Atch 6 Calculation of Contractor Self Performed Work.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
J035--603-24-102 - Repair (Replace) Steam Traps- Robley Rex VAMC - Re-Solicitation
Solicitation number
36C24924R0069
Issued by

About this file

This document is an attachment titled "Atch 6 Calculation of Contractor Self Performed Work.xlsx" that provides a template for offerors to calculate the percentage of work they will self-perform versus subcontract on a federal construction contract. The template requires offerors to provide a breakdown of personnel and material/equipment costs by specification division, identify which vendors are small businesses, and calculate the total self-performed work as a percentage of the overall contract.

The related federal contract opportunity is for the Department of Veterans Affairs to replace failed steam traps at the Robley Rex VA Medical Center in Louisville, Kentucky. The Statement of Work requires the contractor to replace 98 steam traps and associated components, with the VA providing isolation valves, strainers, and check valves. The contract has a 240-day period of performance and includes requirements for training, warranties, and project scheduling to minimize disruptions to medical center operations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1

CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK
Offerors for Contractors (NAICS code 236220) must provide
at least 15 percent (general construction) of the cost of the contract performance incurred for personnel will be spent on the prime contractor's employees. Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead,profit/fee and bond costs shall be added after a subtotal of personnel and material/ Equipment costs has been calculated. Clearly identify the personnel costs you will be performing. Below is a suggested format.
Specification DivisionSB Vendor (Y or N)Personnel CostMaterial/Equipment Costs
PrimeY$0.00$0.00Change SB Vendor to Y or N based on vendor size. Add costs to gray areas only.
SubY$0.00$0.00
SubY$0.00$0.00
SubY$0.00$0.00
SubY$0.00$0.00
SubY$0.00$0.00
SubN$0.00$0.00
SubN$0.00$0.00
SubN$0.00$0.00
SubN$0.00$0.00
SubN$0.00$0.00
(Add additional lines as necessary for each Division applicable to this project)$$
$ - 0$0.00
$$
Sub Total (Personnel Costs, Material/Equipment Costs)$0.00Add percentage to gray areas only.
Percentage0Profit$0.00
Percentage0Home Office Overhead$0.00
Percentage0Bond$0.00
Grand Total$0.00
Calculation of self-performed personnel costs:
1. Total personnel costs * both prime and all subcontractors:$0.00
2. Subtract all subcontractor personnel costs* companies that will perform work
on this contract:$0.00
3. Remainder is ‘Total amount of work to be self-performed under the
Contract’:$0.00
4. Self-performed work = Line 3/Line 1 x 100 =ERROR:#DIV/0!
*personnel costs include labors, mechanics, other tradesmen, and office personnel directly charged to
the project (includes project manager, job superintendent, administrative, estimators, etc.)
I certify the above representations are true and correct to the best of my knowledge.

(Signature and Typed Name of Authorized Representative) Date

(Title of Authorized Representative)

File details come from the government source that posted it. Updated .