GAOA Sutton Campground Holman Vista Water System & Facility Repair
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 1240BH21R0020
- Agency
-
Forest Service
Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237110 Water and Sewer Line and Related Structures Construction
- Place of performance
- Florence OR 97439 USA
Notice details come from SAM.gov. Updated .
About this opportunity
This proposed solicitation is seeking a contractor to replace approximately 7,600 feet of water piping at the Sutton Campground and replace the restroom at Holman Vista day use site located on the Siuslaw National Forest in Lane County, Oregon. The work will be completed in three phases by the Department of Agriculture Forest Service, with the base phase including 3,000 feet of piping replacement and the restroom replacement. Two optional phases will complete additional piping work if funding becomes available. Proposals are due by June 14, 2021 and contract performance must be completed by January 21, 2022.
The set-aside is designated for total small business. The estimated value is between $500,000 and $1,000,000. Phase 1 will replace approximately 3,000 feet of water piping and the restroom. Phases 2 and 3 include additional piping work of approximately 3,400 and 1,200 feet respectively to connect the water systems. Offerors must be registered in the System for Award Management database and maintain registration through award and performance.
Notice text
This proposed solicitation includes all labor, equipment and materials required to replace the existing water pipe network at Sutton Campground and replacing the restroom at Holman Vista day use site with a precast concrete toilet. Both project sites are located on the Siuslaw National Forest.
Most of the water piping will be constructed by directional boring. Drawings show a conceptual water system layout allowing for shifts of locations needed for approval. Best methods of construction (directional boring or open trenching) will be determined prior to construction with contractor input and paid for by actual quantities installed.
This project has three phases of construction depending on pricing and/or as funding becomes available. The base items will be the minimum work completed. Phase 2 and/or Phase 3 will be awarded if funding becomes available.
1. Base Items - Phase 1 will complete approximately 3,000 feet (3-inch diameter or smaller) of water piping for Sutton Loop C, Loop D, and the work center along with replacing the restroom at Holman Vista day use site.
2. Optional Items 1- Phase 2 will complete approximately 3,400 feet (3-inch diameter or smaller) of water piping for Sutton Loop A, Loop B.
3. Optional Items 2 - Phase 3 will complete approximately 1,200 feet (3-inch diameter or smaller) of water piping to connect Sutton Loops C and Loop D to Sutton Loops A and B. Making one system with one water meter.
Existing water system will be abandoned with limited disturbance or clearing to campground.
The project is located on the Siuslaw National Forest, Central Coast Ranger District, Lane County, Oregon. The Government’s estimated magnitude of this project is between $500,000 and $1,000,000 (including optional items). Contract performance shall be complete by 21 January 2022 and estimated start work date is 7 September 2021.
Solicitation will be available for download from beta.sam.gov on or about 5/12/21.
NOTE: prospective awardee shall be registered and active in the System for Award Management (SAM) data base when submitting an offer, and shall continue to be registered until time of award, during performance, and through final payment of a contract resulting from this solicitation. Information on registration may be obtained via the internet at: http://www.sam.gov. All contractors and vendors must complete the electronic version of the Representations and Certifications in the SAM system. If at the time of receipt of offers, an Offeror is not actively and successfully registered in the SAM database, the Offeror will not be considered for award.
Notice history
| Notice | Type | Posted |
|---|---|---|
| GAOA Sutton Campground Holman Vista Water System & Facility Repair | Award Notice | |
| GAOA Sutton Campground Holman Vista Water System & Facility Repair | Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| BPA Setup - Waste Removal and disposal from Vault toilets & Septic tanks at various sites for the Region 6 National Forest | Forest Service | Total Small Business | |
| Oconaluftee Waterline Replacement | Forest Service | Total Small Business | |
| West zone MT hood national forest parent BPA | Forest Service | Total Small Business | |
| GAOA Grizzly Bear Campground | Region 2 - Rocky Mountain Region | Total Small Business | |
| Toilet Pumping for Powers & Gold Beach Ranger District | Region 6 - Pacific Northwest Region | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity