GRSM 213075 Laurel Falls construction

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
140P2024R0016
Agency
National Office National Park Service, Department of the Interior
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Y1PA Construction Of Recreation Facilities (Non-Building)

Notice details come from SAM.gov. Updated .

About this opportunity

The National Park Service (NPS), Department of the Interior, is seeking proposals for the rehabilitation of the Laurel Falls Trail in Great Smoky Mountains National Park near Gatlinburg, Tennessee. The project scope includes demolishing and removing the existing trail surface, rehabilitating the trail foundation and retaining walls, replacing culverts, rehabilitating the viewing platform and signage, and restoring degraded visitor areas. The work also involves rehabilitating and constructing new parking areas along the adjacent Fighting Creek Gap Road. The anticipated contract type is a negotiated firm-fixed price contract, with evaluation of both technical and price proposals. The estimated value of the construction contract is between $5-10 million and the period of performance is 540 days from notice to proceed. The solicitation is expected to be issued on or around November 6, 2023, though funding availability is currently uncertain.

This opportunity is being issued on a full and open basis with no set-aside designation. The NAICS code is 237990 with a $45 million size standard. Interested vendors must have an active registration in the System for Award Management (SAM) to participate. No specific incumbent contractors are named, and no previous awards related to this project have been identified. The place of performance is located in Gatlinburg, Tennessee.

Notice text

SOLICITATION NUMBER: 140P2024R0016
DSC-CS Contracting Services Division National Park Service
P.O. Box 25287
Denver, CO 80225

POINT OF CONTACT:
CONTRACTING SPECIALIST: Donna Prock, donna_prock@nps.gov
CONTRACTING OFFICER: Cary Atwood, cary_atwood@nps.gov

PLACE OF PERFORMANCE: Gatlinburg, Tennessee area, 37738, USA Title of Project: Rehabilitate Laurel Falls Trail

Proposed Solicitation Issue Date: Estimated on/about 6 November 2023.

This is currently an unfunded requirement with a high expectation that funds will be available. When and if funds become available a contract will be awarded at that time.

The NAICS Code for this requirement is 237990 with a size standard of $45 million.

Type of Procurement: It is anticipated that a negotiated firm-fixed price contract will be awarded requiring submission of both a technical and price proposal. The government will consider an offeror's technical capability in comparison to its price.

Estimated Price Range: Construction magnitude is $5,000,000 to $10,000,000

Proposal receipt date is not known at this time. The actual date will be established in the solicitation documents. A pre-proposal meeting may be posted and date/location will be noted in the solicitation.

GENERAL:
The National Park Service (NPS), Department of Interior (DOI), Denver Service Center (DSC), is soliciting proposals on a full and open basis from all interested businesses having the capability to perform the work described below. The solicitation will be issued electronically on the System for Award Management website at www.sam.gov. Proposal documents will be available for download in Microsoft Word, HTML, Microsoft Excel, and Adobe PDF; Specifications will be available in Adobe PDF format; and drawings will be available in PDF format. Please Note: Paper copies of the solicitation will not be made available.
Vendors can search for opportunities and award history on www.sam.gov without registering. The System for Award Management (www.sam.gov) website has an Interested Vendors List and a Watchlist where you can add your company's interest. Registering provides the opportunity to receive notifications; this is a tool of convenience only and does not serve as a guarantee of notification. Interested vendors and plan holders are required to visit the website periodically to check for amendments and other changes to the synopsis or solicitation documents.

Prospective offerors desiring to conduct business with the DOI are required to have an active registration in the Systems for Awards Management (SAM) at www.sam.gov.

This pre-solicitation announcement is not a solicitation document, but pre-notice of an upcoming solicitation. Specific instructions on submitting your proposal will be contained in the solicitation documents to be issued on or after the date listed below.

Description:
The project site is in Great Smoky Mountains National Park and is outside Gatlinburg, TN. The trailhead is seven miles southwest of Gatlinburg along Fighting Creek Gap Road. Access to the trailhead is via Fighting Creek Gap Road. From the trailhead to Laurel Falls, the transportation of construction equipment and building materials will take extra coordination and is limited to equipment that can navigate the existing approximately 5¿ wide asphalt trail. Site access issues will be identified in Division 1 specs.

The project will have limited staging located near the trailhead and along Laurel Falls Trail. The trail will be closed for the duration of construction activities. The Park and Fighting Creek Gap Road will remain open during construction, thus contract activities and logistics must be structured and scheduled to minimize visitor and operations impact. The new improvements will be constructed in an area considered a natural resource and protective measures are required to ensure the surrounding natural areas remain undisturbed and all construction activities remain within project site boundaries identified in the Construction Documents.

This project will rehabilitate the Laurel Falls trail. Work includes demolition and removing the existing surface, rehabilitating the trail foundation, and widening the trail where required. Retaining walls will be rehabilitated and culverts replaced. Work also includes rehabilitating the viewing platform, replacing all directional and informational signage, and rehabilitating the visitor viewing area around the falls. New retaining walls will be installed to prevent erosion, and areas degraded by high visitor traffic will be restored and native vegetation replanted. Existing visitor viewing areas will be rehabilitated and new viewing locations will be evaluated and added as required.

This project includes new and rehabilitated parking areas along the Fighting Creek Gap Road between the Elkmont Campground Entrance Road and Maloney Point. Work includes removing the existing surface, rehabilitating existing parking areas, and constructing new parking areas. New retaining walls will be installed to allow for the new parking areas.

Challenges: one-way in/out 1.3 miles; max trail width 8¿ (no large vehicles); steep mountain terrain; limited staging areas.

Estimated Period of Performance: The total anticipated period of performance is 540 days after Notice to Proceed.

NO RESPONSE TO THIS NOTICE IS REQUIRED AND NO QUESTIONS WILL BE TAKEN AT THIS TIME.

Vendors should continue to monitor the SAM.gov website for further information about this project under notice 140P2023R0044 and/or PMIS# GRSM 213075 Rehabilitate Laurel Falls Trail

Attachments

Files attached to this notice, newest first
File Type Posted
Sol_140P2024R0016_Amd_0007.pdf PDF
Laurel_Falls_CD_Sealed_03_19_2024_Rev_1_Opt_Final_0007.pdf PDF
Minor_Road_Crossings_0007.zip ZIP file
NPS_responses_54-127_2024_3_19_0007_0007.xlsx XLSX spreadsheet
GRSM_213075_LaurelFalls_Specs_FINAL_CD_Clean_-_Addendum_3_-_Final_0007.pdf PDF
NOC_NR2303_212-signed_0007.pdf PDF
NPS_responses_34-53_2024-03-12_0006.xlsx XLSX spreadsheet
Sol_140P2024R0016_Amd_0006.pdf PDF
NPS_Responses_13-33_GRSM_213075__2024-02-28_0005.xlsx XLSX spreadsheet
Sol_140P2024R0016_Amd_0005.pdf PDF
Sol_140P2024R0016_Amd_0004.pdf PDF
NPS_Responses_1-12_GRSM_213075_0004.xlsx XLSX spreadsheet
Sol_140P2024R0016_Amd_0003.pdf PDF
B11_Attachment_7_GRSM_213075_Prebid_Sign-in_0003.pdf PDF
Sol_140P2024R0016_Amd_0002.pdf PDF
Sol_140P2024R0016_Amd_0001.pdf PDF
Attachment_2_GRSM_213075_Laurel_Falls_DWGs_FINAL_CD_9-29-2023_1_0001.pdf PDF
Attachment_5B_Key_Trades_Form.docx DOCX document
Attachment_5C_Past_Experience_Form.docx DOCX document
Attachment_5D_Past_Performance_Form.docx DOCX document
Attachment_1_GRSM_213075_LaurelFalls_Specs_FINAL_CD_9_29_2023.pdf PDF
Sol_140P2024R0016.pdf PDF
Attachment_5A_Proposal_Submission_Package_Cover.docx DOCX document
Attachment_5E_General_References_Form.doc DOC document
Attachment_4_Subcontracting_Plan_Form.doc DOC document
Attachment_5F__Key_Personnel_Blank_Form.docx DOCX document
Attachment_3_DB_WD_TN20220182_10-13-23.pdf PDF
Construction_Contract_Administration.docx DOCX document
Show all 28

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
GRSM 213075 Rehabilitate the Laurel Falls Trail Award Award Notice
GRSM 213075 Laurel Falls construction This notice · Latest solicitation Solicitation
GRSM 213075 Rehabilitate Laurel Falls Trail Original Special Notice

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity