W912EK19R0016_AMENDMENT_0006.pdf

PDF 477 KB Posted

Attached to
Illinois River Basin, Dresden Island Lock, Grundy County, IL Upper Bulkhead Recesses
Solicitation number
W912EK19R0016
Issued by

About this file

Amendment 0006

View the file

Other files

File Type Posted
AMEND_0006_DRAWING.pdf PDF
20180807_DResden_W912EK19R0016_Pre-Bid_Sign-In_Sheet.pdf PDF
W912EK19R0016_AMEND_0005.pdf PDF
AMEND_0005_DRAWINGS.pdf PDF
W912EK19R0016_Amendment_0004.pdf PDF
W912EK19R0016_AMEND_0003_DRAWINGS.pdf PDF
W912EK19R0016_Amendment_0003.pdf PDF
W912EK19R0016_Amendment_0002.pdf PDF
W912EK19R0016_Amendment_0002_BULKHEAD_Plan_Set.pdf PDF
W912EK19R0016_Amendment_0002_BUMPER_SYSTEM_Plan_Set.pdf PDF
W912EK19R0016_Amendment_0002_Drawings.pdf PDF
A22_-_Site_Visit_Attendees.pdf PDF
A22_-_W912EK19R0016_Amendment_0001.pdf PDF
A22_-_Reference_Drawings(a).pdf PDF
A22_-_Reference_Drawings(f).pdf PDF
A22_-_Plans_Volume_2_-_Machinery_Pit_Repairs(e).pdf PDF
A22_-_Plans_Volume_2_-_Machinery_Pit_Repairs(d).pdf PDF
A22_-_Plans_Volume_3_-_Upper_Guidewall_Repairs(c).pdf PDF
A22_-_Plans_Volume_3_-_Upper_Guidewall_Repairs(b).pdf PDF
A22_-_Plans_Volume_2_-_Machinery_Pit_Repairs(a).pdf PDF
A22_-_Reference_Drawings(d).pdf PDF
A22_-_Reference_Drawings(k-1).pdf PDF
A22_-_Reference_Drawings(h).pdf PDF
A22_-_Reference_Drawings(k-2).pdf PDF
A22_-_Plans_General(a).pdf PDF
A22_-_Reference_Drawings(j).pdf PDF
A22_-_Reference_Drawings(g).pdf PDF
A22_-_Reference_Drawings(i-1).pdf PDF
A22_-_Plans_General(d).pdf PDF
A22_-_Reference_Drawings(c).pdf PDF
A22_-_Plans_General(c).pdf PDF
A22_-_Reference_Drawings(l).pdf PDF
A22_-_Plans_Volume_2_-_Machinery_Pit_Repairs(b).pdf PDF
A22_-_Plans_Volume_3_-_Upper_Guidewall_Repairs(d).pdf PDF
A22_-_Plans_Volume_3_-_Upper_Guidewall_Repairs(a).pdf PDF
A22_-_Plans_Volume_1_-_Bulkhead_Recess(b).pdf PDF
A22_-_Reference_Drawings(e).pdf PDF
A22_-_Plans_Volume_2_-_Machinery_Pit_Repairs(c).pdf PDF
A22_-_Plans_Volume_1_-_Bulkhead_Recess(a).pdf PDF
A22_-_Reference_Drawings(b).pdf PDF
A22_-_Plans_General(b).pdf PDF
A22_-_W912EK19R0016.pdf PDF
A22_-_Reference_Drawings(i-2).pdf PDF
A14_-_Draft_Plans_Part_1.pdf PDF
A14_-_Draft_Plans_Part_4.pdf PDF
A14_-_Draft_Plans_Part_2.pdf PDF
A14_-_Draft_Plans_Part_3.pdf PDF
A14_-_Draft_Plans_Part_5.pdf PDF
A14_-_Draft_Specifications.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

96514791516688

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The reason for this amendment is to update the Schedule of Prices, incorporate updated Davis Bacon Wage Rates, update Section 01 11 00, Section 01 22 00, Section 03 15 15, and Draw ing C-101.

The required response date/time has changed from 11-Sep-2019 02:00 PM to 12-Sep-2019 02:00 PM.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 25

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 11-Sep-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EK19R0016

X 9B. DATED (SEE ITEM 11)

01-Aug-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

11-Sep-2019

CODE

CONTRACTING DIVISION

US ARMY CORPS OF ENGINEERS

1500 ROCK ISLAND DRIVE

ROCK ISLAND IL 61201

W912EK 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912EK19R0016

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 11-Sep-2019 02:00 PM to 12-Sep-2019 02:00 PM.

The following have been modified:

SCHEDULE OF PRICES

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

BASE BID

0001 Mobilization and Demobilization 1 JOB XXXXXXXX $ 0002 Temporary Field Office

0002AA First 6 Months 6 MO ____________ $

0002AB Over 6 Months 1 MO ____________ $

0003 Dive Inspections 1 JOB XXXXXXXX $

0004 Emergency Miter Gate Disposal 1 JOB XXXXXXXX $

0005 Emergency Miter Gate Anchorage Removal

1 JOB XXXXXXXX $

0006 Bulkhead Recess Installation

0006AA Concrete Removal 1 JOB XXXXXXXX $

0006AB Deadman Anchors Installation 1 JOB XXXXXXXX $

0006AC Precast Panel Fabrication and Delivery 1 JOB XXXXXXXX $

0006AD Precast Panel Installation 1 JOB XXXXXXXX $

0006AE Bulkhead Recess 1 JOB XXXXXXXX $

0006AF Bulkhead Slot Protection Plate 1 JOB XXXXXXXX $

0007 Sill Concrete Formwork 1 JOB XXXXXXXX $

0008 Sill Concrete Placement 1 JOB XXXXXXXX $

0009 Sill Anchors 1 JOB XXXXXXXX $

0010 Weep Holes 1 JOB XXXXXXXX $

0011 Handrailing 215 LF ____________ $ 0012 Deleted 0013 Electrical Work 1 JOB XXXXXXXX $

0014 Sill Concrete Removal 1 JOB XXXXXXXX $

TOTAL OF ESTIMATED AMOUNTS OF BASE BID

(ITEM NOS. 0001 THROUGH 0014, INCL.)

OPTION A - FABRICATION AND DELIVERY

0101 Bull Gear Components Fabrication and Delivery

1 JOB XXXXXXXX $

0102 Bull Gear Roller Components Fabrication and Delivery

1 JOB XXXXXXXX $

0103 Support Frame and Handrailing 1 JOB XXXXXXXX $ 0104 Cover Plate Fabrication and Delivery 1 JOB XXXXXXXX $

TOTAL OF ESTIMATED AMOUNTS OF OPTION A

(ITEM NOS. 0101 THROUGH 0104, INCL.)

OPTION B - UPPER LAND WALL PIT

0201 Sole Plate and Machinery - Remove and

Reinstall

1 JOB XXXXXXXX $

0202 Bull Gear Components Installation 1 JOB XXXXXXXX $

0203 Bull Gear Roller Components Installation 1 JOB XXXXXXXX $

0204 Vertical Concrete Removal 0204AA First 7 Cubic Yards 7 CY ____________ $

0204AB Over 7 Cubic Yards 2 CY ____________ $

0205 Horizontal Concrete Removal 0205AA First 8 Cubic Yards 8 CY ____________ $

0205AB Over 8 Cubic Yards 2 CY ____________ $

0206 Vertical Concrete Placement 0206AA First 7 Cubic Yards 7 CY ____________ $

0206AB Over 7 Cubic Yards 2 CY ____________ $

0207 Horizontal Concrete Placement 0207AA First 8 Cubic Yards 8 CY ____________ $

0207AB Over 8 Cubic Yards 2 CY ____________ $

0208 Framing Installation 1 JOB XXXXXXXX $ 0209 Cover Plate Installation 1 JOB XXXXXXXX $ 0210 Electrical Work 1 JOB XXXXXXXX $

TOTAL OF ESTIMATED AMOUNTS OF OPTION B

(ITEM NOS. 0201 THROUGH 0210, INCL.)

OPTION C - LOWER LAND WALL PIT

0301 Sole Plate and Machinery - Remove and Reinstall

1 JOB XXXXXXXX $

0302 Bull Gear Components Installation 1 JOB XXXXXXXX $

0303 Bull Gear Roller Components Installation 1 JOB XXXXXXXX $

0304 Vertical Concrete Removal 0304AA First 7 Cubic Yards 7 CY ____________ $

0304AB Over 7 Cubic Yards 2 CY ____________ $

0305 Horizontal Concrete Removal 0305AA First 8 Cubic Yards 8 CY ____________ $

0305AB Over 8 Cubic Yards 2 CY ____________ $

0306 Vertical Concrete Placement 0306AA First 7 Cubic Yards 7 CY ____________ $

0306AB Over 7 Cubic Yards 2 CY ____________ $

0307 Horizontal Concrete Placement 0307AA First 8 Cubic Yards 8 CY ____________ $

0307AB Over 8 Cubic Yards 2 CY ____________ $

0308 Framing Installation 1 JOB XXXXXXXX $ 0309 Cover Plate Installation 1 JOB XXXXXXXX $ 0310 Electrical Work 1 JOB XXXXXXXX $

TOTAL OF ESTIMATED AMOUNTS OF OPTION C

(ITEM NOS. 0301 THROUGH 0310, INCL.)

OPTION D - UPPER I-WALL PIT

0401 Sole Plate and Machinery - Remove and Reinstall

1 JOB XXXXXXXX $

0402 Bull Gear Components Installation 1 JOB XXXXXXXX $

0403 Bull Gear Roller Components Installation 1 JOB XXXXXXXX $

0404 Vertical Concrete Removal 0404AA First 7 Cubic Yards 7 CY ____________ $

0404AB Over 7 Cubic Yards 2 CY ____________ $

0405 Horizontal Concrete Removal 0405AA First 8 Cubic Yards 8 CY ____________ $

0405AB Over 8 Cubic Yards 2 CY ____________ $

0406 Vertical Concrete Placement 0406AA First 7 Cubic Yards 7 CY ____________ $

0406AB Over 7 Cubic Yards 2 CY ____________ $

0407 Horizontal Concrete Placement 0407AA First 8 Cubic Yards 8 CY ____________ $

0407AB Over 8 Cubic Yards 2 CY ____________ $

0408 Framing Installation 1 JOB XXXXXXXX $ 0409 Cover Plate Installation 1 JOB XXXXXXXX $ 0410 Electrical Work 1 JOB XXXXXXXX $

TOTAL OF ESTIMATED AMOUNTS OF OPTION D

(ITEM NOS. 0401 THROUGH 0410, INCL.)

OPTION E - LOWER I-WALL PIT

0501 Sole Plate and Machinery - Remove and

Reinstall

1 JOB XXXXXXXX $

0502 Bull Gear Components Installation 1 JOB XXXXXXXX $

0503 Bull Gear Roller Components Installation 1 JOB XXXXXXXX $

0504 Vertical Concrete Removal 0504AA First 7 Cubic Yards 7 CY ____________ $

0504AB Over 7 Cubic Yards 2 CY ____________ $

0505 Horizontal Concrete Removal 0505AA First 8 Cubic Yards 8 CY ____________ $

0505AB Over 8 Cubic Yards 2 CY ____________ $

0506 Vertical Concrete Placement 0506AA First 7 Cubic Yards 7 CY ____________ $

0506AB Over 7 Cubic Yards 2 CY ____________ $

0507 Horizontal Concrete Placement 0507AA First 8 Cubic Yards 8 CY ____________ $

0507AB Over 8 Cubic Yards 2 CY ____________ $

0508 Framing Installation 1 JOB XXXXXXXX $ 0509 Cover Plate Installation 1 JOB XXXXXXXX $ 0510 Electrical Work 1 JOB XXXXXXXX $

TOTAL OF ESTIMATED AMOUNTS OF OPTION E

(ITEM NOS. 0501 THROUGH 0510, INCL.)

OPTION F - UPPER GUIDE WALL

0601 Bullnose Surface Replacement 1 JOB XXXXXXXX $ 0602 Horizontal Concrete Removal

0602AA First 12 Cubic Yards 12 CY ____________ $ 0602AB Over 12 Cubic Yards 3 CY ____________ $ 0603 Horizontal Concrete Placement 0603AA First 12 Cubic Yards 12 CY ____________ $ 0603AB Over 12 Cubic Yards 3 CY ____________ $ 0604 Electrical Work 1 JOB XXXXXXXX $

0605 Reinforcing Plate 1 JOB XXXXXXXX $

TOTAL OF ESTIMATED AMOUNTS OF OPTION F

(ITEM NOS. 0601 THROUGH 0605, INCL.)

TOTAL OF ESTIMATED AMOUNTS OF BASE BID AND OPTIONS A THROUGH F

(ITEM NOS. 0001 THROUGH 0605, INCL.)

CY = CUBIC YARD JOB = LUMP SUM LF = LINEAR FOOT MO = MONTH

THE GOVERNMENT RESERVES THE RIGHT TO AWARD OPTION A

BY 30 OCTOBER 2019.

IF OPTION A IS EXERCISED, THE CONTRACT WILL NOT BE

EXTENDED.

THE GOVERNMENT RESERVES THE RIGHT TO AWARD OPTIONS B

THROUGH F

BY 15 DECEMBER 2019.

IF OPTIONS B THROUGH F ARE EXERCISED, THE CONTRACT

WILL NOT BE EXTENDED.

SECTION 00700 - CONTRACT CLAUSES

The following have been modified:

DAVIS BACON LABOR RATES

"General Decision Number: IL20190013 08/02/2019

Superseded General Decision Number: IL20180013

State: Illinois

Construction Types: Heavy and Highway

Counties: Ford, Grundy, Iroquois, Kankakee, La Salle, Livingston, Marshall, McLean, Putnam and Woodford Counties in Illinois.

HEAVY AND HIGHWAY CONSTRUCTION PROJECTS (does not include landscape projects for GRUNDY COUNTY).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/04/2019 1 03/01/2019 2 05/03/2019 3 05/10/2019 4 05/17/2019 5 05/31/2019 6 06/07/2019 7 06/21/2019 8 06/28/2019 9 07/26/2019 10 08/02/2019

CARP0174-001 05/01/2019

LASALLE, MARSHALL, and PUTNAM COUNTIES

Rates Fringes

CARPENTER........................$ 36.00 30.44

CARP0237-010 05/01/2019

WOODFORD COUNTY

Rates Fringes

CARPENTER........................$ 35.43 28.77

PILEDRIVERMAN....................$ 36.43 28.77

CARP0237-016 05/01/2017

LIVINGSTON, McLEAN, AND FORD COUNTIES

Rates Fringes

CARPENTER........................$ 34.04 26.47

PILEDRIVERMAN....................$ 35.04 26.47

CARP0555-013 06/01/2017

GRUNDY COUNTY

Rates Fringes

CARPENTER........................$ 46.35 31.30

CARP0555-015 06/01/2019

IROQUOIS AND KANKAKEE COUNTIES

Rates Fringes

CARPENTER........................$ 39.50 34.20

ELEC0009-001 06/03/2018

GRUNDY and KANKAKEE COUNTIES

Rates Fringes

Line Construction Groundman...................$ 40.48 61.52% Lineman and Equipment Operator....................$ 51.90 61.52%

ELEC0034-001 03/01/2019

PEORIA DIVISION - MARSHALL (Area West of Bell Plain & Roberts TWPS) AND WOODFORD (Area West of Kansas, Linn, Palestine & Roanoke TWPS) COUNTIES

ELECTRICIAN......................$ 37.51 21.67

ELEC0051-001 03/04/2019

FORD, IROQUOIS, LASALLE, LIVINGSTON, MCLEAN, MARSHALL, PUTNAM,

and WOODFORD COUNTIES

Line Construction Groundman/Equipment Operator (All crawler type equipment larger than D-4, 15 ton crane or larger).....$ 46.47 32%+6.00 Groundman/Truck Driver......$ 35.33 32%+6.00 Lineman and Substation Technician..................$ 51.67 32%+6.00

ELEC0176-001 06/01/2018

Rates Fringes

ELECTRICIAN

Grundy County...............$ 43.50 39.26 LaSalle County..............$ 43.11 39.24 Putnam County...............$ 41.95 39.21

ELEC0176-004 06/01/2018

FORD (Remainder), IROQUOIS (Excluding Artesia, Pegeon Grove, Loda, Fountain Creek, Lovejoy & Prairie Green TWPS), LA SALLE (Deer Park, Eden, La Salle, Peru, Utica, & Vermilion) KANKAKEE, & PUTNAM (Granville, Hennipin & Senachwine TWPS) COUNTIES

ELECTRICIAN

Ford, Iroquois, and Putnam

Counties....................$ 41.95 39.21 Kankakee and LaSalle Counties....................$ 43.11 39.24

ELEC0197-002 06/01/2019

MCLEAN (Remainder) and WOODFORD (Palestine, El Paso, & Kansas

TWPS) COUNTIES

ELECTRICIAN......................$ 37.55 20.00

ELEC0538-001 12/01/2018

IROQUOIS COUNTY (Fountain Creek, Lovejoy, and Prairie Green

TWPS)

ELECTRICIAN......................$ 34.50 20.74

ELEC0601-002 01/01/2018

FORD (South of Benton TWP), IROQUOIS (Artesia, Pegeon Grove, & Loda TWPS), LA SALLE (Southeastern part), LIVINGSTON, McLEAN (Cropsey, Anchor, Cheney Grove, & Belleflower TWPS), MARSHALL (Roberts, Evans, Bell, Plain, & Bennington TWPS), PUTNAM (Magnolia TWP), and WOODFORD (Linn, Clayton, Minonk, Roanoke, Green, & Panola TWPS) COUNTIES

ELECTRICIAN......................$ 38.99 16.68

* ENGI0150-007 06/01/2019

GRUNDY, KANKAKEE, LA SALLE, LIVINGSTON, AND PUTNAM (East and south of the Illinois River) COUNTIES

OPERATOR: Power Equipment Group 1.....................$ 49.30 41.00 Group 2.....................$ 48.75 41.00 Group 3.....................$ 46.70 41.00 Group 4.....................$ 45.30 41.00 Group 5.....................$ 44.10 41.00

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Asphalt Plant*; Asphalt Heater and Planer combination; Asphalt Heater Scarfire*; Asphalt Spreader;

Autograder; ABG Paver*; Backhoes with Caisson Attachment*;

Belt Loader*; Caisson Rigs*; Car Dumper, Central Redi-Mix Plant*; Combination Backhoe Front End Loader Machine (1 cu yd or over Backhoe bucket with attachments); Concrete Breaker (truck mounted)*; Concrete Conveyor; Concrete Paver over 27E cu ft*; Concrete Placer*; Concrete Tube Float;

Cranes, all attachments*; Cranes, Hammerhead, Linden, Peco and machines of a like nature*; Creter Crane; Crusher, stone etc.; All Derricks; Derrick Boats; Derricks, traveling*; Dredges*; Field Mechanic Welder; Formless Curb and Gutter Machine; Gradall and machines of a like nature;

Grader, Elevating; Grader, Motor Grader, Motor Patrol, Auto Patrol, Form Grader, Pull Grader, Subgrader; Guard Rail

Post Driver mounted*; Hoists, one, two, and three Drum;

Hydraulic Backhoes; Locomotive, all Mucking Machine; Pile Drivers and Skid Rig*; Pre-Stress Machine; Pump Cretes Dual Ram (Requires frequent lubrication and water)*; Rock/Track Tamper; Rock Drill truck mounted; Roto Mill Grinder, 36"" and over*; Roto Mill Grinder, less than 36""; Slip- Form Paver*; Soil Test Drill Rig, truck mounted*; Straddle Buggies; Hydraulic Telescoping Form (tunnel); Tractor Drawn Belt Loader*; Tractor Drawn Belt Loader with attached Pusher (two engineers); Tractor with boom; Tractaire with attachments; Raised or Blind Hoe Drill (Tunnel & Shaft)*;

Trenching Machine; Truck Mounted Concrete Pump with boom;

Underground Boring and/or Mining Machines 5 ft in diameter and over tunnel, etc.*; Underground Boring and/or Mining Machines under 5 ft; Wheel Excavator* & Widener (Apsco)

GROUP 2: Batch Plant; Bituminous Mixer; Boiler and Throttle Valve; Bulldozer; Car Loader Trailing Conveyors;

Combination Backkhoe Front End Loader Machine, less than 1 cu yd Backhoe Bucket with attachments; Compressor and Throttle Valve; Compressor, common receiver (3); Concrete Breaker or Hydro Hammer; Concrete Grinding Machine;

Concrete Mixer or Paver 7S series to and including 27 cu ft; Concrete Spreader; Concrete Curing Machine, Burlap Machine; Belting Machine and Sealing Machine; Concrete Wheel Saw; Conveyor Muck Cars (Haglund or similar type);

all Drills; Finishing Machine-Concrete; Greaser Engineer;

