- ID FLAP FS SC MULTI(1), Custer Motorway Stabilization Project Federal contract opportunity
- Solicitation number
- 69056725R000008
About this file
This document is a Presolicitation Notice for the Custer Motorway Stabilization Project issued by the Western Federal Lands Highway Division of the Federal Highway Administration. The project involves fill slope stabilization at two sites (Milepost 24.0 and 25.3) along the Custer Motorway in the Salmon Challis National Forest, with two bid schedules available: Schedule A covering MP 25.3 slide repair, and Schedule B covering both MP 24.0 and MP 25.3 slide repairs. The work will include stabilizing banks with buried log revetments and rebuilding slopes with reinforced soil techniques.
The solicitation is limited to six pre-approved prime contractors: ASCORP Inc., Granite Construction, Hamilton Construction, M.A. Deatley Construction, MJ Hughes Construction, and Thompson Contracting. Solicitation documents will be available during winter 2025/2026, with interested parties advised to monitor SAM.gov for the exact release date. Technical questions should be emailed to wfl.plansspec@dot.gov, and general questions can be directed to wfl.contracts@dot.gov or 360-619-7520. The project site may have limited accessibility due to snow, and prospective offerors are encouraged to view the location during fall as conditions permit.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Preliminary_ida-fs-sc-multi1_Plan.pdf | ||
| PROJECT DESCRIPTION_ID FLAP FS SC MULTI(1).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Western Federal Lands Highway Division 610 E. Fifth Street
Vancouver, WA 98661 Phone 360-619-7700
Fax 360-619-7846
NOTICE TO PROSPECTIVE OFFERORS
RE: ID FLAP FS SC MULTI(1)
Custer Motorway Stabilization Project
Solicitation No. 69056725R000008
SPECIAL NOTICE RE: Idaho, Montana, and Surrounding Areas Multiple Award Task
Order Contract (MATOC).
THIS PRESOLICITATION NOTICE IS BEING POSTED ON SAM.GOV TO ANNOUNCE
THE UPCOMING PROJECT AND ASSIST POTENTIAL SUBCONTRACTORS BY
PUBLICIZING OPPORTUNITIES. A PROPOSAL WILL ONLY BE ACCEPTED FROM
THE PRIME CONTRACTORS LISTED BELOW.
Contract Number Contractor Name Phone
69056725D000002 ASCORP INC,
DBA DEBCO CONSTRUCTION
217 College Ave. STE 5
Orofino, ID 83544
208-476-3617
69056725D000003 GRANITE CONSTRUCTION
585 W Beach St.
Watsonville, CA 95076
360-606-1335
69056725D000004 HAMILTON CONSTRUCTION
2213 South F Street
Springfield, OR 97477
541-746-2426
69056725D000005 M.A. DEATLEY CONSTRUCTION, INC.
829 Evans Road
Clarkston, WA 99403
509-751-1580
69056725D000006 MJ HUGHES CONSTRUCTION, INC.
11510 NE 87TH AVE
Vancouver, WA 98662
360-314-2024
69056725D000007 THOMPSON CONTRACTING, INC
502 Gruber Rd.
Libby, MT 59923
406-293-5392
The attached preliminary plans are being furnished to aid prospective Offerors in identifying the location and type of work for this project. The project will be advertised during a period when viewing of the project may not be possible due to snow. Therefore, prospective Offerors are encouraged to view the project during fall as conditions permit. After October 1, access will be weather dependent; contact the Forest Service; Salmon Challis National Forest for current road
August 20, 2025
Preliminary Plans letter conditions at 208-879-4100. No Federal Highway Administration personnel will be available for show-me tours.
Two Bid Schedules - The work will be solicited under two alternate schedules, with different amounts of work in each schedule. One schedule will be awarded. See the Project Description document for additional details.
• Schedule A consists of MP 25.3 slide repair.
• Schedule B consists of MP 24.0 and MP 25.3 slide repair.
Project Location and Type of Work - All project work is located along Cuter Motorway in the
Salmon Challis National Forest.
This project consists of fill slope stabilization at two sites along the Custer Motorway (MP 24.0 and MP 25.3). The road is a narrow native material surfaced road with low ADT. The repairs will include stabilizing the banks with buried log revetments and rebuilding the slopes with reinforced soil slopes. The project includes two schedules as follows:
• Schedule A: MP 25.3
• Schedule B: MP 25.3 and MP 24.0
Technical Questions – All technical questions must be submitted by email wfl.plans-spec@dot.gov .
General Questions - Contact our office at wfl.contracts@dot.gov or at 360-619-7520.
Solicitation documents - Documents will be available during the winter of 2025/2026. Please monitor the SAM site (www.sam.gov) for actual date of solicitation release. To receive automatic notification through SAM, you must be logged in and select the “Follow” feature. For more information go to How do I follow items on SAM.gov?.
Thank you for your interest in this project.
mailto:plans-spec@dot.gov mailto:plans-spec@dot.gov mailto:wfl.contracts@dot.gov http://www.sam.gov/ https://www.fsd.gov/gsafsd_sp?id=gsafsd_kb_articles&sys_id=ad9c8da01bfbe1502fe5ed7ae54bcbc8
File details come from the government source that posted it. Updated .