The USDA Forest Service, Beaver Ranger District, cancelled solicitation 1240LT26Q0106 for GAOA Kents Lake Campground Reconstruction at Fishlake National Forest, Utah, through Amendment 0005 posted October 27, 2026, which superseded the October 28, 2026 submission deadline set by Amendment 0004. The government intends to resolicit once additional specification and design revisions are incorporated. The solicitation carried a Total Small Business set-aside under NAICS 237990, Other Heavy and Civil Engineering Construction, and PSC Z2LB.

Place of performance is Beaver, UT 84713, at Kents Lake Campground, reached via State Route 153 from Junction, Utah. Scope covered demolition, concrete features, 23 single-unit aggregate-pad family sites, 6 single-unit concrete-pad sites, 2 double-unit sites, 33 tent pads, water hydrants, a septic holding tank, 3,400 square feet of rockery walls, and culvert installation. The base period was 150 calendar days, with a 45-day optional period. The campground remains closed during construction, and winter weather shutdowns do not count against contract time.

The procurement required a 20% bid guarantee and 100% performance and payment bonds. Small business prime contractors must perform 15% of the work, and construction materials must comply with Buy American requirements. Davis-Bacon wages apply under the wage determination posted through Amendment 0004, which replaced the prior version. Offerors needed an active SAM.gov registration and were required to hold prices firm for 90 calendar days.

Evaluation used lowest price technically acceptable criteria. Only the lowest-priced offer was evaluated for technical acceptability and past performance, and evaluation proceeded to the next lowest offer if that offer was unacceptable. Required submittals included an SF1442, a price schedule, and a technical proposal addressing capability and work sequencing, along with three similar projects completed within the last three years.

The project's estimated magnitude was between $1,000,000 and $5,000,000. The contracting officer of record is Crystal Amos (crystal.amos@usda.gov), who replaced James Edington as point of contact. No incumbent is named.

Notice text

7 versions

Update #7 · Latest ·

SOLICITATION CANCELLED AS OF OCTOBER 27, 2026.  SEE AMENDMENT 0005, ATTACHED

__________________________________________________________________________

On October 09, 2026, amendment 0004 to solicitation 1240LT26Q0106 - GAOA Kents Lk. CG Reconstruction, Fishlake National Forest has been posted to SAM.gov and accomplished the following:

1. Replace Davis Bacon Wages labeled "C04e Attachment 5 General Decision UT20260102 05182026" with Davis Bacon Wages labeled "C05a General Decision UT20260102 05182026."

2. Change submission due date from 10/15/2026 to 10/28/2026.

*****************************************************************************************************************************************************

On September 24, 2026, amendment 0003 to solicitation 1240LT26Q0106 - GAOA Kents Lk. CG Reconstruction, Fishlake National Forest has been posted to SAM.gov and accomplished the following:

1. Post RFI questions and answers labeled C05a Final RFI QA 1240LT26Q0106.

2. Post site visit sign in sheet labeled C05b Site Visit Sign In 1240LT26Q0106.

3. UTILITY TABLES SHALL BE GOVERNMENT FURNSIHED under Line 6 of the notes on page D12 of the drawings is removed in its entirety.

4. Part 2 - Products from specifications SECTION 323125 - COMPOSITE WOOD FENCE is removed in its entirety. See file labeled C05c Attachment 2 Spec 1240LT26Q0106 092426.

5. Extends the due date for quotes from 09/23/2026 to 10/15/2026.

This amendment must be acknowledged and submitted with your proposal.

**********************************************************************************************************************************************

On September 22, 2026 the due date for quotes was extended to October 8, 2026. An amendment will follow that will post the questions and answers thta were received.

***********************************************************************************************************************

On September 3, 2026, amendment 0002 to solicitation 1240LT26Q0106 - GAOA Kents Lk. CG

Reconstruction at Fishlake National Forest has been posted to SAM.gov and accomplished the following:

1. Post the RFI Q&A labeled C05a RFI Q&A 1240LT26Q0106.

2. Post the update Specifications labeled C05b SPECS KentsLakeCG_FINAL_5.2.2026

3. Post the updated SOI labeled C05c SOI Kents Lake 05.18.2026

This amendment must be acknowledged and submitted with your proposal.

