J045--boiler repair hudson valley vahcs - montrose campus

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
36C24226Q0816
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Hudson Valley VA Healthcare System Montrose Campus Montrose, New York 10548, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2 intends to solicit a mechanical contractor to replace a damaged Webster burner assembly on Boiler #2 at VA Hudson Valley Healthcare System Montrose Campus, with a response deadline of August 7, 2026. This is a total small business set-aside, PSC J045, NAICS 238220.

Work is performed at the Boiler Plant (Building 20), 2094 Albany Post Road, Montrose, New York 10548-1454. The scope encompasses replacement in kind of the Webster model HDSXC-105C-9V-750 burner damaged by fireside explosion, all existing burner fuel train field devices (gas and oil) downstream of isolation valves, burner atomization field devices, and the burner air intake manifold with associated ductwork, fittings, filters, and alarms. Additional work includes replacement of damaged refractory in the boiler throat, re-piping the atomizing train to VA Standard Detail SD235239-04, installing a new propane header system sized for all four boilers in the plant (including a 200-gallon propane tank and 250 feet of 1-inch black iron piping), replacing the oxygen sensor, cleaning internal tubes via hydroblasting or mechanical means, and repainting the boiler exterior.

The boiler is a Victory Energy D-type water-tube unit rated at 30,000 lb/hr steam (37.5 MMBtu/h input), originally installed in 2011 with 2019 MicroMod parallel positioning combustion controls. The existing Fireye flame safeguard system (YB110 with YZ300 annunciation module and 45UV5 scanner) was original to the 2011 installation. All work must comply with VA specifications, the VA Design Manual, and the VHA Boiler and Associated Plant Safety Device Testing Manual (Eighth Edition). Contract deliverables include comprehensive testing, commissioning, staff training, manuals, warranty documentation, and test reports.

The contracting office is James J. Peters VA Medical Center, Bronx, New York 10468-3904. Point of contact: Natalie Acevedo. Solicitation number: 36C24226Q0816.

Notice text

Provide the services of a mechanical contractor to replace in kind one (1) existing Webster

burner assembly on Boiler #2 in the Boiler Plant (Building 20) at the VA Hudson Valley

Healthcare System Montrose Campus. The Scope of Work also includes the replacement

of the existing burner train field devices for both gas and oil and the replacement of existing

field devices in the front of the boiler. All replacement of the field devices must be in kind.

Replace burner air intake manifold and all associated ductwork, fittings, filters, alarms, etc.

Other repairs required are listed below. All work shall be performed in accordance with

attached VA specifications, VA Design Manual, and VA Boiler and Associated Plant Safety

Device Testing Manual, Eighth Edition.

Background: Boiler # 2 is a Victory Energy, D-type Water-tube boiler rated at 30,000 lb/hr

steam (approximately 37.5MMBtu/h input). The boiler was originally installed in 2011 with a

Webster model HDSXC-105C-9V-750 Burner. The Micro-Mod Parallel Positioning (Metering)

Combustion Controls were installed in a separate project, in 2019. The burner is equipped for

Natural Gas Firing, as well as Number 2 Fuel Oil with the option for either compressed air or

steam atomization. The back-up (Propane) pilot system is via a small (portable) bottle,

connected by a temporary hose- when needed. The Burner Flame Safeguard system is a Fireye

YB110, with a Fireye YZ300 Expanded Annunciation Module and a Fireye 45UV5 Scanner- all

original to the 2011 project.

Item #1 Replace Boiler #2 Burner Assembly and Controls - The existing Webster Burner for

Boiler #2 is damaged from a fire side explosion and shall be replaced in kind as listed as the

same model identified in the above background (Webster model HDSXC-105C-9V-750 Burner).

All existing burner fuel train field devices (for both gas and fuel oil) located downstream of their

associated isolation valve shall be replaced in kind. All burner atomization field devices located

downstream of associated isolation valve shall also be replaced in kind. Replace the burner air

intake manifold and all associated ductwork, fittings, filters, alarms, etc. Replace all existing

field devices for combustion air in kind (See Attachment D - List of field devices to be replaced).

All existing field devices being replaced shall be handed over to the VA for spare parts. The

existing MICROMOD and Fireye controls systems shall remain.

a.) The contractor shall inspect the existing burner, field devices, and control

systems serving Boiler #2 including all wiring and integrations points. Document

current operational parameters and deficiencies. The VA shall provide the

contractor with the as-built wiring diagrams of the existing MICRO MOD Burner

Management System. Contractor shall field verify information from as-built

documentation in the field and notify the VA COR of any discrepancies.

b.) Provide submittals of all equipment, field devices, and materials to be installed

under contract for VA review and approval.

c.) Delivery Upon approval of submittals, Contractor shall order and then deliver

the replacement equipment and material to site.

d.) Removal - Once the replacement burner is delivered to site, the contractor shall

safely disconnect and remove the existing burner, field devices, associated

wiring, and fuel connections. Contractor shall hand over existing equipment and

field devices to VA who will use equipment for spare parts.

e.) Installation and Integration Contractor shall set the replacement burner and

field devices in place and make all necessary connections to the existing Victory

boiler and existing MicroMod system as well as all electrical and utility

connections. Make connections to fuel supply, electrical systems, and control

panels. Integrate new controls with existing boiler hardware.

f.) Start Up - Contractor shall start up replacement burner.

g.) Testing & Commissioning

a. Once boiler is refilled, Contractor shall perform a hydrostatic test to

ensure that there are no potential tube leaks on Boiler 2.

b. Contractor shall calibrate all gauges and transmitters and test for proper

operation on Boiler #2. Submit all test reports to VA COR

c. Perform operational tests, combustion analysis, and adjustment to

ensure optimal performance. Submit a completed Combustion Test

Report showing the results from the combustion test. Use the attached

Combustion Test Report, Attachment C.

d. For controls, program control logic for optimal efficiency and safety.

Conduct functional and safety tests, including failover and alarms

systems. Submit all test reports to VA COR

e. Contractor shall test all safety devices and tune the combustion on Boiler

2 using the testing methods specified in the VHA Boiler and Associated

Safety Device Testing Manual, Eighth Edition (See Attachment A).

Submit the completed test reports from the Safety Device Testing Manual

to the VA COR.

h.) Training Provide basic operational and maintenance training to VA staff

i.) Deliverables - Contractor shall provide all manuals and warranty documentation,

test and commissioning reports, operator training completion certificates.

j.) Standards and Compliance All work must comply with applicable local, state,

and federal codes, as well as manufacturer s specifications and safety

regulations.

Acceptance Criteria The project will be considered complete when Boiler 2 with its

replacement burner operates in accordance with manufacturer s specifications and

testing requirements, passes all VA performance and safety inspections, and

documentation is delivered to the VA. VA performance and safety inspections shall be

considered passed when Boiler #2 with its replacement burner successfully passes the

tests mentioned in this Statement of Work (SOW) and all tests outlined in the VHA

Boiler and Associated Plant Safety Device Testing Manual, Eighth Edition and all fully

completed test reports, as described in this SOW and the Safety Device Testing manual,

is submitted to the VA.

OTHER REPAIR SERVICES TO BE PERFORMED UNDER THIS CONTRACT

The scheduling and completion of work items not contingent upon the delivery and installation

of the replacement burner for Boiler 2 can be scheduled and performed any time after the

issuance of the NTP but must be completed and accepted by the VA prior to the completion date

of the contract.

Item #2: Replace the damaged refractory in Boiler #2 Replace the refractory around the

boiler throat to match existing refractory as installed by boiler manufacturer. Consult with

Victory Boiler on their recommended replacement method and design. Provide Victory s

recommendation to the VA COR prior to replacement. (NOTE: This work item must be

performed prior to the installation of the replacement burner).

Item #3: Provide hard piped atomizing train to Burner #2 Current piping configuration on

the atomizing train (for steam and air) does not meet VA requirements. Re-pipe both steam

and air atomization chains to be in compliance with VA Standard Detail SD235239-04 (See

Attachment B).

Item #4: Install propane header sized for proper capacity to accommodate all four boilers in

the Boiler Plant.

Propane is used for fueling each burner s pilot ignition. The existing propane delivery system in

the Boiler Plant is inadequate per VA specifications. Contractor shall hire engineering services

to evaluate the capacity needed for the Webster burners on all four (4) boilers and to size an

alternate pilot propane tank, main header, and branch piping to the Boiler #2 burner. Main

header shall have T connection for future installations to burners on Boilers 1, 3, and 4. The

size of the propane tank and main header shall have the capacity to supply four (4) Webster

burners in the plant. For bidding purposes, assume that a 200 gallon pad mounted propane

tank is needed just outside of the Boiler Plant and a 250 long header of 1 black iron pipe is

needed to be hung in front of all four (4) existing boilers. Install black iron branch piping down

to Boiler #2 replacement burner per standard detail 235239-04. Replace (2) existing Low

Pressure Gas (LPG) Pilot field devices in kind (Low Pressure Cutoff Switch and LP Safety Solenoid

Valve). Provide tee connections on main header for future hard pipe branch piping to other 3

boilers in Boiler Plant. Hydrostatic test new tank and piping per VA specifications. When ready

for testing of new burner for Boiler #2, fill tank full with propane.

Item #5: Replace Oxygen Sensor on Boiler #2 Contractor shall install one (1) VA furnished

sensor on breach of Boiler #2. Calibrate and test operation with new controls system.

Item #6: Hydro blast or mechanically clean internal tubes on Boiler #2 to reduce build up.

Item #7: Repaint the exterior of Boiler #2 around the burner casing with high temperature

resistant paint. Prep surface of boiler prior to painting. (NOTE: This work item must be

performed prior to the installation of the replacement burner).

GENERAL REQUIREMENTS

. Prior to submission of proposal, all prospective bidders shall make at least one site visit

to the Montrose Campus to become familiar with the scope of work and the existing

conditions. During this visit, bidders must document all of the field devices on the fuel

and atomizing train to be replaced. These devices will be tagged by VA personnel prior

to the visit. Coordinate the date and time of the visit with the VA COR.

After award, the VA will provide the contractor with the existing floor plans of the Boiler

Plant in AUTOCAD and PDF format along with all pertinent information of the existing

equipment and controls. All work shall be designed in strict compliance to the VA

Boiler Guide and VA specifications.

. Contractor shall complete required paperwork to obtain PIV badges for all workers in

compliance VA badging policy.

. The contractor shall submit submittals of all materials and equipment to be used on the

project. All materials and equipment submittals shall be APPROVED prior to purchase of

items.

. The contractor shall submit a project CPM schedule per VA specs.

. Provide four (4) week advance notice to VA COR for planned utility shutdowns required

to perform work.

. Follow facility s Lock Out Tag Out (LOTO) policy procedures.

. Follow facility s Confined Space policy procedures prior to and during work inside of

boiler.

. All the other existing controls systems in the Boiler Plant serving Boiler s 1, 3, and 4 shall

remain and their system functionality shall not become impaired or rendered inoperable

in any way due to the actions required under this contract for the duration and the

completion of the contract.

Files

Notice history

Notice Type Posted
J045--36C24226P1049 - boiler repair hudson valley vahcs - montrose campus (1X) - Award Award Notice
J045--RFQ - boiler repair hudson valley vahcs - montrose campus Latest solicitation Solicitation
This notice Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Y1DA--Project620-22-110 Replace and Upgrade Fire alarm System at Montrose VAMC Department of Veterans Affairs Franklin D. Roosevelt VA Medical Center Montrose, New York 10548, United States · NAICS 238210 Veterans Integrated Service Network 2 Service-Disabled Veteran-Owned Small Business
Y1DZ--replace chilled water pump at the boiler plant Department of Veterans Affairs Network Contracting Office 2 Bronx, New York 10468, United States · NAICS 236220 Veterans Integrated Service Network 2 Service-Disabled Veteran-Owned Small Business
16292 Steam Boiler Replacement Hill AFB, Utah 84056, United States · NAICS 238220 Air Force Sustainment Center Total Small Business
J048--NEW - Energy Center Steam Header& Boilers valves, gaskets, and vent replacement Department Of Veterans Affairs VA North Texas Health Care System Dallas TX 75216 · NAICS 238220 Veterans Integrated Service Network 17 Service-Disabled Veteran-Owned Small Business
Z1DA--NRM CONST - 528A7-18-707 - Replace Boiler Stack Rome CBOC Rome, New York 13441, United States · NAICS 238220 Veterans Integrated Service Network 2 Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors