J035--603-24-102 - Repair (Replace) Steam Traps- Robley Rex VAMC - Re-Solicitation
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 36C24924R0069
- Agency
-
Veterans Integrated Service Network 9
Veterans Health Administration, Department of Veterans Affairs
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Veterans Affairs (VA) is seeking contractors to replace 98 failed steam traps and associated components at the Robley Rex VA Medical Center in Louisville, Kentucky. Key requirements include providing all labor, materials, and equipment to replace the traps, connector blocks, isolation valves, check valves, strainers, pipe, nipples, and fittings. The VA will supply isolation valves, strainers, and check valves if replacements are needed. Contractors must comply with all relevant codes and standards, provide training for maintenance personnel, and furnish a one-year warranty. Proposals are due by June 7, 2024 at 2:00 PM EDT.
This solicitation is not set-aside for any particular business type. The project has a period of performance of 240 calendar days and is estimated to be between $250,000 and $500,000 in value. After-hours work may be required to minimize disruptions to the medical center's operations. The place of performance is the Robley Rex VA Medical Center in Louisville, Kentucky.
Notice text
2 versions
Update #2 · Latest ·
Site Visit Sign-In Sheet
14 May 2024, 9:30 AM EDT
Project 603-24-102
Replace Steam Traps, Louisville (Robley Rex)
Name Title Company Phone Number Email
Brian Roberts BTR Enterprises LLC 803-993-8242 brian@briantroberts.com
Chad Schenek Perfection Group 812-704-0787 cschenek@perfectiongroup.com
Jimmy Romero Sales Spirax Sarco 931-286-1603 jimmy.romero@us.spiraxsarco.com
James Reed Manager Spirax Sarco 336-543-6386 james.reed@us.spiraxsarco.com
United Enterprises 502-361-4405 www.unitedentLLC.com
___________________________________________________________________________________________________________
END OF DOCUMENT
Update #1 ·
STATEMENT OF WORK (SOW)
Department of Veterans Affairs
Robley Rex VA Medical Center
Repair (Replace) Steam Traps
PART I
Introduction This project will Replace Steam Traps that have failed or need to be converted to steel steam traps at the Robley Rex VA Medical Center, 800 Zorn Avenue, Louisville, KY. The period of performance is 240 days.
Background Existing steam traps have failed, causing steam condensate to back-up, shock, flashing, hammering and equipment failures, and the VA is now requiring that all steam traps and associated fittings used in high pressure and medium pressure steam systems (greater or equal to 15 psi) must be cast steel, forged steel, or stainless steel.
Applicable Codes:
NAICS Code 238220
Product Service Code J035
Project Objectives
Replace 98 traps and all required trap assembly items (VA will supply all isolation valves (if replacement is necessary), strainers, and check valves; The contractor shall supply all traps, pipe, nipples and fittings. The contractor shall install all parts needed (traps, nipples, pipe, isolation valves, check valves, strainers, and trap tags) for each trap being replaced.
Where traps are being replaced, replace failed or missing components at each trap assembly. Refer to VA Standard Details for trap assemblies (attached). Verify complete, compliant, functional assemblies.
Coordinate and monitor to ensure the work is safe and complete. Provide foremen to directly oversee the work crews, ensuring proper precautions and performance.
Minimize disruptions on medical center operations. Some after-hours work will be required to minimize disruptions, equipment connections/verification.
PART II
Scope of Work
The contractor shall reference the attached spreadsheet (Replace Steam Traps Trap Inventory) to see details on each trap assembly. For high and medium pressure steam trap assemblies, cast iron components of the trap assembly will be replaced with steel components. For low pressure steam trap assemblies, only the steam traps and failed or missing components mentioned in the trap inventory spreadsheet will be replaced. Note: Low pressure is considered less than 15 psi.
Contractor is responsible for providing all repair services, labor, and demolition to replace steam traps and trap assemblies. Trap assemblies include steam traps, connector blocks, isolation valves, check valves, strainers, pipe, nipples, and fittings. Work includes mechanical and necessary modifications of associated structures and systems. The contractor shall supply all traps, pipe, nipples and fittings.
The VA will supply all isolation valves, strainers, and check valves if they need to be replaced because they are made of materials that are not suitable, have failed, or are missing.
The contractor shall supply steam traps and connector blocks, pipe, nipples, and fittings. Note: For all high pressure and medium pressure steam trap assemblies, all parts must be cast steel, forged steel or stainless steel (steam traps, connector blocks, pipe, nipples, fittings).
Contractor is to furnish all materials listed above, labor, equipment, tools, supervision, transportation, storage, and quality control necessary to accomplish the objectives in accordance with the SOW and specifications. The contractor shall reference the attached spreadsheet (Replace Steam Traps Trap Inventory), and shall get all replacement traps approved by VA COR prior to purchase and installation.
The project does not include insulating piping within the steam trap assembly (boundary defined by the steam isolation valves). However, the VA will require the contractor to replace any pipe insulation that is damaged or removed unnecessarily.
Scheduling and Duration After-hours project work will be required to minimize disruptions to medical center operations. Medical center normal hours of operation are from 7am to 5pm, Monday through Friday. Work producing noise, dust or blocking hallways must be coordinated outside normal working hours. Coordinate with the Contracting Officer s Representative (COR) at least 7 days in advance. On-site work shall be managed to minimize the effect on medical center. Period of Performance is 240 days. All days within this document refer to calendar days.
Inspections The VA COR is responsible for the inspection of the work called for in this project. Inspections shall be requested at least 7 days in advance by the contractor. Inspections made by the COR are for the sole benefit of the Government and do not relieve the Contractor of any quality control responsibilities. All work shall be inspected during installation and at final completion by the COR.
Warranty All work shall be warranted against defects in material and workmanship for a period of one year.
Training Provide training for M&O personnel. The contractor shall conduct 1 session. The contractor shall organize the training and develop the format/content with the manufacturer s rep. The manufacturer s rep shall conduct the training session(s) for each new type of equipment (each trap type) and the contractor will assist. Contractor shall provide M&O manuals tabbed by trade, including as-builts with referenced tables (spreadsheet indicating the trap model, characteristics and components installed at each location), cutsheets and maintenance instructions for each piece of equipment.
Delivery and Storage The contractor is responsible for all transportation, deliveries and storage of materials and all associated costs. No onsite storage will be provided by the Government.
Fees and Mark-up The contractor s price to the government shall be all-inclusive, including all associated fees/costs and services to complete the work and provide a certified, fully functional system.
Bid/Proposal Item Contractor proposal will not include a bid deduct, so there will be one bid item and complete price. The Bid Item will include all work to replace traps and repair assemblies as indicated in the project documents and scope of work. Total duration is 240 days.
PART III
Guidelines and Standards
Comply with current applicable state, local, & federal building codes as well as codes from other recognized authoritative bodies; including, but not limited to, Associated Air Balance Council (AABC), American Concrete Institute (ACI), Acoustical and Insulating Materials Association (AIMA), American National Standards Institute (ANSI), American Society of Heating, Refrigeration, and Air-Conditioning Engineers (ASHRAE), American Society of Mechanical Engineers (ASME), American Society for Testing and Materials (ASTM), Gypsum Association (GA), Hydraulic Institute (ANSI/HI for pump design, installation and testing), International Building Code (IBC), NEC, NFPA, National Environmental Balancing Bureau (NEBB), National Standard Plumbing Code (NSPC), OSHA (Occupational Safety and Health Administration), Sheet Metal and Air Conditioning Contractors National Association (SMACNA), and American Barriers Act (ABA).
Comply with VA Infection Control Standards.
General Requirements and Notes
Prior to performing work, Contractor will coordinate the work with subcontractors and the VA COR. All details, equipment and material selections, sizing, locations, configurations/arrangements, etc., shall be worked-out in the field by the contractor and his QC. The contractor shall follow the recommendations listed in the Trap Inventory Spreadsheet. The contractor shall then submit the Trap Inventory Spreadsheet with a proposed replacement trap for each line item; listing the manufacturer and model number proposed.
The contractor s superintendent and foremen will be on site at all times during the performance of contract work.
Contractor shall provide all labor, materials, equipment, components, supplies, supervision, and knowledge to perform the job. When furnish , provide , install or similar term is used, it shall mean a complete installation that is ready for use and fully functional.
The contractor shall identify all employees that will be working under the awarded contract. Contractor personnel shall include employees, sub-contractors, suppliers, and delivery personnel entering the medical center. Those employees shall bring photo ID to obtain a VA Contractor identification badge that shall be worn above the belt at all times while on medical center property. Contractor s employees shall return all I.D. badges to designated personnel at the end of the period of performance of the contract. Lost badges will result in a surcharge.
Contractor shall perform safety inspections of all contract operations. All VA and OSHA safety regulations shall be observed during the performance of work. Provide PPE, signage, protection, barriers, and barricades, as required to maintain the safety of contractor and VA staff, visitors, and patients.
Prior to bid, the contractor and subcontractors shall visit the job site to thoroughly familiarize themselves with all the details of this work and working conditions. The contractor shall also verify all dimensions and material takeoffs in the field and shall advise the Contracting Officer and COR of any discrepancy or issues before performing any work. The contractor shall be specifically responsible for the coordination and proper performance of their work in the building.
Contractor shall not allow smoking in any building. Smoking is not permitted on the VA Campus.
Contractor will take adequate precautions to protect adjacent structures, equipment, and walkways in and around the work area.
The Contractor does not have assigned parking and is responsible for parking. Space will be made available for temporary unloading and loading of materials. The contractor will be allowed to park 6 vehicles while the actual work is being performed. Drivers should be particularly concerned with pedestrian traffic, Yield to pedestrians in crosswalks. Seat Belt use is mandatory on all VA grounds.
The Contractor shall keep the work area, including any areas where materials/equipment is being stored, free from accumulations of waste materials at all times. Upon completion of the work, the Contractor shall remove any rubbish and contractor owned materials, equipment, tools, and temporary measures.
When items, equipment, or materials are to be demolished, remove all appurtenances and patch back as necessary using materials consistent with adjacent site preparation. Do not leave any abandoned components or utility feeds. Remove utilities feeds back to the source or an active line, main, or main branch.
Equipment shall be provided by nationally recognized manufacturers that produce and distribute products across the United States for over 5 years. Manufacturers must have local vender representatives within a 300-mile driving distance, capable of responding to issues the same day.
Due to space limitations, the contractor will only have space for a small staging area with 1 Connex, 1 dumpster and 1 vehicle. The contractor shall immediately remove equipment/materials/supplies from the site when it is no longer needed or actively being installed/used. The contractor is responsible for the proper disposal of all waste.
Do not use any cast iron components. Traps shall be carbon steel or stainless steel. Other trap assembly components shall be carbon steel.
Provide and install all necessary devices, equipment and any other components that are required to complete the project and provide a functional system. Do NOT reuse existing components and devices. Any failed components in an assembly shall be replaced. Any missing components required for a complete assembly shall be installed.
Identify/label equipment. Use hard, UV resistant, vinyl tags. Provide a schedule to accurately identify the equipment and reflect the changes.
Submittals/materials/equipment must be processed within 5 days of contract award. Contractor shall review/sign all materials, submittals, providing comments and acting on the submittal. The contractor and their QC specialist shall review submittals/materials prior to installation. Submittals must be approved by all parties prior to the performance of work.
Submit a schedule/plan within 5 days after NTP. If the schedule slips 10 days, submit a revised schedule/plan to the COR and CO, indicating the reasons for the slippage and suggesting actions to remedy the schedule slippage.
Contractual Provisions: This SOW shall be considered as the most specific requirement for this project and shall quash any conflicting requirement(s) or terms. When the requirements/terms of the contract do not directly conflict, that provision shall be considered as an additional requirement.
Completion
Upon completing a segment of work (related to a location/task/objective), the Contractor shall leave the work area in a clean, neat, and orderly condition satisfactory for use.
Upon completion of a segment of work, the Contractor shall demonstrate that all work is complete, and the system is fully functional.
Comply with manufacturer s requirements.
Correct and reinspect any QC listed issues prior to requesting final inspection.
Provide a stamped QC report and certification prior to requesting final inspection. Report shall document the work, inspections, corrective actions and approval of each assembly.
Request for final inspection shall be submitted in writing to contracting officer and COR 7 days in advance of the inspection date.
Attachments
Steam Trap Inventory Spreadsheet April 16 2024
Inverted Bucket Steam Trap Assembly
Float and Thermostatic Steam Trap Assembly
END OF STATEMENT OF WORK
Files
| File | Type | Posted |
|---|---|---|
| 36C24924R0069 0001.docx | DOCX document | |
| Atch 7 Construction Past Performance Questionnaire.docx | DOCX document | |
| Atch 6 Calculation of Contractor Self Performed Work.xlsx | XLSX spreadsheet | |
| Atch 5 Construction Pricing Schedule.xlsx | XLSX spreadsheet | |
| 36C24924R0069.docx | DOCX document | |
| Atch 4 Drawing Inverted Bucket Steam Trap Assembly.pdf | ||
| Atch 3 Drawing Float and Thermostatic Steam Trap Assembly Detail.pdf | ||
| Atch 2 Steam Trap Inventory Spreadsheet April 16 2024.xlsx | XLSX spreadsheet | |
| Atch 1 WD Jefferson County Building KY20240093 dated 03152024.pdf | ||
| Atch 8 RFIs Questions and Answers from Previous Solicitation.docx | DOCX document |
Notice history
| Notice | Type | Posted |
|---|---|---|
| J035--603-24-102 - Repair (Replace) Steam Traps- Robley Rex VAMC | Award Notice | |
| This notice | Solicitation | |
| J035--603-24-102 - Repair (Replace) Steam Traps- Robley Rex VAMC - Re-Solicitation | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| R425--Temporary Operations and Maintenance Staffing Services for Skilled Trades Louisville VA Medical Center, Kentucky | Veterans Integrated Service Network 9 | Service-Disabled Veteran-Owned Small Business | |
| CANCELLATION - NTX Steam Trap Monitoring - CANCELLATION | Veterans Integrated Service Network 17 | Service-Disabled Veteran-Owned Small Business | |
| 657-27-107JC, Replace Select Hot Water Heating System | Veterans Integrated Service Network 15 | Service-Disabled Veteran-Owned Small Business Sole Source | |
| J048--NEW - Energy Center Steam Header& Boilers valves, gaskets, and vent replacement | Veterans Integrated Service Network 17 | Service-Disabled Veteran-Owned Small Business | |
| Medical Gas System Activation and Bulk Oxygen Tank Services | Veterans Integrated Service Network 9 | Service-Disabled Veteran-Owned Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity