Illinois River Basin, Dresden Island Lock, Grundy County, IL Upper Bulkhead Recesses
Award Notice Posted
- Solicitation number
- W912EK19R0016
- Agency
-
ENDIST Rock Island
US Army Corps of Engineers, Department of Defense
- Awarded
- to J.f. Brennan Company, Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- W912EK20C0011 Federal contract award
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Not on record
- Place of performance
- Dresden Island Lock & Dam Channahon, Illinois 60450, United States
Notice details come from SAM.gov. Updated .
Notice text
9 versions
Update #9 · Latest ·
Awarded Vendors: J.F. Brennan Company, Inc.. Contract Award Dollar Amount: $16,582,450.00 inclusive of all options. Contract Award Date: 2019-11-06.
Update #8 ·
The purpose of Amendment 0006 is to update the schedule of prices, incorporate updated Davis Bacon Wage Rates, update Section 01 11 00, 01 22 00, 03 15 15 and update drawing C-101.
The required response date/time has changed from 11-Sep-2019 02:00 PM to 12-Sep-2019 02:00 PM.
.
Update #7 ·
The purpose of Amendment 0004 is to re-open the Question & Answer period for 48 hours to 30 August 2019 at 2:00 PM CST.
The Solicitation closing date has been extended by ONE (1) week to 11 September 2019 at 2:00 PM CST.
.
Update #6 ·
The required response date/time has changed from 04-Sep-2019 02:00 PM to 05-Sep-2019 02:00 PM..
Update #5 ·
Base Bid: Upper Bulkhead Recesses includes, but is not limited to, disposal of two emergency miter gate leaves, associated anchorages & pintle balls; removal and disposal of pintle ball bases; concrete removal; fabrication, delivery & installation of precast concrete panels, precast concrete recess panels, steel deadman beams, and steel protection plate assemblies; installation of concrete anchors, check post installation, installation of anchor and wall armor, concrete placement, underwater concrete placement, diving operations, installation of rock dowels and weep holes, and electrical work.
Option A: Miscellaneous Mechanical Fabrications includes, but is not limited to, fabrication and delivery of bull gear components, bull gear roller components, structural steel framing and grating.
Option B & C: Bull Gear Pit Repairs on the Landwall includes, but is not limited to, installation of miscellaneous mechanical fabrications; horizontal and vertical concrete removal and concrete placement; installation of structural steel framing; removal, disposal & installation of grating; and electrical work.
Option D & E: Bull Gear Pit Repairs on the I-wall includes, but is not limited to, installation of miscellaneous mechanical fabrications; horizontal and vertical concrete removal and concrete placement; removal, cleaning, painting and reinstallation of structural steel framing; removal, disposal & installation of grating; and electrical work.
Option F: Upper Guidewall Repairs includes, but is not limited to, horizontal concrete removal and concrete placement; fabrication, delivery & installation of steel reinforcing plate; and electrical work.
Estimate Range: $10,000,000.00 to $25,000,000.00
Construciton Days: 350 Consecutive Completion Days
Competition: Unrestricted Full & Open
It is anticipated that the plans and specifications for this project will be available on ww.fbo.gov on or about 19 July 2019. Any contractor wanting the plans and specifications must download them from this website.
Updated July 16, 2019: Updated to include DRAFT Plans and Specifications. Please be advised that these are subject to change and no formal solicitation has been issued at this time.
Updated August 1, 2019: Formal Solicitation Uploaded.
Updated August 12, 2019: Amendment 0001 has been uploaded. This amendment addresses the formal site visit and a clarification to proposal submission instructions.
Updated August 19, 2019: List of site visit attendees uploaded.
.
Update #4 ·
Base Bid: Upper Bulkhead Recesses includes, but is not limited to, disposal of two emergency miter gate leaves, associated anchorages & pintle balls; removal and disposal of pintle ball bases; concrete removal; fabrication, delivery & installation of precast concrete panels, precast concrete recess panels, steel deadman beams, and steel protection plate assemblies; installation of concrete anchors, check post installation, installation of anchor and wall armor, concrete placement, underwater concrete placement, diving operations, installation of rock dowels and weep holes, and electrical work.
Option A: Miscellaneous Mechanical Fabrications includes, but is not limited to, fabrication and delivery of bull gear components, bull gear roller components, structural steel framing and grating.
Option B & C: Bull Gear Pit Repairs on the Landwall includes, but is not limited to, installation of miscellaneous mechanical fabrications; horizontal and vertical concrete removal and concrete placement; installation of structural steel framing; removal, disposal & installation of grating; and electrical work.
Option D & E: Bull Gear Pit Repairs on the I-wall includes, but is not limited to, installation of miscellaneous mechanical fabrications; horizontal and vertical concrete removal and concrete placement; removal, cleaning, painting and reinstallation of structural steel framing; removal, disposal & installation of grating; and electrical work.
Option F: Upper Guidewall Repairs includes, but is not limited to, horizontal concrete removal and concrete placement; fabrication, delivery & installation of steel reinforcing plate; and electrical work.
Estimate Range: $10,000,000.00 to $25,000,000.00
Construciton Days: 350 Consecutive Completion Days
Competition: Unrestricted Full & Open
It is anticipated that the plans and specifications for this project will be available on ww.fbo.gov on or about 19 July 2019. Any contractor wanting the plans and specifications must download them from this website.
Updated July 16, 2019: Updated to include DRAFT Plans and Specifications. Please be advised that these are subject to change and no formal solicitation has been issued at this time.
Updated August 1, 2019: Formal Solicitation Uploaded.
Updated August 12, 2019: Amendment 0001 has been uploaded. This amendment addresses the formal site visit and a clarification to proposal submission instructions.
.
Update #3 ·
Base Bid: Upper Bulkhead Recesses includes, but is not limited to, disposal of two emergency miter gate leaves, associated anchorages & pintle balls; removal and disposal of pintle ball bases; concrete removal; fabrication, delivery & installation of precast concrete panels, precast concrete recess panels, steel deadman beams, and steel protection plate assemblies; installation of concrete anchors, check post installation, installation of anchor and wall armor, concrete placement, underwater concrete placement, diving operations, installation of rock dowels and weep holes, and electrical work.
Option A: Miscellaneous Mechanical Fabrications includes, but is not limited to, fabrication and delivery of bull gear components, bull gear roller components, structural steel framing and grating.
Option B & C: Bull Gear Pit Repairs on the Landwall includes, but is not limited to, installation of miscellaneous mechanical fabrications; horizontal and vertical concrete removal and concrete placement; installation of structural steel framing; removal, disposal & installation of grating; and electrical work.
Option D & E: Bull Gear Pit Repairs on the I-wall includes, but is not limited to, installation of miscellaneous mechanical fabrications; horizontal and vertical concrete removal and concrete placement; removal, cleaning, painting and reinstallation of structural steel framing; removal, disposal & installation of grating; and electrical work.
Option F: Upper Guidewall Repairs includes, but is not limited to, horizontal concrete removal and concrete placement; fabrication, delivery & installation of steel reinforcing plate; and electrical work.
Estimate Range: $10,000,000.00 to $25,000,000.00
Construciton Days: 350 Consecutive Completion Days
Competition: Unrestricted Full & Open
It is anticipated that the plans and specifications for this project will be available on ww.fbo.gov on or about 19 July 2019. Any contractor wanting the plans and specifications must download them from this website.
Updated July 16, 2019: Updated to include DRAFT Plans and Specifications. Please be advised that these are subject to change and no formal solicitation has been issued at this time.
Updated August 1, 2019: Formal Solicitation Uploaded.
.
Update #2 ·
Base Bid: Upper Bulkhead Recesses includes, but is not limited to, disposal of two emergency miter gate leaves, associated anchorages & pintle balls; removal and disposal of pintle ball bases; concrete removal; fabrication, delivery & installation of precast concrete panels, precast concrete recess panels, steel deadman beams, and steel protection plate assemblies; installation of concrete anchors, check post installation, installation of anchor and wall armor, concrete placement, underwater concrete placement, diving operations, installation of rock dowels and weep holes, and electrical work.
Option A: Miscellaneous Mechanical Fabrications includes, but is not limited to, fabrication and delivery of bull gear components, bull gear roller components, structural steel framing and grating.
Option B & C: Bull Gear Pit Repairs on the Landwall includes, but is not limited to, installation of miscellaneous mechanical fabrications; horizontal and vertical concrete removal and concrete placement; installation of structural steel framing; removal, disposal & installation of grating; and electrical work.
Option D & E: Bull Gear Pit Repairs on the I-wall includes, but is not limited to, installation of miscellaneous mechanical fabrications; horizontal and vertical concrete removal and concrete placement; removal, cleaning, painting and reinstallation of structural steel framing; removal, disposal & installation of grating; and electrical work.
Option F: Upper Guidewall Repairs includes, but is not limited to, horizontal concrete removal and concrete placement; fabrication, delivery & installation of steel reinforcing plate; and electrical work.
Estimate Range: $10,000,000.00 to $25,000,000.00
Construciton Days: 350 Consecutive Completion Days
Competition: Unrestricted Full & Open
It is anticipated that the plans and specifications for this project will be available on ww.fbo.gov on or about 19 July 2019. Any contractor wanting the plans and specifications must download them from this website.
Updated July 16, 2019: Updated to include DRAFT Plans and Specifications. Please be advised that these are subject to change and no formal solicitation has been issued at this time.
.
Update #1 ·
Base Bid: Upper Bulkhead Recesses includes, but is not limited to, disposal of two emergency miter gate leaves, associated anchorages & pintle balls; removal and disposal of pintle ball bases; concrete removal; fabrication, delivery & installation of precast concrete panels, precast concrete recess panels, steel deadman beams, and steel protection plate assemblies; installation of concrete anchors, check post installation, installation of anchor and wall armor, concrete placement, underwater concrete placement, diving operations, installation of rock dowels and weep holes, and electrical work.
Option A: Miscellaneous Mechanical Fabrications includes, but is not limited to, fabrication and delivery of bull gear components, bull gear roller components, structural steel framing and grating.
Option B & C: Bull Gear Pit Repairs on the Landwall includes, but is not limited to, installation of miscellaneous mechanical fabrications; horizontal and vertical concrete removal and concrete placement; installation of structural steel framing; removal, disposal & installation of grating; and electrical work.
Option D & E: Bull Gear Pit Repairs on the I-wall includes, but is not limited to, installation of miscellaneous mechanical fabrications; horizontal and vertical concrete removal and concrete placement; removal, cleaning, painting and reinstallation of structural steel framing; removal, disposal & installation of grating; and electrical work.
Option F: Upper Guidewall Repairs includes, but is not limited to, horizontal concrete removal and concrete placement; fabrication, delivery & installation of steel reinforcing plate; and electrical work.
Estimate Range: $10,000,000.00 to $25,000,000.00
Construciton Days: 350 Consecutive Completion Days
Competition: Unrestricted Full & Open
It is anticipated that the plans and specifications for this project will be available on ww.fbo.gov on or about 19 July 2019. Any contractor wanting the plans and specifications must download them from this website.
.