Lakehurst-090625revised 090626.doc

DOC document 24 KB Posted

Attached to
JOR 09-0292, CONSTRUCT IASE LAB IN BLDG 194 TELECOM CABLING INSTALLATION, BUILDING 194 Federal contract opportunity
Solicitation number
W912CF-09-B-0015
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command

About this file

Lakehurst-090625revised 090626.doc Panel pp2 has been deleted. Safety switches 1 and 2 is showing on drawing E3 new electrical plan.

View the file

Other files for this federal contract opportunity

Other files attached to JOR 09-0292, CONSTRUCT IASE LAB IN BLDG 194 TELECOM CABLING INSTALLATION, BUILDING 194, newest first.
File Type Posted
BidAbstractW912CF09B0015.pdf PDF
Lakehurst-090625revisedClarfication 090626.doc DOC document
208957 APPROVAL DRAWINGS 2 OF 14.pdf PDF
Atmt_147611_208957 APPROVAL DRAWINGS 1 OF 14.pdf PDF
Atmt_147611_208957 APPROVAL DRAWINGS 4 OF 14.pdf PDF
Atmt_147611_208957 APPROVAL DRAWINGS 3 OF 14.pdf PDF
Lakehurst-090625.doc DOC document
Bid Opening-Eatontown Library--09B0015.doc DOC document
26_20_00.pdf PDF
26_00_00.00_20.pdf PDF
REGISTER.pdf PDF
07_84_00.pdf PDF
01_42_00.pdf PDF
01_78_23.pdf PDF
01_33_00.pdf PDF
26_08_00.pdf PDF
33_70_02.00_10.pdf PDF
194t0904.pdf PDF
194t0905.pdf PDF
194t0901.pdf PDF
194t0903.pdf PDF
MASTER SPEC CABLE 2009.pdf PDF
194t0909.pdf PDF
194t0902.pdf PDF
194t0911.pdf PDF
194t0910.pdf PDF
194t0907.pdf PDF
194t0906.pdf PDF
Lakehurst Building 194-Hanger 5 Spec Info.doc DOC document
194t0908.pdf PDF
W912CF09B0015 JOR 09-0292 TelCom-Cable-CONSTRUCT IASE LAB IN BLDG 194.doc DOC document
lakehusrt search.pdf PDF
Base Map 5_04 large.pdf PDF
SiteVisitLakehurst090601--09B0012 13 14 15.doc DOC document
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Lakehurst, NJ Building 194, W912CF-09-B-0013, W912CF-09-B-0014, and W912CF-09-B-0015

1. In the scope of work, the fiber is called out to be CMR but the 100 pair Cat 3 is Plenum rated.

Is this correct? Should they both be of the same style?

2. There are no teledata outlets shown in room #100. Is this correct?

3. What are the elevations of the Pre-Fab building?

4. Can you supply us architectural drawings for the Pre-Fab building that states what the building is made of or what the interior walls are made of.

5. Where is panel "PP2" located? It is not shown in equipment room # 101.

6. Where are the safety switches 1 & 2 located?

Revised 26 June 2009

Panel pp2 has been deleted.

Safety switches 1 and 2 is showing on drawing E3, new electrical plan.