Amendment-001 - Install Fiber Building(s) 208-209

Closed Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
W91QF425Q0037
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Monterey, California 93944, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Army Materiel Command Mission and Installation Contracting Command Fort Eustis is seeking a contractor to install fiber optic cable connecting Buildings 208 and 209 at the Defense Language Institute Foreign Language Center (DLIFLC) at the Presidio of Monterey, California. The project requires installing a 12-strand single-mode fiber optic cable through existing underground conduit, mounting LC adapter panels in both buildings, and establishing network connectivity to enable live streaming capabilities for graduation ceremonies. The contractor must provide all materials including high-quality armored fiber optic cable, two 6-port duplex LC adapter panels, and a secure wall-mount mini rack enclosure, with all materials required to comply with Trade Agreements Act standards. The government will evaluate quotes using Simplified Acquisition Procedures under a Lowest Priced Technically Acceptable (LPTA) approach, considering both technical risk and price factors. Amendment 001 extended the quote submission deadline to September 23, 2025 at 10:00 AM CST, with the updated performance period running from September 30, 2025 through April 30, 2026.

This solicitation is set aside for small businesses under NAICS code 238210 (Electrical Contractors and Other Wiring Installation Contractors) with a size standard of $19 million, though some documents reference a $47 million standard. The contract will be awarded as a single-award, firm fixed price arrangement for one Contract Line Item covering the complete installation project. The work involves routing approximately 100 feet of cable through existing conduit and building infrastructure, with comprehensive testing required for each fiber strand and connection port to ensure EIA/TIA standards compliance. Contractors must submit two separate quote volumes - one with full pricing and another with redacted pricing for technical evaluation - along with past performance information for up to three similar projects. All work will be performed at the U.S. Army Presidio of Monterey in California, requiring contractors to complete installation access procedures for personnel entering the military facility.

Notice text

2 versions

Update #2 · Latest ·

Amendment #001 - 

a. Extending RFP submittal date to 10 am. CST 23 September 2025.
b. Vendor questions and answ ers included as an attachment.
c. Update Period of Performance "Schedule" - 30 SEP 2025 - 30 APR 2026.
d. Include 52.212-1 Instructions to Offerors (Addendum).
e. All other terms and conditions remain unchanged.

Update #1 ·

Fiber Optic Cable Installation Requirements
1. Starting Point (Building 209 - Communication Room):
o Install an LC adapter panel in the northwest corner of the communication room, adjacent to the .EDU switch rack.
o Route the fiber optic cable along the upper wall, adjacent to the adapter panel, into the next room where the conduit entry is located.
2. Conduit Routing:
o Utilize the pre-installed 60-foot underground conduit connecting Building 209 and Building 208.
o Use the pre-installed pull string/rope/tape to guide the fiber optic cable through the conduit.
o Ensure the existing duct seals at both conduit ends remain intact to maintain waterproofing and firestopping standards.
3. Routing in Building 208 (Theater):
o Upon entry into the mechanical room, route the fiber cable through the wall to the left of its entry point.
o Secure the cable along the wooden ceiling within the crawl space beneath the theater for approximately 100 feet.
o Transition the cable vertically at the north end of the building through an unused airshaft into the lobby preceding the projector room.
4. Termination and Enclosure (Projector Room Lobby):
o Install a 6-port LC fiber adapter panel adjacent to an electrical outlet on the south side of the projector room lobby.
o Mount the fiber optic cable in the specified low-profile, switch-depth wall-mount mini rack enclosure.

Files

Notice history

Notice Type Posted
Award Notice - Amendment-002 - Install Fiber Building(s) 208-209 Award Award Notice
Amendment-002 - Install Fiber Building(s) 208-209 Latest solicitation Solicitation
This notice Original Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Sipr LAN drops Florida 32542, United States · NAICS 541519 Air Force Test Center Total Small Business
Womble Work Center Fiber Optic Installation Mount Ida, Arkansas 71957, United States · NAICS 238210 Region 8 - Southern Region Total Small Business
USDA Forest Service - Hebgen Lake District Office Network Cabling and IT Room Improvements West Yellowstone, Montana 59758, United States · NAICS 238210 Forest Service Total Small Business
Cable, fiber optic NAICS 333998 Naval Supply Systems Command No set-aside
Cable, fiber optic NAICS 333998 Naval Supply Systems Command No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors