1st Amended Attachment 11 Price Component Confirmation Table - Price Components.xlsx
XLSX spreadsheet 11 KB Posted
- Solicitation number
- 47PA0724R0005
About this file
This document is a Price Component Confirmation Table related to a federal contract opportunity for the supply of retail electricity, including carbon pollution-free electricity (CFE), to various federal and non-federal agencies located in the PJM Interconnection/Regional Transmission Operator (PJM/RTO) market area.
The key details are:
- The contract is for a 10-year delivery period beginning with the meter read dates specified in the solicitation.
- The total estimated annual quantity is 1.1 million MWhs.
- The contract will be a Firm-Fixed-Price, Requirements Type contract awarded through a Request for Proposals.
- The Price Component Confirmation Table identifies which cost components must be included in the bid prices, which require individual line item billing, and provides notes on the treatment of each component.
- Cost components include energy commodity costs, ancillary services, transmission costs, capacity costs, and applicable taxes.
- The solicitation is issued by the General Services Administration (GSA) in collaboration with the Department of Defense (DoD) to support the carbon pollution-free electricity goals expressed in Executive Order 14057.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Components
| PRICE COMPONENT CONFIRMATION TABLE | ||||
| Price Component | Treatment | Include In Bid Prices? | Requires Individual Line Item Billing? | Notes |
| Energy Commodity Costs for Bundled CFE to include the cost of the EAC | Fixed | Yes | No | |
| Energy Commodity Costs for Retail Supply (non-CFE) | Fixed | Yes | No | |
| Minimum of +/- 25% annual bandwidth based on the aggregated usage of pricing group for just the retail supply (non-CFE) portion of load | Fixed | Yes | No | |
| Ancillary Services and other ISO Costs (OATT Tariff, Operating Reserves, Management Costs, ISO Fees, Scheduling, hourly tracking costs) | Fixed | Yes | No | |
| Balancing and Congestion Costs | Fixed | Yes | No | |
| Line Losses including distribution losses to the end-use meter | Fixed | Yes | No | |
| State Renewable Portfolio Standards (RPS) compliance costs (other than ORECs) for states where the supplier is responsible (not utility) | Fixed | Yes | No | |
| Transmission Loss Credits (TLCs) | Fixed | Yes | No | |
| Applicable Public Service Commission Fees | Fixed | Yes | No | |
| Ohio Commercial Activity Tax (Only for accounts in Ohio) | ||||
| Enel X Fee @ $.0007 per kWh addressed in Section A.21 of this solicitation | Fixed | Yes | No | |
| Capacity (ICAP & UCAP) | Economic Price Adjustment | No | Yes | |
| Transmission Costs (including Network Integration Transmission Service [NITS], Regional Transmission Expansion Planning [RTEP], Financial Transmission Right [FTR], Transmission Reallocation Costs [TEAC], and Transmission Enhancement [TEC]) | Economic Price Adjustment | No | Yes | |
| Auction Revenue Rights (ARRs) / Reliability Must Run (RMR) | Economic Price Adjustment | No | Yes | |
| FERC Order 745 and FERC 494 / EL05-121-009 Compliance Costs | Economic Price Adjustment | No | Yes | |
| Offshore Wind RECs (ORECs) | Economic Price Adjustment | No | Yes | |
| Applicable Taxes (other than OH Commercial Activity Tax) | Pass-Through at Cost | No | Yes |