20 feet or over) where exposed to an open fall;
Operator of motor buggies; Any work performed in or on all types of cased wells; Cooking, mixing and applying of mastic such as sulfa-seal and/or other coal derivatives
GROUP 3 - Brick Mason and Plasterer Tenders.
GROUP 4 - Dynamite and Powder Men.
LABO1084-001 08/01/2022
BOND (Sorento) and MONTGOMERY COUNTIES
Rates Fringes
LABORERS
Group 1.....................$ 29.41 31.32 Group 2.....................$ 29.91 31.32 Group 3.....................$ 30.91 31.32
LABORER CLASSIFICATIONS:
GROUP 1 - General Laborer
GROUP 2 - Asbestos Abatement Worker and Hazardous Waste Worker; Lead Base Paint Worker
GROUP 3 - Dynamite Man
PAIN0058-002 05/01/2017
Rates Fringes
PAINTER (Bridge).................$ 32.45 17.12
Epoxy or Toxic-Lead-Based Paint Work-$1.00 Premimum
PLAS0090-001 08/01/2018
BOND, CALHOUN, CLINTON (WESTERN HALF EAST TO BUT NOT INCLUDE
CARYLE), GREENE, JERSEY, MACOUPIN, MADISON, MONROE, MONTGOMERY,
and ST. CLAIR COUNTIES
CEMENT MASON/CONCRETE FINISHER...$ 34.50 24.75
PLAS0090-005 08/01/2018
Clinton County
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 34.50 24.75
PLAS0143-007 04/01/2016
WASHINGTON COUNTY
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 36.43 20.87