Att 0002 Bid Schedule.docx

DOCX document 34 KB Posted

Attached to
Garrison Dam Spillway – West Abutment Lignite Drain
Solicitation number
W9128F25BA010
Issued by

About this file

The document is a Bid Schedule for the Garrison Dam Spillway – West Abutment Lignite Drain project, solicited by the Department of the Army Corps of Engineers Engineering District Omaha under Solicitation Number W9128F25BA010. The bid schedule outlines seven line items for construction work, including mobilization/demobilization, cleanouts, manholes, pipe installation, and aggregate filtering, with quantities specified for each item such as 803 linear feet of 12-inch slotted C900 PVC pipe and 1,203 cubic yards of fine filter aggregate.

The bid schedule includes critical pricing instructions, noting that prices must be entered for all items and that in case of discrepancies between unit prices and total amounts, the unit prices will be considered the submitted price. Bidders are required to provide unit prices for each line item, with the total base amount calculated from items 0001 through 0007. The document emphasizes that total amounts submitted without individual item prices will be rejected, and any proposal modifications must clearly state adjustments to respective lump sum and unit prices.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BIDDING PROPOSAL SCHEDULE

ITEM

DESCRIPTION

QUANTITY

UNIT

UNIT PRICE

COST

BASE ITEMS

MOBILIZATION AND DEMOBILIZATION

JOB

ALL REMAINING WORK

CLEANOUTS

JOB

MANHOLE

12-INCH SLOTTED C900 PVC PIPE

LF

FINE FILTER AGGREGATE

1,203

CY

COARSE FILTER AGGREGATE

CY

TOTAL BASE AMOUNT (ITEMS 0001 THRU 0007) $_____________________________

NOTES:

1. Prices must be entered for all items of the schedule. Total amounts submitted without prices being entered on individual items will be rejected. In case of variation between the Job (lumpsum) prices and the total amount, the lumpsum prices will be considered the price submitted. In case of variation between the unit prices and the CLIN amount, the unit prices will be considered the price submitted.

2. A modification to a proposal which provides for a single adjustment to the total amounts, should state the application of the adjustment to each respective lumpsum price and unit price affected.

3. Quantities for unit priced items are estimated only and the respective unit price will prevail in the event of an overrun or underrun subject to General Conditions (Contract Clauses) Clause “Variation in Estimated Quantities”.