Immersion Tank Replacement at FRCE
Closed Solicitation Posted
- Solicitation number
- N68520-26-SIMACQ-JC00000-0172
- Agency
-
Naval Air Systems Command
Department of the Navy, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 333248 All Other Industrial Machinery Manufacturing
- Place of performance
- Cherry Point, North Carolina, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Navy Naval Air Systems Command is soliciting quotes for the replacement of one immersion tank wash system at Fleet Readiness Center East (FRCE) located at Marine Corps Air Station Cherry Point, North Carolina. The replacement system must be a 304 stainless steel unit with a 2,250-gallon capacity designed to hold CEE BEE A-477 stripping agent heated to 170 degrees Fahrenheit, and must include an integrated hydraulic raise/lower platform system with a 4,000-pound load capacity, a 5 HP minimum induction motor agitator, and mechanically driven lid. Key contract requirements include the removal and disposal of existing equipment, installation of new stainless steel ducting and piping, compliance with NFPA fire protection, electrical, and safety standards, and comprehensive training and technical data deliverables. The Government will evaluate proposals using a lowest-price technically acceptable approach, with equipment drawings reviewed solely for technical acceptability and compliance with Statement of Work requirements. Questions must be submitted by March 27, 2026 at 3:00 PM Eastern Daylight Time, with the extended response deadline for quotes being March 30, 2026 at 5:00 PM Eastern Time.
This solicitation is set as a Total Small Business set-aside, specifically for Women-Owned Small Businesses (WOSB). No incumbent contractor is identified in the solicitation documents. The contract consists of five line items covering contract kick-off and Plan of Action and Milestones, removal of existing equipment, immersion tank system with installation, three training sessions, and technical data deliverables, with all pricing structured as firm fixed price. The performance period extends from April 20, 2026 through February 26, 2027, with final delivery required by January 29, 2027 and factory acceptance testing required prior to final acceptance. Work will be performed at Building 137, Shop 93113 at MCAS Cherry Point, North Carolina, with the contractor responsible for all installation labor, rigging equipment, lead and asbestos testing, and compliance with comprehensive facility safety and performance requirements established by FRC East.
Notice text
3 versions
Update #3 · Latest ·
Ammendment 0002
Update CLIN 0005 description to include the text "**NOT SEPARATELY PRICED**"
Extend the Response Date to 30 March 2026.
Amendment 0001
***QUESTIONS & ANSWERS***
1. Lifting System / Parts Handling Intent
QUESTION: SOW Section 3.3.2 references a platform that will raise and lower utilizing a hydraulic system with minimum 3-inch linear shafts and bearings mounted to the machine base.
Please confirm whether the Government intends the replacement system to include:
- an integrated vertical lifting platform as part of the immersion tank system; or
- a separate external lifting/handling arrangement.
ANSWER: An integrated platform.
If the 4,000-lb parts are expected to be loaded using existing shop equipment, please advise whether any specific loading interface, clearance, or protection features should be incorporated into the replacement design.
2. Lift System Power Basis and Intended Use of Compressed Air
QUESTION: Please clarify how the platform lift system is intended to relate to the facility compressed air referenced in SOW Section 3.7.10.
Please confirm:
whether the primary lift system is intended to be hydraulic, pneumatic, or hybrid;
ANSWER: Hydraulic lift system.
if the lift system is hydraulic, what function compressed air is intended to serve within the replacement immersion tank system.
ANSWER: None. It is standard to include compressed air connections within the area if needed.
If compressed air is intended for a defined process function such as valve actuation, agitation, blowoff, or another equipment function, please identify that intended use so offerors can align system design and pricing accordingly.
3. Lifting System / Alternative Handling Approach
QUESTION: SOW Section 3.3.2 references a platform that will raise and lower utilizing a hydraulic system with minimum 3-inch linear shafts and bearings mounted to the machine base.
To align the quotation with the Government’s intended handling approach, please confirm whether offerors are required to provide an integrated lifting platform as part of the immersion tank system, or whether the Government will consider functionally equivalent alternative handling methods that achieve safe loading, immersion, and unloading of the required parts.
ANSWER: No, we will not accept alternative methods other than what is stated in the SOW.
For example, would the Government consider an approach in which the immersion tank is decoupled from the lifting mechanism and parts handling is performed by a dedicated gantry crane, manipulator, or other external lifting system designed for loading and unloading operations?
If alternative approaches are acceptable, please advise whether the Government has any preferences or constraints regarding:
a. separation of the lifting system from the tank structure;
b. loading and unloading access;
c. part positioning accuracy during immersion; and
d. operator safety, maintenance access, and workflow around the tank.
(Annex 1 provided for context and illustration of such alternative)
4. Air Emissions Permitting
QUESTION: Please advise whether the existing immersion strip tank in Shop 93113 operates under any current/existing air emissions permitting requirements, and whether any permit update is anticipated in connection with the replacement system.
ANSWER: System is a one for one replacement so no additional permits should be required. System is only replacing existing duct work.
If permit-related coordination is anticipated, please advise how the Government expects offerors to address that in their quotations and performance.
5. Hazardous Area Classification / Electrical Design Basis
QUESTION: Please advise whether a hazardous area classification has been established for the immersion tank work area in Shop 93113 and, if so, whether any applicable classification or reference information is available for offerors to use in preparing the electrical design. This includes whether explosion-proof electrical systems are required at the installation area.
ANSWER: No hazardous area classification has been established for the immersion tank work area.
6. Existing Survey / Reference Information
QUESTION: If available, please provide or confirm the availability of any of the following existing reference information relevant to the replacement work:
a. prior lead-based paint or asbestos survey information for the existing tank, connected piping, ductwork, or associated insulation;
ANSWER: 3.7.4 Requires lead and asbestos testing by the vendor.
b. Please advise whether any floor slab or structural information is available for the installation location in Shop 93113 sufficient to confirm support of the replacement immersion tank system under operating load. If available, please provide any relevant structural reference information, including known slab bearing capacity limitations or subsurface conditions that could affect installation.
ANSWER: Non-Available at this time.
c. shop photographs showing the tank area, surrounding equipment, access path, overhead conditions, and visible utility connections; and
ANSWER: Photos are not available of the production area.
d. confirmation whether Drawing PE-22152 supersedes the SOW reference to PE-22110, or whether PE-22110 is a separate drawing that should also be provided.
ANSWER: PE-22152 is the only drawing for this project. PE22110 is a misprint and will be corrected in the SOW.
7. Evaluation of Technical Submission
QUESTION: Because the solicitation requires quotation drawings under SOW Section 3.6.7, please clarify how those drawings will be reviewed as part of quotation evaluation. Please confirm:
a. whether quotations will be evaluated on a lowest-price technically acceptable basis, or another basis;
ANSWER: Lowest-price technically acceptable.
b. whether the equipment drawings are reviewed only for technical acceptability/compliance, or whether technical merit will be comparatively evaluated; and
ANSWER: Technical acceptability/compliance.
c. whether any additional non-price factors beyond the submitted drawings will be considered in award.
ANSWER: If the machine meets all technical requirements per the SOW the lowest-price technically acceptable will be reviewed.
REQUEST FOR QUOTE
The Commander, Fleet Readiness Center (COMFRC) Procurement Group (PG), in support of the Fleet Readiness Center East (FRCE) Marine Corps Air Station (MCAS) Cherry Point, North Carolina, intends to procure the replacement of one (1) Immersion Tank Wash System. The install of the new system shall include the removal and DRMO of the old Immersion Tank, piping, and duct work up to connection with duct work at the inside wall.
Please see N6852026Q1010 Solicitation attached to this notice for the full requirement description. Please submit all questions via e-mail to jeffrey.t.smith6.civ@us.navy.mil. All questions must be submitted no later than 3:00 Eastern Daylight Time, 27 March 2026. It is the responsibility of the Offeror to ensure timely Government receipt in accordance with above. The Government is not responsible for responses to questions for which the Offeror did not receive submission confirmation from the Government. Responses to questions will be posted as an update to this announcement via this website. It is the Offeror's responsibility to monitor this announcement for further information.
Requests for Attachment D (Distribution D) shall be submitted to jeffrey.t.smith6.civ@us.navy.mil and adam.c.coombs.mil@us.navy.mil.
DISCLAIMER - THIS ANNOUNCEMENT IS NOT TO BE CONSTRUED AS A COMMITMENT BY THE GOVERNMENT, NOR WILL THE GOVERNMENT PAY FOR ANY INFORMATION SOLICITED OR PROVIDED.
Update #2 ·
***QUESTIONS & ANSWERS***
1. Lifting System / Parts Handling Intent
QUESTION: SOW Section 3.3.2 references a platform that will raise and lower utilizing a hydraulic system with minimum 3-inch linear shafts and bearings mounted to the machine base.
Please confirm whether the Government intends the replacement system to include:
- an integrated vertical lifting platform as part of the immersion tank system; or
- a separate external lifting/handling arrangement.
ANSWER: An integrated platform.
If the 4,000-lb parts are expected to be loaded using existing shop equipment, please advise whether any specific loading interface, clearance, or protection features should be incorporated into the replacement design.
2. Lift System Power Basis and Intended Use of Compressed Air
QUESTION: Please clarify how the platform lift system is intended to relate to the facility compressed air referenced in SOW Section 3.7.10.
Please confirm:
whether the primary lift system is intended to be hydraulic, pneumatic, or hybrid;
ANSWER: Hydraulic lift system.
if the lift system is hydraulic, what function compressed air is intended to serve within the replacement immersion tank system.
ANSWER: None. It is standard to include compressed air connections within the area if needed.
If compressed air is intended for a defined process function such as valve actuation, agitation, blowoff, or another equipment function, please identify that intended use so offerors can align system design and pricing accordingly.
3. Lifting System / Alternative Handling Approach
QUESTION: SOW Section 3.3.2 references a platform that will raise and lower utilizing a hydraulic system with minimum 3-inch linear shafts and bearings mounted to the machine base.
To align the quotation with the Government’s intended handling approach, please confirm whether offerors are required to provide an integrated lifting platform as part of the immersion tank system, or whether the Government will consider functionally equivalent alternative handling methods that achieve safe loading, immersion, and unloading of the required parts.
ANSWER: No, we will not accept alternative methods other than what is stated in the SOW.
For example, would the Government consider an approach in which the immersion tank is decoupled from the lifting mechanism and parts handling is performed by a dedicated gantry crane, manipulator, or other external lifting system designed for loading and unloading operations?
If alternative approaches are acceptable, please advise whether the Government has any preferences or constraints regarding:
a. separation of the lifting system from the tank structure;
b. loading and unloading access;
c. part positioning accuracy during immersion; and
d. operator safety, maintenance access, and workflow around the tank.
(Annex 1 provided for context and illustration of such alternative)
4. Air Emissions Permitting
QUESTION: Please advise whether the existing immersion strip tank in Shop 93113 operates under any current/existing air emissions permitting requirements, and whether any permit update is anticipated in connection with the replacement system.
ANSWER: System is a one for one replacement so no additional permits should be required. System is only replacing existing duct work.
If permit-related coordination is anticipated, please advise how the Government expects offerors to address that in their quotations and performance.
5. Hazardous Area Classification / Electrical Design Basis
QUESTION: Please advise whether a hazardous area classification has been established for the immersion tank work area in Shop 93113 and, if so, whether any applicable classification or reference information is available for offerors to use in preparing the electrical design. This includes whether explosion-proof electrical systems are required at the installation area.
ANSWER: No hazardous area classification has been established for the immersion tank work area.
6. Existing Survey / Reference Information
QUESTION: If available, please provide or confirm the availability of any of the following existing reference information relevant to the replacement work:
a. prior lead-based paint or asbestos survey information for the existing tank, connected piping, ductwork, or associated insulation;
ANSWER: 3.7.4 Requires lead and asbestos testing by the vendor.
b. Please advise whether any floor slab or structural information is available for the installation location in Shop 93113 sufficient to confirm support of the replacement immersion tank system under operating load. If available, please provide any relevant structural reference information, including known slab bearing capacity limitations or subsurface conditions that could affect installation.
ANSWER: Non-Available at this time.
c. shop photographs showing the tank area, surrounding equipment, access path, overhead conditions, and visible utility connections; and
ANSWER: Photos are not available of the production area.
d. confirmation whether Drawing PE-22152 supersedes the SOW reference to PE-22110, or whether PE-22110 is a separate drawing that should also be provided.
ANSWER: PE-22152 is the only drawing for this project. PE22110 is a misprint and will be corrected in the SOW.
7. Evaluation of Technical Submission
QUESTION: Because the solicitation requires quotation drawings under SOW Section 3.6.7, please clarify how those drawings will be reviewed as part of quotation evaluation. Please confirm:
a. whether quotations will be evaluated on a lowest-price technically acceptable basis, or another basis;
ANSWER: Lowest-price technically acceptable.
b. whether the equipment drawings are reviewed only for technical acceptability/compliance, or whether technical merit will be comparatively evaluated; and
ANSWER: Technical acceptability/compliance.
c. whether any additional non-price factors beyond the submitted drawings will be considered in award.
ANSWER: If the machine meets all technical requirements per the SOW the lowest-price technically acceptable will be reviewed.
REQUEST FOR QUOTE
The Commander, Fleet Readiness Center (COMFRC) Procurement Group (PG), in support of the Fleet Readiness Center East (FRCE) Marine Corps Air Station (MCAS) Cherry Point, North Carolina, intends to procure the replacement of one (1) Immersion Tank Wash System. The install of the new system shall include the removal and DRMO of the old Immersion Tank, piping, and duct work up to connection with duct work at the inside wall.
Please see N6852026Q1010 Solicitation attached to this notice for the full requirement description. Please submit all questions via e-mail to jeffrey.t.smith6.civ@us.navy.mil. All questions must be submitted no later than 3:00 Eastern Daylight Time, 27 March 2026. It is the responsibility of the Offeror to ensure timely Government receipt in accordance with above. The Government is not responsible for responses to questions for which the Offeror did not receive submission confirmation from the Government. Responses to questions will be posted as an update to this announcement via this website. It is the Offeror's responsibility to monitor this announcement for further information.
Requests for Attachment D (Distribution D) shall be submitted to jeffrey.t.smith6.civ@us.navy.mil and adam.c.coombs.mil@us.navy.mil.
DISCLAIMER - THIS ANNOUNCEMENT IS NOT TO BE CONSTRUED AS A COMMITMENT BY THE GOVERNMENT, NOR WILL THE GOVERNMENT PAY FOR ANY INFORMATION SOLICITED OR PROVIDED.
Update #1 ·
REQUEST FOR QUOTE
The Commander, Fleet Readiness Center (COMFRC) Procurement Group (PG), in support of the Fleet Readiness Center East (FRCE) Marine Corps Air Station (MCAS) Cherry Point, North Carolina, intends to procure the replacement of one (1) Immersion Tank Wash System. The install of the new system shall include the removal and DRMO of the old Immersion Tank, piping, and duct work up to connection with duct work at the inside wall.
Please see N6852026Q1010 Solicitation attached to this notice for the full requirement description. Please submit all questions via e-mail to jeffrey.t.smith6.civ@us.navy.mil. All questions must be submitted no later than 3:00 Eastern Daylight Time, 27 March 2026. It is the responsibility of the Offeror to ensure timely Government receipt in accordance with above. The Government is not responsible for responses to questions for which the Offeror did not receive submission confirmation from the Government. Responses to questions will be posted as an update to this announcement via this website. It is the Offeror's responsibility to monitor this announcement for further information.
Requests for Attachment D (Distribution D) shall be submitted to jeffrey.t.smith6.civ@us.navy.mil and adam.c.coombs.mil@us.navy.mil.
DISCLAIMER - THIS ANNOUNCEMENT IS NOT TO BE CONSTRUED AS A COMMITMENT BY THE GOVERNMENT, NOR WILL THE GOVERNMENT PAY FOR ANY INFORMATION SOLICITED OR PROVIDED.
Files
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Preventative Maintenance Gas Detection System (Re-Bid) | Naval Air Systems Command | Total Small Business | |
| Zeks Air Refrigerated Dryer System | Naval Air Systems Command | Total Small Business | |
| 26-SIMACQ-D20-0005 D-Dept Control System Parts/Supplies BPA | Naval Sea Systems Command | Total Small Business | |
| Tanker kit, aircraft, in repair/modification of | Naval Supply Systems Command | No set-aside | |
| Tank, fuel, aircraft, in repair/modification of | Naval Supply Systems Command | No set-aside |