***********************************************************************************************************************************************

On August 19, 2026, amendment 0001 to solicitation 1240LT26Q0106 - GAOA Kents Lk. CG Reconstruction, Fishlake National Forest has been posted to SAM.gov and accomplished the following:

  1. Post updated SOI labeled C04a Attachment 1 SOI 1240LT26Q0106.

This SF30 must be acknowledged and submitted with your proposal.

*************************************************************************************************************************************************

The Kent’s Lake Campground Reconstruction Project, part of the Great American Outdoors Act (GAOA) program, will restore the campground’s natural environment while updating facilities to support increasing recreational use and modern vehicle requirements. The work includes demolition of existing structures, installation of new concrete features, upgraded family and tent campsites, improved water and sewer infrastructure, roadway and drainage enhancements, rock and retaining wall construction, fencing and gates, new signage, and site restoration including grading, surfacing, and seeding. The project aims to enhance visitor safety, accessibility, and resource protection while preserving the forest’s natural character.

Update #6 ·

On October 09, 2026, amendment 0004 to solicitation 1240LT26Q0106 - GAOA Kents Lk. CG Reconstruction, Fishlake National Forest has been posted to SAM.gov and accomplished the following:

1. Replace Davis Bacon Wages labeled "C04e Attachment 5 General Decision UT20260102 05182026" with Davis Bacon Wages labeled "C05a General Decision UT20260102 05182026."

2. Change submission due date from 10/15/2026 to 10/28/2026.

*****************************************************************************************************************************************************

On September 24, 2026, amendment 0003 to solicitation 1240LT26Q0106 - GAOA Kents Lk. CG Reconstruction, Fishlake National Forest has been posted to SAM.gov and accomplished the following:

1. Post RFI questions and answers labeled C05a Final RFI QA 1240LT26Q0106.

2. Post site visit sign in sheet labeled C05b Site Visit Sign In 1240LT26Q0106.

3. UTILITY TABLES SHALL BE GOVERNMENT FURNSIHED under Line 6 of the notes on page D12 of the drawings is removed in its entirety.

4. Part 2 - Products from specifications SECTION 323125 - COMPOSITE WOOD FENCE is removed in its entirety. See file labeled C05c Attachment 2 Spec 1240LT26Q0106 092426.

5. Extends the due date for quotes from 09/23/2026 to 10/15/2026.

This amendment must be acknowledged and submitted with your proposal.

**********************************************************************************************************************************************

On September 22, 2026 the due date for quotes was extended to October 8, 2026. An amendment will follow that will post the questions and answers thta were received.

***********************************************************************************************************************

On September 3, 2026, amendment 0002 to solicitation 1240LT26Q0106 - GAOA Kents Lk. CG

Reconstruction at Fishlake National Forest has been posted to SAM.gov and accomplished the following:

1. Post the RFI Q&A labeled C05a RFI Q&A 1240LT26Q0106.

2. Post the update Specifications labeled C05b SPECS KentsLakeCG_FINAL_5.2.2026

3. Post the updated SOI labeled C05c SOI Kents Lake 05.18.2026

This amendment must be acknowledged and submitted with your proposal.

***********************************************************************************************************************************************

On August 19, 2026, amendment 0001 to solicitation 1240LT26Q0106 - GAOA Kents Lk. CG Reconstruction, Fishlake National Forest has been posted to SAM.gov and accomplished the following:

  1. Post updated SOI labeled C04a Attachment 1 SOI 1240LT26Q0106.

This SF30 must be acknowledged and submitted with your proposal.

*************************************************************************************************************************************************

The Kent’s Lake Campground Reconstruction Project, part of the Great American Outdoors Act (GAOA) program, will restore the campground’s natural environment while updating facilities to support increasing recreational use and modern vehicle requirements. The work includes demolition of existing structures, installation of new concrete features, upgraded family and tent campsites, improved water and sewer infrastructure, roadway and drainage enhancements, rock and retaining wall construction, fencing and gates, new signage, and site restoration including grading, surfacing, and seeding. The project aims to enhance visitor safety, accessibility, and resource protection while preserving the forest’s natural character.

Update #5 ·

On September 24, 2026, amendment 0003 to solicitation 1240LT26Q0106 - GAOA Kents Lk. CG Reconstruction, Fishlake National Forest has been posted to SAM.gov and accomplished the following:

1. Post RFI questions and answers labeled C05a Final RFI QA 1240LT26Q0106.

2. Post site visit sign in sheet labeled C05b Site Visit Sign In 1240LT26Q0106.

3. UTILITY TABLES SHALL BE GOVERNMENT FURNSIHED under Line 6 of the notes on page D12 of the drawings is removed in its entirety.

4. Part 2 - Products from specifications SECTION 323125 - COMPOSITE WOOD FENCE is removed in its entirety. See file labeled C05c Attachment 2 Spec 1240LT26Q0106 092426.

5. Extends the due date for quotes from 09/23/2026 to 10/15/2026.

This amendment must be acknowledged and submitted with your proposal.

**********************************************************************************************************************************************

On September 22, 2026 the due date for quotes was extended to October 8, 2026. An amendment will follow that will post the questions and answers thta were received.

***********************************************************************************************************************

On September 3, 2026, amendment 0002 to solicitation 1240LT26Q0106 - GAOA Kents Lk. CG

Reconstruction at Fishlake National Forest has been posted to SAM.gov and accomplished the following:

1. Post the RFI Q&A labeled C05a RFI Q&A 1240LT26Q0106.

2. Post the update Specifications labeled C05b SPECS KentsLakeCG_FINAL_5.2.2026

3. Post the updated SOI labeled C05c SOI Kents Lake 05.18.2026

This amendment must be acknowledged and submitted with your proposal.

***********************************************************************************************************************************************

On August 19, 2026, amendment 0001 to solicitation 1240LT26Q0106 - GAOA Kents Lk. CG Reconstruction, Fishlake National Forest has been posted to SAM.gov and accomplished the following:

  1. Post updated SOI labeled C04a Attachment 1 SOI 1240LT26Q0106.

This SF30 must be acknowledged and submitted with your proposal.

*************************************************************************************************************************************************

The Kent’s Lake Campground Reconstruction Project, part of the Great American Outdoors Act (GAOA) program, will restore the campground’s natural environment while updating facilities to support increasing recreational use and modern vehicle requirements. The work includes demolition of existing structures, installation of new concrete features, upgraded family and tent campsites, improved water and sewer infrastructure, roadway and drainage enhancements, rock and retaining wall construction, fencing and gates, new signage, and site restoration including grading, surfacing, and seeding. The project aims to enhance visitor safety, accessibility, and resource protection while preserving the forest’s natural character.

Update #4 ·

On September 22, 2026 the due date for quotes was extended to October 8, 2026. An amendment will follow that will post the questions and answers thta were received.

***********************************************************************************************************************

On September 3, 2026, amendment 0002 to solicitation 1240LT26Q0106 - GAOA Kents Lk. CG

Reconstruction at Fishlake National Forest has been posted to SAM.gov and accomplished the following:

1. Post the RFI Q&A labeled C05a RFI Q&A 1240LT26Q0106.

2. Post the update Specifications labeled C05b SPECS KentsLakeCG_FINAL_5.2.2026

3. Post the updated SOI labeled C05c SOI Kents Lake 05.18.2026

This amendment must be acknowledged and submitted with your proposal.

***********************************************************************************************************************************************

On August 19, 2026, amendment 0001 to solicitation 1240LT26Q0106 - GAOA Kents Lk. CG Reconstruction, Fishlake National Forest has been posted to SAM.gov and accomplished the following:

  1. Post updated SOI labeled C04a Attachment 1 SOI 1240LT26Q0106.

This SF30 must be acknowledged and submitted with your proposal.

*************************************************************************************************************************************************

The Kent’s Lake Campground Reconstruction Project, part of the Great American Outdoors Act (GAOA) program, will restore the campground’s natural environment while updating facilities to support increasing recreational use and modern vehicle requirements. The work includes demolition of existing structures, installation of new concrete features, upgraded family and tent campsites, improved water and sewer infrastructure, roadway and drainage enhancements, rock and retaining wall construction, fencing and gates, new signage, and site restoration including grading, surfacing, and seeding. The project aims to enhance visitor safety, accessibility, and resource protection while preserving the forest’s natural character.

Update #3 ·

On September 3, 2026, amendment 0002 to solicitation 1240LT26Q0106 - GAOA Kents Lk. CG

Reconstruction at Fishlake National Forest has been posted to SAM.gov and accomplished the following:

1. Post the RFI Q&A labeled C05a RFI Q&A 1240LT26Q0106.

2. Post the update Specifications labeled C05b SPECS KentsLakeCG_FINAL_5.2.2026

3. Post the updated SOI labeled C05c SOI Kents Lake 05.18.2026

This amendment must be acknowledged and submitted with your proposal.

***********************************************************************************************************************************************

On August 19, 2026, amendment 0001 to solicitation 1240LT26Q0106 - GAOA Kents Lk. CG Reconstruction, Fishlake National Forest has been posted to SAM.gov and accomplished the following:

  1. Post updated SOI labeled C04a Attachment 1 SOI 1240LT26Q0106.

This SF30 must be acknowledged and submitted with your proposal.

*************************************************************************************************************************************************

The Kent’s Lake Campground Reconstruction Project, part of the Great American Outdoors Act (GAOA) program, will restore the campground’s natural environment while updating facilities to support increasing recreational use and modern vehicle requirements. The work includes demolition of existing structures, installation of new concrete features, upgraded family and tent campsites, improved water and sewer infrastructure, roadway and drainage enhancements, rock and retaining wall construction, fencing and gates, new signage, and site restoration including grading, surfacing, and seeding. The project aims to enhance visitor safety, accessibility, and resource protection while preserving the forest’s natural character.

Update #2 ·

On August 19, 2026, amendment 0001 to solicitation 1240LT26Q0106 - GAOA Kents Lk. CG Reconstruction, Fishlake National Forest has been posted to SAM.gov and accomplished the following:

  1. Post updated SOI labeled C04a Attachment 1 SOI 1240LT26Q0106.

This SF30 must be acknowledged and submitted with your proposal.

*************************************************************************************************************************************************

The Kent’s Lake Campground Reconstruction Project, part of the Great American Outdoors Act (GAOA) program, will restore the campground’s natural environment while updating facilities to support increasing recreational use and modern vehicle requirements. The work includes demolition of existing structures, installation of new concrete features, upgraded family and tent campsites, improved water and sewer infrastructure, roadway and drainage enhancements, rock and retaining wall construction, fencing and gates, new signage, and site restoration including grading, surfacing, and seeding. The project aims to enhance visitor safety, accessibility, and resource protection while preserving the forest’s natural character.

Update #1 ·

The Kent’s Lake Campground Reconstruction Project, part of the Great American Outdoors Act (GAOA) program, will restore the campground’s natural environment while updating facilities to support increasing recreational use and modern vehicle requirements. The work includes demolition of existing structures, installation of new concrete features, upgraded family and tent campsites, improved water and sewer infrastructure, roadway and drainage enhancements, rock and retaining wall construction, fencing and gates, new signage, and site restoration including grading, surfacing, and seeding. The project aims to enhance visitor safety, accessibility, and resource protection while preserving the forest’s natural character.

Files

Show all 21

Similar open opportunities

Opportunity Agency Set-aside Responses due
GAOA Brainard Lake Recreation Area Deferred Maintenance Ward, Colorado 80481, United States · NAICS 237310 Forest Service Total Small Business
GAOA Tony Grove Dam Spillway Capacity & Seismic Mitigation, Uinta/Wasatch/Cache National Forest Garden City, Utah, United States · NAICS 237990 Forest Service Total Small Business
Yellow Lake Disaster Relief Project – Watershed / Uinta-Wasatch-Cache NF Kamas, Utah 84036, United States · NAICS 115310 Forest Service Total Small Business
Forest Wide Decommissioning Project Roosevelt, Arizona 85545, United States · NAICS 238910 Forest Service Total Small Business
GAOA Pine Creek Vault Toilet HTNF Sparks, Nevada 89431, United States · NAICS 237990 Forest Service Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors