FINAL ROADWAY SUBGRADE INVESTIGATION REPORT
ID PFH 98(1) Goose Lake Road Reconstruction Highway 55 to Brundage Mountain Resort
Adams County, Idaho
PREPARED FOR
Federal Highway Adminisration Western Federal Lands Highway Division
Report prepared by: Colin Cummins, PE Reviewed by: Evan Garich, PE
PARSONS BRINCKERHOFF, INC.
400 SW 6th Avenue Suite 802
Portland, OR 97204
February 9, 2015
TABLE OF CONTENTS
1.0 INTRODUCTION
2.0 LABORATORY TESTING
3.0 SITE CONDITIONS
4.0 REFERENCES
LIST OF TABLES
Table 1: Boring Locations Table 2: Asphalt Thickness Table 3: Base Course Summary Table 4: Subbase and Subgrade Summary
APPENDICES
APPENDIX A Project Vicinity Map
APPENDIX B Exploration Location Plan
APPENDIX C Exploration Photographs
APPENDIX D Boring Logs
APPENDIX E Laboratory Test Results
APPENDIX F Task Order DTFH7015F17002
Page | i
1.0 INTRODUCTION
This report presents the results of our subgrade investigation of Goose Lake Road in Adams County, Idaho. This report has been prepared by Parsons Brinckerhoff (PB) for the use by FHWA and their approved agents. The information contained in this report is based on field conditions and laboratory test results.
1.1. Project Description
The Goose Lake Road Reconstruction project consists of the reconstruction of approximately 4 miles of existing roadway from Highway 55 to Brundage Mountain Ski resort. The site is located approximately 6 miles northwest of McCall in Adams County, Idaho. The project roadway generally runs north to south and is located within the Payette National Forest, see Appendix A for Project Vicinity Map. Portions of the roadway may be widened as part of the reconstruction project. It is expected that the final reconstructed grade will be at or slightly higher than existing grade.
1.2. Scope of Services
Our scope of services for this subgrade investigation is described in the STATEMENT OF WORK section of Task Order No. DTFH7015F17002. Our authorized scope of work includes the following items:
• Drill seventeen (17) Subgrade Borings to a depth of 5 feet or refusal.
• Perform laboratory tests on the different encountered soils.
• Create boring logs based on field and laboratory testing.
• Draft and Final Subgrade Investigation Report.
A copy of the task order is located in Appendix F of this report.
1.3. METHODS
Drilling operations were under the direction of a PB geotechnical engineer with five (5) years of experience. The drilling was performed by Haz-Tech Drilling Inc. based in Meridian, Idaho and occurred January 6-8, 2015. The drilling was performed with a truck-mounted CME-55 drill rig using a ten (10) inch diameter solid stem auger with a twelve (12) inch diameter bit attached.
The borings were completed and samples were obtained according to the following procedure:
1. The auger was advanced through the asphalt
2. The hole was cleaned of all asphalt cuttings, and an asphalt measurement was taken.
3. A small bag sample of the underlying material was taken within the first few inches.
4. The auger was placed back in the hole and advanced to bottom of the material layer.
Page | 1
5. The hole was cleaned off all loose cuttings which were then bagged and labeled for laboratory testing.
6. A depth measurement was taken.
7. Steps 3 through 6 were repeated for each material type until the bottom of the hole was reached.
8. After maximum depth was reached, the auger was removed while the hole was inspected by Geotechnical Engineer.
9. After inspection, the boring was backfilled with compacted gravel and sand then patched with cold mix asphalt.
1.3.1. Boring Locations
The borings were spaced at approximately ¼ mile intervals and alternated between the north-and southbound lanes. The borings were located in the center of the travel lanes. The following table summarizes the as drilled boring locations. The latitude and longitude readings were obtained from a hand held GPS unit. A Boring Location Plan is located in Appendix B of this report.
Table 1: Boring Locations
Boring Lane Approx.
MP
Latitude (° N)
Longitude (° W)
GLSG15-01 NB 0.10 44.958950 116.169933
GLSG15-02 SB 0.25 44.961083 116.169717
GLSG15-03 NB 0.50 44.964417 116.168767
GLSG15-04 SB 0.77 44.968300 116.167850
GLSG15-05 NB 1.03 44.971500 116.165417
GLSG15-06 SB 1.28 44.974967 116.166617
GLSG15-07 NB 1.53 44.978250 116.167617
GLSG15-08 SB 1.80 44.981867 116.167200
GLSG15-09 NB 2.00 44.984350 116.166850
GLSG15-10 SB 2.25 44.987450 116.166683
GLSG15-11 NB 2.58 44.991817 116.165817
GLSG15-12 SB 2.80 44.995233 116.165850
GLSG15-13 NB 3.02 44.997333 116.163900
GLSG15-14 SB 3.34 44.999950 116.164533
GLSG15-15 NB 3.44 45.001400 116.164267
GLSG15-16 SB 3.69 45.001633 116.163350
GLSG15-17 NB 3.84 45.000950 116.161900
2.0 LABORATORY TESTING
Samples of the encountered material, at each boring location, were collected and classified in the field. Select samples were choose and tested to determine; in-situ moisture content, particle size distribution (sieve analysis), atterberg limits and R-value according to the applicable
Page | 2
AASHTO or ASTM methods as stated in Section 4.C of the Task Order. The samples were delivered to an accredited laboratory in Boise, Idaho run by Strata.
Laboratory results are located in Appendix E of this report and summarized on the Boring Logs, see Appendix D. The laboratory testing results are also discussed further in the following sections of this report.
3.0 SITE CONDITIONS
The existing roadway generally runs north-south with an approximate elevation change of 1,000 feet. The road is generally one lane in each direction with occasional turnouts along the alignment. The road generally runs along the side of the mountains with an apparent cross-section that is partially cut into the mountain and partially on fill. The surrounding area consists of undeveloped Forest Service land with occasional crossings for other roads and trails. Boring logs detailing the encountered soil conditions at each site are included in Appendix C of this report. The borings were generally advanced to a maximum depth of 5 feet below the asphalt surface. Borings GLSG15-05, -06 and -16 were terminated prior to depth of 5 feet, due to drilling refusal on either a boulder or bedrock material.
3.1. Asphalt Thickness
The asphalt thickness ranged from 5.5 inches to 9 inches with a median value of 6.5 inches. A full pavement distress survey was not included in our scope of work. The following table summarizes the encountered asphalt thickness at each boring location.
Table 2: Asphalt Thickness Boring Thickness (in)
GLSG15-01 5.5
GLSG15-02 5.5
GLSG15-03 6.0
GLSG15-04 5.5
GLSG15-05 6.5
GLSG15-06 7.0
GLSG15-07 7.0
GLSG15-08 8.3
GLSG15-09 9.0
GLSG15-10 6.5
GLSG15-11 8.0
GLSG15-12 7.5
GLSG15-13 6.5
GLSG15-14 8.5
GLSG15-15 6.5
GLSG15-16 7.5
GLSG15-17 6.5
Page | 3
3.2. Base Course Conditions
Below the asphalt a relatively consistent layer with thicknesses ranging from 5 to 24 inches was encountered. According to the Unified Soil Classification System (ASTM, 2006) the material consisted of silty Gravel with sand (GM) to silty Sand with gravel (SM). The fines content, percentage of material passing the #200 sieve, ranged from 14 to 38 percent. The following table summarizes the encountered thickness, select laboratory testing results and soil classification at each boring location.
Table 3: Base Course Summary
Boring Thickness (in)
Grain Size R- Value
Classification
Gravel
Sand
Fines USCS1 AASHTO2
GLSG15-01 6 --
GLSG15-02 13 --
GLSG15-03 24 36 45 19 -- SC A-2-4
GLSG15-04 18 --
GLSG15-05 18 12 60 28 -- SM A-2-4
GLSG15-06 5 --
GLSG15-07 6 --
GLSG15-08 6 --
GLSG15-09 11 50 30 20 33 GM A-2-4
GLSG15-10 14 16 56 28 62 SM A-2-4
GLSG15-11 16 --
GLSG15-12 18 18 57 25 -- SM A-2-4
GLSG15-13 14 --
GLSG15-14 12 --
GLSG15-15 19 13 62 25 -- SM A-2-4
GLSG15-16 17 14 54 32 61 SM A-2-4
GLSG15-17 14 6 56 38 -- SM A-2-4
1 Unified Soil Classification System, ASTM D2487-06
2 AASHTO M145
3.3. Subbase and Subgrade Conditions
Conditions below the base course generally consisted granular material. According to the Unified Soil Classification System (ASTM, 2006) the encountered granular material primarily consisted of silty Sand (SM) with varying amounts of gravel with fines content ranging from 10 to 37 percent. The following table summarizes select laboratory testing results at each boring location.
Page | 4
Page | 5
Table 4: Subbase and Subgrade Summary
Boring Grain Size R-
Value
Classification
Gravel
Sand
Fines USCS1 AASHTO2
GLSG15-01 56 30.3 13.7 63 GM A-1-a
GLSG15-02 27 40 33 23 SC A-2-6
GLSG15-03 13 57 30 SM A-2-7
GLSG15-04 13 50 37 SC A-4
GLSG15-06 6 70 24 73 SM A-2-4
GLSG15-07 4 63 33 76 SM A-2-4
GLSG15-08 18 56 26 75 SM A-2-4
GLSG15-09 6 69 25 71 SM A-2-4
GLSG15-10 15 61 24 SM A-2-4
GLSG15-11 34 53 13 84 SM A-2-4
GLSG15-13 32 51 17 82 SM A-1-a GLSG15-14 44 46 10 83 SP-SM A-1-b GLSG15-15 47 43.5 9.5 GP-GM A-1-b GLSG15-17 30 47 23 77 SM A-1-a 1 Unified Soil Classification System, ASTM D2487-06
2 AASHTO M145
3.4. Groundwater Conditions
Groundwater was not encountered during drilling. At the time of drilling, significant amounts of snow were present adjacent to the pavement surface. It should be noted that groundwater levels will fluctuate throughout the year with rainfall, local irrigation and other factors.
4.0 REFERENCES
Federal Highway Administration (FHWA), Western Federal Lands Highway Division, 2014, Task Oder No. DTFH7015F17002
Standard Practice for Classification of Soils for Engineering Purposes (Unified Soil Classification
System), ASTM International, D 2487, 2006.
APPENDIX A
Project Vicinity Map
Brundage Mountain Resort
McCall, Idaho
Brundage Mountain Resort
Project Limits
N
McCall, Idaho
Brundage Mountain Resort
Project Limits
CLIENT NUMBER: ID PFH 98(1)
PROJECT NUMBER: 80421CC2
PROJECT NAME: Goose Lake Road Reconstruction Project Vicinity Map
N
McCall, Idaho
Brundage Mountain Resort
Project Limits
APPENDIX B
Boring Location Plan
CLIENT NUMBER: ID PFH 98(1)
PROJECT NUMBER: 80421CC2
PROJECT NAME: Goose Lake Road Reconstruction
A‐1
Boring Location Plan
N Key
Approximate Boring Location 2000 feet
PROJECT NAME: Goose Lake Road Reconstruction
A‐2
Boring Location Plan
N Key
Approximate Boring Location 2000 feet
PROJECT NAME: Goose Lake Road Reconstruction
A‐3
Boring Location Plan
NKey
Approximate Boring Location 2000 feet
APPENDIX C
Exploration Photographs
General Drilling Setup
Auger Sampling
C-1
Boring Completion and Patch
C-2
APPENDIX D
Boring Logs
Bottom of Boring at 5 feet below asphalt surface.
AUGER
AUGER
AUGER
AUGER
AUGER
AUGER
Moisture = 8.9%
%Gravel = 56, %Sand = 30.3, %Fines = 13.7, LL=29, PI=1, R-Value = 63
ASPHALT, 5.5" thick
Grayish brown, SAND and gravel (FILL), moist.
Brown, GRAVEL, some sand and silt, moist, GM (A-1-a).
Brown, GRAVEL, some sand, moist.
SURFACE ELEV.:
CME 55
COMPLETION DEPTH:EXCAVATION EQUIPMENT:
INSPECTOR: C. Cummins
Boring No.
CLIENT:
PROJECT:
CONTRACTOR:
LOCATION:
DATE: 1/8/15 TIME:
N: 44.958950
NB Lane
BORING NUMBER:
E: 116.169933
5 feet
REMARKS
D E
P T
H fe et
OFFSET:
COORD.
LOCATION:
T Y
P E
SAMPLE
G R
A P
H
IC
L O
G
10:05 am
Mile Post:
Goose Lake Road Reconstruction Brundage Mointain / Goose Lake Rd., Adams County, ID
Western Federal Lands Highway Division HAZ-Tech Drilling
DESCRIPTION
6' R
LO
C
A T
IO
N
N U
M B
E R
0.10
BORING LOG
B
O R
IN
G
L O
G
G R
A B
S A
M P
LE
S
O N
LY
C C
2_ G
O O
S E
LA
K
E .G
P J
M A
IN
LI
B _C
R C
5.
G
LB
/9 /1
GLSG15-01
PB PROJECT NO.:
CLIENT PROJECT NO.:
SHEET NUMBER: of
SheetGLSG15-01 of
ID PFH 98(1)
80421CC2
AUGER
AUGER
AUGER
AUGER
AUGER
Moisture = 16.3%
%Gravel = 27, %Sand = 40, %Fines = 33, LL=40, PI=19, R-Value = 23
ASPHALT, 5.5" thick
Brownish gray, GRAVEL and sand (FILL), moist.
Brownish dark gray, GRAVEL, some sand and clay, moist.
Grayish brown, SAND, some clay and gravel, moist, SC (A-2-6).
SURFACE ELEV.:
CME 55
COMPLETION DEPTH:EXCAVATION EQUIPMENT:
INSPECTOR: C. Cummins
Boring No.
CLIENT:
PROJECT:
CONTRACTOR:
LOCATION:
DATE: 1/8/15 TIME:
N: 44.961083
SB Lane
BORING NUMBER:
E: 116.169717
5 feet
REMARKS
D E
P T
H fe et
OFFSET:
COORD.
LOCATION:
T Y
P E
SAMPLE
G R
A P
H
IC
L O
G
9:20 am
Mile Post:
Goose Lake Road Reconstruction Brundage Mointain / Goose Lake Rd., Adams County, ID
Western Federal Lands Highway Division HAZ-Tech Drilling
DESCRIPTION
6' L
LO
C
A T
IO
N
N U
M B
E R
0.25
BORING LOG
B
O R
IN
G
L O
G
G R
A B
S A
M P
LE
S
O N
LY
C C
2_ G
O O
S E
LA
K
E .G
P J
M A
IN
LI
B _C
R C
5.
G
LB
/9 /1
GLSG15-02
PB PROJECT NO.:
CLIENT PROJECT NO.:
SHEET NUMBER: of
SheetGLSG15-02 of
AUGER
AUGER
AUGER
AUGER
Moisture = 7.0%
%Gravel = 36, %Sand = 45, %Fines = 19, LL=27, PI=10
Moisture = 24.4%
%Gravel = 13, %Sand = 57, %Fines = 30, LL=41, PI=15
ASPHALT, 6" thick
Brownish gray, SAND (FILL), some gravel and clay, moist, SC (A-2-4).
Brown, SAND, some silt and gravel, moist, SM (A-2-7).
SURFACE ELEV.:
CME 55
COMPLETION DEPTH:EXCAVATION EQUIPMENT:
INSPECTOR: C. Cummins
Boring No.
CLIENT:
PROJECT:
CONTRACTOR:
LOCATION:
DATE: 1/8/15 TIME:
N: 44.964417
NB Lane
BORING NUMBER:
E: 116.168767
5 feet
REMARKS
D E
P T
H fe et
OFFSET:
COORD.
LOCATION:
T Y
P E
SAMPLE
G R
A P
H
IC
L O
G
8:30 am
Mile Post:
Goose Lake Road Reconstruction Brundage Mointain / Goose Lake Rd., Adams County, ID
Western Federal Lands Highway Division HAZ-Tech Drilling
DESCRIPTION
6' R
LO
C
A T
IO
N
N U
M B
E R
0.50
BORING LOG
B
O R
IN
G
L O
G
G R
A B
S A
M P
LE
S
O N
LY
C C
2_ G
O O
S E
LA
K
E .G
P J
M A
IN
LI
B _C
R C
5.
G
LB
/9 /1
GLSG15-03
PB PROJECT NO.:
CLIENT PROJECT NO.:
SHEET NUMBER: of
SheetGLSG15-03 of
AUGER
AUGER
AUGER
Moisture = 21.1%
%Gravel = 13, %Sand = 50, %Fines = 37, LL = 30, PI = 8, R-Value = 24
ASPHALT, 5.5" thick
Brownish gray, GRAVEL and sand (FILL), moist.
Brown and black, SAND, some clay and gravel, moist, SC (A-4).
SURFACE ELEV.:
CME 55
COMPLETION DEPTH:EXCAVATION EQUIPMENT:
INSPECTOR: C. Cummins
Boring No.
CLIENT:
PROJECT:
CONTRACTOR:
LOCATION:
DATE: 1/7/15 TIME:
N: 44.968300
SB Lane
BORING NUMBER:
E: 116.167850
5 feet
REMARKS
D E
P T
H fe et
OFFSET:
COORD.
LOCATION:
T Y
P E
SAMPLE
G R
A P
H
IC
L O
G
3:30 pm
Mile Post:
Goose Lake Road Reconstruction Brundage Mointain / Goose Lake Rd., Adams County, ID
Western Federal Lands Highway Division HAZ-Tech Drilling
DESCRIPTION
6' L
LO
C
A T
IO
N
N U
M B
E R
0.77
BORING LOG
B
O R
IN
G
L O
G
G R
A B
S A
M P
LE
S
O N
LY
C C
2_ G
O O
S E
LA
K
E .G
P J
M A
IN
LI
B _C
R C
5.
G
LB
/9 /1
GLSG15-04
PB PROJECT NO.:
CLIENT PROJECT NO.:
SHEET NUMBER: of
SheetGLSG15-04 of
Bottom of Boring at 2 feet below asphalt surface.
Drilling refusal on large boulder or bedrock.
AUGER
AUGER
Moisture = 8.3%
%Gravel = 12, %Sand = 60, %Fines = 28, LL = N/A, PI =
NP
ASPHALT, 6.5" thick
Brown, SAND (FILL), some silt and gravel, moist, SM (A-2-4). 1
SURFACE ELEV.:
CME 55
COMPLETION DEPTH:EXCAVATION EQUIPMENT:
INSPECTOR: C. Cummins
Boring No.
CLIENT:
PROJECT:
CONTRACTOR:
LOCATION:
DATE: 1/7/15 TIME:
N: 44.971500
NB Lane
BORING NUMBER:
E: 116.165417
2 feet
REMARKS
D E
P T
H fe et
OFFSET:
COORD.
LOCATION:
T Y
P E
SAMPLE
G R
A P
H
IC
L O
G
3:05 pm
Mile Post:
Goose Lake Road Reconstruction Brundage Mointain / Goose Lake Rd., Adams County, ID
Western Federal Lands Highway Division HAZ-Tech Drilling
DESCRIPTION
6' R
LO
C
A T
IO
N
N U
M B
E R
1.03
BORING LOG
B
O R
IN
G
L O
G
G R
A B
S A
M P
LE
S
O N
LY
C C
2_ G
O O
S E
LA
K
E .G
P J
M A
IN
LI
B _C
R C
5.
G
LB
/9 /1
GLSG15-05
PB PROJECT NO.:
CLIENT PROJECT NO.:
SHEET NUMBER: of
SheetGLSG15-05 of
Bottom of Boring at 3 feet below asphalt surface.
Drilling refusal on large boulder or bedrock.
AUGER
AUGER
AUGER
AUGER
Moisture = 4.0%
%Gravel = 6, %Sand = 70, %Fines = 24, LL = N/A, PI = NP, R-Value = 73
ASPHALT, 7" thick
Brown, SAND and gravel (FILL), moist.
Grayish brown, SAND, some silt, trace gravel, moist, SM (A-2-4).
SURFACE ELEV.:
CME 55
COMPLETION DEPTH:EXCAVATION EQUIPMENT:
INSPECTOR: C. Cummins
Boring No.
CLIENT:
PROJECT:
CONTRACTOR:
LOCATION:
DATE: 1/7/15 TIME:
N: 44.974967
SB Lane
BORING NUMBER:
E: 116.166617
3 feet
REMARKS
D E
P T
H fe et
OFFSET:
COORD.
LOCATION:
T Y
P E
SAMPLE
G R
A P
H
IC
L O
G
2:00 pm
Mile Post:
Goose Lake Road Reconstruction Brundage Mointain / Goose Lake Rd., Adams County, ID
Western Federal Lands Highway Division HAZ-Tech Drilling
DESCRIPTION
6' L
LO
C
A T
IO
N
N U
M B
E R
1.28
BORING LOG
B
O R
IN
G
L O
G
G R
A B
S A
M P
LE
S
O N
LY
C C
2_ G
O O
S E
LA
K
E .G
P J
M A
IN
LI
B _C
R C
5.
G
LB
/9 /1
GLSG15-06
PB PROJECT NO.:
CLIENT PROJECT NO.:
SHEET NUMBER: of
SheetGLSG15-06 of
AUGER
AUGER
AUGER
AUGER
Moisture = 13.9%
%Gravel = 4, %Sand = 63, %Fines = 33, LL = 30, PI = 4, R-Value = 76
ASPHALT, 7" thick
Brown, GRAVEL and sand (FILL), moist.
Dark brown, SAND, some silt, trace gravel, moist, SM (A-2-4).
Brown, SAND and gravel, moist.
SURFACE ELEV.:
CME 55
COMPLETION DEPTH:EXCAVATION EQUIPMENT:
INSPECTOR: C. Cummins
Boring No.
CLIENT:
PROJECT:
CONTRACTOR:
LOCATION:
DATE: 1/7/15 TIME:
N: 44.978250
NB Lane
BORING NUMBER:
E: 116.167617
5 feet
REMARKS
D E
P T
H fe et
OFFSET:
COORD.
LOCATION:
T Y
P E
SAMPLE
G R
A P
H
IC
L O
G
1:10 am
Mile Post:
Goose Lake Road Reconstruction Brundage Mointain / Goose Lake Rd., Adams County, ID
Western Federal Lands Highway Division HAZ-Tech Drilling
DESCRIPTION
6' R
LO
C
A T
IO
N
N U
M B
E R
1.53
BORING LOG
B
O R
IN
G
L O
G
G R
A B
S A
M P
LE
S
O N
LY
C C
2_ G
O O
S E
LA
K
E .G
P J
M A
IN
LI
B _C
R C
5.
G
LB
/9 /1
GLSG15-07
PB PROJECT NO.:
CLIENT PROJECT NO.:
SHEET NUMBER: of
SheetGLSG15-07 of
AUGER
AUGER
AUGER
Moisture = 12.7%
%Gravel = 18, %Sand = 56, %Fines = 26, LL = 32, PI = 1, R-Value = 75
ASPHALT, 8.25" thick
Brown, GRAVEL and sand (FILL), moist.
Brown, SAND, some silt and gravel, moist, SM (A-2-4).
SURFACE ELEV.:
CME 55
COMPLETION DEPTH:EXCAVATION EQUIPMENT:
INSPECTOR: C. Cummins
Boring No.
CLIENT:
PROJECT:
CONTRACTOR:
LOCATION:
DATE: 1/7/15 TIME:
N: 44.981867
SB Lane
BORING NUMBER:
E: 116.167200
5 feet
REMARKS
D E
P T
H fe et
OFFSET:
COORD.
LOCATION:
T Y
P E
SAMPLE
G R
A P
H
IC
L O
G
12:30 pm
Mile Post:
Goose Lake Road Reconstruction Brundage Mointain / Goose Lake Rd., Adams County, ID
Western Federal Lands Highway Division HAZ-Tech Drilling
DESCRIPTION
6' L
LO
C
A T
IO
N
N U
M B
E R
1.80
BORING LOG
B
O R
IN
G
L O
G
G R
A B
S A
M P
LE
S
O N
LY
C C
2_ G
O O
S E
LA
K
E .G
P J
M A
IN
LI
B _C
R C
5.
G
LB
/9 /1
GLSG15-08
PB PROJECT NO.:
CLIENT PROJECT NO.:
SHEET NUMBER: of
SheetGLSG15-08 of
AUGER
AUGER
AUGER
Moisture = 12.1%
%Gravel = 50, %Sand = 30, %Fines = 20, LL = 31, PI = 8, R-Value = 33
Moisture = 11.0%
%Gravel = 6, %Sand = 69, %Fines = 25, LL = N/A, PI = NP, R-Value = 71
ASPHALT, 9" thick
Brown, GRAVEL (FILL), some sand and silt, moist, GM (A-2-4).
Grayish brown, SAND, some silt, trace gravel, moist, SM (A-2-4).
SURFACE ELEV.:
CME 55
COMPLETION DEPTH:EXCAVATION EQUIPMENT:
INSPECTOR: C. Cummins
Boring No.
CLIENT:
PROJECT:
CONTRACTOR:
LOCATION:
DATE: 1/7/15 TIME:
N: 44.984350
NB Lane
BORING NUMBER:
E: 116.166850
5 feet
REMARKS
D E
P T
H fe et
OFFSET:
COORD.
LOCATION:
T Y
P E
SAMPLE
G R
A P
H
IC
L O
G
11:50 am
Mile Post:
Goose Lake Road Reconstruction Brundage Mointain / Goose Lake Rd., Adams County, ID
Western Federal Lands Highway Division HAZ-Tech Drilling
DESCRIPTION
6' R
LO
C
A T
IO
N
N U
M B
E R
2.00
BORING LOG
B
O R
IN
G
L O
G
G R
A B
S A
M P
LE
S
O N
LY
C C
2_ G
O O
S E
LA
K
E .G
P J
M A
IN
LI
B _C
R C
5.
G
LB
/9 /1
GLSG15-09
PB PROJECT NO.:
CLIENT PROJECT NO.:
SHEET NUMBER: of
SheetGLSG15-09 of
AUGER
AUGER
AUGER
AUGER
AUGER
AUGER
Moisture = 12.3%
%Gravel = 16, %Sand = 56, %Fines = 28, LL = N/A, PI = NP, R-Value = 62
Moisture = 16.5%
%Gravel = 15, %Sand = 61, %Fines = 24, LL = N/A, PI =
NP
ASPHALT, 6.5" thick
Grayish brown, SAND (FILL), some silt and gravel, moist, SM (A-2-4).
Brown, SAND, some gravel, moist.
Dark brown, SAND, some silt and gravel, moist, SM (A-2-4).
SURFACE ELEV.:
CME 55
COMPLETION DEPTH:EXCAVATION EQUIPMENT:
INSPECTOR: C. Cummins
Boring No.
CLIENT:
PROJECT:
CONTRACTOR:
LOCATION:
DATE: 1/7/15 TIME:
N: 44.987450
SB Lane
BORING NUMBER:
E: 116.166683
5 feet
REMARKS
D E
P T
H fe et
OFFSET:
COORD.
LOCATION:
T Y
P E
SAMPLE
G R
A P
H
IC
L O
G
10:55 am
Mile Post:
Goose Lake Road Reconstruction Brundage Mointain / Goose Lake Rd., Adams County, ID
Western Federal Lands Highway Division HAZ-Tech Drilling
DESCRIPTION
6' L
LO
C
A T
IO
N
N U
M B
E R
2.25
BORING LOG
B
O R
IN
G
L O
G
G R
A B
S A
M P
LE
S
O N
LY
C C
2_ G
O O
S E
LA
K
E .G
P J
M A
IN
LI
B _C
R C
5.
G
LB
/9 /1
GLSG15-10
PB PROJECT NO.:
CLIENT PROJECT NO.:
SHEET NUMBER: of
SheetGLSG15-10 of
AUGER
AUGER
AUGER
Moisture = 4.9%
%Gravel = 34, %Sand = 53, %Fines = 13, LL = N/A, PI = NP, R-Value = 84
ASPHALT, 8" thick
Brown, GRAVEL (FILL), some sand, moist.
Grayish brown, SAND, some gravel and silt, moist, SM (A-2-4).
SURFACE ELEV.:
CME 55
COMPLETION DEPTH:EXCAVATION EQUIPMENT:
INSPECTOR: C. Cummins
Boring No.
CLIENT:
PROJECT:
CONTRACTOR:
LOCATION:
DATE: 1/7/15 TIME:
N: 44.991817
NB Lane
BORING NUMBER:
E: 116.165817
5 feet
REMARKS
D E
P T
H fe et
OFFSET:
COORD.
LOCATION:
T Y
P E
SAMPLE
G R
A P
H
IC
L O
G
10:05 am
Mile Post:
Goose Lake Road Reconstruction Brundage Mointain / Goose Lake Rd., Adams County, ID
Western Federal Lands Highway Division HAZ-Tech Drilling
DESCRIPTION
6' R
LO
C
A T
IO
N
N U
M B
E R
2.58
BORING LOG
B
O R
IN
G
L O
G
G R
A B
S A
M P
LE
S
O N
LY
C C
2_ G
O O
S E
LA
K
E .G
P J
M A
IN
LI
B _C
R C
5.
G
LB
/9 /1
GLSG15-11
PB PROJECT NO.:
CLIENT PROJECT NO.:
SHEET NUMBER: of
SheetGLSG15-11 of
AUGER
AUGER
AUGER
Moisture = 10.7%
%Gravel = 18, %Sand = 57, %Fines = 25, LL = 26, PI = 2
ASPHALT, 7.5" thick
Brown, SAND (FILL), some silt and gravel, moist, SM (A-2-4).
Brown, GRAVEL, some sand, moist.
SURFACE ELEV.:
CME 55
COMPLETION DEPTH:EXCAVATION EQUIPMENT:
INSPECTOR: C. Cummins
Boring No.
CLIENT:
PROJECT:
CONTRACTOR:
LOCATION:
DATE: 1/7/15 TIME:
N: 44.995233
SB Lane
BORING NUMBER:
E: 116.165850
5 feet
REMARKS
D E
P T
H fe et
OFFSET:
COORD.
LOCATION:
T Y
P E
SAMPLE
G R
A P
H
IC
L O
G
9:15 am
Mile Post:
Goose Lake Road Reconstruction Brundage Mointain / Goose Lake Rd., Adams County, ID
Western Federal Lands Highway Division HAZ-Tech Drilling
DESCRIPTION
6' L
LO
C
A T
IO
N
N U
M B
E R
2.80
BORING LOG
B
O R
IN
G
L O
G
G R
A B
S A
M P
LE
S
O N
LY
C C
2_ G
O O
S E
LA
K
E .G
P J
M A
IN
LI
B _C
R C
5.
G
LB
/9 /1
GLSG15-12
PB PROJECT NO.:
CLIENT PROJECT NO.:
SHEET NUMBER: of
SheetGLSG15-12 of
AUGER
AUGER
AUGER
AUGER %Gravel = 32, %Sand = 51, %Fines = 17, LL = N/A, PI = NP, R-value = 82
ASPHALT, 6.5" thick
Grayish brown, GRAVEL and sand (FILL), moist.
Light brown, SAND, some gravel and silt, moist, SM (A-1-b).
SURFACE ELEV.:
CME 55
COMPLETION DEPTH:EXCAVATION EQUIPMENT:
INSPECTOR: C. Cummins
Boring No.
CLIENT:
PROJECT:
CONTRACTOR:
LOCATION:
DATE: 1/6/15 TIME:
N: 44.997333
NB Lane
BORING NUMBER:
E: 116.163900
5 feet
REMARKS
D E
P T
H fe et
OFFSET:
COORD.
LOCATION:
T Y
P E
SAMPLE
G R
A P
H
IC
L O
G
4:15 pm
Mile Post:
Goose Lake Road Reconstruction Brundage Mointain / Goose Lake Rd., Adams County, ID
Western Federal Lands Highway Division HAZ-Tech Drilling
DESCRIPTION
6' R
LO
C
A T
IO
N
N U
M B
E R
3.02
BORING LOG
B
O R
IN
G
L O
G
G R
A B
S A
M P
LE
S
O N
LY
C C
2_ G
O O
S E
LA
K
E .G
P J
M A
IN
LI
B _C
R C
5.
G
LB
/9 /1
GLSG15-13
PB PROJECT NO.:
CLIENT PROJECT NO.:
SHEET NUMBER: of
SheetGLSG15-13 of
AUGER
AUGER
AUGER
AUGER
Moisture = 8.2%
%Gravel = 44, %Sand = 46, %Fines = 10, LL = N/A, PI = NP, R-Value = 83
ASPHALT, 8.5" thick
Brown, GRAVEL and sand (FILL), moist.
Brown, SAND and gravel, some silt, moist, SP-SM (A-1-b).
SURFACE ELEV.:
CME 55
COMPLETION DEPTH:EXCAVATION EQUIPMENT:
INSPECTOR: C. Cummins
Boring No.
CLIENT:
PROJECT:
CONTRACTOR:
LOCATION:
DATE: 1/6/15 TIME:
N: 44.999950
SB Lane
BORING NUMBER:
E: 116.164533
5 feet
REMARKS
D E
P T
H fe et
OFFSET:
COORD.
LOCATION:
T Y
P E
SAMPLE
G R
A P
H
IC
L O
G
1:00 pm
Mile Post:
Goose Lake Road Reconstruction Brundage Mointain / Goose Lake Rd., Adams County, ID
Western Federal Lands Highway Division HAZ-Tech Drilling
DESCRIPTION
6' L
LO
C
A T
IO
N
N U
M B
E R
3.34
BORING LOG
B
O R
IN
G
L O
G
G R
A B
S A
M P
LE
S
O N
LY
C C
2_ G
O O
S E
LA
K
E .G
P J
M A
IN
LI
B _C
R C
5.
G
LB
/9 /1
GLSG15-14
PB PROJECT NO.:
CLIENT PROJECT NO.:
SHEET NUMBER: of
SheetGLSG15-14 of
AUGER
AUGER
AUGER
Moisture = 21.1%
%Gravel = 13, %Sand = 62, %Fines = 25, LL = N/A, PI =
NP
Moisture = 6.3%
%Gravel = 47, %Sand = 43.5, %Fines = 9.5, LL = N/A, PI
= NP
ASPHALT, 6.5" thick
Brown, SAND (FILL), some silt and gravel, moist, SM (A-2-4).
Light brown, GRAVEL and sand, trace silt, moist, GP-GM (A-1-b).
SURFACE ELEV.:
CME 55
COMPLETION DEPTH:EXCAVATION EQUIPMENT:
INSPECTOR: C. Cummins
Boring No.
CLIENT:
PROJECT:
CONTRACTOR:
LOCATION:
DATE: 1/6/15 TIME:
N: 45.001400
NB Lane
BORING NUMBER:
E: 116.164267
5 feet
REMARKS
D E
P T
H fe et
OFFSET:
COORD.
LOCATION:
T Y
P E
SAMPLE
G R
A P
H
IC
L O
G
3:15 pm
Mile Post:
Goose Lake Road Reconstruction Brundage Mointain / Goose Lake Rd., Adams County, ID
Western Federal Lands Highway Division HAZ-Tech Drilling
DESCRIPTION
6' R
LO
C
A T
IO
N
N U
M B
E R
3.44
BORING LOG
B
O R
IN
G
L O
G
G R
A B
S A
M P
LE
S
O N
LY
C C
2_ G
O O
S E
LA
K
E .G
P J
M A
IN
LI
B _C
R C
5.
G
LB
/9 /1
GLSG15-15
PB PROJECT NO.:
CLIENT PROJECT NO.:
SHEET NUMBER: of
SheetGLSG15-15 of
Bottom of Boring at 4.5 feet below asphalt surface.
AUGER
AUGER
AUGER
AUGER
AUGER
Moisture = 11.2%
%Gravel = 14, %Sand = 54, %Fines = 32, LL = N/A, PI = NP, R-Value 61, samples at 1' and 1.5' combined
ASPHALT, 7.5" thick
Brown, SAND (FILL), some silt and gravel, moist, SM (A-2-4).
Brown, GRAVEL, some sand, moist.
SURFACE ELEV.:
CME 55
COMPLETION DEPTH:EXCAVATION EQUIPMENT:
INSPECTOR: C. Cummins
Boring No.
CLIENT:
PROJECT:
CONTRACTOR:
LOCATION:
DATE: 1/6/15 TIME:
N: 45.001633
SB Lane
BORING NUMBER:
E: 116.163350
4.5 feet
REMARKS
D E
P T
H fe et
OFFSET:
COORD.
LOCATION:
T Y
P E
SAMPLE
G R
A P
H
IC
L O
G
11:45 am
Mile Post:
Goose Lake Road Reconstruction Brundage Mointain / Goose Lake Rd., Adams County, ID
Western Federal Lands Highway Division HAZ-Tech Drilling
DESCRIPTION
6' L
LO
C
A T
IO
N
N U
M B
E R
3.69
BORING LOG
B
O R
IN
G
L O
G
G R
A B
S A
M P
LE
S
O N
LY
C C
2_ G
O O
S E
LA
K
E .G
P J
M A
IN
LI
B _C
R C
5.
G
LB
/9 /1
GLSG15-16
PB PROJECT NO.:
CLIENT PROJECT NO.:
SHEET NUMBER: of
SheetGLSG15-16 of
AUGER
AUGER
AUGER
%Gravel = 6, %Sand = 56, %Fines = 38, LL = N/A, PI =
NP
Moisture = 8.5%
%Gravel = 30, %Sand = 47, %Fines = 23, LL = N/A, PI = NP, R-Value = 77
ASPHALT, 6.5" thick
Brown, SAND (FILL), some silt, trace gravel, moist, SM (A-4).
Brown, SAND, some gravel and silt, moist, SM (A-1-a).
SURFACE ELEV.:
CME 55
COMPLETION DEPTH:EXCAVATION EQUIPMENT:
INSPECTOR: C. Cummins
Boring No.
CLIENT:
PROJECT:
CONTRACTOR:
LOCATION:
DATE: 1/6/15 TIME:
N: 45.000950
NB Lane
BORING NUMBER:
E: 116.161900
5 feet
REMARKS
D E
P T
H fe et
OFFSET:
COORD.
LOCATION:
T Y
P E
SAMPLE
G R
A P
H
IC
L O
G
2:15 pm
Mile Post:
Goose Lake Road Reconstruction Brundage Mointain / Goose Lake Rd., Adams County, ID
Western Federal Lands Highway Division HAZ-Tech Drilling
DESCRIPTION
6' R
LO
C
A T
IO
N
N U
M B
E R
3.84
BORING LOG
B
O R
IN
G
L O
G
G R
A B
S A
M P
LE
S
O N
LY
C C
2_ G
O O
S E
LA
K
E .G
P J
M A
IN
LI
B _C
R C
5.
G
LB
/9 /1
GLSG15-17
PB PROJECT NO.:
CLIENT PROJECT NO.:
SHEET NUMBER: of
SheetGLSG15-17 of
APPENDIX E
Laboratory Testing Results
. Page 1
Client:
Determination of Water (Moisture) Content of Soil
Standards: ASTM D2216
Moisture
Content, %
8.9
16.3
7.0
24.4
21.1
8.3
4.0
13.9
12.7
12.1
11.0
12.3
16.5
4.9
10.7
7.1
8.2
21.1
6.3
11.2
9.5
8.5
Reviewed By:
1.7-2.0
1.7-2.0
0.5-0.75
2.2-2.5
1.3-1.5
0.75-1.0
1.7-2.0
0.6-1.0
2-2.25
0.6-1.0
1-1.25
1.1-1.5
1-1.25
2.5-2.75
0.5-1.0
Depth (ft)
GLSG15-08
GLSG15-9
GLSG15-9
GLSG15-10
GLSG15-01
GLSG15-02
GLSG15-03
GLSG15-03
GLSG15-04
GLSG15-05
GLSG15-06
GLSG15-07
BO1500029KK
BO1500029MM
BO1500029OO
BO1500029QQ
BO1500029CC
BO1500029EE
BO1500029GG
BO1500029II
Isaac Rede
GLSG15-17 1.7-2.0
GLSG15-15
GLSG15-15
GLSG15-16
GLSG15-17
0.6-1.0
0.5-1.0
GLSG15-11
GLSG15-12
GLSG15-13
GLSG15-14
1.9-2.0
0.7-1.0
GLSG15-10 2.9-3.0
Sample Number Location
2.5-3
Sample Number: BO1500029
Sampled By: Client
Date Received: 1/2/2015
Laboratory Services Manager
Murray, UT 84107
Sample Location: GLSG 15
BO1500029A
BO1500029C
BO1500029E
BO1500029G
BO1500029I
BO1500029K
Laboratory Report
Project: FHWA Western Federal Lands Highway Division Project Number: BO15029A
Parsons Brinckerhoff
488 East Winchester St, Suite 400
Date: 2/6/15
Tested By: A. Mabee
BO1500029AA
BO1500029M
BO1500029O
BO1500029Q
BO1500029S
BO1500029Y
IDIQ Professional Engineering Design Services
BO1500029U
BO1500029W
Reviewed by:________________________________
Note: This report covers only material as represented by this sample and does not necessarily cover all soil from this layer or source.
R-VALUE
ASTM D2844
3"
2 1/2"
2"
1 1/2 '
1"
3/4"
1/2"
3/8"
No. 4
No. 8
No. 16
No. 30
No. 50
No. 100
No. 200
Project: FWWA Western Federal Lands Highway Division IDIQ Professional Engineering Design Services
Client: Parsons Brinckerhoff Sample ID: GLSG15 - 01 @ 1.25 - 2.2 feet Soil Description: Silty Gravel with Sand (GM)
Project Number: BO15029A Sample Number: BO1500029B Date Tested: 1/22/15 By: I. Rede
SOIL CONSTANTS
R VALUE: 63
Atterberg Limits: LL = 29, PI = 1
0 0
R value
E x u d a ti o n P re s s u re L b s
.0
.5
.0
.5
.0
.5
.0
.5
.0
E x p a n s io n P re s s u re P S I)
GRADATION: AASHTO T-11, T27
None
R VALUE DATA
Point 1 Point 2 Point 3
Exudation, PSI
Dry Density, PCF
Moisture Content, %
Exp. Pressure, PSI
137.4
7.6
0.00
135.6
6.8
0.00
132.9
6.3
0.00
300 PSI Line
13.7
Note: This report covers only material as represented by this sample and does not necessarily cover all soil from this layer or source.
R-VALUE
ASTM D2844
Project: FWWA Western Federal Lands Highway Division IDIQ Professional Engineering Design Services
Client: Parsons Brinckerhoff Sample ID: GLSG15 - 02 @ 2.75 - 5.0 feet Soil Description: Clayey Sand with Gravel (SC)
Project Number: BO15029A Sample Number: BO1500029D Date Tested: 2/3/15 By: A. McCormick
SOIL CONSTANTS
R VALUE: 23
Atterberg Limits: LL = 40, PI = 19
0 0
R value
E x u d a ti o n P re s s u re L
.5
.0
.5
.0
.5
.0
.5
.0
E x p a n s io n P re s s u re P S I)
GRADATION: AASHTO T-11, T27
None
R VALUE DATA
Point 1 Point 2 Point 3
Exudation, PSI
Dry Density, PCF
Moisture Content, %
Exp. Pressure, PSI
107.9
18.6
0.00
110.5
17.6
0.00
113.2
16.6
0.03
300 PSI Line
3"
2 1/2"
2"
1 1/2 '
1"
3/4"
1/2"
3/8"
No. 4
No. 8
No. 16
No. 30
No. 50
No. 100
No. 200
Sieve Analysis of Fine and Coarse Aggregates
Standards: ASTM C136/C117
Percent
Metric Passing
64 mm 100
50 mm 100
37.5 mm 97
25 mm 95
19 mm 92
12.5 mm 84
9.5 mm 78
4.75 mm 64
2.36 mm 56
1.18 mm 49
0.6 mm 39
0.3 mm 29
0.15 mm 23
0.075 mm 19
Liquid Limit and Plasticity Index of Soils
Standards: ASTM D4318
LL= 27
PI= 10
Reviewed By:
IDIQ Professional Engineering Design Services
A. McCormick
Isaac Rede
Sample Description: Clayey Sand with Gravel (SC)
No. 30
No. 50
No. 100
No. 200
3/8"
No. 4
No. 8
No. 16
Laboratory Report
Project: FHWA Western Federal Lands Highway Division Project Number: BO15029A
Parsons Brinckerhoff
488 East Winchester St, Suite 400
Date: 2/6/15
Tested By: A. Mabee, I. Rede
Sieve Size
2 1/2"
2"
11/2"
1"
3/4"
1/2"
Laboratory Services Manager
Murray, UT 84107
Sample Location: GLSG 15-03 @ 1.0 - 2.5 feet Sample Number: BO1500029F
Sampled By: Client
Date Received: 1/2/2015
Sieve Analysis of Fine and Coarse Aggregates
Standards: ASTM C136/C117
Percent
Metric Passing
64 mm 100
50 mm 100
37.5 mm 100
25 mm 99
19 mm 96
12.5 mm 92
9.5 mm 92
4.75 mm 87
2.36 mm 82
1.18 mm 78
0.6 mm 69
0.3 mm 55
0.15 mm 44
0.075 mm 30
Liquid Limit and Plasticity Index of Soils
Standards: ASTM D4318
LL= 41
PI= 15
Reviewed By:
IDIQ Professional Engineering Design Services
A. McCormick
Isaac Rede
Sample Description: Silty Sand (SM)
No. 30
No. 50
No. 100
No. 200
3/8"
No. 4
No. 8
No. 16
Laboratory Report
Project: FHWA Western Federal Lands Highway Division Project Number: BO15029A
Parsons Brinckerhoff
488 East Winchester St, Suite 400
Date: 2/6/15
Tested By: A. Mabee, I. Rede
Sieve Size
2 1/2"
2"
11/2"
1"
3/4"
1/2"
Laboratory Services Manager
Murray, UT 84107
Sample Location: GLSG 15-03 @ 3.0 -5.0 feet Sample Number: BO1500029H
Note: This report covers only material as represented by this sample and does not necessarily cover all soil from this layer or source.
R-VALUE
ASTM D2844
Project: FWWA Western Federal Lands Highway Division IDIQ Professional Engineering Design Services
Client: Parsons Brinckerhoff Sample ID: GLSG15 - 04 @ 2.25 - 5 feet Soil Description: Clayey Sand (SC)
Project Number: BO15029A Sample Number: BO1500029B Date Tested: 2/3/15 By: A. McCormick
SOIL CONSTANTS
R VALUE: 24
Atterberg Limits: LL = 30, PI = 8
0 0
R value
E x u d a ti o n P re s s u re L
.5
.0
.5
.0
.5
.0
.5
.0
E x p a n s io n P re s s u re P S I)
GRADATION: AASHTO T-11, T27
None
R VALUE DATA
Point 1 Point 2 Point 3
Exudation, PSI
Dry Density, PCF
Moisture Content, %
Exp. Pressure, PSI
117.1
14.2
0.00
119.3
13.1
0.00
121.1
12.1
0.06
300 PSI Line
3"
2 1/2"
2"
1 1/2 '
1"
3/4"
1/2"
3/8"
No. 4
No. 8
No. 16
No. 30
No. 50
No. 100
No. 200
Sieve Analysis of Fine and Coarse Aggregates
Standards: ASTM C136/C117
Percent
Metric Passing
64 mm 100
50 mm 100
37.5 mm 100
25 mm 100
19 mm 99
12.5 mm 96
9.5 mm 94
4.75 mm 88
2.36 mm 81
1.18 mm 74
0.6 mm 66
0.3 mm 55
0.15 mm 41
0.075 mm 28
Liquid Limit and Plasticity Index of Soils
Standards: ASTM D4318
LL= NV*
*NV = No Value, NP = Non Plastic PI= NP*
Reviewed By:
IDIQ Professional Engineering Design Services
A. McCormick
Isaac Rede
Sample Description: Silty Sand (SM)
No. 30
No. 50
No. 100
No. 200
3/8"
No. 4
No. 8
No. 16
Laboratory Report
Project: FHWA Western Federal Lands Highway Division Project Number: BO15029A
Parsons Brinckerhoff
488 East Winchester St, Suite 400
Date: 2/6/15
Tested By: A. Mabee, I. Rede
Sieve Size
2 1/2"
2"
11/2"
1"
3/4"
1/2"
Laboratory Services Manager
Murray, UT 84107
Sample Location: GLSG 15-05 @ 1.0 - 2.0 feet Sample Number: BO1500029L
Note: This report covers only material as represented by this sample and does not necessarily cover all soil from this layer or source.
R-VALUE
ASTM D2844
Project: FWWA Western Federal Lands Highway Division IDIQ Professional Engineering Design Services
Client: Parsons Brinckerhoff Sample ID: GLSG15 - 06 @ 1.25 - 3.0 feet Soil Description: Silty Sand (SM)
Project Number: BO15029A Sample Number: BO1500029N Date Tested: 1/31/15 By: K. Henderson
SOIL CONSTANTS
R VALUE: 73
Atterberg Limits: LL = NV*, PI = NP* *NV = No Value, NP = Non Plastic
0 0
R value
E x u d a ti o n P re s s u re L
.5
.0
.5
.0
.5
.0
.5
.0
E x p a n s io n P re s s u re P S I)
GRADATION: AASHTO T-11, T27
None
R VALUE DATA
Point 1 Point 2 Point 3
Exudation, PSI
Dry Density, PCF
Moisture Content, %
Exp. Pressure, PSI
126.8
9.4
0.00
126.6
8.8
0.00
127.7
8.3
0.00
300 PSI Line
3"
2 1/2"
2"
1 1/2 '
1"
3/4"
1/2"
3/8"
No. 4
No. 8
No. 16
No. 30
No. 50
No. 100
No. 200
Note: This report covers only material as represented by this sample and does not necessarily cover all soil from this layer or source.
R-VALUE
ASTM D2844
Project: FWWA Western Federal Lands Highway Division IDIQ Professional Engineering Design Services
Client: Parsons Brinckerhoff Sample ID: GLSG15 - 07 @ 1.5 - 2.5 feet Soil Description: Silty Sand (SM)
Project Number: BO15029A Sample Number: BO1500029P Date Tested: 1/31/15 By: K. Henderson
SOIL CONSTANTS
R VALUE: 76
Atterberg Limits: LL = 30, PI = 4
0 0
R value
E x u d a ti o n P re s s u re L
.5
.0
.5
.0
.5
.0
.5
.0
E x p a n s io n P re s s u re P S I)
GRADATION: AASHTO T-11, T27
None
R VALUE DATA
Point 1 Point 2 Point 3
Exudation, PSI
Dry Density, PCF
Moisture Content, %
Exp. Pressure, PSI
118.8
10.0
0.00
120.0
9.0
0.00
119.1
8.3
0.00
300 PSI Line
3"
2 1/2"
2"
1 1/2 '
1"
3/4"
1/2"
3/8"
No. 4
No. 8
No. 16
No. 30
No. 50
No. 100
No. 200
Note: This report covers only material as represented by this sample and does not necessarily cover all soil from this layer or source.
R-VALUE
ASTM D2844
Project: FWWA Western Federal Lands Highway Division IDIQ Professional Engineering Design Services
Client: Parsons Brinckerhoff Sample ID: GLSG15 - 08 @ 1.5 - 5.0 feet Soil Description: Silty Sand with Gravel (SM)
Project Number: BO15029A Sample Number: BO1500029R Date Tested: 1/22/15 By: I. Rede
SOIL CONSTANTS
R VALUE: 75
Atterberg Limits: LL = 32, PI = 1
0 0
R value
E x u d a ti o n P re s s u re L
.5
.0
.5
.0
.5
.0
.5
.0
E x p a n s io n P re s s u re P S I)
GRADATION: AASHTO T-11, T27
None
R VALUE DATA
Point 1 Point 2 Point 3
Exudation, PSI
Dry Density, PCF
Moisture Content, %
Exp. Pressure, PSI
114.8
14.5
0.00
115.3
13.5
0.00
117.0
11.9
0.00
300 PSI Line
3"
2 1/2"
2"
1 1/2 '
1"
3/4"
1/2"
3/8"
No. 4
No. 8
No. 16
No. 30
No. 50
No. 100
No. 200
Note: This report covers only material as represented by this sample and does not necessarily cover all soil from this layer or source.
R-VALUE
ASTM D2844
Project: FWWA Western Federal Lands Highway Division IDIQ Professional Engineering Design Services
Client: Parsons Brinckerhoff Sample ID: GLSG15 - 09 @ 1.0 - 1.7 feet Soil Description: Silty Gravel with Sand (GM)
Project Number: BO15029A Sample Number: BO1500029T Date Tested: 1/30/15 By: A. Mabee
SOIL CONSTANTS
R VALUE: 33
Atterberg Limits: LL = 31, PI = 8
0 0
R value
E x u d a ti o n P re s s u re L
.5
.0
.5
.0
.5
.0
.5
.0
E x p a n s io n P re s s u re P S I)
GRADATION: AASHTO T-11, T27
None
R VALUE DATA
Point 1 Point 2 Point 3
Exudation, PSI
Dry Density, PCF
Moisture Content, %
Exp. Pressure, PSI
123.8
13.3
0.00
124.3
12.3
0.00
130.3
11.5
0.00
300 PSI Line
3"
2 1/2"
2"
1 1/2 '
1"
3/4"
1/2"
3/8"
No. 4
No. 8
No. 16
No. 30
No. 50
No. 100
No. 200
Note: This report covers only material as represented by this sample and does not necessarily cover all soil from this layer or source.
R-VALUE
ASTM D2844
Project: FWWA Western Federal Lands Highway Division IDIQ Professional Engineering Design Services
Client: Parsons Brinckerhoff Sample ID: GLSG15 - 09 @ 2.0 - 5.0 feet Soil Description: Silty Sand (SM)
Project Number: BO15029A Sample Number: BO1500029V Date Tested: 1/30/15 By: K. Henderson
SOIL CONSTANTS
R VALUE: 71
Atterberg Limits: LL = NV*, PI = NP* *NV = No Value, NP = Non Plastic
0 0
R value
E x u d a ti o n P re s s u re L
.5
.0
.5
.0
.5
.0
.5
.0
E x p a n s io n P re s s u re P S I)
GRADATION: AASHTO T-11, T27
None
R VALUE DATA
Point 1 Point 2 Point 3
Exudation, PSI
Dry Density, PCF
Moisture Content, %
Exp. Pressure, PSI
120.7
12.3
0.00
121.9
11.3
0.00
121.5
9.7
0.00
300 PSI Line
3"
2 1/2"
2"
1 1/2 '
1"
3/4"
1/2"
3/8"
No. 4
No. 8
No. 16
No. 30
No. 50
No. 100
No. 200
Note: This report covers only material as represented by this sample and does not necessarily cover all soil from this layer or source.
R-VALUE
ASTM D2844
Project: FWWA Western Federal Lands Highway Division IDIQ Professional Engineering Design Services
Client: Parsons Brinckerhoff Sample ID: GLSG15 - 10 @ 1.0 - 1.7 feet Soil Description: Silty Sand with Gravel (SM)
Project Number: BO15029A Sample Number: BO1500029X Date Tested: 1/28/15 By: A. Mabee
SOIL CONSTANTS
R VALUE: 62
Atterberg Limits: LL = NV*, PI = NP* *NV = No Value, NP = Non Plastic
0 0
R value
E x u d a ti o n P re s s u re L
.5
.0
.5
.0
.5
.0
.5
.0
E x p a n s io n P re s s u re P S I)
GRADATION: AASHTO T-11, T27
None
R VALUE DATA
Point 1 Point 2 Point 3
Exudation, PSI
Dry Density, PCF
Moisture Content, %
Exp. Pressure, PSI
123.9
11.6
0.00
125.4
10.7
0.00
126.6
10.2
0.00
300 PSI Line
3"
2 1/2"
2"
1 1/2 '
1"
3/4"
1/2"
3/8"
No. 4
No. 8
No. 16
No. 30
No. 50
No. 100
No. 200
Sieve Analysis of Fine and Coarse Aggregates
Standards: ASTM C136/C117
Percent
Metric Passing
64 mm 100
50 mm 100
37.5 mm 100
25 mm 99
19 mm 98
12.5 mm 94
9.5 mm 92
4.75 mm 85
2.36 mm 75
1.18 mm 66
0.6 mm 58
0.3 mm 47
0.15 mm 36
0.075 mm 24
Liquid Limit and Plasticity Index of Soils
Standards: ASTM D4318
LL= NV*
*NV = No Value, NP = Non Plastic PI= NP*
Reviewed By:
IDIQ Professional Engineering Design Services
A. McCormick
Isaac Rede
Sample Description: Silty Sand with Gravel (SM)
No. 30
No. 50
No. 100
No. 200
3/8"
No. 4
No. 8
No. 16
Laboratory Report
Project: FHWA Western Federal Lands Highway Division Project Number: BO15029A
Parsons Brinckerhoff
488 East Winchester St, Suite 400
Date: 2/6/15
Tested By: A. Mabee, I. Rede
Sieve Size
2 1/2"
2"
11/2"
1"
3/4"
1/2"
Laboratory Services Manager
Murray, UT 84107
Sample Location: GLSG 15-10 @ 3.0 - 5.0 feet Sample Number: BO1500029Z
Note: This report covers only material as represented by this sample and does not necessarily cover all soil from this layer or source.
R-VALUE
ASTM D2844
Project: FWWA Western Federal Lands Highway Division IDIQ Professional Engineering Design Services
Client: Parsons Brinckerhoff Sample ID: GLSG15 - 11 @ 2.0 - 5.0 feet Soil Description: Silty Sand with Gravel (SM)
Project Number: BO15029A Sample Number: BO1500029BB Date Tested: 1/28/15 By: I. Rede
SOIL CONSTANTS
R VALUE: 84
Atterberg Limits: LL = NV*, PI = NP* *NV = No Value, NP = Non Plastic
0 0
R value
E x u d a ti o n P re s s u re L
.5
.0
.5
.0
.5
.0
.5
.0
E x p a n s io n P re s s u re P S I)
GRADATION: AASHTO T-11, T27
None
R VALUE DATA
Point 1 Point 2 Point 3
Exudation, PSI
Dry Density, PCF
Moisture Content, %
Exp. Pressure, PSI
129.0
9.3
0.00
131.3
8.6
0.00
130.2
8.0
0.00
300 PSI Line
3"
2 1/2"
2"
1 1/2 '
1"
3/4"
1/2"
3/8"
No. 4
No. 8
No. 16
No. 30
No. 50
No. 100
No. 200
Sieve Analysis of Fine and Coarse Aggregates
Standards: ASTM C136/C117
Percent
Metric Passing
64 mm 100
50 mm 100
37.5 mm 100
25 mm 99
19 mm 98
12.5 mm 93
9.5 mm 90
4.75 mm 82
2.36 mm 75
1.18 mm 69
0.6 mm 62
0.3 mm 51
0.15 mm 38
0.075 mm 25
Liquid Limit and Plasticity Index of Soils
Standards: ASTM D4318
LL= 26
PI= 2
Reviewed By:
Sample Number: BO1500029DD
Sampled By: Client
Date Received: 1/2/2015
Murray, UT 84107
Sample Location: GLSG 15-12 @ 1.0 - 2.0 feet
Sieve Size
2 1/2"
2"
11/2"
1"
3/4"
1/2"
Laboratory Services Manager
Laboratory Report
Project: FHWA Western Federal Lands Highway Division Project Number: BO15029A
Parsons Brinckerhoff
488 East Winchester St, Suite 400
Date: 2/6/15
Tested By: A. Mabee, I. Rede
No. 200
3/8"
No. 4
No. 8
No. 16
No. 100
IDIQ Professional Engineering Design Services
A. McCormick
Isaac Rede
Sample Description: Silty Sand with Gravel (SM)
No. 30
No. 50
Note: This report covers only material as represented by this sample and does not necessarily cover all soil from this layer or source.
R-VALUE
ASTM D2844
Project: FWWA Western Federal Lands Highway Division IDIQ Professional Engineering Design Services
Client: Parsons Brinckerhoff Sample ID: GLSG15 - 13 @ 2.0 - 5.0 feet Soil Description: Silty Sand with Gravel (SM)
Project Number: BO15029A Sample Number: BO1500029FF Date Tested: 1/27/15 By: I. Rede
SOIL CONSTANTS
R VALUE: 82
Atterberg Limits: LL = NV*, PI = NP* *NV = No Value, NP = Non Plastic
0 0
R value
E x u d a ti o n P re s s u re L
.5
.0
.5
.0
.5
.0
.5
.0
E x p a n s io n P re s s u re P S I)
GRADATION: AASHTO T-11, T27
None
R VALUE DATA
Point 1 Point 2 Point 3
Exudation, PSI
Dry Density, PCF
Moisture Content, %
Exp. Pressure, PSI
127.3
9.6
0.00
129.3
8.7
0.00
129.5
7.3
0.00
300 PSI Line
3"
2 1/2"
2"
1 1/2 '
1"
3/4"
1/2"
3/8"
No. 4
No. 8
No. 16
No. 30
No. 50
No. 100
No. 200
Note: This report covers only material as represented by this sample and does not necessarily cover all soil from this layer or source.
R-VALUE
ASTM D2844
Project: FWWA Western Federal Lands Highway Division IDIQ Professional Engineering Design Services
Client: Parsons Brinckerhoff Sample ID: GLSG15 - 14 @ 2.0 - 5.02 feet Soil Description: P.G. Sand with Silt and Gravel (SP-SM)
Project Number: BO15029A Sample Number: BO1500029HH Date Tested: 1/27/15 By: A. McCormick
SOIL CONSTANTS
R VALUE: 83
Atterberg Limits: LL = NV*, PI = NP* *NV = No Value, NP = Non Plastic
0 0
R value
E x u d a ti o n P re s s u re L
.5
.0
.5
.0
.5
.0
.5
.0
E x p a n s io n P re s s u re P S I)
GRADATION: AASHTO T-11, T27
None
R VALUE DATA
Point 1 Point 2 Point 3
Exudation, PSI
Dry Density, PCF
Moisture Content, %
Exp. Pressure, PSI
121.4
10.2
0.00
36.7
9.6
0.00
123.1
8.7
0.00
300 PSI Line
4"
3"
2 1/2"
2"
1 1/2 '
1"
3/4"
1/2"
3/8"
No. 4
No. 8
No. 16
No. 30
No. 50
No. 100
No. 200
Sieve Analysis of Fine and Coarse Aggregates
Standards: ASTM C136/C117
Percent
Metric Passing
64 mm 100
50 mm 100
37.5 mm 100
25 mm 99
19 mm 98
12.5 mm 95
9.5 mm 93
4.75 mm 87
2.36 mm 82
1.18 mm 76
0.6 mm 69
0.3 mm 56
0.15 mm 41
0.075 mm 25
Liquid Limit and Plasticity Index of Soils
Standards: ASTM D4318
LL= NV*
*NV = No Value, NP = Non Plastic PI= NP*
Reviewed By:
Sample Number: BO1500029JJ
Sampled By: Client
Date Received: 1/2/2015
Murray, UT 84107
Sample Location: GLSG 15-15 @ 0.75 - 2.0 feet
Sieve Size
2 1/2"
2"
11/2"
1"
3/4"
1/2"
Laboratory Services Manager
Laboratory Report
Project: FHWA Western Federal Lands Highway Division Project Number: BO15029A
Parsons Brinckerhoff
488 East Winchester St, Suite 400
Date: 2/6/15
Tested By: A. Mabee, I. Rede
No. 200
3/8"
No. 4
No. 8
No. 16
No. 100
IDIQ Professional Engineering Design Services
A. McCormick
Isaac Rede
Sample Description: Silty Sand (SM)
Sieve Analysis of Fine and Coarse Aggregates
Standards: ASTM C136/C117
Percent
Metric Passing
64 mm 100
50 mm 98
37.5 mm 96
25 mm 90
19 mm 81
12.5 mm 68
9.5 mm 62
4.75 mm 53
2.36 mm 45
1.18 mm 41
0.6 mm 37
0.3 mm 29
0.15 mm 19
0.075 mm 9.5
Liquid Limit and Plasticity Index of Soils
Standards: ASTM D4318
LL= NV*
*NV = No Value, NP = Non Plastic PI= NP*
Reviewed By:
Sample Number: BO1500029LL
Sampled By: Client
Date Received: 1/2/2015
Murray, UT 84107
Sample Location: GLSG 15-15 @ 2.5 - 5.0 feet
Sample Description: P.G. Gravel with Silt and Sand (GP-GM)
Sieve Size
2 1/2"
2"
11/2"
1"
3/4"
1/2"
Laboratory Services Manager
Laboratory Report
Project: FHWA Western Federal Lands Highway Division Project Number: BO15029A
Parsons Brinckerhoff
488 East Winchester St, Suite 400
Date: 2/6/15
Tested By: A. Mabee, I. Rede
No. 200
3/8"
No. 4
No. 8
No. 16
No. 100
IDIQ Professional Engineering Design Services
A. McCormick
Isaac Rede
Note: This report covers only material as represented by this sample and does not necessarily cover all soil from this layer or source.
R-VALUE
ASTM D2844
Project: FWWA Western Federal Lands Highway Division IDIQ Professional Engineering Design Services
Client: Parsons Brinckerhoff Sample ID: GLSG15 - 16 @ 1.5 - 2.0 feet Soil Description: Silty Sand (SM)
Project Number: BO15029A Sample Number: BO1500029NN Date Tested: 1/26/15 By: A. Mabee
SOIL CONSTANTS
R VALUE: 61
Atterberg Limits: LL = NV*, PI = NP* *NV = No Value, NP = Non Plastic
0 0
R value
E x u d a ti o n P re s s u re L
.5
.0
.5
.0
.5
.0
.5
.0
E x p a n s io n P re s s u re P S I)
GRADATION: AASHTO T-11, T27
None
R VALUE DATA
Point 1 Point 2 Point 3
Exudation, PSI
Dry Density, PCF
Moisture Content, %
Exp. Pressure, PSI
126.3
10.6
0.03
125.8
9.7
0.06
128.9
8.3
0.12
300 PSI Line
3"
2 1/2"
2"
1 1/2 '
1"
3/4"
1/2"
3/8"
No. 4
No. 8
No. 16
No. 30
No. 50
No. 100
No. 200
Sieve Analysis of Fine and Coarse Aggregates
Standards: ASTM C136/C117
Percent
Metric Passing
64 mm 100
50 mm 100
37.5 mm 100
25 mm 100
19 mm 99
12.5 mm 98
9.5 mm 97
4.75 mm 94
2.36 mm 91
1.18 mm 87
0.6 mm 80
0.3 mm 69
0.15 mm 54
0.075 mm 38.0
Liquid Limit and Plasticity Index of Soils
Standards: ASTM D4318
LL= 22
*NP = Non Plastic PI= NP*
Reviewed By:
Sample Number: BO1500029PP
Sampled By: Client
Date Received: 1/2/2015
Murray, UT 84107
Sample Location: GLSG 15-17 @ 1.0 - 1.7 feet
Sample Description: Silty Sand (SM)
Sieve Size
2 1/2"
2"
11/2"
1"
3/4"
1/2"
Laboratory Services Manager
Laboratory Report
Project: FHWA Western Federal Lands Highway Division Project Number: BO15029A
Parsons Brinckerhoff
488 East Winchester St, Suite 400
Date: 2/6/15
Tested By: A. Mabee, I. Rede
No. 200
3/8"
No. 4
No. 8
No. 16
No. 100
IDIQ Professional Engineering Design Services
A. McCormick
Isaac Rede
Note: This report covers only material as represented by this sample and does not necessarily cover all soil from this layer or source.
R-VALUE
ASTM D2844
Project: FWWA Western Federal Lands Highway Division IDIQ Professional Engineering Design Services
Client: Parsons Brinckerhoff Sample ID: GLSG15 - 17 @ 2.0 - 5.0 feet Soil Description: Silty Sand with Gravel (SM)
Project Number: BO15029A Sample Number: BO1500029RR Date Tested: 1/26/15 By: A. Mabee
SOIL CONSTANTS
R VALUE: 77
Atterberg Limits: LL = NV*, PI = NP* *NV = No Value, NP = Non Plastic
0 0
R value
E x u d a ti o n P re s s u re L
.5
.0
.5
.0
.5
.0
.5
.0
E x p a n s io n P re s s u re P S I)
GRADATION: AASHTO T-11, T27
None
R VALUE DATA
Point 1 Point 2 Point 3
Exudation, PSI
Dry Density, PCF
Moisture Content, %
Exp. Pressure, PSI
121.8
11.6
0.00
122.7
10.7
0.00
122.3
9.5
0.00
300 PSI Line
3"
2 1/2"
2"
1 1/2 '
1"
3/4"
1/2"
3/8"
No. 4
No. 8
No. 16
No. 30
No. 50
No. 100
No. 200
APPENDIX F
Task Order DTFH7015F17002
Contract No. DTFH70-10-D-00017 Page 1 Task Order No. DTFH7015F17002 December 4, 2014 Goose Lake Road, ID PFH 98(1)
STATEMENT OF WORK
Task Order No. DTFH7015F17002, Contract No. DTFH70-10-D-00017
ID PFH 98(1), GOOSE LAKE ROAD RECONSTRUCTION
Roadway Subgrade Investigation Report
December 4, 2014
I. INTRODUCTION
A. Project Summary
Federal Highway Administration (FHWA) is proposing to complete preliminary design for the Goose Lake Road Reconstruction project.
The Participating Agencies are the FHWA, the USDA Forest Service (FS), and Adams County (COUNTY).
The proposed project consists of reconstruction of the road from its intersection with State Highway 55 to the entrance of the Brundage Mountain Ski Area to meet current design standards.
FHWA is preparing to proceed with plans for a roadway subgrade drilling investigation along Goose Lake Road in Adams County, Idaho. The proposed drilling project consists of 17 subgrade borings to investigate roadway conditions. Work requirements are described in detail below and include all drilling work, sample collection, material testing, hole logging and inspection, and boring log preparation.
B. Project Location
The proposed project is located approximately 5 miles west of McCall in Adams County, Idaho. Approximate Global Positioning System (GPS) coordinates for the beginning of the project are:
Latitude 44.957728 Longitude -116.170550
The proposed project comprises a 4-mile section of Goose Lake Road.
C. Work Description
This Task Order includes the following work: project management and geotechnical investigation.
II. Project Development
FHWA is the lead agency for the project. Do not accept any direction or take additional work that is beyond the scope of this Task Order that has not been approved through the
Contract No. DTFH70-10-D-00017 Page 2
Contracting Officer (CO). Provide to the Contracting Officer’s Representative (COR) all submittals and deliverables listed in this SOW for submittal to FHWA and the Government. Review comments received from FHWA and other reviewing agencies are valid only if provided through the COR. The COR only will provide Government furnished materials and services, except for forms, documents and information available directly from websites listed in this SOW. During discussions with Partner agencies and others, do not suggest performance of additional work that is beyond the scope of this Task Order. The FHWA Contracting Officer (CO) is the only representative that has the authority to revise or add work under the requirements of this Task Order.
III. PROJECT MANAGEMENT
A. Project Management
Project management will continue throughout the duration of this Task Order. It includes the work necessary to manage analysis and production efforts, coordination with FHWA, administering this contract, monitoring progress, lead project team meetings, and direct the quality control and quality assurance activities for the Project Development tasks.
Specific project management activities include:
1. Project Coordination
While performing the work described under this Task Order, discussions with staff from the FS, and COUNTY, as well as other FHWA employees will be required. Participate freely in these discussions, answer questions, and respond to requests for information. However, do not accept any direction or take additional work that is beyond the scope of this Task Order. Establish and monitor all sub-consultant contracts, as needed.
2. Meetings
No meetings are anticipated for this Task Order
3. Progress Reports and Invoices
Prepare and submit progress reports and invoices on a monthly basis. Describe prime and sub-consultants past month accomplishments and future month expectations.
IV. STATEMENT OF WORK TASKS
A. Drilling
Procure a drill contractor to complete all drilling work as outlined in this statement of work. Drill seventeen (17) Subgrade Borings at approximate ¼ mile intervals along the existing roadway starting at the intersection with the state highway and terminating at the end of the project. In general, alternate the boring locations on either side of the roadway
Contract No. DTFH70-10-D-00017 Page 3 to gather information from both the cut and fill sides of the roadway. Drill borings within the existing roadway and between the wheel paths. All borings shall be drilled in locations accessible with a truck mounted drill rig.
All borings will be drilled in accordance to this Statement of…