JOR 09-0292, construct iase lab in bldg 194 telecom cabling installation, building 194
Awarded Award Notice Posted
- Solicitation number
- W912CF-09-B-0015
- Agency
- Mission and Installation Contracting Command Army Materiel Command, Department of Defense
- Awarded
- to Infocom Technology Inc.
- Set-aside
- HUBZone
Opportunity facts
- Contract number
- W912CF09C0009 Federal contract award
- NAICS code
- 238210 Electrical Contractors and Other Wiring Installation Contractors
- PSC
- Not on record
- Place of performance
- Lakehurst Naval Air Station Lakehurst , New Jersey 0873, United States
Notice details come from SAM.gov. Updated .
Notice text
Added: May 13, 2009 2:18 pm
JOR 09-0292, CONSTRUCT IASE LAB IN BLDG 194 -TELECOM CABLING INSTALLATION, BUILDING 194 FOR LAKEHURST NAVAL AIR STATION, LAKEHURST, NJ
HUBZone set-aside
The subject project requires installation of premise cabling and hardware for 35,000sqft Pre-Fab building within building 194 (Hanger 5).
In Pre-fab building install (45) ((3)-4 pair per station outlet) category 6 telecom outlets through 4000 raceway and tray systems in Laser, Control and Stimulation rooms from Telecom room. Includes patch panels, termination blocks, relay racks and testing.
Install fiber and copper backbone from building 194 point of entry to new telecom room in pre-fab building. Install 48 strand CMR rated single mode fiber and 100 pair 24 awg Category 3 plenum backbone cable via existing floor conduit and new RGS conduit. The fiber backbone cable will terminate at the building point of entry, and in the Telecom Room in the Pre-Fab Building.
The copper cable will terminate at the building point of entry, Vault 1 electrical room, and in the new Telecom Room in the Pre-Fab building.
Install termination hardware including (2) rack mounted fiber patch panels, fusion spliced ST pigtails and patch cords. Copper termination includes copper patch panels, termination blocks, associated wire management hardware, relay racks.
Install 48 strand CMR indoor/ outdoor single mode fiber backbone cable (approximately 7,000ft) from Hanger 1 DCO to building 194 point of entry through existing OSP duct and new innerduct with (1) 48 strand maintenance hole splice along route.
Install termination/ splice hardware including (2) rack/ wall mounted fiber patch panels, fusion spliced ST pigtails and patch cords. Splice enclosure will include fusion splice trays and all associated hardware.
Cables will be installed, terminated, labeled, and tested per Fort Monmouth Specifications, ARMY guidelines, codes and commercial industry standards.
Construction completion period is 90 days.
Liquidated damages in the amount of $200.00 per day
NAICS 238210
Magnitude: FAR 36.204: (b) $25k to $100k.
There is no unit bid price schedule.
There is no Government furnished equipment.
Bid Bond Required.
W912CF09B0015
13 May FBO Synopsis
28 May Solicitation
TBA Drawings
TBA Site Visits
30 June Bid Opening
All information needed to bid this award will be posted on FBO.
>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>
Attachments
Show all 35
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity