Garrison Dam Spillway – West Abutment Lignite Drain
Closed Solicitation Posted
- Solicitation number
- W9128F25BA010
- Agency
-
ENDIST Omaha
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- North Dakota 58565, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers Engineering District Omaha is seeking a contractor to construct a new drainage system at the Garrison Dam Spillway's west abutment in North Dakota, classified as a dam safety project. The project involves installing an 812-foot long, 12-inch slotted C900 PVC drain pipe surrounded by a two-stage gravel and sand filter system, along with two cleanouts and a manhole connecting to an existing 18-inch PVC collector pipe. This solicitation uses a two-step sealed bidding process with a firm fixed-price contract, requiring contractors to submit technical proposals in Step-One that will be evaluated on two factors: past performance and construction approach, both of which must receive an "acceptable" rating to advance to Step-Two for price evaluation. The original Step-One proposal deadline of June 24, 2025 was extended to July 8, 2025, and as of October 29, 2025, RME LTD., LLC was identified as the only technically acceptable firm to proceed to Step-Two bidding. Performance and payment bonds equal to 100% of the contract price are required, and Davis-Bacon prevailing wage rates apply to this project.
This solicitation is unrestricted with no set-asides and is open to both small and large businesses. The contract magnitude is estimated between $1,000,000 and $5,000,000, with the government's cost estimate at $3,099,671.15 and RME LTD., LLC's Step-Two offer at $2,979,190.00. The project encompasses seven contract line items covering mobilization/demobilization, cleanouts, manholes, 803 linear feet of 12-inch slotted C900 PVC pipe, and 1,203 cubic yards of fine filter aggregate. Contractors have a 10-calendar day period to begin performance after receiving the notice to proceed, with a total project performance period of 450 calendar days. The work will be performed at Garrison Dam in Riverdale, North Dakota, with the most recent bid abstract posted on December 3, 2025.
Notice text
5 versions
Update #5 · Latest ·
The Bid Abstract is posted.
______________________________________________________________________
** UPDATE 29 OCT 2025 - Results of Step 1 - Technical Evaluation of the Two Step IFP process
The following firm submission has been identified as being technically acceptable and shall proceed to Step 2 of the Two Step IFB process.
RME LTD., LLC – 115 IVERNESS DR EAST SUITE 100, ENGLEWOOD, CO 80112
Amendment 0002:
The due date for Step One offers has been extended to 8 July 2025.
Amendment 0001:
The updates made to the 00 22 00 are listed within the conformed copy of the solicitation in Amendment 0001.
__________________________________________________________________________________________________________
Solicitaiton and associated documents are posted below. Please see attachments.
Update #4 ·
** UPDATE 29 OCT 2025 - Results of Step 1 - Technical Evaluation of the Two Step IFP process
The following firm submission has been identified as being technically acceptable and shall proceed to Step 2 of the Two Step IFB process.
RME LTD., LLC – 115 IVERNESS DR EAST SUITE 100, ENGLEWOOD, CO 80112
Amendment 0002:
The due date for Step One offers has been extended to 8 July 2025.
Amendment 0001:
The updates made to the 00 22 00 are listed within the conformed copy of the solicitation in Amendment 0001.
__________________________________________________________________________________________________________
Solicitaiton and associated documents are posted below. Please see attachments.
Update #3 ·
Amendment 0002:
The due date for Step One offers has been extended to 8 July 2025.
Amendment 0001:
The updates made to the 00 22 00 are listed within the conformed copy of the solicitation in Amendment 0001.
__________________________________________________________________________________________________________
Solicitaiton and associated documents are posted below. Please see attachments.
Update #2 ·
Amendment 0001:
The updates made to the 00 22 00 are listed within the conformed copy of the solicitation in Amendment 0001.
__________________________________________________________________________________________________________
Solicitaiton and associated documents are posted below. Please see attachments.
Update #1 ·
Solicitaiton and associated documents are posted below. Please see attachments.
Files
Show all 12
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| Garrison Dam Spillway – West Abutment Lignite Drain | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Garrison trash rack modification crane rental | ENDIST Omaha | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity