About this file

REGISTER.pdf

View the file

Other files for this federal contract opportunity

Other files attached to JOR 09-0292, CONSTRUCT IASE LAB IN BLDG 194 TELECOM CABLING INSTALLATION, BUILDING 194, newest first.
File Type Posted
BidAbstractW912CF09B0015.pdf PDF
Lakehurst-090625revisedClarfication 090626.doc DOC document
Lakehurst-090625revised 090626.doc DOC document
208957 APPROVAL DRAWINGS 2 OF 14.pdf PDF
Atmt_147611_208957 APPROVAL DRAWINGS 3 OF 14.pdf PDF
Lakehurst-090625.doc DOC document
Atmt_147611_208957 APPROVAL DRAWINGS 1 OF 14.pdf PDF
Atmt_147611_208957 APPROVAL DRAWINGS 4 OF 14.pdf PDF
Bid Opening-Eatontown Library--09B0015.doc DOC document
26_20_00.pdf PDF
26_00_00.00_20.pdf PDF
01_42_00.pdf PDF
01_78_23.pdf PDF
01_33_00.pdf PDF
26_08_00.pdf PDF
33_70_02.00_10.pdf PDF
07_84_00.pdf PDF
194t0906.pdf PDF
Lakehurst Building 194-Hanger 5 Spec Info.doc DOC document
194t0908.pdf PDF
194t0904.pdf PDF
194t0905.pdf PDF
194t0901.pdf PDF
194t0903.pdf PDF
MASTER SPEC CABLE 2009.pdf PDF
194t0909.pdf PDF
194t0902.pdf PDF
194t0911.pdf PDF
194t0910.pdf PDF
194t0907.pdf PDF
W912CF09B0015 JOR 09-0292 TelCom-Cable-CONSTRUCT IASE LAB IN BLDG 194.doc DOC document
lakehusrt search.pdf PDF
Base Map 5_04 large.pdf PDF
SiteVisitLakehurst090601--09B0012 13 14 15.doc DOC document
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 2 PAGES

Hangar 5 at Lakehurst

01 33 00 SD-01 Preconstruction Submittals

1.7 GSubmittal register

07 84 00 SD-02 Shop Drawings 2.1Firestopping Materials

SD-07 Certificates 2.1Firestopping Materials 1.5Installer Qualifications 3.3Inspection

26 08 00 SD-06 Test Reports

3.1 GAcceptance tests and inspections

SD-07 Certificates

1.4.1 GQualifications

1.4.3 GAcceptance test and inspections

procedure 26 20 00 SD-02 Shop Drawings

2.12 GPanelboards

GTransformers GCable trays GWireways

SD-03 Product Data GTransformers GGrounding Busbar

SD-06 Test Reports GTransformer tests

SD-09 Manufacturer’s Field Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 2 PAGES

Hangar 5 at Lakehurst

26 20 00 2.29.1Transformer factory tests 33 70 02.00 10 SD-02 Shop Drawings

1.4.1Detail Drawings 1.4.2As-Built Drawings

SD-03 Product Data GFault Current Analysis GProtective Device

2.2 GNameplates

2.1 GMaterial and Equipment

3.2 GInstallation Requirements

SD-06 Test Reports 2.17Factory Tests 3.12Field Testing 3.12.12Operating Tests 3.3.1.4Cable Installation

SD-07 Certificates 2.1Material and Equipment 3.4Cable Joints 3.13.2Installation Engineer

SD-10 Operation and Maintenance Data

3.13.1Operation and Maintenance Manuals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

File details come from the government source that posted it. Updated .