Attachment D - Field Devices To Be Replaced on Boiler 2.pdf
PDF 3 MB Posted
- Solicitation number
- 36C24226Q0816
About this file
This is an appendix detailing field devices on Boiler 2 that are to be replaced during a boiler retrofit or upgrade project. The document lists 53 individual field devices organized by subsystem, including the Gas Train, Gas Pilot, LPG Pilot, #2 Oil Train, Atomizing Steam, Feedwater, Steam, Combustion Air, and Flue Gas systems.
Each device entry specifies the tag number, field device description, device ID number (where applicable), associated panel (SCADA, BMS, or TITAN), and panel point designation. Devices to be replaced in kind include transmitters for gas flow, pressure, temperature, and level measurements; solenoid valves for gas, oil, steam, and air control; pressure switches and cutoff switches; flow meters; damper actuators; and analyzer equipment. Notable devices include gas flow orifice transmitter GT-FIT-P-1118, gas header pressure transmitter GT-FIT-P-1100, oil burner pressure transmitter OIL-PIT-P-11124, and oxygen analyzer ZR22/ZR402. The contractor is required to verify all devices in the field and replace them with equivalent equipment meeting the original specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24226Q0816.docx | DOCX document | |
| Attachment B - VA Standard Detail SD 235239-04.pdf | ||
| ATTACHEMENT A 23 21 11-Boiler Plant Piping.pdf | ||
| Attachment C - SAMPLE of Combustion Calibration Test Report.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VHAMORANDERE
Highlight
VHAMORANDERE
Highlight
VHAMORANDERE
Highlight
VHAMORANDERE
Highlight
VHAMORANDERE
Highlight
VHAMORANDERE
Highlight
VHAMORANDERE
Typewritten Text = Field devices to be replaced in kind. Contractor shall verify in field
VHAMORANDERE
Highlight
VHAMORANDERE
Highlight
VHAMORANDERE
Highlight
VHAMORANDERE
Highlight
VHAMORANDERE
Highlight
VHAMORANDERE
Highlight
VHAMORANDERE
Highlight
VHAMORANDERE
Highlight
VHAMORANDERE
Highlight
VHAMORANDERE
Highlight
VHAMORANDERE
Highlight
VHAMORANDERE
Highlight
VHAMORANDERE
Highlight
VHAMORANDERE
Highlight
VHAMORANDERE
Highlight
VHAMORANDERE
Highlight
VHAMORANDERE
Highlight
VHAMORANDERE
Highlight
VHAMORANDERE
Highlight
VHAMORANDERE
Highlight
VHAMORANDERE
Highlight
VHAMORANDERE
Highlight
VHAMORANDERE
Highlight
VHAMORANDERE
Highlight
VHAMORANDERE
Highlight
VHAMORANDERE
Highlight
VHAMORANDERE
Highlight
VHAMORANDERE
Highlight
VHAMORANDERE
Highlight
VHAMORANDERE
Highlight
VHAMORANDERE
Typewritten Text Attachment D - Field Devices on Boiler 2 To Be Replaced
VHAMORANDERE
Highlight
VHAMORANDERE
Highlight
VHAMORANDERE
Highlight
VHAMORANDERE
Highlight
VHAMORANDERE
Highlight
VHAMORANDERE
Highlight
VHAMORANDERE
Highlight
VHAMORANDERE
Highlight
VHAMORANDERE
Highlight
File details come from the government source that posted it. Updated .