Roadway_Subgrade_Investigation_Report.pdf

PDF 3 MB Posted

Attached to
ID PFH 98(1), Goose Lake Road Reconstruction
Solicitation number
DTFH70-15-R-00005
Issued by

About this file

Roadway Subgrade Investigation

View the file

Other files

File Type Posted
A002_ID_PFH_98(1) _Goose_Lake_Road_Reconstruction.pdf PDF
Goose_Lake.Box.dst —
Goose_Concrete_Box.dwg DWG drawing
Goose_Lake_Cover.dwg DWG drawing
A001_ID_PFH_98(1) _Goose_Lake_Road_Reconstruction_np.pdf PDF
DJ A-mono.Box.stb —
Goose_Lake.Cover.dst —
Goose_Structural_Plate.dwg DWG drawing
Goose_Lake.Arch.dst —
Goose_Lake.Arch.txt TXT text file
Goose_Lake.Cover.txt TXT text file
Goose_Lake_AOPs.pdf PDF
FSVisitor_Map-NAD83-STPL-M-PayetteNF.tif TIF image
Goose_Structural_Plate.dgn —
Goose_Lake_Preliminary_Estimate.pdf PDF
Goose_Concrete_Box.dgn —
USFS_Logo.jpg JPG image
DJ A-mono.Arch.stb —
Goose_Lake.Box.txt TXT text file
DJ A-mono.Cover.stb —
Goose_Lake_Cover.dgn —
monochrome.Cover.stb —
Goose_Lake_Road_dsl.dgn —
Final_Project_Scoping_Report.pdf PDF
Form_E1-Project_Experience-Design.pdf PDF
RFQ_ID_PFH_98(1)_Goose_Lake_Road_Reconstruction.pdf PDF
Vicinity_Map.pdf PDF
Form_K1-Key_Personnel_Resume.pdf PDF
Form_E2-Project_Experience-Contractor.pdf PDF
Form_P2-PastPerformance-Construction.pdf PDF
Biological_Assessment-Biological_Evaluation_for_TEPC_Fish_Species.pdf PDF
Biological_Evaluation_for_Listed_and_Sensitive_Wildlife_Species.pdf PDF
Preliminary_Wetland_Identification_Report.pdf PDF
February_2015_Public_Meeting_Summary.pdf PDF
Hazardous_Waste_Investigation_and_Records_Search.pdf PDF
Goose_Lake_Road_plm.dgn —
Goose_Lake_Road_con.dgn —
Form_P1-PastPerformance-Design.pdf PDF
Goose_Lake_Road.tin —
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FINAL ROADWAY SUBGRADE INVESTIGATION REPORT

ID PFH 98(1) Goose Lake Road Reconstruction Highway 55 to Brundage Mountain Resort

Adams County, Idaho

PREPARED FOR

Federal Highway Adminisration Western Federal Lands Highway Division

Report prepared by: Colin Cummins, PE Reviewed by: Evan Garich, PE

PARSONS BRINCKERHOFF, INC.

400 SW 6th Avenue Suite 802

Portland, OR 97204

February 9, 2015

TABLE OF CONTENTS

1.0 INTRODUCTION

2.0 LABORATORY TESTING

3.0 SITE CONDITIONS

4.0 REFERENCES

LIST OF TABLES

Table 1: Boring Locations Table 2: Asphalt Thickness Table 3: Base Course Summary Table 4: Subbase and Subgrade Summary

APPENDICES

APPENDIX A Project Vicinity Map

APPENDIX B Exploration Location Plan

APPENDIX C Exploration Photographs

APPENDIX D Boring Logs

APPENDIX E Laboratory Test Results

APPENDIX F Task Order DTFH7015F17002

Page | i

1.0 INTRODUCTION

This report presents the results of our subgrade investigation of Goose Lake Road in Adams County, Idaho. This report has been prepared by Parsons Brinckerhoff (PB) for the use by FHWA and their approved agents. The information contained in this report is based on field conditions and laboratory test results.

1.1. Project Description

The Goose Lake Road Reconstruction project consists of the reconstruction of approximately 4 miles of existing roadway from Highway 55 to Brundage Mountain Ski resort. The site is located approximately 6 miles northwest of McCall in Adams County, Idaho. The project roadway generally runs north to south and is located within the Payette National Forest, see Appendix A for Project Vicinity Map. Portions of the roadway may be widened as part of the reconstruction project. It is expected that the final reconstructed grade will be at or slightly higher than existing grade.

1.2. Scope of Services

Our scope of services for this subgrade investigation is described in the STATEMENT OF WORK section of Task Order No. DTFH7015F17002. Our authorized scope of work includes the following items:

• Drill seventeen (17) Subgrade Borings to a depth of 5 feet or refusal.

• Perform laboratory tests on the different encountered soils.

• Create boring logs based on field and laboratory testing.

• Draft and Final Subgrade Investigation Report.

A copy of the task order is located in Appendix F of this report.

1.3. METHODS

Drilling operations were under the direction of a PB geotechnical engineer with five (5) years of experience. The drilling was performed by Haz-Tech Drilling Inc. based in Meridian, Idaho and occurred January 6-8, 2015. The drilling was performed with a truck-mounted CME-55 drill rig using a ten (10) inch diameter solid stem auger with a twelve (12) inch diameter bit attached.

The borings were completed and samples were obtained according to the following procedure:

1. The auger was advanced through the asphalt

2. The hole was cleaned of all asphalt cuttings, and an asphalt measurement was taken.

3. A small bag sample of the underlying material was taken within the first few inches.

4. The auger was placed back in the hole and advanced to bottom of the material layer.

Page | 1

5. The hole was cleaned off all loose cuttings which were then bagged and labeled for laboratory testing.

6. A depth measurement was taken.

7. Steps 3 through 6 were repeated for each material type until the bottom of the hole was reached.

8. After maximum depth was reached, the auger was removed while the hole was inspected by Geotechnical Engineer.

9. After inspection, the boring was backfilled with compacted gravel and sand then patched with cold mix asphalt.

1.3.1. Boring Locations

The borings were spaced at approximately ¼ mile intervals and alternated between the north-and southbound lanes. The borings were located in the center of the travel lanes. The following table summarizes the as drilled boring locations. The latitude and longitude readings were obtained from a hand held GPS unit. A Boring Location Plan is located in Appendix B of this report.

Table 1: Boring Locations

Boring Lane Approx.

MP

Latitude (° N)

Longitude (° W)

GLSG15-01 NB 0.10 44.958950 116.169933

GLSG15-02 SB 0.25 44.961083 116.169717

GLSG15-03 NB 0.50 44.964417 116.168767

GLSG15-04 SB 0.77 44.968300 116.167850

GLSG15-05 NB 1.03 44.971500 116.165417

GLSG15-06 SB 1.28 44.974967 116.166617

GLSG15-07 NB 1.53 44.978250 116.167617

GLSG15-08 SB 1.80 44.981867 116.167200

GLSG15-09 NB 2.00 44.984350 116.166850

GLSG15-10 SB 2.25 44.987450 116.166683

GLSG15-11 NB 2.58 44.991817 116.165817

GLSG15-12 SB 2.80 44.995233 116.165850

GLSG15-13 NB 3.02 44.997333 116.163900

GLSG15-14 SB 3.34 44.999950 116.164533

GLSG15-15 NB 3.44 45.001400 116.164267

GLSG15-16 SB 3.69 45.001633 116.163350

GLSG15-17 NB 3.84 45.000950 116.161900

2.0 LABORATORY TESTING

Samples of the encountered material, at each boring location, were collected and classified in the field. Select samples were choose and tested to determine; in-situ moisture content, particle size distribution (sieve analysis), atterberg limits and R-value according to the applicable

Page | 2

AASHTO or ASTM methods as stated in Section 4.C of the Task Order. The samples were delivered to an accredited laboratory in Boise, Idaho run by Strata.

Laboratory results are located in Appendix E of this report and summarized on the Boring Logs, see Appendix D. The laboratory testing results are also discussed further in the following sections of this report.

3.0 SITE CONDITIONS

The existing roadway generally runs north-south with an approximate elevation change of 1,000 feet. The road is generally one lane in each direction with occasional turnouts along the alignment. The road generally runs along the side of the mountains with an apparent cross-section that is partially cut into the mountain and partially on fill. The surrounding area consists of undeveloped Forest Service land with occasional crossings for other roads and trails. Boring logs detailing the encountered soil conditions at each site are included in Appendix C of this report. The borings were generally advanced to a maximum depth of 5 feet below the asphalt surface. Borings GLSG15-05, -06 and -16 were terminated prior to depth of 5 feet, due to drilling refusal on either a boulder or bedrock material.

3.1. Asphalt Thickness

The asphalt thickness ranged from 5.5 inches to 9 inches with a median value of 6.5 inches. A full pavement distress survey was not included in our scope of work. The following table summarizes the encountered asphalt thickness at each boring location.

Table 2: Asphalt Thickness Boring Thickness (in)

GLSG15-01 5.5

GLSG15-02 5.5

GLSG15-03 6.0

GLSG15-04 5.5

GLSG15-05 6.5

GLSG15-06 7.0

GLSG15-07 7.0

GLSG15-08 8.3

GLSG15-09 9.0

GLSG15-10 6.5

GLSG15-11 8.0

GLSG15-12 7.5

GLSG15-13 6.5

GLSG15-14 8.5

GLSG15-15 6.5

GLSG15-16 7.5

GLSG15-17 6.5

Page | 3

3.2. Base Course Conditions

Below the asphalt a relatively consistent layer with thicknesses ranging from 5 to 24 inches was encountered. According to the Unified Soil Classification System (ASTM, 2006) the material consisted of silty Gravel with sand (GM) to silty Sand with gravel (SM). The fines content, percentage of material passing the #200 sieve, ranged from 14 to 38 percent. The following table summarizes the encountered thickness, select laboratory testing results and soil classification at each boring location.

