ID PFH 98(1), Goose Lake Road Reconstruction

Award Notice Posted

Solicitation number
DTFH70-15-R-00005
Agency
Awarded
to Western Construction Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
DTFH7016C00009 Federal contract award
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record
Place of performance
6 miles West of McCall Idaho. McCall, Idaho ., United States

Notice details come from SAM.gov. Updated .

Notice text

Western Federal Lands Highway Division (WFLHD) is conducting a two-phased Design-Build (D-B) selection process for project ID PFH 98(1), Goose Lake Road Reconstruction located 6 miles West of McCall, Idaho.

Under this Notice, WFLHD is soliciting D-B firms/teams to participate in Phase One - qualification Based Selection of a two-phased selection process to determine which D-B firms/teams are the most qualified to manage, design, and build the Project.  Through this process, WFLHD will create a short list of D-B firms/teams.  D-B firms/teams placed on the short list will then be eligible to submit Technical and Price proposals for the Project.  responses from individual construction or consultant firms not offering to provide all required services will not be accepted.

Tentatively a Request for Qualification will be issued early to mid June 2015.

Project Length:  4 miles

Description of Work:  Design/Build for the construction of 4 miles of the existing road to achieve a 26-foot pavement width. Spot realignments to substandard curves and intersection improvements at State Highway 55 and along the route to improve safety. Major excavation into existing cut slopes, retaining walls, new drainage culverts, including Aquatic Organism Passage structures, new roadway signing and guardrail and Right-of-way acquisition.                                                                       

Files

File Type Posted
A002_ID_PFH_98(1) _Goose_Lake_Road_Reconstruction.pdf PDF
DJ A-mono.Box.stb —
Goose_Structural_Plate.dwg DWG drawing
Goose_Lake_AOPs.pdf PDF
Goose_Structural_Plate.dgn —
A001_ID_PFH_98(1) _Goose_Lake_Road_Reconstruction_np.pdf PDF
Goose_Lake.Cover.dst —
Goose_Lake_Preliminary_Estimate.pdf PDF
Goose_Concrete_Box.dgn —
Goose_Lake.Box.txt TXT text file
DJ A-mono.Arch.stb —
USFS_Logo.jpg JPG image
monochrome.Cover.stb —
DJ A-mono.Cover.stb —
Goose_Lake_Cover.dgn —
Goose_Concrete_Box.dwg DWG drawing
Goose_Lake.Box.dst —
Goose_Lake_Cover.dwg DWG drawing
Goose_Lake.Arch.dst —
Goose_Lake.Arch.txt TXT text file
Goose_Lake.Cover.txt TXT text file
FSVisitor_Map-NAD83-STPL-M-PayetteNF.tif TIF image
Form_K1-Key_Personnel_Resume.pdf PDF
Form_P2-PastPerformance-Construction.pdf PDF
Hazardous_Waste_Investigation_and_Records_Search.pdf PDF
February_2015_Public_Meeting_Summary.pdf PDF
Form_E2-Project_Experience-Contractor.pdf PDF
Biological_Evaluation_for_Listed_and_Sensitive_Wildlife_Species.pdf PDF
Biological_Assessment-Biological_Evaluation_for_TEPC_Fish_Species.pdf PDF
Preliminary_Wetland_Identification_Report.pdf PDF
Goose_Lake_Road_plm.dgn —
Goose_Lake_Road.tin —
Goose_Lake_Road_dsl.dgn —
Vicinity_Map.pdf PDF
Goose_Lake_Road_con.dgn —
Form_P1-PastPerformance-Design.pdf PDF
Roadway_Subgrade_Investigation_Report.pdf PDF
Final_Project_Scoping_Report.pdf PDF
RFQ_ID_PFH_98(1)_Goose_Lake_Road_Reconstruction.pdf PDF
Form_E1-Project_Experience-Design.pdf PDF
Show all 40

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors