GSA: PJM Carbon-Pollution Free Electricity/Retail Electricity 2024
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 47PA0724R0005
- Agency
-
Public Buildings Service
General Services Administration
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 221122 Electric Power Distribution
- PSC
- S112 Utilities- Electric
- Place of performance
- Washington, District of Columbia 20405, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. General Services Administration (GSA), in collaboration with the U.S. Department of Defense (DoD), is issuing a solicitation to procure the supply of retail electricity, including carbon pollution-free electricity (CFE), and any ancillary services to be delivered to various federal and non-federal agencies located in the PJM Interconnection/Regional Transmission Operator (PJM/RTO) market area. The solicitation supports the CFE goals expressed in Executive Order 14057, which aims for the federal government to source 100% CFE by 2030, including 50% on a 24/7 hourly matching basis. Proposals will be evaluated on both price and non-price factors, including the amount of CFE provided. Potential offerors are encouraged to submit any questions or comments to the Contracting Officer as early as possible, and the closing response date is provided in the solicitation.
This solicitation is not set-aside for any specific business size or socioeconomic category. All responsible sources are encouraged to submit proposals, and award will be made to the offeror(s) who are properly registered on SAM.gov and approved licensed retail electricity suppliers in the applicable states. The total estimated annual quantity is 1.1 million MWh's, and the contract will be a 10-year Firm-Fixed-Price, Requirements Type contract. The place of performance includes accounts located in Delaware, Illinois, Maryland, New Jersey, Ohio, and Pennsylvania.
Notice text
9 versions
Update #9 · Latest ·
11/18/2024 Amendment 0007: Revised Pricing Group 8 to Exhibit 1
10/03/2024: Replaced sixth amended Exhibit 1 due to missing fields in the pivot table.
10/02/2024 Amendment 0006: provides instructions for offerors to enter into proprietary information agreements with GSA contractors for evaluation purposes. Revises the amount of CFE required for FY2035 and provides a sixth amended Exhibit 1. All other terms and conditions remain the same.
09/19/2024 Amendment 0005: provides a fifth amended Exhibit 1. All other terms and conditions remain the same.
09/17/2024 Amendment 0004: provides a fourth amended Exhibit 1. All other terms and conditions remain the same.
09/11/2024 Amendment 0003: incorporates 1. Questions and Answers Part 3. 2. Provides a third amended Solicitation and Exhibit 1. 3. Extends the technical proposal due and the price proposal due date. All other terms and conditions remain the same.
08/29/2024 Amendment 0002: incorporates: 1. Questions and Answers Part 2. 2. Provides a second amended Solicitation and Exhibit 1. All other terms and conditions remain the same.
08/15/2024 Amendment 0001: incorporates: 1. Questions and Answers Part 1; 2.Extends the technical proposal and price proposal due dates 3. Provides a revised Solicitation and Exhibit 1. 4. Updates Attachment 11. All other terms and conditions remain the same.
07/31/2024 Orignal Solicitation: The U.S. General Services Administration (GSA), in collaboration with the U.S. Department of Defense (DoD), previously released a Request for Information (RFI) and hosted an Industry Day in Washington, D.C. on February 20, 2024, seeking information from contractors who could supply carbon pollution-free electricity (CFE) in the PJM Interconnection/Regional Transmission Operator (PJM/RTO). Both agencies took the input gathered from the RFI and the industry forum to shape each agency’s procurement strategies and solicitations. As such, GSA and DoD are publishing two separate solicitations seeking contractors who could provide CFE for federal civilian and defense agencies located in the PJM/RTO market area. Both solicitations support the CFE goals expressed in Section 203 of Executive Order (EO) 14057, Catalyzing Clean Energy Industries and Jobs Through Federal Sustainability (December 8, 2021). This order sets a goal for the Federal Government to source 100 percent CFE by 2030, including 50 percent hourly matching (24/7 CFE).
This solicitation is for the supply of retail electricity, to include CFE, and any ancillary services to be delivered to various Federal and non-Federal agencies located in the PJM/RTO market area. GSA is soliciting offers for a 10-year delivery period beginning with the meter read dates specified on Exhibit 1 of the solicitation. The GSA solicitation includes accounts located in all or parts of Delaware, Illinois, Maryland, New Jersey, Ohio, and Pennsylvania. The total estimated annual quantity is 1.1 million MWh’s. The contract(s) awarded will be Firm-Fixed-Price, Requirements Type. The solicitation is issued as a Request for Proposals. Additional requirements may be added by amendment.
CFE is defined by EO 14057 to mean electrical energy produced from resources that generate no carbon emissions, including marine energy, solar, wind, hydrokinetic (including tidal, wave, current, and thermal), geothermal, hydroelectric, nuclear, renewably sourced hydrogen, and electrical energy generation from fossil resources to the extent there is active capture and storage of carbon dioxide emissions that meets EPA requirements.
The EO 14057 Implementing Instructions further state that for CFE to count toward the government-wide goals established by EO 14057, the generation must i) produce CFE; ii) be placed in service on or after October 1, 2021, either as a new resource or as new capacity at an existing resource modified to increase output; and iii) deliver CFE to the same grid region of Federal facility consumption.
Additional information regarding GSA’s support of EO 14057 CFE goals can be found at:
https://www.gsa.gov/real-estate/facilities-management/utility-services/carbon-pollutionfree-electricity
All potential offerors are highly encouraged to submit any questions or comments to bonnie.bueter@gsa.gov as early as possible, but prior to the deadline for questions and answers in the solicitation.
Instructions for requesting facility interval data are included in the solicitation.
All responsible sources are encouraged to submit a responsive and complete proposal.
Award will be made to offeror(s), who, at the time of award, are properly registered on www.SAM.gov and are on the approved list of licensed retail electricity suppliers in the state in which the award(s) is/are to be made. No proposed award(s) will be made to offeror(s) who appears on the Office of Foreign Assets Control - Specially Designated National (SDN) List, the Industry & Security - Denied Persons List (DPL), Federal Awardee Performance and Integrity Information Sys (FAPIIS), and/or Excluded Parties List System (EPLS).
The closing response date is provided in block 8 of the SF 1449.
Contracting Officer:
Bonnie Bueter Bonnie.bueter@gsa.gov
Update #8 ·
10/03/2024: Replaced sixth amended Exhibit 1 due to missing fields in the pivot table.
10/02/2024 Amendment 0006: provides instructions for offerors to enter into proprietary information agreements with GSA contractors for evaluation purposes. Revises the amount of CFE required for FY2035 and provides a sixth amended Exhibit 1. All other terms and conditions remain the same.
09/19/2024 Amendment 0005: provides a fifth amended Exhibit 1. All other terms and conditions remain the same.
09/17/2024 Amendment 0004: provides a fourth amended Exhibit 1. All other terms and conditions remain the same.
09/11/2024 Amendment 0003: incorporates 1. Questions and Answers Part 3. 2. Provides a third amended Solicitation and Exhibit 1. 3. Extends the technical proposal due and the price proposal due date. All other terms and conditions remain the same.
08/29/2024 Amendment 0002: incorporates: 1. Questions and Answers Part 2. 2. Provides a second amended Solicitation and Exhibit 1. All other terms and conditions remain the same.
08/15/2024 Amendment 0001: incorporates: 1. Questions and Answers Part 1; 2.Extends the technical proposal and price proposal due dates 3. Provides a revised Solicitation and Exhibit 1. 4. Updates Attachment 11. All other terms and conditions remain the same.
07/31/2024 Orignal Solicitation: The U.S. General Services Administration (GSA), in collaboration with the U.S. Department of Defense (DoD), previously released a Request for Information (RFI) and hosted an Industry Day in Washington, D.C. on February 20, 2024, seeking information from contractors who could supply carbon pollution-free electricity (CFE) in the PJM Interconnection/Regional Transmission Operator (PJM/RTO). Both agencies took the input gathered from the RFI and the industry forum to shape each agency’s procurement strategies and solicitations. As such, GSA and DoD are publishing two separate solicitations seeking contractors who could provide CFE for federal civilian and defense agencies located in the PJM/RTO market area. Both solicitations support the CFE goals expressed in Section 203 of Executive Order (EO) 14057, Catalyzing Clean Energy Industries and Jobs Through Federal Sustainability (December 8, 2021). This order sets a goal for the Federal Government to source 100 percent CFE by 2030, including 50 percent hourly matching (24/7 CFE).
This solicitation is for the supply of retail electricity, to include CFE, and any ancillary services to be delivered to various Federal and non-Federal agencies located in the PJM/RTO market area. GSA is soliciting offers for a 10-year delivery period beginning with the meter read dates specified on Exhibit 1 of the solicitation. The GSA solicitation includes accounts located in all or parts of Delaware, Illinois, Maryland, New Jersey, Ohio, and Pennsylvania. The total estimated annual quantity is 1.1 million MWh’s. The contract(s) awarded will be Firm-Fixed-Price, Requirements Type. The solicitation is issued as a Request for Proposals. Additional requirements may be added by amendment.
CFE is defined by EO 14057 to mean electrical energy produced from resources that generate no carbon emissions, including marine energy, solar, wind, hydrokinetic (including tidal, wave, current, and thermal), geothermal, hydroelectric, nuclear, renewably sourced hydrogen, and electrical energy generation from fossil resources to the extent there is active capture and storage of carbon dioxide emissions that meets EPA requirements.
The EO 14057 Implementing Instructions further state that for CFE to count toward the government-wide goals established by EO 14057, the generation must i) produce CFE; ii) be placed in service on or after October 1, 2021, either as a new resource or as new capacity at an existing resource modified to increase output; and iii) deliver CFE to the same grid region of Federal facility consumption.
Additional information regarding GSA’s support of EO 14057 CFE goals can be found at:
https://www.gsa.gov/real-estate/facilities-management/utility-services/carbon-pollutionfree-electricity
All potential offerors are highly encouraged to submit any questions or comments to bonnie.bueter@gsa.gov as early as possible, but prior to the deadline for questions and answers in the solicitation.
Instructions for requesting facility interval data are included in the solicitation.
All responsible sources are encouraged to submit a responsive and complete proposal.
Award will be made to offeror(s), who, at the time of award, are properly registered on www.SAM.gov and are on the approved list of licensed retail electricity suppliers in the state in which the award(s) is/are to be made. No proposed award(s) will be made to offeror(s) who appears on the Office of Foreign Assets Control - Specially Designated National (SDN) List, the Industry & Security - Denied Persons List (DPL), Federal Awardee Performance and Integrity Information Sys (FAPIIS), and/or Excluded Parties List System (EPLS).
The closing response date is provided in block 8 of the SF 1449.
Contracting Officer:
Bonnie Bueter Bonnie.bueter@gsa.gov
Update #7 ·
10/02/2024 Amendment 0006: provides instructions for offerors to enter into proprietary information agreements with GSA contractors for evaluation purposes. Revises the amount of CFE required for FY2035 and provides a sixth amended Exhibit 1. All other terms and conditions remain the same.
09/19/2024 Amendment 0005: provides a fifth amended Exhibit 1. All other terms and conditions remain the same.
09/17/2024 Amendment 0004: provides a fourth amended Exhibit 1. All other terms and conditions remain the same.
09/11/2024 Amendment 0003: incorporates 1. Questions and Answers Part 3. 2. Provides a third amended Solicitation and Exhibit 1. 3. Extends the technical proposal due and the price proposal due date. All other terms and conditions remain the same.
08/29/2024 Amendment 0002: incorporates: 1. Questions and Answers Part 2. 2. Provides a second amended Solicitation and Exhibit 1. All other terms and conditions remain the same.
08/15/2024 Amendment 0001: incorporates: 1. Questions and Answers Part 1; 2.Extends the technical proposal and price proposal due dates 3. Provides a revised Solicitation and Exhibit 1. 4. Updates Attachment 11. All other terms and conditions remain the same.
07/31/2024 Orignal Solicitation: The U.S. General Services Administration (GSA), in collaboration with the U.S. Department of Defense (DoD), previously released a Request for Information (RFI) and hosted an Industry Day in Washington, D.C. on February 20, 2024, seeking information from contractors who could supply carbon pollution-free electricity (CFE) in the PJM Interconnection/Regional Transmission Operator (PJM/RTO). Both agencies took the input gathered from the RFI and the industry forum to shape each agency’s procurement strategies and solicitations. As such, GSA and DoD are publishing two separate solicitations seeking contractors who could provide CFE for federal civilian and defense agencies located in the PJM/RTO market area. Both solicitations support the CFE goals expressed in Section 203 of Executive Order (EO) 14057, Catalyzing Clean Energy Industries and Jobs Through Federal Sustainability (December 8, 2021). This order sets a goal for the Federal Government to source 100 percent CFE by 2030, including 50 percent hourly matching (24/7 CFE).
This solicitation is for the supply of retail electricity, to include CFE, and any ancillary services to be delivered to various Federal and non-Federal agencies located in the PJM/RTO market area. GSA is soliciting offers for a 10-year delivery period beginning with the meter read dates specified on Exhibit 1 of the solicitation. The GSA solicitation includes accounts located in all or parts of Delaware, Illinois, Maryland, New Jersey, Ohio, and Pennsylvania. The total estimated annual quantity is 1.1 million MWh’s. The contract(s) awarded will be Firm-Fixed-Price, Requirements Type. The solicitation is issued as a Request for Proposals. Additional requirements may be added by amendment.
CFE is defined by EO 14057 to mean electrical energy produced from resources that generate no carbon emissions, including marine energy, solar, wind, hydrokinetic (including tidal, wave, current, and thermal), geothermal, hydroelectric, nuclear, renewably sourced hydrogen, and electrical energy generation from fossil resources to the extent there is active capture and storage of carbon dioxide emissions that meets EPA requirements.
The EO 14057 Implementing Instructions further state that for CFE to count toward the government-wide goals established by EO 14057, the generation must i) produce CFE; ii) be placed in service on or after October 1, 2021, either as a new resource or as new capacity at an existing resource modified to increase output; and iii) deliver CFE to the same grid region of Federal facility consumption.
Additional information regarding GSA’s support of EO 14057 CFE goals can be found at:
https://www.gsa.gov/real-estate/facilities-management/utility-services/carbon-pollutionfree-electricity
All potential offerors are highly encouraged to submit any questions or comments to bonnie.bueter@gsa.gov as early as possible, but prior to the deadline for questions and answers in the solicitation.
Instructions for requesting facility interval data are included in the solicitation.
All responsible sources are encouraged to submit a responsive and complete proposal.
Award will be made to offeror(s), who, at the time of award, are properly registered on www.SAM.gov and are on the approved list of licensed retail electricity suppliers in the state in which the award(s) is/are to be made. No proposed award(s) will be made to offeror(s) who appears on the Office of Foreign Assets Control - Specially Designated National (SDN) List, the Industry & Security - Denied Persons List (DPL), Federal Awardee Performance and Integrity Information Sys (FAPIIS), and/or Excluded Parties List System (EPLS).
The closing response date is provided in block 8 of the SF 1449.
Contracting Officer:
Bonnie Bueter Bonnie.bueter@gsa.gov
Update #6 ·
09/19/2024 Amendment 0005: provides a fifth amended Exhibit 1. All other terms and conditions remain the same.
09/17/2024 Amendment 0004: provides a fourth amended Exhibit 1. All other terms and conditions remain the same.
09/11/2024 Amendment 0003: incorporates 1. Questions and Answers Part 3. 2. Provides a third amended Solicitation and Exhibit 1. 3. Extends the technical proposal due and the price proposal due date. All other terms and conditions remain the same.
08/29/2024 Amendment 0002: incorporates: 1. Questions and Answers Part 2. 2. Provides a second amended Solicitation and Exhibit 1. All other terms and conditions remain the same.
08/15/2024 Amendment 0001: incorporates: 1. Questions and Answers Part 1; 2.Extends the technical proposal and price proposal due dates 3. Provides a revised Solicitation and Exhibit 1. 4. Updates Attachment 11. All other terms and conditions remain the same.
07/31/2024 Orignal Solicitation: The U.S. General Services Administration (GSA), in collaboration with the U.S. Department of Defense (DoD), previously released a Request for Information (RFI) and hosted an Industry Day in Washington, D.C. on February 20, 2024, seeking information from contractors who could supply carbon pollution-free electricity (CFE) in the PJM Interconnection/Regional Transmission Operator (PJM/RTO). Both agencies took the input gathered from the RFI and the industry forum to shape each agency’s procurement strategies and solicitations. As such, GSA and DoD are publishing two separate solicitations seeking contractors who could provide CFE for federal civilian and defense agencies located in the PJM/RTO market area. Both solicitations support the CFE goals expressed in Section 203 of Executive Order (EO) 14057, Catalyzing Clean Energy Industries and Jobs Through Federal Sustainability (December 8, 2021). This order sets a goal for the Federal Government to source 100 percent CFE by 2030, including 50 percent hourly matching (24/7 CFE).
This solicitation is for the supply of retail electricity, to include CFE, and any ancillary services to be delivered to various Federal and non-Federal agencies located in the PJM/RTO market area. GSA is soliciting offers for a 10-year delivery period beginning with the meter read dates specified on Exhibit 1 of the solicitation. The GSA solicitation includes accounts located in all or parts of Delaware, Illinois, Maryland, New Jersey, Ohio, and Pennsylvania. The total estimated annual quantity is 1.1 million MWh’s. The contract(s) awarded will be Firm-Fixed-Price, Requirements Type. The solicitation is issued as a Request for Proposals. Additional requirements may be added by amendment.
CFE is defined by EO 14057 to mean electrical energy produced from resources that generate no carbon emissions, including marine energy, solar, wind, hydrokinetic (including tidal, wave, current, and thermal), geothermal, hydroelectric, nuclear, renewably sourced hydrogen, and electrical energy generation from fossil resources to the extent there is active capture and storage of carbon dioxide emissions that meets EPA requirements.
The EO 14057 Implementing Instructions further state that for CFE to count toward the government-wide goals established by EO 14057, the generation must i) produce CFE; ii) be placed in service on or after October 1, 2021, either as a new resource or as new capacity at an existing resource modified to increase output; and iii) deliver CFE to the same grid region of Federal facility consumption.
Additional information regarding GSA’s support of EO 14057 CFE goals can be found at:
https://www.gsa.gov/real-estate/facilities-management/utility-services/carbon-pollutionfree-electricity
All potential offerors are highly encouraged to submit any questions or comments to bonnie.bueter@gsa.gov as early as possible, but prior to the deadline for questions and answers in the solicitation.
Instructions for requesting facility interval data are included in the solicitation.
All responsible sources are encouraged to submit a responsive and complete proposal.
Award will be made to offeror(s), who, at the time of award, are properly registered on www.SAM.gov and are on the approved list of licensed retail electricity suppliers in the state in which the award(s) is/are to be made. No proposed award(s) will be made to offeror(s) who appears on the Office of Foreign Assets Control - Specially Designated National (SDN) List, the Industry & Security - Denied Persons List (DPL), Federal Awardee Performance and Integrity Information Sys (FAPIIS), and/or Excluded Parties List System (EPLS).
The closing response date is provided in block 8 of the SF 1449.
Contracting Officer:
Bonnie Bueter Bonnie.bueter@gsa.gov
Update #5 ·
09/17/2024 Amendment 0004: provides a fourth amended Exhibit 1. All other terms and conditions remain the same.
09/11/2024 Amendment 0003: incorporates 1. Questions and Answers Part 3. 2. Provides a third amended Solicitation and Exhibit 1. 3. Extends the technical proposal due and the price proposal due date. All other terms and conditions remain the same.
08/29/2024 Amendment 0002: incorporates: 1. Questions and Answers Part 2. 2. Provides a second amended Solicitation and Exhibit 1. All other terms and conditions remain the same.
08/15/2024 Amendment 0001: incorporates: 1. Questions and Answers Part 1; 2.Extends the technical proposal and price proposal due dates 3. Provides a revised Solicitation and Exhibit 1. 4. Updates Attachment 11. All other terms and conditions remain the same.
07/31/2024 Orignal Solicitation: The U.S. General Services Administration (GSA), in collaboration with the U.S. Department of Defense (DoD), previously released a Request for Information (RFI) and hosted an Industry Day in Washington, D.C. on February 20, 2024, seeking information from contractors who could supply carbon pollution-free electricity (CFE) in the PJM Interconnection/Regional Transmission Operator (PJM/RTO). Both agencies took the input gathered from the RFI and the industry forum to shape each agency’s procurement strategies and solicitations. As such, GSA and DoD are publishing two separate solicitations seeking contractors who could provide CFE for federal civilian and defense agencies located in the PJM/RTO market area. Both solicitations support the CFE goals expressed in Section 203 of Executive Order (EO) 14057, Catalyzing Clean Energy Industries and Jobs Through Federal Sustainability (December 8, 2021). This order sets a goal for the Federal Government to source 100 percent CFE by 2030, including 50 percent hourly matching (24/7 CFE).
This solicitation is for the supply of retail electricity, to include CFE, and any ancillary services to be delivered to various Federal and non-Federal agencies located in the PJM/RTO market area. GSA is soliciting offers for a 10-year delivery period beginning with the meter read dates specified on Exhibit 1 of the solicitation. The GSA solicitation includes accounts located in all or parts of Delaware, Illinois, Maryland, New Jersey, Ohio, and Pennsylvania. The total estimated annual quantity is 1.1 million MWh’s. The contract(s) awarded will be Firm-Fixed-Price, Requirements Type. The solicitation is issued as a Request for Proposals. Additional requirements may be added by amendment.
CFE is defined by EO 14057 to mean electrical energy produced from resources that generate no carbon emissions, including marine energy, solar, wind, hydrokinetic (including tidal, wave, current, and thermal), geothermal, hydroelectric, nuclear, renewably sourced hydrogen, and electrical energy generation from fossil resources to the extent there is active capture and storage of carbon dioxide emissions that meets EPA requirements.
The EO 14057 Implementing Instructions further state that for CFE to count toward the government-wide goals established by EO 14057, the generation must i) produce CFE; ii) be placed in service on or after October 1, 2021, either as a new resource or as new capacity at an existing resource modified to increase output; and iii) deliver CFE to the same grid region of Federal facility consumption.
Additional information regarding GSA’s support of EO 14057 CFE goals can be found at:
https://www.gsa.gov/real-estate/facilities-management/utility-services/carbon-pollutionfree-electricity
All potential offerors are highly encouraged to submit any questions or comments to bonnie.bueter@gsa.gov as early as possible, but prior to the deadline for questions and answers in the solicitation.
Instructions for requesting facility interval data are included in the solicitation.
All responsible sources are encouraged to submit a responsive and complete proposal.
Award will be made to offeror(s), who, at the time of award, are properly registered on www.SAM.gov and are on the approved list of licensed retail electricity suppliers in the state in which the award(s) is/are to be made. No proposed award(s) will be made to offeror(s) who appears on the Office of Foreign Assets Control - Specially Designated National (SDN) List, the Industry & Security - Denied Persons List (DPL), Federal Awardee Performance and Integrity Information Sys (FAPIIS), and/or Excluded Parties List System (EPLS).
The closing response date is provided in block 8 of the SF 1449.
Contracting Officer:
Bonnie Bueter Bonnie.bueter@gsa.gov
Update #4 ·
09/11/2024 Amendment 0003: incorporates 1. Questions and Answers Part 3. 2. Provides a third amended Solicitation and Exhibit 1. 3. Extends the technical proposal due and the price proposal due date. All other terms and conditions remain the same.
08/29/2024 Amendment 0002: incorporates: 1. Questions and Answers Part 2. 2. Provides a second amended Solicitation and Exhibit 1. All other terms and conditions remain the same.
08/15/2024 Amendment 0001: incorporates: 1. Questions and Answers Part 1; 2.Extends the technical proposal and price proposal due dates 3. Provides a revised Solicitation and Exhibit 1. 4. Updates Attachment 11. All other terms and conditions remain the same.
07/31/2024 Orignal Solicitation: The U.S. General Services Administration (GSA), in collaboration with the U.S. Department of Defense (DoD), previously released a Request for Information (RFI) and hosted an Industry Day in Washington, D.C. on February 20, 2024, seeking information from contractors who could supply carbon pollution-free electricity (CFE) in the PJM Interconnection/Regional Transmission Operator (PJM/RTO). Both agencies took the input gathered from the RFI and the industry forum to shape each agency’s procurement strategies and solicitations. As such, GSA and DoD are publishing two separate solicitations seeking contractors who could provide CFE for federal civilian and defense agencies located in the PJM/RTO market area. Both solicitations support the CFE goals expressed in Section 203 of Executive Order (EO) 14057, Catalyzing Clean Energy Industries and Jobs Through Federal Sustainability (December 8, 2021). This order sets a goal for the Federal Government to source 100 percent CFE by 2030, including 50 percent hourly matching (24/7 CFE).
This solicitation is for the supply of retail electricity, to include CFE, and any ancillary services to be delivered to various Federal and non-Federal agencies located in the PJM/RTO market area. GSA is soliciting offers for a 10-year delivery period beginning with the meter read dates specified on Exhibit 1 of the solicitation. The GSA solicitation includes accounts located in all or parts of Delaware, Illinois, Maryland, New Jersey, Ohio, and Pennsylvania. The total estimated annual quantity is 1.1 million MWh’s. The contract(s) awarded will be Firm-Fixed-Price, Requirements Type. The solicitation is issued as a Request for Proposals. Additional requirements may be added by amendment.
CFE is defined by EO 14057 to mean electrical energy produced from resources that generate no carbon emissions, including marine energy, solar, wind, hydrokinetic (including tidal, wave, current, and thermal), geothermal, hydroelectric, nuclear, renewably sourced hydrogen, and electrical energy generation from fossil resources to the extent there is active capture and storage of carbon dioxide emissions that meets EPA requirements.
The EO 14057 Implementing Instructions further state that for CFE to count toward the government-wide goals established by EO 14057, the generation must i) produce CFE; ii) be placed in service on or after October 1, 2021, either as a new resource or as new capacity at an existing resource modified to increase output; and iii) deliver CFE to the same grid region of Federal facility consumption.
Additional information regarding GSA’s support of EO 14057 CFE goals can be found at:
https://www.gsa.gov/real-estate/facilities-management/utility-services/carbon-pollutionfree-electricity
All potential offerors are highly encouraged to submit any questions or comments to bonnie.bueter@gsa.gov as early as possible, but prior to the deadline for questions and answers in the solicitation.
Instructions for requesting facility interval data are included in the solicitation.
All responsible sources are encouraged to submit a responsive and complete proposal.
Award will be made to offeror(s), who, at the time of award, are properly registered on www.SAM.gov and are on the approved list of licensed retail electricity suppliers in the state in which the award(s) is/are to be made. No proposed award(s) will be made to offeror(s) who appears on the Office of Foreign Assets Control - Specially Designated National (SDN) List, the Industry & Security - Denied Persons List (DPL), Federal Awardee Performance and Integrity Information Sys (FAPIIS), and/or Excluded Parties List System (EPLS).
The closing response date is provided in block 8 of the SF 1449.
Contracting Officer:
Bonnie Bueter Bonnie.bueter@gsa.gov
Update #3 ·
08/29/2024 Amendment 0002: incorporates: 1. Questions and Answers Part 2. 2. Provides a second amended Solicitation and Exhibit 1. All other terms and conditions remain the same.
08/15/2024 Amendment 0001: incorporates: 1. Questions and Answers Part 1; 2.Extends the technical proposal and price proposal due dates 3. Provides a revised Solicitation and Exhibit 1. 4. Updates Attachment 11. All other terms and conditions remain the same.
07/31/2024 Orignal Solicitation: The U.S. General Services Administration (GSA), in collaboration with the U.S. Department of Defense (DoD), previously released a Request for Information (RFI) and hosted an Industry Day in Washington, D.C. on February 20, 2024, seeking information from contractors who could supply carbon pollution-free electricity (CFE) in the PJM Interconnection/Regional Transmission Operator (PJM/RTO). Both agencies took the input gathered from the RFI and the industry forum to shape each agency’s procurement strategies and solicitations. As such, GSA and DoD are publishing two separate solicitations seeking contractors who could provide CFE for federal civilian and defense agencies located in the PJM/RTO market area. Both solicitations support the CFE goals expressed in Section 203 of Executive Order (EO) 14057, Catalyzing Clean Energy Industries and Jobs Through Federal Sustainability (December 8, 2021). This order sets a goal for the Federal Government to source 100 percent CFE by 2030, including 50 percent hourly matching (24/7 CFE).
This solicitation is for the supply of retail electricity, to include CFE, and any ancillary services to be delivered to various Federal and non-Federal agencies located in the PJM/RTO market area. GSA is soliciting offers for a 10-year delivery period beginning with the meter read dates specified on Exhibit 1 of the solicitation. The GSA solicitation includes accounts located in all or parts of Delaware, Illinois, Maryland, New Jersey, Ohio, and Pennsylvania. The total estimated annual quantity is 1.1 million MWh’s. The contract(s) awarded will be Firm-Fixed-Price, Requirements Type. The solicitation is issued as a Request for Proposals. Additional requirements may be added by amendment.
CFE is defined by EO 14057 to mean electrical energy produced from resources that generate no carbon emissions, including marine energy, solar, wind, hydrokinetic (including tidal, wave, current, and thermal), geothermal, hydroelectric, nuclear, renewably sourced hydrogen, and electrical energy generation from fossil resources to the extent there is active capture and storage of carbon dioxide emissions that meets EPA requirements.
The EO 14057 Implementing Instructions further state that for CFE to count toward the government-wide goals established by EO 14057, the generation must i) produce CFE; ii) be placed in service on or after October 1, 2021, either as a new resource or as new capacity at an existing resource modified to increase output; and iii) deliver CFE to the same grid region of Federal facility consumption.
Additional information regarding GSA’s support of EO 14057 CFE goals can be found at:
https://www.gsa.gov/real-estate/facilities-management/utility-services/carbon-pollutionfree-electricity
All potential offerors are highly encouraged to submit any questions or comments to bonnie.bueter@gsa.gov as early as possible, but prior to the deadline for questions and answers in the solicitation.
Instructions for requesting facility interval data are included in the solicitation.
All responsible sources are encouraged to submit a responsive and complete proposal.
Award will be made to offeror(s), who, at the time of award, are properly registered on www.SAM.gov and are on the approved list of licensed retail electricity suppliers in the state in which the award(s) is/are to be made. No proposed award(s) will be made to offeror(s) who appears on the Office of Foreign Assets Control - Specially Designated National (SDN) List, the Industry & Security - Denied Persons List (DPL), Federal Awardee Performance and Integrity Information Sys (FAPIIS), and/or Excluded Parties List System (EPLS).
The closing response date is provided in block 8 of the SF 1449.
Contracting Officer:
Bonnie Bueter Bonnie.bueter@gsa.gov
Update #2 ·
08/15/2024 Amendment 0001: incorporates: 1. Questions and Answers Part 1; 2.Extends the technical proposal and price proposal due dates 3. Provides a revised Solicitation and Exhibit 1. 4. Updates Attachment 11. All other terms and conditions remain the same.
07/31/2024 Orignal Solicitation: The U.S. General Services Administration (GSA), in collaboration with the U.S. Department of Defense (DoD), previously released a Request for Information (RFI) and hosted an Industry Day in Washington, D.C. on February 20, 2024, seeking information from contractors who could supply carbon pollution-free electricity (CFE) in the PJM Interconnection/Regional Transmission Operator (PJM/RTO). Both agencies took the input gathered from the RFI and the industry forum to shape each agency’s procurement strategies and solicitations. As such, GSA and DoD are publishing two separate solicitations seeking contractors who could provide CFE for federal civilian and defense agencies located in the PJM/RTO market area. Both solicitations support the CFE goals expressed in Section 203 of Executive Order (EO) 14057, Catalyzing Clean Energy Industries and Jobs Through Federal Sustainability (December 8, 2021). This order sets a goal for the Federal Government to source 100 percent CFE by 2030, including 50 percent hourly matching (24/7 CFE).
This solicitation is for the supply of retail electricity, to include CFE, and any ancillary services to be delivered to various Federal and non-Federal agencies located in the PJM/RTO market area. GSA is soliciting offers for a 10-year delivery period beginning with the meter read dates specified on Exhibit 1 of the solicitation. The GSA solicitation includes accounts located in all or parts of Delaware, Illinois, Maryland, New Jersey, Ohio, and Pennsylvania. The total estimated annual quantity is 1.1 million MWh’s. The contract(s) awarded will be Firm-Fixed-Price, Requirements Type. The solicitation is issued as a Request for Proposals. Additional requirements may be added by amendment.
CFE is defined by EO 14057 to mean electrical energy produced from resources that generate no carbon emissions, including marine energy, solar, wind, hydrokinetic (including tidal, wave, current, and thermal), geothermal, hydroelectric, nuclear, renewably sourced hydrogen, and electrical energy generation from fossil resources to the extent there is active capture and storage of carbon dioxide emissions that meets EPA requirements.
The EO 14057 Implementing Instructions further state that for CFE to count toward the government-wide goals established by EO 14057, the generation must i) produce CFE; ii) be placed in service on or after October 1, 2021, either as a new resource or as new capacity at an existing resource modified to increase output; and iii) deliver CFE to the same grid region of Federal facility consumption.
Additional information regarding GSA’s support of EO 14057 CFE goals can be found at:
https://www.gsa.gov/real-estate/facilities-management/utility-services/carbon-pollutionfree-electricity
All potential offerors are highly encouraged to submit any questions or comments to bonnie.bueter@gsa.gov as early as possible, but prior to the deadline for questions and answers in the solicitation.
Instructions for requesting facility interval data are included in the solicitation.
All responsible sources are encouraged to submit a responsive and complete proposal.
Award will be made to offeror(s), who, at the time of award, are properly registered on www.SAM.gov and are on the approved list of licensed retail electricity suppliers in the state in which the award(s) is/are to be made. No proposed award(s) will be made to offeror(s) who appears on the Office of Foreign Assets Control - Specially Designated National (SDN) List, the Industry & Security - Denied Persons List (DPL), Federal Awardee Performance and Integrity Information Sys (FAPIIS), and/or Excluded Parties List System (EPLS).
The closing response date is provided in block 8 of the SF 1449.
Contracting Officer:
Bonnie Bueter Bonnie.bueter@gsa.gov
Update #1 ·
The U.S. General Services Administration (GSA), in collaboration with the U.S. Department of Defense (DoD), previously released a Request for Information (RFI) and hosted an Industry Day in Washington, D.C. on February 20, 2024, seeking information from contractors who could supply carbon pollution-free electricity (CFE) in the PJM Interconnection/Regional Transmission Operator (PJM/RTO). Both agencies took the input gathered from the RFI and the industry forum to shape each agency’s procurement strategies and solicitations. As such, GSA and DoD are publishing two separate solicitations seeking contractors who could provide CFE for federal civilian and defense agencies located in the PJM/RTO market area. Both solicitations support the CFE goals expressed in Section 203 of Executive Order (EO) 14057, Catalyzing Clean Energy Industries and Jobs Through Federal Sustainability (December 8, 2021). This order sets a goal for the Federal Government to source 100 percent CFE by 2030, including 50 percent hourly matching (24/7 CFE).
This solicitation is for the supply of retail electricity, to include CFE, and any ancillary services to be delivered to various Federal and non-Federal agencies located in the PJM/RTO market area. GSA is soliciting offers for a 10-year delivery period beginning with the meter read dates specified on Exhibit 1 of the solicitation. The GSA solicitation includes accounts located in all or parts of Delaware, Illinois, Maryland, New Jersey, Ohio, and Pennsylvania. The total estimated annual quantity is 1.1 million MWh’s. The contract(s) awarded will be Firm-Fixed-Price, Requirements Type. The solicitation is issued as a Request for Proposals. Additional requirements may be added by amendment.
CFE is defined by EO 14057 to mean electrical energy produced from resources that generate no carbon emissions, including marine energy, solar, wind, hydrokinetic (including tidal, wave, current, and thermal), geothermal, hydroelectric, nuclear, renewably sourced hydrogen, and electrical energy generation from fossil resources to the extent there is active capture and storage of carbon dioxide emissions that meets EPA requirements.
The EO 14057 Implementing Instructions further state that for CFE to count toward the government-wide goals established by EO 14057, the generation must i) produce CFE; ii) be placed in service on or after October 1, 2021, either as a new resource or as new capacity at an existing resource modified to increase output; and iii) deliver CFE to the same grid region of Federal facility consumption.
Additional information regarding GSA’s support of EO 14057 CFE goals can be found at:
https://www.gsa.gov/real-estate/facilities-management/utility-services/carbon-pollutionfree-electricity
All potential offerors are highly encouraged to submit any questions or comments to bonnie.bueter@gsa.gov as early as possible, but prior to the deadline for questions and answers in the solicitation.
Instructions for requesting facility interval data are included in the solicitation.
All responsible sources are encouraged to submit a responsive and complete proposal.
Award will be made to offeror(s), who, at the time of award, are properly registered on www.SAM.gov and are on the approved list of licensed retail electricity suppliers in the state in which the award(s) is/are to be made. No proposed award(s) will be made to offeror(s) who appears on the Office of Foreign Assets Control - Specially Designated National (SDN) List, the Industry & Security - Denied Persons List (DPL), Federal Awardee Performance and Integrity Information Sys (FAPIIS), and/or Excluded Parties List System (EPLS).
The closing response date is provided in block 8 of the SF 1449.
Contracting Officer:
Bonnie Bueter Bonnie.bueter@gsa.gov
Files
Show all 28
Notice history
| Notice | Type | Posted |
|---|---|---|
| GSA: PJM Carbon-Pollution Free Electricity/Retail Electricity 2024 | Award Notice | |
| This notice | Solicitation | |
| GSA: PJM Carbon-Pollution Free Electricity/Retail Electricity 2024 | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| SPE60427R0400 - miso 2027 | Energy | No set-aside | |
| Electricity 2027 | Reserve Command | No set-aside | |
| Renewable Energy Credit | Office of Science | No set-aside |