Highlift Shovels or Front End Loader; Hoist-Sewer Dragging Machine; Hydraulic Boom Trucks, all attachments; Hydro- Blaster requires two operators (one Group 4); Hydraulic Boom Trucks (All attachments); Locomotives, Dinky; Off-Road Hauling Units (including articulating); Laser Screed; Pump Cretes, Squeeze Cretes-Screw Type pumps, Gypsum Bulker and Pump; Rock Drill-Crawler or Skid*; Rock Drill-Truck Mounted*; Roller Asphalt; Rotary Snow Plows; Rototiller, Seaman, etc. self-Propelled; Scoops-Tractor Drawn;

Self-propelled Compactor; Spreader-Chip-Stone etc; Scraper;

Scraper-Prime Mover in Tandem regardless of size (add $1.00 to to Group 2 hourly rate for each hour and for each machine attached thereto); Tank Car Heater; Tractors, Push, pulling Sheeps Foot, Disc, Compactor, etc; Tug Boats

GROUP 3: Boilers; Brooms, all power propelled; Cement Supply Tender; Compressor, Common Receiver (2); Concrete Mixer, two bag and over; Conveyor, Portable; Farm type Tractors used for mowing, seeding, etc; Fireman on Boilers; Forklift Trucks; Grouting Machines; Hoists, Automatic; Hoists, all Elevators; Hoists, Tugger single Drum; Jeep Diggers; Low Boys; Pipe Jacking Machines; Post-Hole Digger; Power Saw, Concrete, Power Driven; Pug Mills; Rollers, other than asphalt; Seed and Straw Blower; Steam Generators; Stump Machine; Winch Trucks with A-Frame; Work Boats;Tamper-Form motor driven

GROUP 4: Air compressor - Small 250 and under (1 to 5 not to exceed a total of 300 ft); Air Compressor - Large over 250;

Combination - Small Equipment Operator; Generators - Small 50 kw and under; Generators - Large, over 50 kw; Heaters, Mechanical; Hydraulic power unit (Pile Driving, Extracting or Drilling); Hydro-Blaster requires two operators (one Group 2); Light Plants All (1 to 5); Pumps, over 3"" (1 to 3, not to exceed a total of 300 ft); Tractaire; Welding Machines (2 through 5); Winches, 4 small electric drill winches

GROUP 5: Bobcats (All); Brick Forklifts; Directional Boring Machine Locator; Oilers

*Equipment requires an Oiler

ENGI0649-004 04/01/2017

McLEAN, MARSHALL, PUTNAM (West of the Illinois River), and

WOODFORD COUNTIES

OPERATOR: Power Equipment Group 1.....................$ 39.69 31.23+A Group 2.....................$ 36.83 31.23+A Group 3.....................$ 32.12 31.23+A

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Cranes: Overhead Cranes; Hydro Crane; Shovels;

Crane type Backfiller; Tower Cranes-Mobile, Crawler, Stationary; Derricks, Hoist (3 drum); Draglines; Drott Yumbo & similar types considered as Cranes; 360 Degrees Swing Excavator, Backhoe; Derrick Boats; Pile Driver and Skid Rigs; Clam Shell; Locomotive Cranes; Road Pavers (Single Drum, Dual Drum, Tri Batcher); Motor Patrol & Power Blades (Dunmore, Elevating & similar types); Mechanics;

Central Concrete Mixing Plant Operator; Asphalt Batch Plant Operator and Plant Engineer; Gradall; Caisson Rigs; Skimmer Scoop, Koehring Scooper; Dredges (all types); Hoptoe; All Cherry Pickers; Work Boat; Ross Carrier; Helicopter; Dozer;

Tournadozer; Tournapulls (all & similar types); Concrete and all recycle machines, Multiple Unit Earth Movers; 75 cents per hour for each scoop over one; Scoops (all sizes);

Pushcats; Endloaders (all types); Asphalt Surfacing Machine; Slip Form Paver; Rock Crusher; Material Crusher (outside pits and quarries); Screening Plants (outside pits and quarries); Tunnel Boring Machine; Heavy Equipment Greaser (Top Greaser on Spread); CMI, Auto Grade, CMI Belt Placer (3 track & similar types); Side Booms; Starting Engineer on Pipeline or Construction (eleven 11 pieces or more); Asphalt Heater & Planer Combination; Wheel Tractors with Dozer, Hoe or End Loader attachements; CAT Earthwork Compactors and similar types; Blaw Knox Spreader & similar types; Trench Machines; Pump Crete, Belt Crete, Squeeze Crete, Screw Type Pumps & Gypsum; Creter Crane; Concrete Pump Truck; Formless Finishing Machines; Flaherty Spreader or similar types; Screedman on Laydown Machine; Vermeer Concrete Saw; Laser Screed; Span Saw; Dredge Leverman;

Dredge Engineer; Lull or similar type; Hydro-Boom Truck;

Guard Rail Machine.

GROUP 2: Bulker & Pump; Power Launches; Boring Machine & Pipe Jacking Machine; Dinkeys; Carts, powered haul unit for a boring machine; P-H one Pass Soil Cement Machines and similar types: Wheel Tractor; Back Fillers; Euclid Loader;

Fork LIfts; Jeep with Ditching Machines or other attachments; Tuneluger; Automatic Cement & Gravel Batching Plants; Mobile Drills Soil Testing and similar types);

Pugmill with Pump; All 1 and 2 Drum Hoists; De-watering Systems; Straw Blower; Hydro Seeder; Bump Grinders, Self Propelled; Assistant Heavy Equipment Greaser; Apsco Spreader Tractors (Track-Type w/o Power Units pulling Rollers); Rollers on Asphalt, Brick, or Macadam; Concrete Breakers; Concrete Spreaders; Cement Strippers; Cement Finishing Machines & CMI Texture & Reel Curing Machines;

Vibro-Tampers & similar types self-propelled; Mechanical Bull-Floats; Self-Propelled Concrete Saw; Truck Mounted Power Saws; Curb Cutters; Mixers over 3 bags to 27E; Winch & Boom Trucks; Tractor pulling Power Blade or Elevating Grader; Porter Rex Rail; Clary Screed; Mule pulling Rollers; Pugmill w/o Pump; Barber Greene or similar Loaders; Track Type Tractor with power unit attached;

Fireman; Spray Machine on paving; Curb Machine; Paved Ditch Machine; Power Broom; Self-Propelled Sweepers; Self- Propelled Conveyors; Power Subgrader; Oil Distributor;

Straight Tractor; Truck Crane Oiler; Truck Type Oilers;

Directional Boring Machine; Horizontal Directional Drill;

Articulating End Dump Vehicles; Starting Engineer (6 to 10 pieces).

GROUP 3: Straight Framed Truck and Truck Mounted Vac Unit, Starting Engineer (3 to 5 pieces); Trac Air Machine w/o attachments; Rollers, 5 tons & under on earth & gravel;

Form Grader; Bulk Cement Plant; Oilers.

- Escalated Rate on Crane, Derrick Booms, and Tower Cranes:

Additional $1.00 per hour over scale when Crane or Derrick is positioned 50 ft. or more above adjacent ground level or water level. $.05 per hour, per foot, over 90 feet including jib. $0.02 per hour, per ton - over 50-ton capacity.

- Operating engineers who operate Lattice Boom Crawler Cranes, Lattice Boom Truck Cranes, Telescopic Boom Cranes less than 17.5 Tons, Tower Cranes, Overhead Cranes and have been Certified by hte National Commission for the Certification of Crane Operators on the equipment they operate shall receive $1.60 per hour over scale.

A. On designated Hazardous Waste jobs, operators shall receive:

Level A add $4.00 to the appropriate group rate; Levels B and C add $3.00 to the appropriate group rate; and Level D add $2.00 to the appropriate group rate.

ENGI0841-002 04/01/2018

FORD and IROQUOIS COUNTIES

Rates Fringes

OPERATOR: Power Equipment

GROUP 1.....................$ 41.00 21.15

GROUP 2.....................$ 25.90 21.15

POWER EQUIPMENT OPERATOR CLASSFICATIONS

GROUP 1: Power Cranes, Draglines, Derricks, Shovels, Gradalls, Mechanics, Tractor Highlift, Tournadozer, Concrete Mixers with Skip, Tournamixer, Two-Drum Machine, One-Drum Hoist with Tower or Boom, Cableways, Tower Machines, Motor Patrol, Boom Tractor, Boom or Winch Truck, Winch or Hydraulic Boom Truck, Truck Crane, Tournapull, Tractor Operating Scoops, Bulldozer, Push Tractor, Asphalt Planer, Finishing Machine on Asphalt, Large Rollers on Earth, Rollers on Asphalt Mix, Ross Carrier or Similar Machine, Gravel Processing Machine, Asphalt Plant Engineer, Paver Operator, Farm Tractor with Half Yard Bucket and/or Backhoe Attachments, Dredge Engineer, or Dredge Operator, Central Mix Plant Engineer, CMI or Similar Type Machine, Truck or Skid Mounted Concrete Pump, Tower Crane, Engine or Rock Crusher Plant, Concrete Plant Engineer, Ditching Machine with Dual Attachment, Tractor Mounted Loaders, Cherry Picker, Hydro Crane, Standard or Dinkey Locomotives, Scoopmobiles, Euclid Loader, Soil Cement Machine, Back Filler, Elevating Machine, Power Blade, Drilling Machines Including Well Testing, Caissons, Shaft or Any Similar Type Drilling Machines, Motor Driven Paint Machine, Pipe Cleaning Machine, Pipe Wrapping Machine, Pipe Bending Machine, Apsco Paver, Boring Machine, (Head Equipment Greaser), Barber- Greene Loaders, Formless Paver, (Well

Point System), Concrete Spreader, Hydra Ax, Span Saw and Similar Types, Marine Scoops, Brush Mulcher, Brush Burner, Mesh Placer, Tree Mover, Helicopter Crew (3), Piledriver - Skid or Crawler, Stump Remover, Root Rake, Tug Boat Operator, Refrigerating Machine, Freezing Operator, Chair Cart-Self Propelled, Hydra Seeder, Straw Blower, Power Sub Grader, Bull Float, Finishing Machine, Self-Propelled Pavement Breaker (Backhoe Attached), Lull (or Similar Type Machine), Two Air Compressors, Compressors Hooked in Manifold, Overhead Crane, Chip Spreader, Mud Cat, Sull-Air Fork Lifts (Except When Used For Landscaping Work), Soil Stabilazer (Seaman Tiller, Bo Mag, Rago Gator and Similar Types or Equipment), Tube Float, Spray Machine, Curing Machine, Concrete or Asphalt Milling Machine, Snooper Truck Operator.

GROUP 2: Concrete Mixers Without Skips, Rock Crusher, Ditching Machine Under 6', Curbing Machine, one Drum Machines without Tower or Boom, Air Tugger, Self-Propelled Concrete Saw, Machine- Mounted Post Hole Digger, Two to Four Generators, Water Pumps, or Welding Machines, within 400 ft., Air Compressor 600 cu. ft. and Under, Rollers on Aggregate and Seal Coat Surfaces, Fork Lifts (When Used For Landscaping Work, Concrete and Blacktop Curb Machine, Farm Tractor with less than Half Yard Bucket, One Water Pump, Oilers, Air Valves or Steam Valves, One Welding Machine, Truck Jack, Mud Jack, Gunnite Machine, House Elevators when used for Hoisting Material, Engine Tenders, Wagon Drill, Flex Plane, Conveyor, Siphons and Pulsometer, Switchman, Fireman on Paint Pots, Fireman on Asphalt Plants, Distributor Operators on Trucks, Tampers, Self- Propelled Power Broom, Striping Machine (Motor Driven), Form Tamper, Bulk Cement Plant Equipment Greaser, Deck Hands, Truck Crane Oiler-Driver, Cement Blimps, Form Grader, Temporary Heat, Throttle Valve, Farm Tractor, Super Sucker (and Similar Type of Equipment).

IRON0112-002 05/01/2018

LIVINGSTON, MARSHALL (Southwestern corner), MCLEAN (Western Half), and WOODFORD COUNTIES

IRONWORKER.......................$ 37.44 28.07

IRON0380-005 05/01/2018

FORD and MCLEAN (Eastern Half) COUNTIES

Rates Fringes

IRONWORKER.......................$ 32.86 24.34

IRON0444-001 06/01/2018

GRUNDY COUNTY

Rates Fringes

IRONWORKER.......................$ 43.00 38.20

IRON0444-003 06/01/2018

La Salle, Marshall (Except the Southwestern Part), and Putnman Counties

IRONWORKER.......................$ 41.75 35.38

IRON0444-005 06/01/2018

Kankabee County

Rates Fringes

IRONWORKER.......................$ 42.25 35.80

LABO0075-003 06/01/2017

GRUNDY COUNTY

Rates Fringes

LABORER

GROUP 1.....................$ 41.20 27.47

GROUP 2.....................$ 41.55 27.47

GROUP 3.....................$ 41.28 27.47

GROUP 4.....................$ 41.43 27.47

GROUP 5.....................$ 41.40 27.47

GROUP 6.....................$ 41.55 27.47

GROUP 7.....................$ 41.40 27.47

LABORER CLASSIFICATIONS

GROUP 1 - Mortar mixers; Scaffolds; Sewer and trench work (ground level down to 8 feet); Catch basin and manhole diggers, mesh handling on road to work, Cement and mineral filler handler, concrete puddlers, Batch dumpers (cemt & asphalt); Vibrator operator; Sand and Stone wheelers to mixer (handler); Concrete wheelers; Airtamping hammermen;

Concrete & paving breakers; Rock drillers/ Jackhammermen;

Chipping hammermen; Asphalt; laborer; Chain and power saws;

Pit men; Fencing laborers; Mason tender (mortar and brick wheeler); Kettlemen & tarmen, tank cleaners; Scaffold, staging laborers; Pot Firemen (tarmen); Heaters tender for any purpose; Water pumps (portable water pumps shall be tended by laborers if the employer determines tending is required); Rip rap; Handling of slab steel road forms in any manner (except road form setting); Setting center strips, Contraction and expansion joints (road work);

Unloading and handling of lumber, brick, transite materials, cast iron water pipe, reinforced concrete rods, sewer and drain tile railroad tiles and all other creosoted materials, paving blocks and concrete forms; Handling of insulation of any type, all work involving the unloading of materials, fixtures, or furnishing, whether crated or uncrated; all mortar and composition mixers of sewer work;

track laborers; Chimney and silo laborers working at a height of 1 to 48 feet; All laborers working on swing, suspended, or any type or make of scaffolding 1 to 48 feet;

All laborers working inside a sphere or any type or make of tank; Working inside a sphere or any type or make of tank from bottom to a height of 48 feet; Form Strippers (any type); Mechanical or motorized buggies, for concrete or masonsl Use of skid steer loads or any other machinery which replaces the wheelbarrow or buggy; Handling multiple concrete duct or any other type of pipe used in public utility work unless otherwise specified herein; Snapping of wall ties and removal of rods, drilling of anchor bolt holes; Concrete or aspahlt clipper type saws and self-propelled saws; Shoulder and grade laborers; All hydraulic electric and air or any other type of tools; Grouting and caulking; Cleaning lumber, Nail pulling, Deck hand;

Dredgehand; shore laborer; Bankmen on Floating Plant; Tool and material checkers; signalmen and Flagmen on all construction work defined herein; Cleaning of debris;

Removal of trees; Concrete curing, temporary concrete protection regardless of manner or materials used; Laborers on Apsco; Janitorial; Wrecking and demolition laborers

GROUP 2 - Sewer and drain pipelayers and multiple concrete duct or any other type of pipe used on public utility work (ground level to 8 feet); Pumpcrete pipehandlers;

GROUP 3 - Asphalt rakers; Hod Carriers; Plasterer Laborers;

Gunnite laborers, Slab for setters on roads, highways, streets, airports runaways, and radii (any type of form) stringline men for all aforementioned work; Wage and tower drillers on land and floating plant used on dredging;

Asphalt gunners and plug men (undercoating on road work);

Mortar pump laborers; Plaster pump laborer

GROUP 4 - Tunnel miners, and all laborers inside tunnel; air blown pipemen, torchmen (burners); Mortaring men on sewer and drain pipe (the applying of mortar and composition mixes), all bottom men on sewer work-all sewer and drain pipelayers-multiple concrete duct or any other type of pipe used on public utility work-8 feet or more below ground level, and all other sewer and trench laborers 8 feet or more below ground level regardless of excavation area; All labor work inside cofferdam; Use of a 10 foot or more drill steel for hand held drills; Caisson laborers ground level dwon 15 feet; All air tools 8 feet or more below ground level; All laborers working on swining-suspended on any type or make of scaffold, 48 feet to 100 feet; All chimney and silo laborers working at a height of 48 to 100 feet;

All tamping hammers over 150 lbs.; All laborers working inside of a sphere or any type or make of tank at a height of 48 feet to 100 feet; all hydraulic, electric and air tools or any other type 8 feet or more below ground level;

Vibrators-any type-8 feet or more below ground level

GROUP 5 - Gunnite nozzle men; Caisson laborers and all tamping hammers from 150 lbs and over; from 15 feet below ground level down to 50 feet

GROUP 6 - All underground cavern laborers; Caisson laborers 50 feet or more below ground level; Laborers working under radio active conditions (suiting up); Blasting men (Powdermen)

GROUP 7 - Dosimeter (any device) used for monitoring nuclear exposure; Asbestos abatement worker; Toxic and hazardous waste removal laborer

LABO0362-001 05/01/2018

MCLEAN COUNTY

Rates Fringes

LABORER

GROUP 1.....................$ 32.04 24.43

GROUP 2.....................$ 33.04 24.43

LABORER CLASSIFICATIONS

GROUP 1 - All classifications not listed below

GROUP 2 - Asbestos Abatement Worker and Hazardous Waste Worker; Lead Base Paint Worker; Dynamite Man

LABO0393-001 05/01/2019

BUREAU, LA SALLE, and PUTNAM COUNTIES

LABORER

Group 1.....................$ 30.25 26.01 Group 2.....................$ 30.45 26.01 Group 3.....................$ 30.65 26.01 Group 4.....................$ 31.25 26.01

LABORER CLASSIFICATIONS

GROUP 1: UNSKILLED - All classifications not listed below

GROUP 2: SEMI-SKILLED - Handling of materials treated with oil, creosote, asphalt and/or foriegn material harmful to skin or clothing; Track laborers; Cement handlers; Chloride handlers; Unloading and laborers with Steel Workers and Re-bars; Concrete Workers )wet); Batch Dumpers; Mason Tenders; Kettle and Tar Men; Tank Cleaners; Plastic Installers; Scaffold Workers; Motorized buggies or motorized ubit used for wet concrete or handling of building materials; Laborers with de-watering systems;

Sewer workers plus depth; Vibrator Operators; Motor Mixer Operators; Cement Silica, clay, fly ash, lime and plasters, handlers (bulk or bag); Cofferdam workers plus depth;

Concrete paving, placing, cutting and tying of reinforcing;

Deck hand, dredge hand and shore laborers; Backmen on floating plant; Asphalt workers with machine and layers;

Grade checker; Power tools; Driving all stakes, stringlines for all machinery; Setting and building of manholes and catch basins; Stripping of all concrete forms except paving forms; All concrete paving and slope walls, placing, cutting and tying of reinforcing (re-bars and wire mesh)

GROUP 3: SKILLED - Mason Tenders; Caisson Workers plus depth; Gunnite Nozzle Men; Lead Man on Sewer Work; Welders, Cutters, Burners & Torchmen; Chain Saw Operators; Paving Breaker, Jackhammer & Drill Operators; Layout Man and/or tile layer; Steel Form Setters (Street & Hwy); Air Tamping hammerman; Signal man on Crane; Concrete Saw Operator;

Screenman on Asphalt Pavers; Front End Man on Chip Spreader; Laborers tending masons with hot materials or where foreign materials are used; Multiple Concrete duct-leadman; Luteman; Asphalt Raker; Curb Asphalt Machine Operator; Ready mix scalemen, permanent, portable or temporary plant; Laborers handling masterplate or similar materials; Laser Beam Operator; Coring Machine Operator;

Plasterer Tenders; Underpinning and Shoring of Building;

Material selector when working with firebrick or castable materials; Fire Watch; Signalling of all power equipment;

Tree Topper or Trimmer

GROUP 4: Dynamite man; Asbestos Abatement Worker and Hazardous Waste Worker

LABO0751-002 05/01/2017

FORD, IROQUOIS, and KANKAKEE COUNTIES

Rates Fringes

LABORER

Group 1.....................$ 36.21 27.02 Group 2.....................$ 37.21 27.02

LABORER CLASSIFICATIONS

GROUP 1: UNSKILLED; SEMI-SKILLED - Handling of materials treated with oil, creosote, asphalt and/or foriegn material harmful to skin or clothing; Track laborers; Cement handlers; Chloride handlers; Unloading and laborers with Steel Workers and Re-bars; Concrete Workers (wet); Batch Dumpers; Mason Tenders; Kettle and Tar Men; Tank Cleaners;

Plastic Installers; Scaffold Workers; Motorized buggies or motorized unit used for wet concrete or handling of building materials; Laborers with de-watering systems;

Sewer workers plus depth; Vibrator Operators; Motor Mixer Operators; Cement Silica, clay, fly ash, lime and plasters, handlers (bulk or bag); Cofferdam workers plus depth;

Concrete paving, placing, cutting and tying of reinforcing;

Deck hand, dredge hand and shore laborers; Bankmen on floating plant; Asphalt workers with machine and layers;

Grade checker; Power tools; Driving all stakes, stringlines for all machinery; Setting and building of manholes and catch basins; Stripping of all concrete forms except paving forms; All concrete paving and slope walls, placing, cutting and tying of reinforcing (re-bars and wire mesh);

SKILLED - Caisson Workers plus depth; Gunnite Nozzle Men;

Lead Man on Sewer Work; Welders, Cutters, Burners & Torchmen; Chain Saw Operators; Paving Breaker, Jackhammer & Drill Operators; Layout Man and/or tile layer; Steel Form Setters (Street & Hwy); Air Tamping hammerman; Signal man on Crane; Concrete Saw Operator; Screenman on Asphalt Pavers; Front End Man on Chip Spreader; Laborers tending masons with hot materials or where foreign materials are used; Multiple Concrete duct-leadman; Luteman; Asphalt Raker; Curb Asphalt Machine Operator; Ready mix scalemen, permanent, portable or temporary plant; Laborers handling masterplate or similar materials; Laser Beam Operator;

Coring Machine Operator; Plasterer Tenders; Underpinning and Shoring of Building; Material selector when working with firebrick or castable materials; Fire Watch;

Signalling of all power equipment; Tree Topper or Trimmer

GROUP 2: Dynamite man; Asbestos Abatement Worker and Hazardous Waste Worker

LABO0996-001 05/01/2018

LIVINGSTON, MARSHALL, AND WOODFORD COUNTIES

Rates Fringes

LABORER

GROUP 1.....................$ 32.73 23.74

GROUP 2.....................$ 33.73 23.74

LABORER CLASSIFICATIONS

GROUP 1: All classifications not listed below

GROUP 2: Dynamite Man; Asbestos Abatement Worker and Hazardous Waste Worker; and Lead Base Paint Worker

PAIN0014-005 06/01/2018

GRUNDY COUNTY

Rates Fringes

PAINTER..........................$ 46.55 27.24

PAIN0030-010 07/01/2018

BUREAU, FORD, HANCOCK, LA SALLE, LIVINGSTON, MCDONOUGH, MCLEAN,

PUTNAM AND STARK COUNTIES

PAINTER

Brush, Roller, Pressure Roller, Spray, Airless Spray, Sandblasting, Taper, Drywall Taper/Finisher, Structural Steel, and Bridges..........$ 36.85 21.80

PAIN0157-001 07/01/2018

FULTON, MARSHALL, MASON, PEORIA, SCHUYLER, TAZEWELL AND

WOODFORD COUNTIES

PAINTER

Brush, Spray, Pressure Roller, Sandblasting, Bridges, & New Structural Steel Work..................$ 36.85 21.80

PLAS0011-003 06/01/2019

LASALLE & PUTNAM COUNTIES

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 38.04 27.37

PLAS0011-011 06/01/2019

IROQUOIS AND KANKAKEE COUNTIES

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 44.45 29.09

PLAS0018-010 05/01/2017

MARSHALL and WOODFORD (North and West of Routes 116 and 117)

COUNTIES

CEMENT MASON/CONCRETE FINISHER...$ 32.11 25.52

PLAS0018-018 05/01/2017

LIVINGSTON (Southern Part), MCLEAN, and WOODFORD (South of Route 116) COUNTIES

CEMENT MASON/CONCRETE FINISHER...$ 33.46 22.22

PLAS0018-024 05/01/2017

LIVINGSTON (Northern Part) COUNTY

CEMENT MASON/CONCRETE FINISHER...$ 32.11 25.52

PLAS0143-006 05/01/2015

FORD COUNTY

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 31.51 17.50

TEAM0026-003 05/01/2019

FORD ( Elliot, Gibson City, Harpster, Melvin, Paxton, Roberts & Sibley), IROQUOIS (Fountain Creek, Lovejoy, Milford, Pigeon Grove, Prairie Green & Stockland),MCLEAN (South of a straight line from where Route 24 intersects the Woodford County line in a Southeast direction to the South Southwest corner of Livingston County) COUNTIES

TRUCK DRIVER

Group 1.....................$ 38.06 19.62 Group 2.....................$ 38.61 19.62 Group 3.....................$ 38.87 19.62 Group 4.....................$ 39.23 19.62 Group 5.....................$ 40.27 19.62

CLASSIFICATIONS:

GROUP 1: Drivers on 2 axles hauling less than 9 tons; air compressor & welding machines and brooms, including those pulled by separate units; Truck Driver Helper, warehouse employees; Mechanic Helpers; greasers and tiremen; pick-up trucks when hauling material, tools, or workers to and from and on the job site; and forklifts up to 6,000 lb capacity.

GROUP 2: 2 or 3 axles hualing more than 9 tons but hauling less than 16 tons; A-frame winch trucks; hydrolift trucks;

Vactor Trucks or similar equipment when used for transportation purposes; Forklift over 6,000 lb.capacity;

winch trucks; and four axle combiation units.

GROUP 3: 2, 3 or 4 Axles hauling 16 tons or more; 5-Axles or more combination units; drivers on water pulls; articulated dump trucks; mechanics and working forepersons.

GROUP 4: Low Boy and Oil Distributors.

GROUP 5: Drivers who require special protective clothing while employed on hazardous waste work.

* TEAM0050-005 05/01/2019

MARSHALL AND WOODFORD COUNTIES

Rates Fringes

TRUCK DRIVER

Group 1.....................$ 38.17 19.85 Group 2.....................$ 38.71 19.85 Group 3.....................$ 39.01 19.85 Group 4.....................$ 39.34 19.85 Group 5.....................$ 40.39 19.85

CLASSIFICATIONS:

GROUP 1: Drivers on 2 axles hauling less than 9 tons; air compressor & welding machines and brooms, including those pulled by separate units; Truck Driver Helper, warehouse employees; Mechanic Helpers; greasers and tiremen; pick-up trucks when hauling material, tools, or workers to and from and on the job site; and forklifts up to 6,000 lb capacity.

GROUP 2: 2 or 3 axles hualing more than 9 tons but hauling less than 16 tons; A-frame winch trucks; hydrolift trucks;

Vactor Trucks or similar equipment when used for transportation purposes; Forklift over 6,000 lb.capacity;

winch trucks; and four axle combiation units.

GROUP 3: 2, 3 or 4 Axles hauling 16 tons or more; 5-Axles or more combination units; drivers on water pulls; articulated dump trucks; mechanics and working forepersons.

GROUP 4: Low Boy and Oil Distributors.

GROUP 5: Drivers who require special protective clothing while employed on hazardous waste work.

* TEAM0179-006 06/01/2017

FORD (North section the of the County North of a line from the Southeastern corner of Livingston County straight East to the Ford-Irquois County Line), GRUNDY, LIVINGSTON (Avoca, Belle Prairie, Broughton, Charlotte, Chatsworth, Dwight, Eppards Point, Esmen, Fayette, Forrest, Germanville, Indian Grove, Nebraska, Odell, Owega, Pike, Pleasant Ridge, Pontiac, Rooks Creek, Round Grove, Saunemin, Sullivan, Union, & Waldo), MCLEAN (North of a straight line starting at the intersection of McLean-Woodford Counties line & Route 24 in a Southeastern direction to the South Southwest corner of Livingston County), and WOODFORD (Northeast corner east of Route 51/251 & North of Route 24) COUNTIES

2 or 3 Axle Trucks..........$ 37.68 0.15+a 4 Axle Trucks...............$ 37.83 0.15+a 5 Axle Trucks...............$ 38.03 0.15+a 6 Axle Trucks...............$ 38.23 0.15+a

FOOTNOTES:

a. $733.20 per week.

b. Lowboy rate based on number of axles

An additional $.20 per axle shall be paid for all vehicles with more than six (6) axles.

CLASSIFICATIONS:

Group 1 - Frame Truck when used for transportation purposes;

Air Compressor and Welding Machines, including those pulled by cars, pick-up trucks and tractors; Ambulances;

Articulated Dumps; Batch Gate Lockers; Batch Hopperman; Car and Truck Washers; Carry Alls; Forl Lifts and Hoisters;

Helpers; Mechanics Helpers and Greasers; Oil Distributors, two-man operation; Pavement Breakers; Pole Trailer, up to 40 feet; Pothole Repair Trucks; Power Mower Tractors; Quick Change Barrier; Self-Propelled Chip Spreader; Shipping and Receiving Clerks and Checkers; Skipman; Slurry Trucks, two-man operation; Slurry Trucks, Conveyor Operated - 2 or 3 man operation; Teamsters; Unskilled Dumpmen; Warehousemen and Dockmen; Truck Drivers hauling warning lights, barricades, and portable toilets on the job site

Group 2 - Dispatcher; Dump Crets and Adgetators under 7 yards; Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnapulls or Turnatrailers when pulling other than self-loading equipment or similar equipment under 16 cubic yards; Mixer Trucks under 7 yards; Ready-Mix Plant Hopper Operator; Winch Trucks, 2 Axles

Group 3 - Dump Crets and Adgetators, 7 yards and over;

Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnapulls or Turnatrailers when pulling other than self-loading equipment or similar equipment over 16 cubic yards; Explosives and/or Fission Material Trucks; Mixer Trucks 7 yards or over; Mobile Cranes while in transit; Oil Distributors, one-man operation; Pole Trailer, over 40 feet; Pole and Expandable Trailers hauling material over 50 feet long;

Slurry Trucks, one-man operation; Winch Trucks, 3 axles or more; Mechanic - *Truck Welder and *Truck Painter*These classifications shall only apply in areas where and when it has been a past area practice; Asphalt Plant Operators in areas where it has been past practice

Group 4 - Dual-purpose vehicels, such as mounted crane tucks with hoist and accessories; Foreman; Master Mechanic;

Self-loading equipment like P.B. and trucks with scoops on the front

* TEAM0179-007 06/01/2017

KANKAKEE AND IROQUOIS (All of Iroquois except the townships of Milford, Stockland, Loda, Pigeon Grove, Fountain Creek, Lovejoy, and Prairie Green) COUNTIES

2 or 3 axles................$ 37.68 0.15+a 4 axles.....................$ 37.83 0.15+a 5 axles.....................$ 38.03 0.15+a 6 axles.....................$ 38.23 0.15+a

FOOTNOTES:

a. $733.20 per week.

b. Lowboy rate based on number of axles

An additional $.20 per axle shall be paid for all vehicles with more than six (6) axles.

CLASSIFICATIONS:

Group 1 - Frame Truck when used for transportation purposes;

Air Compressor and Welding Machines, including those pulled by cars, pick-up trucks and tractors; Ambulances;

Articulated Dumps; Batch Gate Lockers; Batch Hopperman; Car and Truck Washers; Carry Alls; Forl Lifts and Hoisters;

Helpers; Mechanics Helpers and Greasers; Oil Distributors, two-man operation; Pavement Breakers; Pole Trailer, up to 40 feet; Pothole Repair Trucks; Power Mower Tractors; Quick Change Barrier; Self-Propelled Chip Spreader; Shipping and Receiving Clerks and Checkers; Skipman; Slurry Trucks, two-man operation; Slurry Trucks, Conveyor Operated - 2 or 3 man operation; Teamsters; Unskilled Dumpmen; Warehousemen and Dockmen; Truck Drivers hauling warning lights, barricades, and portable toilets on the job site

Group 2 - Dispatcher; Dump Crets and Adgetators under 7 yards; Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnapulls or Turnatrailers when pulling other than self-loading equipment or similar equipment under 16 cubic yards; Mixer Trucks under 7 yards; Ready-Mix Plant Hopper

Operator; Winch Trucks, 2 Axles

Group 3 - Dump Crets and Adgetators, 7 yards and over;

Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnapulls or Turnatrailers when pulling other than self-loading equipment or similar equipment over 16 cubic yards; Explosives and/or Fission Material Trucks; Mixer Trucks 7 yards or over; Mobile Cranes while in transit; Oil Distributors, one-man operation; Pole Trailer, over 40 feet; Pole and Expandable Trailers hauling material over 50 feet long;

Slurry Trucks, one-man operation; Winch Trucks, 3 axles or more; Mechanic - *Truck Welder and *Truck Painter*These classifications shall only apply in areas where and when it has been a past area practice; Asphalt Plant Operators in areas where it has been past practice

Group 4 - Dual-purpose vehicels, such as mounted crane tucks with hoist and accessories; Foreman; Master Mechanic;

Self-loading equipment like P.B. and trucks with scoops on the front

* TEAM0722-004 05/01/2019

LASALLE, LIVINGSTON (all of the Livingston except Amity, Avoca, Belle Prairie, Broughton, Charlotte, Chatsworth, Dwight, Eppards Point, Esmen, Fayette, Flanagan, Forrest, Germansville, Indian Grove, Nebraska Township, Nevada, Newton, Odell, Oswego, Pike, Pleasant Ridge, Pontiac, Rooks Creek, Round Grove, Saunemin, Sullivan, Sunbury, Union & Waldo), PUTNAM COUNTIES

Group 1.....................$ 38.06 19.62 Group 2.....................$ 38.61 19.62 Group 3.....................$ 38.87 19.62 Group 4.....................$ 39.23 19.62 Group 5.....................$ 40.27 19.62

CLASSIFICATIONS:

GROUP 1: Drivers on 2 axles hauling less than 9 tons; air compressor & welding machines and brooms, including those pulled by separate units; Truck Driver Helper, warehouse employees; Mechanic Helpers; greasers and tiremen; pick-up trucks when hauling material, tools, or workers to and from and on the job site; and forklifts up to 6,000 lb capacity.

GROUP 2: 2 or 3 axles hualing more than 9 tons but hauling less than 16 tons; A-frame winch trucks; hydrolift trucks;

Vactor Trucks or similar equipment when used for transportation purposes; Forklift over 6,000 lb.capacity;

winch trucks; and four axle combiation units.

GROUP 3: 2, 3 or 4 Axles hauling 16 tons or more; 5-Axles or more combination units; drivers on water pulls; articulated dump trucks; mechanics and working forepersons.

GROUP 4: Low Boy and Oil Distributors.

GROUP 5: Drivers who require special protective clothing while employed on hazardous waste work.

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.