Table 3: Base Course Summary

Boring Thickness (in)

Grain Size R- Value

Classification

Gravel

Sand

Fines USCS1 AASHTO2

GLSG15-01 6 --

GLSG15-02 13 --

GLSG15-03 24 36 45 19 -- SC A-2-4

GLSG15-04 18 --

GLSG15-05 18 12 60 28 -- SM A-2-4

GLSG15-06 5 --

GLSG15-07 6 --

GLSG15-08 6 --

GLSG15-09 11 50 30 20 33 GM A-2-4

GLSG15-10 14 16 56 28 62 SM A-2-4

GLSG15-11 16 --

GLSG15-12 18 18 57 25 -- SM A-2-4

GLSG15-13 14 --

GLSG15-14 12 --

GLSG15-15 19 13 62 25 -- SM A-2-4

GLSG15-16 17 14 54 32 61 SM A-2-4

GLSG15-17 14 6 56 38 -- SM A-2-4

1 Unified Soil Classification System, ASTM D2487-06

2 AASHTO M145

3.3. Subbase and Subgrade Conditions

Conditions below the base course generally consisted granular material. According to the Unified Soil Classification System (ASTM, 2006) the encountered granular material primarily consisted of silty Sand (SM) with varying amounts of gravel with fines content ranging from 10 to 37 percent. The following table summarizes select laboratory testing results at each boring location.

Page | 4

Page | 5

Table 4: Subbase and Subgrade Summary

Boring Grain Size R-

Value

Classification

Gravel

Sand

Fines USCS1 AASHTO2

GLSG15-01 56 30.3 13.7 63 GM A-1-a

GLSG15-02 27 40 33 23 SC A-2-6

GLSG15-03 13 57 30 SM A-2-7

GLSG15-04 13 50 37 SC A-4

GLSG15-06 6 70 24 73 SM A-2-4

GLSG15-07 4 63 33 76 SM A-2-4

GLSG15-08 18 56 26 75 SM A-2-4

GLSG15-09 6 69 25 71 SM A-2-4

GLSG15-10 15 61 24 SM A-2-4

GLSG15-11 34 53 13 84 SM A-2-4

GLSG15-13 32 51 17 82 SM A-1-a GLSG15-14 44 46 10 83 SP-SM A-1-b GLSG15-15 47 43.5 9.5 GP-GM A-1-b GLSG15-17 30 47 23 77 SM A-1-a 1 Unified Soil Classification System, ASTM D2487-06

2 AASHTO M145

3.4. Groundwater Conditions

Groundwater was not encountered during drilling. At the time of drilling, significant amounts of snow were present adjacent to the pavement surface. It should be noted that groundwater levels will fluctuate throughout the year with rainfall, local irrigation and other factors.

4.0 REFERENCES

Federal Highway Administration (FHWA), Western Federal Lands Highway Division, 2014, Task Oder No. DTFH7015F17002

Standard Practice for Classification of Soils for Engineering Purposes (Unified Soil Classification

System), ASTM International, D 2487, 2006.

APPENDIX A

Project Vicinity Map

Brundage Mountain Resort

McCall, Idaho

Brundage Mountain Resort

Project Limits

N

McCall, Idaho

Brundage Mountain Resort

Project Limits

CLIENT NUMBER: ID PFH 98(1)

PROJECT NUMBER: 80421CC2

PROJECT NAME: Goose Lake Road Reconstruction Project Vicinity Map

N

McCall, Idaho

Brundage Mountain Resort

Project Limits

APPENDIX B

Boring Location Plan

CLIENT NUMBER: ID PFH 98(1)

PROJECT NUMBER: 80421CC2

PROJECT NAME: Goose Lake Road Reconstruction

A‐1

Boring Location Plan

N Key

Approximate Boring Location 2000 feet

PROJECT NAME: Goose Lake Road Reconstruction

A‐2

Boring Location Plan

N Key

Approximate Boring Location 2000 feet

PROJECT NAME: Goose Lake Road Reconstruction

A‐3

Boring Location Plan

NKey

Approximate Boring Location 2000 feet

APPENDIX C

Exploration Photographs

General Drilling Setup

Auger Sampling

C-1

Boring Completion and Patch

C-2

APPENDIX D

Boring Logs

Bottom of Boring at 5 feet below asphalt surface.

AUGER

AUGER

AUGER

AUGER

AUGER

AUGER

Moisture = 8.9%

%Gravel = 56, %Sand = 30.3, %Fines = 13.7, LL=29, PI=1, R-Value = 63

ASPHALT, 5.5" thick

Grayish brown, SAND and gravel (FILL), moist.

Brown, GRAVEL, some sand and silt, moist, GM (A-1-a).

Brown, GRAVEL, some sand, moist.

SURFACE ELEV.:

CME 55

COMPLETION DEPTH:EXCAVATION EQUIPMENT:

INSPECTOR: C. Cummins

Boring No.

CLIENT:

PROJECT:

CONTRACTOR:

LOCATION:

DATE: 1/8/15 TIME:

N: 44.958950

NB Lane

BORING NUMBER:

E: 116.169933

5 feet

REMARKS

D E

P T

H fe et

OFFSET:

COORD.

LOCATION:

T Y

P E

SAMPLE

G R

A P

H

IC

L O

G

10:05 am

Mile Post:

Goose Lake Road Reconstruction Brundage Mointain / Goose Lake Rd., Adams County, ID

Western Federal Lands Highway Division HAZ-Tech Drilling

DESCRIPTION

6' R

LO

C

A T

IO

N

N U

M B

E R

0.10

BORING LOG

B

O R

IN

G

L O

G

G R

A B

S A

M P

LE

S

O N

LY

C C

2_ G

O O

S E

LA

K

E .G

P J

M A

IN

LI

B _C

R C

5.

G

LB

/9 /1

GLSG15-01

PB PROJECT NO.:

CLIENT PROJECT NO.:

SHEET NUMBER: of

SheetGLSG15-01 of

ID PFH 98(1)

80421CC2

AUGER

AUGER

AUGER

AUGER

AUGER

Moisture = 16.3%

%Gravel = 27, %Sand = 40, %Fines = 33, LL=40, PI=19, R-Value = 23

ASPHALT, 5.5" thick

Brownish gray, GRAVEL and sand (FILL), moist.

Brownish dark gray, GRAVEL, some sand and clay, moist.

Grayish brown, SAND, some clay and gravel, moist, SC (A-2-6).

SURFACE ELEV.:

CME 55

COMPLETION DEPTH:EXCAVATION EQUIPMENT:

INSPECTOR: C. Cummins

Boring No.

CLIENT:

PROJECT:

CONTRACTOR:

LOCATION:

DATE: 1/8/15 TIME:

N: 44.961083

SB Lane

BORING NUMBER:

E: 116.169717

5 feet

REMARKS

D E

P T

H fe et

OFFSET:

COORD.

LOCATION:

T Y

P E

SAMPLE

G R

A P

H

IC

L O

G

9:20 am

Mile Post:

Goose Lake Road Reconstruction Brundage Mointain / Goose Lake Rd., Adams County, ID

Western Federal Lands Highway Division HAZ-Tech Drilling

DESCRIPTION

6' L

LO

C

A T

IO

N

N U

M B

E R

0.25

BORING LOG

B

O R

IN

G

L O

G

G R

A B

S A

M P

LE

S

O N

LY

C C

2_ G

O O

S E

LA

K

E .G

P J

M A

IN

LI

B _C

R C

5.

G

LB

/9 /1

GLSG15-02

PB PROJECT NO.:

CLIENT PROJECT NO.:

SHEET NUMBER: of

SheetGLSG15-02 of

AUGER

AUGER

AUGER

AUGER

Moisture = 7.0%

%Gravel = 36, %Sand = 45, %Fines = 19, LL=27, PI=10

Moisture = 24.4%

%Gravel = 13, %Sand = 57, %Fines = 30, LL=41, PI=15

ASPHALT, 6" thick

Brownish gray, SAND (FILL), some gravel and clay, moist, SC (A-2-4).

Brown, SAND, some silt and gravel, moist, SM (A-2-7).

SURFACE ELEV.:

CME 55

COMPLETION DEPTH:EXCAVATION EQUIPMENT:

INSPECTOR: C. Cummins

Boring No.

CLIENT:

PROJECT:

CONTRACTOR:

LOCATION:

DATE: 1/8/15 TIME:

N: 44.964417

NB Lane

BORING NUMBER:

E: 116.168767

5 feet

REMARKS

D E

P T

H fe et

OFFSET:

COORD.

LOCATION:

T Y

P E

SAMPLE

G R

A P

H

IC

L O

G

8:30 am

Mile Post:

Goose Lake Road Reconstruction Brundage Mointain / Goose Lake Rd., Adams County, ID

Western Federal Lands Highway Division HAZ-Tech Drilling

DESCRIPTION

6' R

LO

C

A T

IO

N

N U

M B

E R

0.50

BORING LOG

B

O R

IN

G

L O

G

G R

A B

S A

M P

LE

S

O N

LY

C C

2_ G

O O

S E

LA

K

E .G

P J

M A

IN

LI

B _C

R C

5.

G

LB

/9 /1

GLSG15-03

PB PROJECT NO.:

CLIENT PROJECT NO.:

SHEET NUMBER: of

SheetGLSG15-03 of

AUGER

AUGER

AUGER

Moisture = 21.1%

%Gravel = 13, %Sand = 50, %Fines = 37, LL = 30, PI = 8, R-Value = 24

ASPHALT, 5.5" thick

Brownish gray, GRAVEL and sand (FILL), moist.

Brown and black, SAND, some clay and gravel, moist, SC (A-4).

SURFACE ELEV.:

CME 55

COMPLETION DEPTH:EXCAVATION EQUIPMENT:

INSPECTOR: C. Cummins

Boring No.

CLIENT:

PROJECT:

CONTRACTOR:

LOCATION:

DATE: 1/7/15 TIME:

N: 44.968300

SB Lane

BORING NUMBER:

E: 116.167850

5 feet

REMARKS

D E

P T

H fe et

OFFSET:

COORD.

LOCATION:

T Y

P E

SAMPLE

G R

A P

H

IC

L O

G

3:30 pm

Mile Post:

Goose Lake Road Reconstruction Brundage Mointain / Goose Lake Rd., Adams County, ID

Western Federal Lands Highway Division HAZ-Tech Drilling

DESCRIPTION

6' L

LO

C

A T

IO

N

N U

M B

E R

0.77

BORING LOG

B

O R

IN

G

L O

G

G R

A B

S A

M P

LE

S

O N

LY

C C

2_ G

O O

S E

LA

K

E .G

P J

M A

IN

LI

B _C

R C

5.

G

LB

/9 /1

GLSG15-04

PB PROJECT NO.:

CLIENT PROJECT NO.:

SHEET NUMBER: of

SheetGLSG15-04 of

Bottom of Boring at 2 feet below asphalt surface.

Drilling refusal on large boulder or bedrock.

AUGER

AUGER

Moisture = 8.3%

%Gravel = 12, %Sand = 60, %Fines = 28, LL = N/A, PI =

NP

ASPHALT, 6.5" thick

Brown, SAND (FILL), some silt and gravel, moist, SM (A-2-4). 1

SURFACE ELEV.:

CME 55

COMPLETION DEPTH:EXCAVATION EQUIPMENT:

INSPECTOR: C. Cummins

Boring No.

CLIENT:

PROJECT:

CONTRACTOR:

LOCATION:

DATE: 1/7/15 TIME:

N: 44.971500

NB Lane

BORING NUMBER:

E: 116.165417

2 feet

REMARKS

D E

P T

H fe et

OFFSET:

COORD.

LOCATION:

T Y

P E

SAMPLE

G R

A P

H

IC

L O

G

3:05 pm

Mile Post:

Goose Lake Road Reconstruction Brundage Mointain / Goose Lake Rd., Adams County, ID

Western Federal Lands Highway Division HAZ-Tech Drilling

DESCRIPTION

6' R

LO

C

A T

IO

N

N U

M B

E R

1.03

BORING LOG

B

O R

IN

G

L O

G

G R

A B

S A

M P

LE

S

O N

LY

C C

2_ G

O O

S E

LA

K

E .G

P J

M A

IN

LI

B _C

R C

5.

G

LB

/9 /1

GLSG15-05

PB PROJECT NO.:

CLIENT PROJECT NO.:

SHEET NUMBER: of

SheetGLSG15-05 of

Bottom of Boring at 3 feet below asphalt surface.

Drilling refusal on large boulder or bedrock.

AUGER

AUGER

AUGER

AUGER

Moisture = 4.0%

%Gravel = 6, %Sand = 70, %Fines = 24, LL = N/A, PI = NP, R-Value = 73

ASPHALT, 7" thick

Brown, SAND and gravel (FILL), moist.

Grayish brown, SAND, some silt, trace gravel, moist, SM (A-2-4).

SURFACE ELEV.:

CME 55

COMPLETION DEPTH:EXCAVATION EQUIPMENT:

INSPECTOR: C. Cummins

Boring No.

CLIENT:

PROJECT:

CONTRACTOR:

LOCATION:

DATE: 1/7/15 TIME:

N: 44.974967

SB Lane

BORING NUMBER:

E: 116.166617

3 feet

REMARKS

D E

P T

H fe et

OFFSET:

COORD.

LOCATION:

T Y

P E

SAMPLE

G R

A P

H

IC

L O

G

2:00 pm

Mile Post:

Goose Lake Road Reconstruction Brundage Mointain / Goose Lake Rd., Adams County, ID

Western Federal Lands Highway Division HAZ-Tech Drilling

DESCRIPTION

6' L

LO

C

A T

IO

N

N U

M B

E R

1.28

BORING LOG

B

O R

IN

G

L O

G

G R

A B

S A

M P

LE

S

O N

LY

C C

2_ G

O O

S E

LA

K

E .G

P J

M A

IN

LI

B _C

R C

5.

G

LB

/9 /1

GLSG15-06

PB PROJECT NO.:

CLIENT PROJECT NO.:

SHEET NUMBER: of

SheetGLSG15-06 of

AUGER

AUGER

AUGER

AUGER

Moisture = 13.9%

%Gravel = 4, %Sand = 63, %Fines = 33, LL = 30, PI = 4, R-Value = 76

ASPHALT, 7" thick

Brown, GRAVEL and sand (FILL), moist.

Dark brown, SAND, some silt, trace gravel, moist, SM (A-2-4).

Brown, SAND and gravel, moist.

SURFACE ELEV.:

CME 55

COMPLETION DEPTH:EXCAVATION EQUIPMENT:

INSPECTOR: C. Cummins

Boring No.

CLIENT:

PROJECT:

CONTRACTOR:

LOCATION:

DATE: 1/7/15 TIME:

N: 44.978250

NB Lane

BORING NUMBER:

E: 116.167617

5 feet

REMARKS

D E

P T

H fe et

OFFSET:

COORD.

LOCATION:

T Y

P E

SAMPLE

G R

A P

H

IC

L O

G

1:10 am

Mile Post:

Goose Lake Road Reconstruction Brundage Mointain / Goose Lake Rd., Adams County, ID

Western Federal Lands Highway Division HAZ-Tech Drilling

DESCRIPTION

6' R

LO

C

A T

IO

N

N U

M B

E R

1.53

BORING LOG

B

O R

IN

G

L O

G

G R

A B

S A

M P

LE

S

O N

LY

C C

2_ G

O O

S E

LA

K

E .G

P J

M A

IN

LI

B _C

R C

5.

G

LB

/9 /1

GLSG15-07

PB PROJECT NO.:

CLIENT PROJECT NO.:

SHEET NUMBER: of

SheetGLSG15-07 of

AUGER

AUGER

AUGER

Moisture = 12.7%

%Gravel = 18, %Sand = 56, %Fines = 26, LL = 32, PI = 1, R-Value = 75

ASPHALT, 8.25" thick

Brown, GRAVEL and sand (FILL), moist.

Brown, SAND, some silt and gravel, moist, SM (A-2-4).

SURFACE ELEV.:

CME 55

COMPLETION DEPTH:EXCAVATION EQUIPMENT:

INSPECTOR: C. Cummins

Boring No.

CLIENT:

PROJECT:

CONTRACTOR:

LOCATION:

DATE: 1/7/15 TIME:

N: 44.981867

SB Lane

BORING NUMBER:

E: 116.167200

5 feet

REMARKS

D E

P T

H fe et

OFFSET:

COORD.

LOCATION:

T Y

P E

SAMPLE

G R

A P

H

IC

L O

G

12:30 pm

Mile Post:

Goose Lake Road Reconstruction Brundage Mointain / Goose Lake Rd., Adams County, ID

Western Federal Lands Highway Division HAZ-Tech Drilling

DESCRIPTION

6' L

LO

C

A T

IO

N

N U

M B

E R

1.80

BORING LOG

B

O R

IN

G

L O

G

G R

A B

S A

M P

LE

S

O N

LY

C C

2_ G

O O

S E

LA

K

E .G

P J

M A

IN

LI

B _C

R C

5.

G

LB

/9 /1

GLSG15-08

PB PROJECT NO.:

CLIENT PROJECT NO.:

SHEET NUMBER: of

SheetGLSG15-08 of

AUGER

AUGER

AUGER

Moisture = 12.1%

%Gravel = 50, %Sand = 30, %Fines = 20, LL = 31, PI = 8, R-Value = 33

Moisture = 11.0%

%Gravel = 6, %Sand = 69, %Fines = 25, LL = N/A, PI = NP, R-Value = 71

ASPHALT, 9" thick

Brown, GRAVEL (FILL), some sand and silt, moist, GM (A-2-4).

Grayish brown, SAND, some silt, trace gravel, moist, SM (A-2-4).

SURFACE ELEV.:

CME 55

COMPLETION DEPTH:EXCAVATION EQUIPMENT:

INSPECTOR: C. Cummins

Boring No.

CLIENT:

PROJECT:

CONTRACTOR:

LOCATION:

DATE: 1/7/15 TIME:

N: 44.984350

NB Lane

BORING NUMBER:

E: 116.166850

5 feet

REMARKS

D E

P T

H fe et

OFFSET:

COORD.

LOCATION:

T Y

P E

SAMPLE

G R

A P

H

IC

L O

G

11:50 am

Mile Post:

Goose Lake Road Reconstruction Brundage Mointain / Goose Lake Rd., Adams County, ID

Western Federal Lands Highway Division HAZ-Tech Drilling

DESCRIPTION

6' R

LO

C

A T

IO

N

N U

M B

E R

2.00

BORING LOG

B

O R

IN

G

L O

G

G R

A B

S A

M P

LE

S

O N

LY

C C

2_ G

O O

S E

LA

K

E .G

P J

M A

IN

LI

B _C

R C

5.

G

LB

/9 /1

GLSG15-09

PB PROJECT NO.:

CLIENT PROJECT NO.:

SHEET NUMBER: of

SheetGLSG15-09 of

AUGER

AUGER

AUGER

AUGER

AUGER

AUGER

Moisture = 12.3%

%Gravel = 16, %Sand = 56, %Fines = 28, LL = N/A, PI = NP, R-Value = 62

Moisture = 16.5%

%Gravel = 15, %Sand = 61, %Fines = 24, LL = N/A, PI =

NP

ASPHALT, 6.5" thick

Grayish brown, SAND (FILL), some silt and gravel, moist, SM (A-2-4).

Brown, SAND, some gravel, moist.

Dark brown, SAND, some silt and gravel, moist, SM (A-2-4).

SURFACE ELEV.:

CME 55

COMPLETION DEPTH:EXCAVATION EQUIPMENT:

INSPECTOR: C. Cummins

Boring No.

CLIENT:

PROJECT:

CONTRACTOR:

LOCATION:

DATE: 1/7/15 TIME:

N: 44.987450

SB Lane

BORING NUMBER:

E: 116.166683

5 feet

REMARKS

D E

P T

H fe et

OFFSET:

COORD.

LOCATION:

T Y

P E

SAMPLE

G R

A P

H

IC

L O

G

10:55 am

Mile Post:

Goose Lake Road Reconstruction Brundage Mointain / Goose Lake Rd., Adams County, ID

Western Federal Lands Highway Division HAZ-Tech Drilling

DESCRIPTION

6' L

LO

C

A T

IO

N

N U

M B

E R

2.25

BORING LOG

B

O R

IN

G

L O

G

G R

A B

S A

M P

LE

S

O N

LY

C C

2_ G

O O

S E

LA

K

E .G

P J

M A

IN

LI

B _C

R C

5.

G

LB

/9 /1

GLSG15-10

PB PROJECT NO.:

CLIENT PROJECT NO.:

SHEET NUMBER: of

SheetGLSG15-10 of

AUGER

AUGER

AUGER

Moisture = 4.9%

%Gravel = 34, %Sand = 53, %Fines = 13, LL = N/A, PI = NP, R-Value = 84

ASPHALT, 8" thick

Brown, GRAVEL (FILL), some sand, moist.

Grayish brown, SAND, some gravel and silt, moist, SM (A-2-4).

SURFACE ELEV.:

CME 55

COMPLETION DEPTH:EXCAVATION EQUIPMENT:

INSPECTOR: C. Cummins

Boring No.

CLIENT:

PROJECT:

CONTRACTOR:

LOCATION:

DATE: 1/7/15 TIME:

N: 44.991817

NB Lane

BORING NUMBER:

E: 116.165817

5 feet

REMARKS

D E

P T

H fe et

OFFSET:

COORD.

LOCATION:

T Y

P E

SAMPLE

G R

A P

H

IC

L O

G

10:05 am

Mile Post:

Goose Lake Road Reconstruction Brundage Mointain / Goose Lake Rd., Adams County, ID

Western Federal Lands Highway Division HAZ-Tech Drilling

DESCRIPTION

6' R

LO

C

A T

IO

N

N U

M B

E R

2.58

BORING LOG

B

O R

IN

G

L O

G

G R

A B

S A

M P

LE

S

O N

LY

C C

2_ G

O O

S E

LA

K

E .G

P J

M A

IN

LI

B _C

R C

5.

G

LB

/9 /1

GLSG15-11

PB PROJECT NO.:

CLIENT PROJECT NO.:

SHEET NUMBER: of

SheetGLSG15-11 of

AUGER

AUGER

AUGER

Moisture = 10.7%

%Gravel = 18, %Sand = 57, %Fines = 25, LL = 26, PI = 2

ASPHALT, 7.5" thick

Brown, SAND (FILL), some silt and gravel, moist, SM (A-2-4).

Brown, GRAVEL, some sand, moist.

SURFACE ELEV.:

CME 55

COMPLETION DEPTH:EXCAVATION EQUIPMENT:

INSPECTOR: C. Cummins

Boring No.

CLIENT:

PROJECT:

CONTRACTOR:

LOCATION:

DATE: 1/7/15 TIME:

N: 44.995233

SB Lane

BORING NUMBER:

E: 116.165850

5 feet

REMARKS

D E

P T

H fe et

OFFSET:

COORD.

LOCATION:

T Y

P E

SAMPLE

G R

A P

H

IC

L O

G

9:15 am

Mile Post:

Goose Lake Road Reconstruction Brundage Mointain / Goose Lake Rd., Adams County, ID

Western Federal Lands Highway Division HAZ-Tech Drilling

DESCRIPTION

6' L

LO

C

A T

IO

N

N U

M B

E R

2.80

BORING LOG

B

O R

IN

G

L O

G

G R

A B

S A

M P

LE

S

O N

LY

C C

2_ G

O O

S E

LA

K

E .G

P J

M A

IN

LI

B _C

R C

5.

G

LB

/9 /1

GLSG15-12

PB PROJECT NO.:

CLIENT PROJECT NO.:

SHEET NUMBER: of

SheetGLSG15-12 of

AUGER

AUGER

AUGER

AUGER %Gravel = 32, %Sand = 51, %Fines = 17, LL = N/A, PI = NP, R-value = 82

ASPHALT, 6.5" thick

Grayish brown, GRAVEL and sand (FILL), moist.

Light brown, SAND, some gravel and silt, moist, SM (A-1-b).

SURFACE ELEV.:

CME 55

COMPLETION DEPTH:EXCAVATION EQUIPMENT:

INSPECTOR: C. Cummins

Boring No.

CLIENT:

PROJECT:

CONTRACTOR:

LOCATION:

DATE: 1/6/15 TIME:

N: 44.997333

NB Lane

BORING NUMBER:

E: 116.163900

5 feet

REMARKS

D E

P T

H fe et

OFFSET:

COORD.

LOCATION:

T Y

P E

SAMPLE

G R

A P

H

IC

L O

G

4:15 pm

Mile Post:

Goose Lake Road Reconstruction Brundage Mointain / Goose Lake Rd., Adams County, ID

Western Federal Lands Highway Division HAZ-Tech Drilling

DESCRIPTION

6' R

LO

C

A T

IO

N

N U

M B

E R

3.02

BORING LOG

B

O R

IN

G

L O

G

G R

A B

S A

M P

LE

S

O N

LY

C C

2_ G

O O

S E

LA

K

E .G

P J

M A

IN

LI

B _C

R C

5.

G

LB

/9 /1

GLSG15-13

PB PROJECT NO.:

CLIENT PROJECT NO.:

SHEET NUMBER: of

SheetGLSG15-13 of

AUGER

AUGER

AUGER

AUGER

Moisture = 8.2%

%Gravel = 44, %Sand = 46, %Fines = 10, LL = N/A, PI = NP, R-Value = 83

ASPHALT, 8.5" thick

Brown, GRAVEL and sand (FILL), moist.

Brown, SAND and gravel, some silt, moist, SP-SM (A-1-b).

SURFACE ELEV.:

CME 55

COMPLETION DEPTH:EXCAVATION EQUIPMENT:

INSPECTOR: C. Cummins

Boring No.

CLIENT:

PROJECT:

CONTRACTOR:

LOCATION:

DATE: 1/6/15 TIME:

N: 44.999950

SB Lane

BORING NUMBER:

E: 116.164533

5 feet

REMARKS

D E

P T

H fe et

OFFSET:

COORD.

LOCATION:

T Y

P E

SAMPLE

G R

A P

H

IC

L O

G

1:00 pm

Mile Post:

Goose Lake Road Reconstruction Brundage Mointain / Goose Lake Rd., Adams County, ID

Western Federal Lands Highway Division HAZ-Tech Drilling

DESCRIPTION

6' L

LO

C

A T

IO

N

N U

M B

E R

3.34

BORING LOG

B

O R

IN

G

L O

G

G R

A B

S A

M P

LE

S

O N

LY

C C

2_ G

O O

S E

LA

K

E .G

P J

M A

IN

LI

B _C

R C

5.

G

LB

/9 /1

GLSG15-14

PB PROJECT NO.:

CLIENT PROJECT NO.:

SHEET NUMBER: of

SheetGLSG15-14 of

AUGER

AUGER

AUGER

Moisture = 21.1%

%Gravel = 13, %Sand = 62, %Fines = 25, LL = N/A, PI =

NP

Moisture = 6.3%

%Gravel = 47, %Sand = 43.5, %Fines = 9.5, LL = N/A, PI

= NP

ASPHALT, 6.5" thick

Brown, SAND (FILL), some silt and gravel, moist, SM (A-2-4).

Light brown, GRAVEL and sand, trace silt, moist, GP-GM (A-1-b).

SURFACE ELEV.:

CME 55

COMPLETION DEPTH:EXCAVATION EQUIPMENT:

INSPECTOR: C. Cummins

Boring No.

CLIENT:

PROJECT:

CONTRACTOR:

LOCATION:

DATE: 1/6/15 TIME:

N: 45.001400

NB Lane

BORING NUMBER:

E: 116.164267

5 feet

REMARKS

D E

P T

H fe et

OFFSET:

COORD.

LOCATION:

T Y

P E

SAMPLE

G R

A P

H

IC

L O

G

3:15 pm

Mile Post:

Goose Lake Road Reconstruction Brundage Mointain / Goose Lake Rd., Adams County, ID

Western Federal Lands Highway Division HAZ-Tech Drilling

DESCRIPTION

6' R

LO

C

A T

IO

N

N U

M B

E R

3.44

BORING LOG

B

O R

IN

G

L O

G

G R

A B

S A

M P

LE

S

O N

LY

C C

2_ G

O O

S E

LA

K

E .G

P J

M A

IN

LI

B _C

R C

5.

G

LB

/9 /1

GLSG15-15

PB PROJECT NO.:

CLIENT PROJECT NO.:

SHEET NUMBER: of

SheetGLSG15-15 of

Bottom of Boring at 4.5 feet below asphalt surface.

AUGER

AUGER

AUGER

AUGER

AUGER

Moisture = 11.2%

%Gravel = 14, %Sand = 54, %Fines = 32, LL = N/A, PI = NP, R-Value 61, samples at 1' and 1.5' combined

ASPHALT, 7.5" thick

Brown, SAND (FILL), some silt and gravel, moist, SM (A-2-4).

Brown, GRAVEL, some sand, moist.

SURFACE ELEV.:

CME 55

COMPLETION DEPTH:EXCAVATION EQUIPMENT:

INSPECTOR: C. Cummins

Boring No.

CLIENT:

PROJECT:

CONTRACTOR:

LOCATION:

DATE: 1/6/15 TIME:

N: 45.001633

SB Lane

BORING NUMBER:

E: 116.163350

4.5 feet

REMARKS

D E

P T

H fe et

OFFSET:

COORD.

LOCATION:

T Y

P E

SAMPLE

G R

A P

H

IC

L O

G

11:45 am

Mile Post:

Goose Lake Road Reconstruction Brundage Mointain / Goose Lake Rd., Adams County, ID

Western Federal Lands Highway Division HAZ-Tech Drilling

DESCRIPTION

6' L

LO

C

A T

IO

N

N U

M B

E R

3.69

BORING LOG

B

O R

IN

G

L O

G

G R

A B

S A

M P

LE

S

O N

LY

C C

2_ G

O O

S E

LA

K

E .G

P J

M A

IN

LI

B _C

R C

5.

G

LB

/9 /1

GLSG15-16

PB PROJECT NO.:

CLIENT PROJECT NO.:

SHEET NUMBER: of

SheetGLSG15-16 of

AUGER

AUGER

AUGER

%Gravel = 6, %Sand = 56, %Fines = 38, LL = N/A, PI =

NP

Moisture = 8.5%

%Gravel = 30, %Sand = 47, %Fines = 23, LL = N/A, PI = NP, R-Value = 77

ASPHALT, 6.5" thick

Brown, SAND (FILL), some silt, trace gravel, moist, SM (A-4).

Brown, SAND, some gravel and silt, moist, SM (A-1-a).

SURFACE ELEV.:

CME 55

COMPLETION DEPTH:EXCAVATION EQUIPMENT:

INSPECTOR: C. Cummins

Boring No.

CLIENT:

PROJECT:

CONTRACTOR:

LOCATION:

DATE: 1/6/15 TIME:

N: 45.000950

NB Lane

BORING NUMBER:

E: 116.161900

5 feet

REMARKS

D E

P T

H fe et

OFFSET:

COORD.

LOCATION:

T Y

P E

SAMPLE

G R

A P

H

IC

L O

G

2:15 pm

Mile Post:

Goose Lake Road Reconstruction Brundage Mointain / Goose Lake Rd., Adams County, ID

Western Federal Lands Highway Division HAZ-Tech Drilling

DESCRIPTION

6' R

LO

C

A T

IO

N

N U

M B

E R

3.84

BORING LOG

B

O R

IN

G

L O

G

G R

A B

S A

M P

LE

S

O N

LY

C C

2_ G

O O

S E

LA

K

E .G

P J

M A

IN

LI

B _C

R C

5.

G

LB

/9 /1

GLSG15-17

PB PROJECT NO.:

CLIENT PROJECT NO.:

SHEET NUMBER: of

SheetGLSG15-17 of

APPENDIX E

Laboratory Testing Results

. Page 1

Client:

Determination of Water (Moisture) Content of Soil

Standards: ASTM D2216

Moisture

Content, %

8.9

16.3

7.0

24.4

21.1

8.3

4.0

13.9

12.7

12.1

11.0

12.3

16.5

4.9

10.7

7.1

8.2

21.1

6.3

11.2

9.5

8.5

Reviewed By:

1.7-2.0

1.7-2.0

0.5-0.75

2.2-2.5

1.3-1.5

0.75-1.0

1.7-2.0

0.6-1.0

2-2.25

0.6-1.0

1-1.25

1.1-1.5

1-1.25

2.5-2.75

0.5-1.0

Depth (ft)

GLSG15-08

GLSG15-9

GLSG15-9

GLSG15-10

GLSG15-01

GLSG15-02

GLSG15-03

GLSG15-03

GLSG15-04

GLSG15-05

GLSG15-06

GLSG15-07

BO1500029KK

BO1500029MM

BO1500029OO

BO1500029QQ

BO1500029CC

BO1500029EE

BO1500029GG

BO1500029II

Isaac Rede

GLSG15-17 1.7-2.0

GLSG15-15

GLSG15-15

GLSG15-16

GLSG15-17

0.6-1.0

0.5-1.0

GLSG15-11

GLSG15-12

GLSG15-13

GLSG15-14

1.9-2.0

0.7-1.0

GLSG15-10 2.9-3.0

Sample Number Location

2.5-3

Sample Number: BO1500029

Sampled By: Client

Date Received: 1/2/2015

Laboratory Services Manager

Murray, UT 84107

Sample Location: GLSG 15

BO1500029A

BO1500029C

BO1500029E

BO1500029G

BO1500029I

BO1500029K

Laboratory Report

Project: FHWA Western Federal Lands Highway Division Project Number: BO15029A

Parsons Brinckerhoff

488 East Winchester St, Suite 400

Date: 2/6/15

Tested By: A. Mabee

BO1500029AA

BO1500029M

BO1500029O

BO1500029Q

BO1500029S

BO1500029Y

IDIQ Professional Engineering Design Services

BO1500029U

BO1500029W

Reviewed by:________________________________

Note: This report covers only material as represented by this sample and does not necessarily cover all soil from this layer or source.

R-VALUE

ASTM D2844

3"

2 1/2"

2"

1 1/2 '

1"

3/4"

1/2"

3/8"

No. 4

No. 8

No. 16

No. 30

No. 50

No. 100

No. 200

Project: FWWA Western Federal Lands Highway Division IDIQ Professional Engineering Design Services

Client: Parsons Brinckerhoff Sample ID: GLSG15 - 01 @ 1.25 - 2.2 feet Soil Description: Silty Gravel with Sand (GM)

Project Number: BO15029A Sample Number: BO1500029B Date Tested: 1/22/15 By: I. Rede

SOIL CONSTANTS

R VALUE: 63

Atterberg Limits: LL = 29, PI = 1

0 0

R value

E x u d a ti o n P re s s u re L b s

.0

.5

.0

.5

.0

.5

.0

.5

.0

E x p a n s io n P re s s u re P S I)

GRADATION: AASHTO T-11, T27

None

R VALUE DATA

Point 1 Point 2 Point 3

Exudation, PSI

Dry Density, PCF

Moisture Content, %

Exp. Pressure, PSI

137.4

7.6

0.00

135.6

6.8

0.00

132.9

6.3

0.00

300 PSI Line

13.7

Note: This report covers only material as represented by this sample and does not necessarily cover all soil from this layer or source.

R-VALUE

ASTM D2844

Project: FWWA Western Federal Lands Highway Division IDIQ Professional Engineering Design Services

Client: Parsons Brinckerhoff Sample ID: GLSG15 - 02 @ 2.75 - 5.0 feet Soil Description: Clayey Sand with Gravel (SC)

Project Number: BO15029A Sample Number: BO1500029D Date Tested: 2/3/15 By: A. McCormick

SOIL CONSTANTS

R VALUE: 23

Atterberg Limits: LL = 40, PI = 19

0 0

R value

E x u d a ti o n P re s s u re L

.5

.0

.5

.0

.5

.0

.5

.0

E x p a n s io n P re s s u re P S I)

GRADATION: AASHTO T-11, T27

None

R VALUE DATA

Point 1 Point 2 Point 3

Exudation, PSI

Dry Density, PCF

Moisture Content, %

Exp. Pressure, PSI

107.9

18.6

0.00

110.5

17.6

0.00

113.2

16.6

0.03

300 PSI Line

3"

2 1/2"

2"

1 1/2 '

1"

3/4"

1/2"

3/8"

No. 4

No. 8

No. 16

No. 30

No. 50

No. 100

No. 200

Sieve Analysis of Fine and Coarse Aggregates

Standards: ASTM C136/C117

Percent

Metric Passing

64 mm 100

50 mm 100

37.5 mm 97

25 mm 95

19 mm 92

12.5 mm 84

9.5 mm 78

4.75 mm 64

2.36 mm 56

1.18 mm 49

0.6 mm 39

0.3 mm 29

0.15 mm 23

0.075 mm 19

Liquid Limit and Plasticity Index of Soils

Standards: ASTM D4318

LL= 27

PI= 10

Reviewed By:

IDIQ Professional Engineering Design Services

A. McCormick

Isaac Rede

Sample Description: Clayey Sand with Gravel (SC)

No. 30

No. 50

No. 100

No. 200

3/8"

No. 4

No. 8

No. 16

Laboratory Report

Project: FHWA Western Federal Lands Highway Division Project Number: BO15029A

Parsons Brinckerhoff

488 East Winchester St, Suite 400

Date: 2/6/15

Tested By: A. Mabee, I. Rede

Sieve Size

2 1/2"

2"

11/2"

1"

3/4"

1/2"

Laboratory Services Manager

Murray, UT 84107

Sample Location: GLSG 15-03 @ 1.0 - 2.5 feet Sample Number: BO1500029F

Sampled By: Client

Date Received: 1/2/2015

Sieve Analysis of Fine and Coarse Aggregates

Standards: ASTM C136/C117

Percent

Metric Passing

64 mm 100

50 mm 100

37.5 mm 100

25 mm 99

19 mm 96

12.5 mm 92

9.5 mm 92

4.75 mm 87

2.36 mm 82

1.18 mm 78

0.6 mm 69

0.3 mm 55

0.15 mm 44

0.075 mm 30

Liquid Limit and Plasticity Index of Soils

Standards: ASTM D4318

LL= 41

PI= 15

Reviewed By:

IDIQ Professional Engineering Design Services

A. McCormick

Isaac Rede

Sample Description: Silty Sand (SM)

No. 30

No. 50

No. 100

No. 200

3/8"

No. 4

No. 8

No. 16

Laboratory Report

Project: FHWA Western Federal Lands Highway Division Project Number: BO15029A

Parsons Brinckerhoff

488 East Winchester St, Suite 400

Date: 2/6/15

Tested By: A. Mabee, I. Rede

Sieve Size

2 1/2"

2"

11/2"

1"

3/4"

1/2"

Laboratory Services Manager

Murray, UT 84107

Sample Location: GLSG 15-03 @ 3.0 -5.0 feet Sample Number: BO1500029H

Note: This report covers only material as represented by this sample and does not necessarily cover all soil from this layer or source.

R-VALUE

ASTM D2844

Project: FWWA Western Federal Lands Highway Division IDIQ Professional Engineering Design Services

Client: Parsons Brinckerhoff Sample ID: GLSG15 - 04 @ 2.25 - 5 feet Soil Description: Clayey Sand (SC)

Project Number: BO15029A Sample Number: BO1500029B Date Tested: 2/3/15 By: A. McCormick

SOIL CONSTANTS

R VALUE: 24

Atterberg Limits: LL = 30, PI = 8

0 0

R value

E x u d a ti o n P re s s u re L

.5

.0

.5

.0

.5

.0

.5

.0

E x p a n s io n P re s s u re P S I)

GRADATION: AASHTO T-11, T27

None

R VALUE DATA

Point 1 Point 2 Point 3

Exudation, PSI

Dry Density, PCF

Moisture Content, %

Exp. Pressure, PSI

117.1

14.2

0.00

119.3

13.1

0.00

121.1

12.1

0.06

300 PSI Line

3"

2 1/2"

2"

1 1/2 '

1"

3/4"

1/2"

3/8"

No. 4

No. 8

No. 16

No. 30

No. 50

No. 100

No. 200

Sieve Analysis of Fine and Coarse Aggregates

Standards: ASTM C136/C117

Percent

Metric Passing

64 mm 100

50 mm 100

37.5 mm 100

25 mm 100

19 mm 99

12.5 mm 96

9.5 mm 94

4.75 mm 88

2.36 mm 81

1.18 mm 74

0.6 mm 66

0.3 mm 55

0.15 mm 41

0.075 mm 28

Liquid Limit and Plasticity Index of Soils

Standards: ASTM D4318

LL= NV*

*NV = No Value, NP = Non Plastic PI= NP*

Reviewed By:

IDIQ Professional Engineering Design Services

A. McCormick

Isaac Rede

Sample Description: Silty Sand (SM)

No. 30

No. 50

No. 100

No. 200

3/8"

No. 4

No. 8

No. 16

Laboratory Report

Project: FHWA Western Federal Lands Highway Division Project Number: BO15029A

Parsons Brinckerhoff

488 East Winchester St, Suite 400

Date: 2/6/15

Tested By: A. Mabee, I. Rede

Sieve Size

2 1/2"

2"

11/2"

1"

3/4"

1/2"

Laboratory Services Manager

Murray, UT 84107

Sample Location: GLSG 15-05 @ 1.0 - 2.0 feet Sample Number: BO1500029L

Note: This report covers only material as represented by this sample and does not necessarily cover all soil from this layer or source.

R-VALUE

ASTM D2844

Project: FWWA Western Federal Lands Highway Division IDIQ Professional Engineering Design Services

Client: Parsons Brinckerhoff Sample ID: GLSG15 - 06 @ 1.25 - 3.0 feet Soil Description: Silty Sand (SM)

Project Number: BO15029A Sample Number: BO1500029N Date Tested: 1/31/15 By: K. Henderson

SOIL CONSTANTS

R VALUE: 73

Atterberg Limits: LL = NV*, PI = NP* *NV = No Value, NP = Non Plastic

0 0

R value

E x u d a ti o n P re s s u re L

.5

.0

.5

.0

.5

.0

.5

.0

E x p a n s io n P re s s u re P S I)

GRADATION: AASHTO T-11, T27

None

R VALUE DATA

Point 1 Point 2 Point 3

Exudation, PSI

Dry Density, PCF

Moisture Content, %

Exp. Pressure, PSI

126.8

9.4

0.00

126.6

8.8

0.00

127.7

8.3

0.00

300 PSI Line

3"

2 1/2"

2"

1 1/2 '

1"

3/4"

1/2"

3/8"

No. 4

No. 8

No. 16

No. 30

No. 50

No. 100

No. 200

Note: This report covers only material as represented by this sample and does not necessarily cover all soil from this layer or source.

R-VALUE

ASTM D2844

Project: FWWA Western Federal Lands Highway Division IDIQ Professional Engineering Design Services

Client: Parsons Brinckerhoff Sample ID: GLSG15 - 07 @ 1.5 - 2.5 feet Soil Description: Silty Sand (SM)

Project Number: BO15029A Sample Number: BO1500029P Date Tested: 1/31/15 By: K. Henderson

SOIL CONSTANTS

R VALUE: 76

Atterberg Limits: LL = 30, PI = 4

0 0

R value

E x u d a ti o n P re s s u re L

.5

.0

.5

.0

.5

.0

.5

.0

E x p a n s io n P re s s u re P S I)

GRADATION: AASHTO T-11, T27

None

R VALUE DATA

Point 1 Point 2 Point 3

Exudation, PSI

Dry Density, PCF

Moisture Content, %

Exp. Pressure, PSI

118.8

10.0

0.00

120.0

9.0

0.00

119.1

8.3

0.00

300 PSI Line

3"

2 1/2"

2"

1 1/2 '

1"

3/4"

1/2"

3/8"

No. 4

No. 8

No. 16

No. 30

No. 50

No. 100

No. 200

Note: This report covers only material as represented by this sample and does not necessarily cover all soil from this layer or source.

R-VALUE

ASTM D2844

Project: FWWA Western Federal Lands Highway Division IDIQ Professional Engineering Design Services

Client: Parsons Brinckerhoff Sample ID: GLSG15 - 08 @ 1.5 - 5.0 feet Soil Description: Silty Sand with Gravel (SM)

Project Number: BO15029A Sample Number: BO1500029R Date Tested: 1/22/15 By: I. Rede

SOIL CONSTANTS

R VALUE: 75

Atterberg Limits: LL = 32, PI = 1

0 0

R value

E x u d a ti o n P re s s u re L

.5

.0

.5

.0

.5

.0

.5

.0

E x p a n s io n P re s s u re P S I)

GRADATION: AASHTO T-11, T27

None

R VALUE DATA

Point 1 Point 2 Point 3

Exudation, PSI

Dry Density, PCF

Moisture Content, %

Exp. Pressure, PSI

114.8

14.5

0.00

115.3

13.5

0.00

117.0

11.9

0.00

300 PSI Line

3"

2 1/2"

2"

1 1/2 '

1"

3/4"

1/2"

3/8"

No. 4

No. 8

No. 16

No. 30

No. 50

No. 100

No. 200

Note: This report covers only material as represented by this sample and does not necessarily cover all soil from this layer or source.

R-VALUE

ASTM D2844

Project: FWWA Western Federal Lands Highway Division IDIQ Professional Engineering Design Services

Client: Parsons Brinckerhoff Sample ID: GLSG15 - 09 @ 1.0 - 1.7 feet Soil Description: Silty Gravel with Sand (GM)

Project Number: BO15029A Sample Number: BO1500029T Date Tested: 1/30/15 By: A. Mabee

SOIL CONSTANTS

R VALUE: 33

Atterberg Limits: LL = 31, PI = 8

0 0

R value

E x u d a ti o n P re s s u re L

.5

.0

.5

.0

.5

.0

.5

.0

E x p a n s io n P re s s u re P S I)

GRADATION: AASHTO T-11, T27

None

R VALUE DATA

Point 1 Point 2 Point 3

Exudation, PSI

Dry Density, PCF

Moisture Content, %

Exp. Pressure, PSI

123.8

13.3

0.00

124.3

12.3

0.00

130.3

11.5

0.00

300 PSI Line

3"

2 1/2"

2"

1 1/2 '

1"

3/4"

1/2"

3/8"

No. 4

No. 8

No. 16

No. 30

No. 50

No. 100

No. 200

Note: This report covers only material as represented by this sample and does not necessarily cover all soil from this layer or source.

R-VALUE

ASTM D2844

Project: FWWA Western Federal Lands Highway Division IDIQ Professional Engineering Design Services

Client: Parsons Brinckerhoff Sample ID: GLSG15 - 09 @ 2.0 - 5.0 feet Soil Description: Silty Sand (SM)

Project Number: BO15029A Sample Number: BO1500029V Date Tested: 1/30/15 By: K. Henderson

SOIL CONSTANTS

R VALUE: 71

Atterberg Limits: LL = NV*, PI = NP* *NV = No Value, NP = Non Plastic

0 0

R value

E x u d a ti o n P re s s u re L

.5

.0

.5

.0

.5

.0

.5

.0

E x p a n s io n P re s s u re P S I)

GRADATION: AASHTO T-11, T27

None

R VALUE DATA

Point 1 Point 2 Point 3

Exudation, PSI

Dry Density, PCF

Moisture Content, %

Exp. Pressure, PSI

120.7

12.3

0.00

121.9

11.3

0.00

121.5

9.7

0.00

300 PSI Line

3"

2 1/2"

2"

1 1/2 '

1"

3/4"

1/2"

3/8"

No. 4

No. 8

No. 16

No. 30

No. 50

No. 100

No. 200

Note: This report covers only material as represented by this sample and does not necessarily cover all soil from this layer or source.

R-VALUE

ASTM D2844

Project: FWWA Western Federal Lands Highway Division IDIQ Professional Engineering Design Services

Client: Parsons Brinckerhoff Sample ID: GLSG15 - 10 @ 1.0 - 1.7 feet Soil Description: Silty Sand with Gravel (SM)

Project Number: BO15029A Sample Number: BO1500029X Date Tested: 1/28/15 By: A. Mabee

SOIL CONSTANTS

R VALUE: 62

Atterberg Limits: LL = NV*, PI = NP* *NV = No Value, NP = Non Plastic

0 0

R value

E x u d a ti o n P re s s u re L

.5

.0

.5

.0

.5

.0

.5

.0

E x p a n s io n P re s s u re P S I)

GRADATION: AASHTO T-11, T27

None

R VALUE DATA

Point 1 Point 2 Point 3

Exudation, PSI

Dry Density, PCF

Moisture Content, %

Exp. Pressure, PSI

123.9

11.6

0.00

125.4

10.7

0.00

126.6

10.2

0.00

300 PSI Line

3"

2 1/2"

2"

1 1/2 '

1"

3/4"

1/2"

3/8"

No. 4

No. 8

No. 16

No. 30

No. 50

No. 100

No. 200

Sieve Analysis of Fine and Coarse Aggregates

Standards: ASTM C136/C117

Percent

Metric Passing

64 mm 100

50 mm 100

37.5 mm 100

25 mm 99

19 mm 98

12.5 mm 94

9.5 mm 92

4.75 mm 85

2.36 mm 75

1.18 mm 66

0.6 mm 58

0.3 mm 47

0.15 mm 36

0.075 mm 24

Liquid Limit and Plasticity Index of Soils

Standards: ASTM D4318

LL= NV*

*NV = No Value, NP = Non Plastic PI= NP*

Reviewed By:

IDIQ Professional Engineering Design Services

A. McCormick

Isaac Rede

Sample Description: Silty Sand with Gravel (SM)

No. 30

No. 50

No. 100

No. 200

3/8"

No. 4

No. 8

No. 16

Laboratory Report

Project: FHWA Western Federal Lands Highway Division Project Number: BO15029A

Parsons Brinckerhoff

488 East Winchester St, Suite 400

Date: 2/6/15

Tested By: A. Mabee, I. Rede

Sieve Size

2 1/2"

2"

11/2"

1"

3/4"

1/2"

Laboratory Services Manager

Murray, UT 84107

Sample Location: GLSG 15-10 @ 3.0 - 5.0 feet Sample Number: BO1500029Z

Note: This report covers only material as represented by this sample and does not necessarily cover all soil from this layer or source.

R-VALUE

ASTM D2844

Project: FWWA Western Federal Lands Highway Division IDIQ Professional Engineering Design Services

Client: Parsons Brinckerhoff Sample ID: GLSG15 - 11 @ 2.0 - 5.0 feet Soil Description: Silty Sand with Gravel (SM)

Project Number: BO15029A Sample Number: BO1500029BB Date Tested: 1/28/15 By: I. Rede

SOIL CONSTANTS

R VALUE: 84

Atterberg Limits: LL = NV*, PI = NP* *NV = No Value, NP = Non Plastic

0 0

R value

E x u d a ti o n P re s s u re L

.5

.0

.5

.0

.5

.0

.5

.0

E x p a n s io n P re s s u re P S I)

GRADATION: AASHTO T-11, T27

None

R VALUE DATA

Point 1 Point 2 Point 3

Exudation, PSI

Dry Density, PCF

Moisture Content, %

Exp. Pressure, PSI

129.0

9.3

0.00

131.3

8.6

0.00

130.2

8.0

0.00

300 PSI Line

3"

2 1/2"

2"

1 1/2 '

1"

3/4"

1/2"

3/8"

No. 4

No. 8

No. 16

No. 30

No. 50

No. 100

No. 200

Sieve Analysis of Fine and Coarse Aggregates

Standards: ASTM C136/C117

Percent

Metric Passing

64 mm 100

50 mm 100

37.5 mm 100

25 mm 99

19 mm 98

12.5 mm 93

9.5 mm 90

4.75 mm 82

2.36 mm 75

1.18 mm 69

0.6 mm 62

0.3 mm 51

0.15 mm 38

0.075 mm 25

Liquid Limit and Plasticity Index of Soils

Standards: ASTM D4318

LL= 26

PI= 2

Reviewed By:

Sample Number: BO1500029DD

Sampled By: Client

Date Received: 1/2/2015

Murray, UT 84107

Sample Location: GLSG 15-12 @ 1.0 - 2.0 feet

Sieve Size

2 1/2"

2"

11/2"

1"

3/4"

1/2"

Laboratory Services Manager

Laboratory Report

Project: FHWA Western Federal Lands Highway Division Project Number: BO15029A

Parsons Brinckerhoff

488 East Winchester St, Suite 400

Date: 2/6/15

Tested By: A. Mabee, I. Rede

No. 200

3/8"

No. 4

No. 8

No. 16

No. 100

IDIQ Professional Engineering Design Services

A. McCormick

Isaac Rede

Sample Description: Silty Sand with Gravel (SM)

No. 30

No. 50

Note: This report covers only material as represented by this sample and does not necessarily cover all soil from this layer or source.

R-VALUE

ASTM D2844

Project: FWWA Western Federal Lands Highway Division IDIQ Professional Engineering Design Services

Client: Parsons Brinckerhoff Sample ID: GLSG15 - 13 @ 2.0 - 5.0 feet Soil Description: Silty Sand with Gravel (SM)

Project Number: BO15029A Sample Number: BO1500029FF Date Tested: 1/27/15 By: I. Rede

SOIL CONSTANTS

R VALUE: 82

Atterberg Limits: LL = NV*, PI = NP* *NV = No Value, NP = Non Plastic

0 0

R value

E x u d a ti o n P re s s u re L

.5

.0

.5

.0

.5

.0

.5

.0

E x p a n s io n P re s s u re P S I)

GRADATION: AASHTO T-11, T27

None

R VALUE DATA

Point 1 Point 2 Point 3

Exudation, PSI

Dry Density, PCF

Moisture Content, %

Exp. Pressure, PSI

127.3

9.6

0.00

129.3

8.7

0.00

129.5

7.3

0.00

300 PSI Line

3"

2 1/2"

2"

1 1/2 '

1"

3/4"

1/2"

3/8"

No. 4

No. 8

No. 16

No. 30

No. 50

No. 100

No. 200

Note: This report covers only material as represented by this sample and does not necessarily cover all soil from this layer or source.

R-VALUE

ASTM D2844

Project: FWWA Western Federal Lands Highway Division IDIQ Professional Engineering Design Services

Client: Parsons Brinckerhoff Sample ID: GLSG15 - 14 @ 2.0 - 5.02 feet Soil Description: P.G. Sand with Silt and Gravel (SP-SM)

Project Number: BO15029A Sample Number: BO1500029HH Date Tested: 1/27/15 By: A. McCormick

SOIL CONSTANTS

R VALUE: 83

Atterberg Limits: LL = NV*, PI = NP* *NV = No Value, NP = Non Plastic

0 0

R value

E x u d a ti o n P re s s u re L

.5

.0

.5

.0

.5

.0

.5

.0

E x p a n s io n P re s s u re P S I)

GRADATION: AASHTO T-11, T27

None

R VALUE DATA

Point 1 Point 2 Point 3

Exudation, PSI

Dry Density, PCF

Moisture Content, %

Exp. Pressure, PSI

121.4

10.2

0.00

36.7

9.6

0.00

123.1

8.7

0.00

300 PSI Line

4"

3"

2 1/2"

2"

1 1/2 '

1"

3/4"

1/2"

3/8"

No. 4

No. 8

No. 16

No. 30

No. 50

No. 100

No. 200

Sieve Analysis of Fine and Coarse Aggregates

Standards: ASTM C136/C117

Percent

Metric Passing

64 mm 100

50 mm 100

37.5 mm 100

25 mm 99

19 mm 98

12.5 mm 95

9.5 mm 93

4.75 mm 87

2.36 mm 82

1.18 mm 76

0.6 mm 69

0.3 mm 56

0.15 mm 41

0.075 mm 25

Liquid Limit and Plasticity Index of Soils

Standards: ASTM D4318

LL= NV*

*NV = No Value, NP = Non Plastic PI= NP*

Reviewed By:

Sample Number: BO1500029JJ

Sampled By: Client

Date Received: 1/2/2015

Murray, UT 84107

Sample Location: GLSG 15-15 @ 0.75 - 2.0 feet

Sieve Size

2 1/2"

2"

11/2"

1"

3/4"

1/2"

Laboratory Services Manager

Laboratory Report

Project: FHWA Western Federal Lands Highway Division Project Number: BO15029A

Parsons Brinckerhoff

488 East Winchester St, Suite 400

Date: 2/6/15

Tested By: A. Mabee, I. Rede

No. 200

3/8"

No. 4

No. 8

No. 16

No. 100

IDIQ Professional Engineering Design Services

A. McCormick

Isaac Rede

Sample Description: Silty Sand (SM)

Sieve Analysis of Fine and Coarse Aggregates

Standards: ASTM C136/C117

Percent

Metric Passing

64 mm 100

50 mm 98

37.5 mm 96

25 mm 90

19 mm 81

12.5 mm 68

9.5 mm 62

4.75 mm 53

2.36 mm 45

1.18 mm 41

0.6 mm 37

0.3 mm 29

0.15 mm 19

0.075 mm 9.5

Liquid Limit and Plasticity Index of Soils

Standards: ASTM D4318

LL= NV*

*NV = No Value, NP = Non Plastic PI= NP*

Reviewed By:

Sample Number: BO1500029LL

Sampled By: Client

Date Received: 1/2/2015

Murray, UT 84107

Sample Location: GLSG 15-15 @ 2.5 - 5.0 feet

Sample Description: P.G. Gravel with Silt and Sand (GP-GM)

Sieve Size

2 1/2"

2"

11/2"

1"

3/4"

1/2"

Laboratory Services Manager

Laboratory Report

Project: FHWA Western Federal Lands Highway Division Project Number: BO15029A

Parsons Brinckerhoff

488 East Winchester St, Suite 400

Date: 2/6/15

Tested By: A. Mabee, I. Rede

No. 200

3/8"

No. 4

No. 8

No. 16

No. 100

IDIQ Professional Engineering Design Services

A. McCormick

Isaac Rede

Note: This report covers only material as represented by this sample and does not necessarily cover all soil from this layer or source.

R-VALUE

ASTM D2844

Project: FWWA Western Federal Lands Highway Division IDIQ Professional Engineering Design Services

Client: Parsons Brinckerhoff Sample ID: GLSG15 - 16 @ 1.5 - 2.0 feet Soil Description: Silty Sand (SM)

Project Number: BO15029A Sample Number: BO1500029NN Date Tested: 1/26/15 By: A. Mabee

SOIL CONSTANTS

R VALUE: 61

Atterberg Limits: LL = NV*, PI = NP* *NV = No Value, NP = Non Plastic

0 0

R value

E x u d a ti o n P re s s u re L

.5

.0

.5

.0

.5

.0

.5

.0

E x p a n s io n P re s s u re P S I)

GRADATION: AASHTO T-11, T27

None

R VALUE DATA

Point 1 Point 2 Point 3

Exudation, PSI

Dry Density, PCF

Moisture Content, %

Exp. Pressure, PSI

126.3

10.6

0.03

125.8

9.7

0.06

128.9

8.3

0.12

300 PSI Line

3"

2 1/2"

2"

1 1/2 '

1"

3/4"

1/2"

3/8"

No. 4

No. 8

No. 16

No. 30

No. 50

No. 100

No. 200

Sieve Analysis of Fine and Coarse Aggregates

Standards: ASTM C136/C117

Percent

Metric Passing

64 mm 100

50 mm 100

37.5 mm 100

25 mm 100

19 mm 99

12.5 mm 98

9.5 mm 97

4.75 mm 94

2.36 mm 91

1.18 mm 87

0.6 mm 80

0.3 mm 69

0.15 mm 54

0.075 mm 38.0

Liquid Limit and Plasticity Index of Soils

Standards: ASTM D4318

LL= 22

*NP = Non Plastic PI= NP*

Reviewed By:

Sample Number: BO1500029PP

Sampled By: Client

Date Received: 1/2/2015

Murray, UT 84107

Sample Location: GLSG 15-17 @ 1.0 - 1.7 feet

Sample Description: Silty Sand (SM)

Sieve Size

2 1/2"

2"

11/2"

1"

3/4"

1/2"

Laboratory Services Manager

Laboratory Report

Project: FHWA Western Federal Lands Highway Division Project Number: BO15029A

Parsons Brinckerhoff

488 East Winchester St, Suite 400

Date: 2/6/15

Tested By: A. Mabee, I. Rede

No. 200

3/8"

No. 4

No. 8

No. 16

No. 100

IDIQ Professional Engineering Design Services

A. McCormick

Isaac Rede

Note: This report covers only material as represented by this sample and does not necessarily cover all soil from this layer or source.

R-VALUE

ASTM D2844

Project: FWWA Western Federal Lands Highway Division IDIQ Professional Engineering Design Services

Client: Parsons Brinckerhoff Sample ID: GLSG15 - 17 @ 2.0 - 5.0 feet Soil Description: Silty Sand with Gravel (SM)

Project Number: BO15029A Sample Number: BO1500029RR Date Tested: 1/26/15 By: A. Mabee

SOIL CONSTANTS

R VALUE: 77

Atterberg Limits: LL = NV*, PI = NP* *NV = No Value, NP = Non Plastic

0 0

R value

E x u d a ti o n P re s s u re L

.5

.0

.5

.0

.5

.0

.5

.0

E x p a n s io n P re s s u re P S I)

GRADATION: AASHTO T-11, T27

None

R VALUE DATA

Point 1 Point 2 Point 3

Exudation, PSI

Dry Density, PCF

Moisture Content, %

Exp. Pressure, PSI

121.8

11.6

0.00

122.7

10.7

0.00

122.3

9.5

0.00

300 PSI Line

3"

2 1/2"

2"

1 1/2 '

1"

3/4"

1/2"

3/8"

No. 4

No. 8

No. 16

No. 30

No. 50

No. 100

No. 200

APPENDIX F

Task Order DTFH7015F17002

Contract No. DTFH70-10-D-00017 Page 1 Task Order No. DTFH7015F17002 December 4, 2014 Goose Lake Road, ID PFH 98(1)

STATEMENT OF WORK

Task Order No. DTFH7015F17002, Contract No. DTFH70-10-D-00017

ID PFH 98(1), GOOSE LAKE ROAD RECONSTRUCTION

Roadway Subgrade Investigation Report

December 4, 2014

I. INTRODUCTION

A. Project Summary

Federal Highway Administration (FHWA) is proposing to complete preliminary design for the Goose Lake Road Reconstruction project.

The Participating Agencies are the FHWA, the USDA Forest Service (FS), and Adams County (COUNTY).

The proposed project consists of reconstruction of the road from its intersection with State Highway 55 to the entrance of the Brundage Mountain Ski Area to meet current design standards.

FHWA is preparing to proceed with plans for a roadway subgrade drilling investigation along Goose Lake Road in Adams County, Idaho. The proposed drilling project consists of 17 subgrade borings to investigate roadway conditions. Work requirements are described in detail below and include all drilling work, sample collection, material testing, hole logging and inspection, and boring log preparation.

B. Project Location

The proposed project is located approximately 5 miles west of McCall in Adams County, Idaho. Approximate Global Positioning System (GPS) coordinates for the beginning of the project are:

Latitude 44.957728 Longitude -116.170550

The proposed project comprises a 4-mile section of Goose Lake Road.

C. Work Description

This Task Order includes the following work: project management and geotechnical investigation.

II. Project Development

FHWA is the lead agency for the project. Do not accept any direction or take additional work that is beyond the scope of this Task Order that has not been approved through the

Contract No. DTFH70-10-D-00017 Page 2

Contracting Officer (CO). Provide to the Contracting Officer’s Representative (COR) all submittals and deliverables listed in this SOW for submittal to FHWA and the Government. Review comments received from FHWA and other reviewing agencies are valid only if provided through the COR. The COR only will provide Government furnished materials and services, except for forms, documents and information available directly from websites listed in this SOW. During discussions with Partner agencies and others, do not suggest performance of additional work that is beyond the scope of this Task Order. The FHWA Contracting Officer (CO) is the only representative that has the authority to revise or add work under the requirements of this Task Order.

III. PROJECT MANAGEMENT

A. Project Management

Project management will continue throughout the duration of this Task Order. It includes the work necessary to manage analysis and production efforts, coordination with FHWA, administering this contract, monitoring progress, lead project team meetings, and direct the quality control and quality assurance activities for the Project Development tasks.

Specific project management activities include:

1. Project Coordination

While performing the work described under this Task Order, discussions with staff from the FS, and COUNTY, as well as other FHWA employees will be required. Participate freely in these discussions, answer questions, and respond to requests for information. However, do not accept any direction or take additional work that is beyond the scope of this Task Order. Establish and monitor all sub-consultant contracts, as needed.

2. Meetings

No meetings are anticipated for this Task Order

3. Progress Reports and Invoices

Prepare and submit progress reports and invoices on a monthly basis. Describe prime and sub-consultants past month accomplishments and future month expectations.

IV. STATEMENT OF WORK TASKS

A. Drilling

Procure a drill contractor to complete all drilling work as outlined in this statement of work. Drill seventeen (17) Subgrade Borings at approximate ¼ mile intervals along the existing roadway starting at the intersection with the state highway and terminating at the end of the project. In general, alternate the boring locations on either side of the roadway

Contract No. DTFH70-10-D-00017 Page 3 to gather information from both the cut and fill sides of the roadway. Drill borings within the existing roadway and between the wheel paths. All borings shall be drilled in locations accessible with a truck mounted drill rig.

All borings will be drilled in accordance to this Statement of…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .