Lakehurst-090625revisedClarfication 090626.doc

DOC document 29 KB Posted

Attached to
JOR 09-0292, CONSTRUCT IASE LAB IN BLDG 194 TELECOM CABLING INSTALLATION, BUILDING 194 Federal contract opportunity
Solicitation number
W912CF-09-B-0015
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command

About this file

Lakehurst-090625revisedClarfication 090626.doc Revised 26 June 2009 Clarification No more updates

View the file

Other files for this federal contract opportunity

Other files attached to JOR 09-0292, CONSTRUCT IASE LAB IN BLDG 194 TELECOM CABLING INSTALLATION, BUILDING 194, newest first.
File Type Posted
BidAbstractW912CF09B0015.pdf PDF
Lakehurst-090625revised 090626.doc DOC document
208957 APPROVAL DRAWINGS 2 OF 14.pdf PDF
Atmt_147611_208957 APPROVAL DRAWINGS 1 OF 14.pdf PDF
Atmt_147611_208957 APPROVAL DRAWINGS 4 OF 14.pdf PDF
Atmt_147611_208957 APPROVAL DRAWINGS 3 OF 14.pdf PDF
Lakehurst-090625.doc DOC document
Bid Opening-Eatontown Library--09B0015.doc DOC document
REGISTER.pdf PDF
26_20_00.pdf PDF
26_00_00.00_20.pdf PDF
07_84_00.pdf PDF
01_42_00.pdf PDF
01_78_23.pdf PDF
01_33_00.pdf PDF
26_08_00.pdf PDF
33_70_02.00_10.pdf PDF
194t0904.pdf PDF
194t0905.pdf PDF
194t0901.pdf PDF
194t0903.pdf PDF
MASTER SPEC CABLE 2009.pdf PDF
194t0909.pdf PDF
194t0902.pdf PDF
194t0911.pdf PDF
194t0910.pdf PDF
194t0907.pdf PDF
194t0906.pdf PDF
Lakehurst Building 194-Hanger 5 Spec Info.doc DOC document
194t0908.pdf PDF
W912CF09B0015 JOR 09-0292 TelCom-Cable-CONSTRUCT IASE LAB IN BLDG 194.doc DOC document
lakehusrt search.pdf PDF
Base Map 5_04 large.pdf PDF
SiteVisitLakehurst090601--09B0012 13 14 15.doc DOC document
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Lakehurst, NJ Building 194, W912CF-09-B-0013, W912CF-09-B-0014, and W912CF-09-B-0015

Revised 26 June 2009 Clarification Drawing T1 TERMINATION HARDWARE SYMBOLS

B, C, AND D BLOCKS

SHALL READ AS SIEMON S210MB2-192FT NOT S210MB2-300FT

THIS WILL ALLOW UP TO 48-4 PAIR CATEGORY 6 STATIONS TO BE TERMINATED ON EACH BLOCK.

1. In the scope of work, the fiber is called out to be CMR but the 100 pair Cat 3 is Plenum rated. Is this correct? Should they both be of the same style?

THE PLENUM RATED 100 PAIR 24AWG CATEGORY COPPER BACKBONE WILL BE INSTALLED FROM VAULT 1 ELECTRICAL ROOM TO THE TELECOM ROOM IN THE IASE LAB IN BUILDING 194.

THE OPTICAL FIBER CABLE IS INDOOR/OUTDOOR RATED OFNR USED THROUGHOUT THE WHOLE PROJECT.

2. There are no teledata outlets shown in room #100. Is this correct?

THERE IS NO TELECOM/ DATA STATIONS OUTLETS IN THE LASER LAB ROOM 100 AT THIS TIME.

3. What are the elevations of the Pre-Fab building?

SEE ATTACHED

4. Can you supply us architectural drawings for the Pre-Fab building that states what the building is made of or what the interior walls are made of.

SEE ATTACHED

5. Where is panel "PP2" located? It is not shown in equipment room # 101.

PANEL PP2 HAS BEEN DELETED

6. Where are the safety switches 1 & 2 located?

SAFETY SWITCHES 1 & 2 IS SHOWING IN DRAWING E3, NEW ELECTRICAL PLAN

Reference:

DrawingUpdate090625

Type: Other (Draft RFPs/RFIs, Responses to Questions, etc..)

Label: DrawingUpdate090625

Posted Date: June 25, 2009

Lakehurst-090625.doc (24.50 Kb)

Description: Lakehurst-090625.doc

208957 APPROVAL DRAWINGS 2 OF 14.pdf (251.60 Kb)

Description: 208957 APPROVAL DRAWINGS 2 OF 14.pdf

Atmt_147611_208957 APPROVAL DRAWINGS 1 OF 14.pdf (579.80 Kb)

Description: Atmt_147611_208957 APPROVAL DRAWINGS 1 OF 14.pdf

Atmt_147611_208957 APPROVAL DRAWINGS 3 OF 14.pdf (453.97 Kb)

Description: Atmt_147611_208957 APPROVAL DRAWINGS 3 OF 14.pdf

Atmt_147611_208957 APPROVAL DRAWINGS 4 OF 14.pdf (212.17 Kb)

Description: Atmt_147611_208957 APPROVAL DRAWINGS 4 OF 14.pdf

File details come from the government source that posted it. Updated .