Abstract for W9128F25BA010 - GDSM West Abutment Lignite Drain.pdf
PDF 337 KB Posted
- Solicitation number
- W9128F25BA010
About this file
This is an Abstract of Offers for Construction document issued by the US Army Corps of Engineers for the Garrison Dam Spillway - West Abutment Lignite Drain project. The solicitation (W9128F25BA010) was issued on 29-Oct-25 with an opening date of 2-Dec-25, and involves two bidders: IGE and RME LTD, LLC. The project includes seven Contract Line Items (CLINs) covering mobilization, demobilization, cleanouts, manholes, PVC piping, and filter aggregates. The government estimate shows a total base amount of $3,099,671.15, while the second offeror (RME LTD, LLC) proposed a lower total of $2,979,190.00. The solicitation indicates 8 amendments were issued, and bid security was required. The contracting officer is Nadine L. Catania from the Omaha, NE contracting division.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2. DATE ISSUED 3. DATE OPENED
29-Oct-25 2-Dec-25
I CERTIFY THAT I HAVE OPENED, READ AND
AND RECORDED ON THIS ABSTRACT
ALL OFFERS RECEIVED IN RESPONSE DATE SIGNED
C. REASONABLE CONTRACT
7A 7B 7C D. E. F.
ITEM # DESCRIPTION OF OFFER ITEM EST. QTY UNIT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT
CLIN 0001 MOBILIZATION AND DEMOBILIZATION
1 JOB N/A 526,800.00$ N/A 817,275.00$
CLIN 0002 ALL REMAINING WORK
1 JOB N/A 1,799,900.00$ N/A 1,300,000.00$
CLIN 0003 CLEANOUTS
1 JOB N/A 19,900.00$ N/A 46,375.00$
CLIN 0004 MANHOLE
1 JOB N/A 84,100.00$ N/A 108,650.00$
CLIN 0005 12-INCH SLOTTED C900 PVC PIPE
803 LF 319.84$ 256,831.52$ 381.00$ 305,943.00$
CLIN 0006 FINE FILTER AGGREGATE
1203 CY 279.33$ 336,033.99$ 259.00$ 311,577.00$
CLIN 0007 COARSE FILTER AGGREGATE
247 CY 308.12$ 76,105.64$ 360.00$ 88,920.00$
TOTAL BASE AMOUNT (Basic Bid Items No. 0001 thru 007) 3,099,671.15$ 2,979,190.00$
Bid Security:
C. AMENDMENTS ACKNOWLEDGED:
NO. 2
A. OFFEROR
B. REASONABLE CONTRACT
(Without Profit)
(Including Profit)
Bid Security: Yes
C. AMENDMENTS ACKNOWLEDGED: 3
6. NUMBER OF AMENDMENTS ISSUED : 8
GARRISON DAM SPILLWAY - WEST ABUTMENT LIGNITE DRAIN A. OFFEROR
IGE RME LTD, LLC
A. HIRED LABOR
UEI: ZF9TWHMF62K3
l PAGES
9. OFFERS
TO THIS SOLICITATION
SIGNATURE
NAME AND TITLE OF CERTIFYING OFFICIAL (Type) Nadine L. Catania - Contracting Officer
NO. 1
ABSTRACT OF OFFERS - CONSTRUCTION
1. SOLICITATION NUMBER
W9128F25BA010
4. ISSUING OFFICE
8. GOVERNMENT ESTIMATE
(Check A, B or C AND COMPLETE D, E AND F)
5. PROJECT TITLE
OMAHA, NE 68102-1618
1616 CAPITOL AVENUE
CONTRACTING DIVISION (CENWO-CT)
US ARMY CORPS OF ENGINEERS
3 December 2025
File details come from the government source that posted it. Updated .