HUMBOLT PACIFIC CREST TRAIL BRIDGE REPLACEMENT
Solicitation number
1240LT27Q0026
Issued by

About this file

This is a Schedule of Items for a federal construction solicitation related to bridge replacement on the Pacific Crest Trail. The solicitation (1240LT27Q0026) is issued by the Department of Agriculture Forest Service for the Humboldt-Toiyabe National Forest in Mono County, California, with the objective of replacing a trail bridge over the West Fork West Walker River in the Hoover Wilderness. The project consists of five base line items measured on a lump-sum basis: mobilization including helicopter transport, full removal of the existing bridge and components, structure excavation and backfill for approaches and foundation, approach railing (30 linear feet), and design, fabrication, transport, and installation of a 35-foot glulam deck panel bridge. No unit prices or total pricing are shown in the schedule provided.

Key dates for this procurement include a site visit scheduled for November 3, 2026, conducted via Zoom due to the remote location; questions and answers due by November 4, 2026; and quotes due by November 28, 2026, at 1700 Mountain Time. The anticipated award date is December 10, 2026, with a period of performance from July 1, 2027, through October 29, 2027 (120 days). The Contracting Officer Representative is Jordan Burge, Civil Engineer, Forest Service, who can be contacted at jordan.burge@usda.gov. Offerors are permitted to conduct site visits at their convenience in addition to the scheduled Zoom site visit.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule of Items

SCHEDULE OF ITEMS
Pacific Crest Trail (PCT)
Humboldt-Toiyabe National Forest
Mono County, California
FSM 2400
Base Items
Item NumberDescriptionMethod of MeasurementUnitQuantityUnit PriceTotal
90701Mobilization (includes helicopter)LSQLS1
91101Full removal of existing bridge and all componentsLSQLS1
91102Structure excavation and backfill (including approaches and bridge foundation)LSQLS1
93701Approach railingAQLF30
9610135' glulam deck panel bridge: design, fabricate, transport, and installLSQLS1
Total$0