J063--HIRSCH SECURITY SYSTEMS UPGRADE Final Amendment - POP (12/01/2023 - 11/30/2027)
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 36C26224Q0082
- Agency
-
Veterans Integrated Service Network 22
Veterans Health Administration, Department of Veterans Affairs
- Responses due
- Set-aside
- Service-Disabled Veteran-Owned Small Business
Opportunity facts
- NAICS code
- 561621 Security Systems Services (except Locksmiths)
- Place of performance
- Department of Veterans Affairs Northern Arizona VA Healthcare System (Navahcs) Prescott, Arizona 86313, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks security systems upgrade services for the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22. Products and services include replacing outdated access control hardware with new Hirsch systems, installing security cameras, integrating software, and providing maintenance through November 2027. Proposals will be evaluated based on pricing, past performance, and compliance with the solicitation's terms. The response deadline is December 1, 2023.
This opportunity is set aside for service-disabled veteran-owned small businesses. The NAICS code is 561621 and PSC code is J063. Hirsch Security Systems is the potential incumbent. The period of performance is from December 2023 through November 2027 for security upgrades across over 200 VA facilities valued at an estimated $5-10 million. Services will be provided at VA medical centers and clinics located in Veterans Integrated Service Network 22 which covers facilities in Arizona, Nevada, Utah, Idaho, and Montana.
Notice text
3 versions
Update #3 · Latest ·
CONTINUATION PAGE
The purpose of this amendment is to answer contractor questions and submit a final SOW change, minor, to the contract solicitation. The manufacturer has combined the Part Number for the Door Licenses and so the one license covers all of the doors. Also, we are changing from Option Years to Phases so allow for a speedier process. Depending on availability of funds several phases may be completed in the same fiscal year. Pricing should be indicative of the phases, with the understanding that the initial funding is only for Phase I. Should Phase I be completed before September 30, 2024, and there be more funds available to complete all of Phase II, the Government has the ability, not the obligation, to enact Phase II.
Please note the following attachments were added to the Contract Opportunities site folder as discussed during the site visit. The missing floor plans for B162 and B164, and the C-CURE iSTAR Controller Report, SWH02 All Doors Report, SWH09 Input Status Report, Outputs Report, and SWH16 Reader Status Report. It is the contractors responsibility to download these from the Contract Opportunities Site as they need them.
**IMPORTANT** This solicitation is being made under FAR part 13 Simplified Acquisition Procedures. No further discussions will be conducted. Interested contractors shall only send their best offer with their capability statement, if any.
Late submissions shall be treated in accordance with the solicitation provision at FAR 52.212-1(f). All quotes regarding this solicitation should be forwarded in writing via e-mail to the Point of Contact listed below. Quotes should be based on the information provided as no discussions will be allowed. Point of Contact Norman Napper-Rogers, Contracting Officer, Norman.Napper-Rogers@va.gov.
QUESTIONS & ANSWERS
Are there drawings/floor plans for these buildings, or would we be able to conduct a job walk at the sites? (Site visit for Prescott, drawings/floor plans for satellites.)
Drawings of the facilities upgrades will also be available.
Are the hardware items in the schedule the requested replacement items for the
CCURE\Software house hardware items?
The old CCURE system has many anomalies, so the new Hirsch system is a direct replacement of all old CCURE hardware.
Can the Government confirm the POP dates?
The contract will be funded in Phases and the Phases can be completed earlier, and a new phase started if funding is available earlier. The POP is being modified to the following dates 01/01/2024 12/31/2024 (Phase I), 01/01/2025 12/31/2025 (Phase II), 01/01/2026 12/31/2026 (Phase III), 01/01/2027 12/31/2027 (Phase IV). This will allow for continued progression throughout the contract and can make shorten the project time.
Can the customer identify the existing Hirsch system to include the server model, system ID, software version, etc.?
Server is a custom Build, Velocity/Hirsch software ver. 3.8.4
Can the customer also confirm if the Hirsch Support Agreement is still active?
It is currently active.
Can the customer clarify the requirement for upgrades across 4 option years?
Provide software and firmware to maintain updates and compliance, in a phased deployment.
Are these buildings not ready for an upgrade?
All buildings are ready but is contingent on availability of funding.
Can the Contractor propose a shorter delivery schedule?
No. The schedule is contingent on funding.
The Bill of Materials is identified for all building during the base year and option years 1-3. However, a Bill of Materials has not been provided for the building in Option Year 4. Can the customer provide this list of materials so that OY4 can be quoted?
What was Option Year 4, the CBOCs, is being removed from the contract at this time. There will be no need for this information at this time.
Update #2 ·
CONTINUATION PAGE
The purpose of this modification is to extend the deadline for submitting final questions and the final quotes for the solicitation. The following situations arose that increased the need to push the POP date and the submission due date.
All final questions must be submitted by 11/10/2023. NO further questions will be answered after that time. All answers to questions will go out will the final modification of this solicitation.
Option Year 4 includes the Community Based Outpatient Clinics (CBOCs), we have requested permission from the landlords to have an outside contractor (not the landlord) do the work, and until they approve or deny that request, we cannot finalize OY4 for the bid. This will be decided and be published in the final modification of the solicitation as well.
Once I have confirmation of the CBOC participation, I will send out the CBOC Equipment lists and maps as well. There will not be any site visits to the CBOCs.
Final Modification will be posted to Contract Opportunities on 11/17/2023.
All Quotes are due by 12/01/2023.
POP to begin on 01/01/2024.
**NOTE** PLEASE REMEMBER ALL CORRESPONDANCE MUST BE IN WRITING, VIA EMAIL TO Norman.Napper-Rogers@va.gov. SUBJECT LINE MUST READ RESPONSE TO RFQ 36C26224Q0082 .
Update #1 ·
CONTINUATION PAGE The purpose of this modification is to set up a site-visit for contractors to walk the site and to answer some questions while extending the receipt date to allow for adjustments to quotes after the site-visit. The site visit will begin at 11:00 am MST (Local Time) on 10/27/2023. Late arrivals will not be honored. Contractors shall check-in with VA Police upon arrival, in B28 where they will be met by Contracting and Engineering Staff for the Tour. Please arrive early to be checked in. The NAVAHCS Electronics Tech will be walking the site. The old CCURE system has many anomalies, so the new Hirsch system is a direct replacement of all old CCURE hardware. Drawings of the facilities upgrades will also be available via email. Please provide best quote on the attached schedule.
Files
Show 40 more
50 files listed here. See the rest on GovTribe.
Notice history
| Notice | Type | Posted |
|---|---|---|
| J063--hirsch security systems upgrade - POP (01/01/2024 - 12/31/2027) | Award Notice | |
| This notice | Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Boise VA Security Equipment & Software Service Maintenance | Veterans Integrated Service Network 20 | Service-Disabled Veteran-Owned Small Business | |
| J012-- Fire Alarm Suppression Maintenance & Repair Services | Veterans Integrated Service Network 16 | Service-Disabled Veteran-Owned Small Business | |
| J063 Service and Software Updates to Security Access Control and Camera Systems Across Idaho/ Eastern Oregon VA Locations | Veterans Integrated Service Network 20 | No set-aside | |
| J041--PMI ICE Machine Service Contract -w/wd, B+4, POP 1/1/2027 - 12/31/2027 | Veterans Integrated Service Network 22 | Service-Disabled Veteran-Owned Small Business | |
| S206--691 | North Campus Security Staffing | PoP: 05/14/2027 - 12/31/2028 | Veterans Integrated Service Network 22 | Service-Disabled Veteran-Owned Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity