C05b SPECS KentsLakeCG_FINAL_5.2.2026.docx
DOCX document 273 KB Posted
- Solicitation number
- 1240LT26Q0106
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Specifications document (Section C) for the Kent's Lake Campground Road Reconstruction Project, a Great American Outdoors Act (GAOA) program initiative located on the Beaver Ranger District of Fishlake National Forest near Beaver, Utah. The project involves comprehensive reconstruction and rehabilitation of an existing campground, with a contract period of 150 calendar days for base bid items and 45 additional calendar days for optional items, commencing in late summer/early fall 2026.
Base bid work includes reconstruction of the main campground loop road with adjacent pullouts, day-use area roadway with dedicated parking, rehabilitation of 30 individual family sites with improved access, one family group site, campground host site improvements, dedicated restroom parking, replacement of roadway information signs and nine water hydrants, and improved drainage throughout. Optional bid items include a day-use picnic area with a 25' x 25' concrete pad, four picnic tables, a 24' x 24' steel shade structure, two concrete sidewalks, and one additional water hydrant. The specifications detail extensive requirements for construction staking (Section 010250), mobilization (Section 011900), submittal procedures (Section 013300), and quality control (Section 014100), along with technical specifications for sediment and erosion control, waste disposal, concrete work, sidewalks, stairs, and railings. Material sources are specified as commercial for crushed aggregate, borrow fill, and rockery retaining wall materials. The contractor must obtain NPDES permits, implement stream protection and traffic control plans, pressure wash all equipment before entering National Forest lands, and manage temporary toilet facilities seasonally. All construction materials, testing, and labor are contractor-provided, with payment structured as lump sum or unit price items as specified in the Schedule of Items, and no separate compensation for incidental work such as traffic control, staking, or erosion control measures.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section C - Description/Specifications/Statement of Work
GENERAL SPECIFICATIONS
Kent’s Lake Campground Road Reconstruction Project
FINAL – 05/02/2026
SCOPE OF CONTRACT
The Kent’s Lake Campground Reconstruction Project is part of the ongoing Great American Outdoors Act (GAOA) program. As part of the program, this project will focus on restoring the natural characteristics of the campground while accommodating capacity requirements with ongoing increases to recreational use within the forest and sizing requirements for vehicle use while staying in approved Forest Service Campgrounds.
The work includes the following Base Bid Items (Quantities will be included in the attached Schedule of Items, but not limited to) The Kent's Lake Campground Reconstruction project is part of the ongoing Great American Outdoors Act (GAOA) program. As part of the program, this project will focus on restoring the natural characteristics of the campground while accommodating capacity requirements with ongoing increases to recreational use within the forest and sizing requirements for vehicle use while staying in approved Forest Service campgrounds.
This project will consist of reconstruction/rehabilitation of the existing Kent's Lake Campground located 15 miles southeast of Beaver, Utah.The project will consist of (but not limited to these base bid items); reconstruction of the main campground loop road with adjacent pullouts, reconstruction of the day use area roadway with adding dedicated parking, rehabilitation of 30 rehabilitated individual family sites with improved access, rehabilitation of 1 family group site, improvements to the existing campground host site, addition of dedicated restroom parking for recently added vault restrooms, replacement of existing roadway information signs, replacement of 9 water hydrants, and improved drainage throughout the campground. several of the existing individual family sites will require the addition of rockery retaining walls, please verify retaining wall placement per the project drawings.
Reinstallation of an existing pole to pole wood fence and standard stock gate will be required as part of the roadway realignment.
The following items will be considered optional bid items and will consist of (but not limited to); addition of a day use picnic area (25' x 25' 6" thick concrete pad with reinforcement), 4 new picnic tables, and one (24' x 24') steel shade structure. Two separate concrete sidewalks (6" depth), one new water hydrant, and all necessary preparatory work for this designated area.
Please see the schedule of items for all work associated with this project.
PROJECT LOCATION
The project is on the Beaver Ranger District of the Fishlake National Forest, Beaver County, Utah. GPS Coordinates: 38.237153° N, -112.460103° W. It is located approximately 15 miles by road Southeast of Beaver, Utah. From Interstate 15, the project may be accessed via State Highways 160, 153 then on Forest Service Roads (FSR) 137 and 572. The campground is located on the south side of FSR 572.
Government Sources and Pits:
1. Commercial Grade Crushed Aggregate - commercial source.
2. Borrow/Fill Materials – commercial source.
3. Specified Rockery Retaining Wall Materials – commercial source.
SITE INFORMATION AND LIMITATIONS
The following site conditions are considered incidental to the contract and the contractor will not be paid directly for any of the following items:
4. Construction sites will be closed to the public during construction. The Forest Service will issue a closure order to the public. The Contractor will be responsible for signing and limiting public access.
5. Contractor will provide all materials and labor necessary to protect streams, wet or dry, during construction activities. The Contractor will be required to submit a stream protection plan and receive approval from the COR, in writing, prior to the beginning of construction.
6. All construction equipment shall be pressure washed before entering National Forest System lands. The removal of mud and debris from treads, tracks and undercarriage, with emphasis on axles, frame, cross-members, motor mounts, and underneath steps, running boards, and front bumper/brush guard assemblies will be required. The purpose is to reduce or eliminate the transportation of noxious weeds, which is required by Federal and State regulations. Please coordinate with the project COR to ensure inspections are performed prior to the delivery of equipment to the project site.
7. Water will not be available at the site for construction purposes. When the seasonal portion of the water system is shut-down, water is available nearby. Coordinate water access with the Contracting Officer.
8. Toilet facilities are available at the site seasonally. When the seasonal portion of the water system is shut-down, the contractor shall provide temporary toilet facilities (porta-potty) at the site during all construction work.
TRAFFIC CONTROL AND CONSTRUCTION SIGNING
No work that endangers, interferes, or conflicts with traffic or access to work sites shall be performed until a plan for satisfactory warning and handling of traffic has been submitted by the contractor and approved by the COR and Utah Department of Transportation. Construction signing for traffic control shall conform to the Manual of Uniform Traffic Control Devices (MUTCD). All traffic control signs will be placed in areas adequate for a truck pulling a fifth wheel trailer to be turned around. Contractor shall not be paid directly for this item, rather it will be considered incidental to other items of work listed in the Schedule of Items.
WORK CAMPS, STAGING AND STORAGE AREAS
Areas for staging operations and storage of materials shall be approved by the CO. The Contractor must request in writing for approval from the CO to stage trailers (work or housing) on site.
INSPECTION OF WORKSITE
The contractor acknowledges they have taken the necessary steps to ascertain the nature and location of work, and have investigated and satisfied themselves as to the general and local conditions that can affect the work or its cost. Any failure of the contractor to take the actions described and acknowledged in this paragraph will not relieve the Contractor from the responsibility of estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expenses to the government.
START DATE
Late Summer/Early Fall 2026.
CONTRACT TIME
Base Bid: 150 Calendar Days Optional Bid Items: 45 Calendar Days
SPECIFICATIONS
The following specifications are attached. Some sections in the schedule of items refer to other sections not listed and are subsidiary to or are included in payment for other pay items in this contract. These items are considered incidental and no additional compensation will be made.
SECTION 010250 - CONSTRUCTION STAKING
SECTION 011900 - MOBILIZATION
SECTION 013300 - SUBMITTAL PROCEDURES
SECTION 014100 - QUALITY CONTROL
SECTION 023701 - SEDIMENT AND EROSION CONTROL MEASURES
SECTION 024100 - WASTE MATERIAL DISPOSAL
SECTION 024102 - REMOVAL AND DISPOSAL OF STRUCTURES AND OBSTRUCTIONS
SECTION 033000 - CAST-IN-PLACE CONCRETE
SECTION 033540 - CONCRETE SIDEWALK AND STAIRS
SECTION 055210 - PIPE AND GUARD RAIL RAILINGS
SECTION 099100 - PAINTING
SECTION 101400 - SIGNS
SECTION 101415 - SITE IDENTIFICATION SIGN (HDPE)
SECTION 129400 - FAMILY UNIT AND SITE FURNISHINGS
SECTION 221100 - WATER DISTRIBUTION SYSTEMS
SECTION 136000 - PRE-MANUFACTURED SHELTER
SECTION 221102 - CURB VALVES AND BOXES
SECTION 221105 - WATER HYDRANTS
SECTION 221310 - SEWAGE HOLDING TANK
SECTION 311000 - CLEARING AND GRUBBING
SECTION 312000 - EARTHWORK
SECTION 312010 - SELECT BORROW
SECTION 312100 - PROJECT SITE PREPARATION AND GRADING
SECTION 312225 - EXCAVATION & EMBANKMENT
SECTION 321204 - CRUSHED AGGREGATE BASE OR SURFACE COURSE
SECTION 321206 - LOOSE ROCK RIPRAP
SECTION 321210 - ROCKERY RETAINING WALL
SECTION 321513 - FOOT TRAIL
SECTION 322100 - TENT PADS
SECTION 322205 - BARRIER ROCKS
SECTION 322622 - PRECAST CONCRETE CURB STOPS
SECTION 323110 - CATTLEGUARD
SECTION 323116 - GATES FOR ROADS
SECTION 323125 - COMPOSITE WOOD FENCE
SECTION 323120 - STOCK GATE
SECTION 329206 - SEEDING
SECTION 332228 - CULVERT PIPE AND PIPE ARCHES
END OF SECTION C
May 2026
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK 000001-2
USDA FOREST SERVICE, R4
Kent's Lake Campground Road Reconstruction Project
SECTION 010250 - CONSTRUCTION STAKING
1. GENERAL
SUMMARY
This work shall consist of the construction staking of roads, parking lots, parking spurs, family units, tent pads, paths, stairways, culverts, retaining walls, buildings, and utilities in accordance with the Drawings and Specifications. The work includes the furnishing of all labor, equipment, instruments, materials, transportation and other incidentals necessary to complete the construction staking in accordance with these specifications and acceptable engineering practice.
QUALITY CONTROL
Construction staking shall be accomplished under the direction of a Civil Engineer, Engineering Technician, or Land Surveyor closely associated and familiar with construction staking; periodic visits to the project site are required.
MEASUREMENT AND PAYMENT
Measurement shall be lump sum for surveying and staking the project through all phases of construction.
1. Base Bid Items
2. Optional Bid Items
PRODUCTS
GOVERNMENT-FURNISHED SURVEY CONTROL SHEETS
The Government will provide the contractor with a set of survey control sheets showing horizontal and vertical control for site to be staked. The Government will provide the Contractor with layout information that will include:
3. Control Points - Northing, Easting, Existing Elevations.
4. Roads, Spurs, Parking Areas - Northing, Easting, and Finish Elevations for centerline and edge of roads, spurs, parking areas.
5. Pathways and Trailways - Northing, Easting, and Finish Elevations for centerline.
6. Buildings and Other Structures - Northing, Easting, and Finish Elevations for corners of buildings, other structures (septic tanks, fencing, etc).
7. Camp Sites, Picnic Sites, and Tent Pads - Northing, Easting, and Finish Elevations for corners of Camp Picnic Sites.
8. Segmented Retaining Walls - Northing, Easting, and Finish Elevations and Existing Elevations (for reference) for subgrade (at top and bottom of wall) at start and end of wall, corners, stairs, and at maximum 25 foot along wall. (points at top of wall and bottom of wall). Note - Top of wall shall be a minimum of 4 inches above finish grade and bottom of wall shall be a minimum of 12 inches below finish grade.
STAKES
Identification stakes and hubs shall be of sufficient length and width to provide and solid set in the ground and to provide space for marking above ground when applicable. Other dimensions and materials may be used, such as steel reinforcing bars, wire flagging and markers, and metal pins, if approved in writing by the Contracting Officer (CO). The top 2 inches of all slope, guard, reference, clearing, and structure stakes shall be painted or marked with plastic flagging. Colors used on stakes or for flagging shall be as follows:
| 9. Roads, parking lots, and parking spurs | -Orange | ||
| 10. Waterlines, utilities, and culverts | -Blue | ||
| 11. Family Units, group units, stairs, and paths | -Red | ||
| 12. Buildings, excavation and grading | -Yellow | ||
| 13. Tent pads | -Blue/White Striped |
SURVEY NOTE PAPER AND BOOKS
Paper for survey notes shall be moisture-resistant paper. Notes shall be contained in books with covers that will protect the contents and retain the pages in numerical sequence during field use. Field notebooks or note paper shall be furnished by the contractor.
EXECUTION
GENERAL
The Contractor shall be required to provide all necessary staking and control for all phases of construction. The contractor shall use the data and information shown on the project drawings to establish the location of all facilities to be constructed under this contract. The Contractor may choose any method of establishing horizontal and vertical controls provided the following minimum precision and accuracy requirements are met.
Accuracy requirements:
14. Minimum position close; 1/1000
15. Vertical closure: 0.05 ft (vertical)/station (100 feet horizontal)
16. Cross section and slope stake precision:
Allowable deviation of cross section line projection from a true perpendicular to tangents, a true bisector of angle points, or a true radius of curves: +/-3 degrees.
Cross section topography measurements shall be taken so that variations in ground form a straight line connecting the cross section points will not exceed: 1.0 ft.
Horizontal and vertical accuracy for slope stake, slope stake references, and clearing limits. In feet or percentage of horizontal distance measured form centerline or reference stake, whichever is greater. Slope reference stakes and slope stakes: 0.15 ft or 0.6%. Clearing limits: 1.0 ft.
ESTABLISHING AND REFERENCING IMPROVEMENT LOCATIONS
Access Roads, Parking Spurs, and Parking lots:
17. Slope stakes (cut and fill catch points), clearing limits, and slope stake references shall be established on both sides of the centerline at each station established. Slope stakes and slope stake references shall be located on a line at right angles to tangents and on radial lines or curves. Slope stake catch points shall be located by using the grading plans and/or profiles, typical road section templates, as shown on the drawings and the information provided with staking points.
18. Slope stakes shall be set at 50-foot intervals, at significant breaks in the ground profile, culvert locations, and widening transition points. Slope stakes shall be set at 25 foot intervals around curves having a radius less than 100 feet.
Group Units, Family Units and tent Pads
19. Slope stakes shall be established at the corners of family units. Slope stakes shall be written to reference the finish grade of the unit or pad being staked.
Paths and Trails
20. Slope stakes (cut and fill catch points), clearing limits, and slope stake references shall be established on both sides of the centerline at each station established. Slope stakes and slope stake references shall be located on a line at right angles to tangents and on radial lines or curves. Slope stake catch points shall be located by using the grading plans and/or profiles, and typical path and trail section templates as shown on the drawings.
21. Slope stakes shall be set at 10-foot intervals, at significant breaks in the ground profile, culvert locations, and widening transition points.
Culverts
22. Slope stakes and slope reference stakes shall be set at all culvert locations. A culvert reference stake and hub shall be set on the centerline of the culvert 10 feet from each end or beyond the clearing limit, which ever is greater. The following shall be recorded on these stakes:
The actual field measured length The vertical and horizontal distance from hubs to the invert at the ends of the culvert.
Waterline, Sewerline, & other Utilities
23. Waterline, Sewerline, & other Utilities shall be staked at the locations shown on the drawings with the specified minimum burial depth. Waterline and sewerline elevations shall be accurately staked to provide for drainage as indicated on the drawings. Grade stakes shall be established as necessary to provide the control for the construction work.
Buildings
24. Slope stakes and slope stake references shall be established at each corner and as necessary to provide adequate construction control.
DISCREPANCIES
The contractor shall compare the staked centerline horizontal and vertical alignment with the design data. Differences between previously recorded and observed elevations of bench marks shall be referred to the Contracting Officer. Differences in centerline profile elevations exceeding 1 foot at any two or more consecutive points shall be reported to the contracting Officer for evaluation and possible revision. Staking of these areas shall be deferred until the Contacting Officer resolves these differences.
VERTICAL CONTROL
Vertical control for construction shall be as referenced on the Drawings.
MARKING STAKES
All stakes shall be legibly marked, in the format agreed upon with the Contracting Officer, with a stake pencil that leaves an imprinted or with waterproof ink. Marking shall conform to the nomenclature below;
| PI | Point of Intersection of tangents | |
| PC | Point of curvature | |
| POC | Point on curve | |
| Pt | Point of tangency | |
| POT | Point on tangent | |
| RP | Reference point | |
| P | P-line (preliminary location line) | |
| L | L-line (final location line) | |
| BM | Bench mark | |
| TBM | Temporary bench mark | |
| BT | Begin taper (any) | |
| ET | End taper (any) | |
| C | Cut | |
| F | Fill | |
| L | Centerline | |
| D | Ditch | |
| W | Width |
SURVEY NOTES
All survey data shall be neatly recorded in survey books. All survey notes shall become the property of the Forest Service. Errors shall be deleted by lining out. Date, crew names and positions, instrumentation, and weather shall be recorded in the notes at the beginning of each day’s work. The party chief shall sign or initial each page of the notes immediately after the last entry for each day’s work.
Electronically recorded survey notes shall be consecutively numbered and headed to identify the contents. The notes shall be supported and accompanied by a bound book that records the project name and for each day identifies date, crew names and positions, instrumentation, weather, type of survey, stationing of sections between which survey was performed, and survey data or sketched that cannot be electronically recorded. The party chief shall sign or initial the electronically recorded notes and Day Book immediately after the last entry for each day’s work.
END OF SECTION 010250
CONSTRUCTION STAKING 010250-5
Kent's Lake Campground Road Reconstruction Project
SECTION 011900 - MOBILIZATION
1. GENERAL
SUMMARY
This item is intended to compensate the Contractor for operations including, but not limited to, those necessary for the movement of personnel, equipment, supplies, and incidentals to the project site; for payment of premiums for bonds and insurance for the project; and for any other work and operations which must be performed or costs that must be incurred incident to the initiation of meaningful work at the site and for which payment is not otherwise provided for under the contract.
MEASUREMENT AND PAYMENT
The measurement shall be lump sum for mobilization. Payment shall be as follows:
1. Bond premiums will be reimbursed after receipt of the evidence of payment.
2. 50% of the lump sum, not to exceed 5% of the original contract amount, will be paid following completion of 5% of the original contract amount not including mobilization and bond premiums.
3. Payment of the remaining portion of the lump sum, up to 10% of the original contract amount, will be paid following completion of 10% of the original contract amount not including mobilization and bond premiums.
4. Any portion of the lump sum in excess of 10% of the original contract amount will be paid after final acceptance.
5. Progress payments for mobilization and preparatory work shall be subject to retainage.
PRODUCTS (NOT USED)
EXECUTION (NOT USED)
END OF SECTION 011900
MOBILIZATION 011900-1
Kent's Lake Campground Road Reconstruction Project
SECTION 013300 - SUBMITTAL PROCEDURES
1. GENERAL
SUMMARY
This Section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other miscellaneous submittals. See Table 013300-1 for a summary of required submittals.
See other specification section within this package for additional requirements on submittal.
SUBMITTAL PROCEDURES
Coordination: Coordinate preparation and processing of submittals with performance of construction activities.
1. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination.
The Contracting Officer (CO) reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.
Processing Time: Allow enough time for submittal review, including time for re-submittals, as follows. Time for review shall commence on CO's receipt of submittal.
2. Initial Review: Allow 14 days for initial review of each submittal. Allow additional time if processing must be delayed to permit coordination with subsequent submittals. CO will advise Contractor when a submittal being processed must be delayed for coordination.
3. If intermediate submittal is necessary, process it in same manner as initial submittal.
4. Allow 14 days for processing each re-submittal.
5. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing.
Identification: Place a permanent label or title block on each submittal for identification.
6. Indicate name of firm or entity that prepared each submittal on label or title block.
7. Provide a space on label or beside title block to record Contractor's review and approval markings and action taken by CO.
8. Include the following information on label for processing and recording action taken:
Project name.
Date.
Name and address of Contractor.
Name of manufacturer.
Unique identifier, including revision number.
Number and title of appropriate Specification Section.
Drawing number and detail references, as appropriate.
If more than one item is shown on submittal sheet, identify item.
Deviations: Highlight, encircle, or otherwise identify deviations from the Contract Documents on submittals.
Additional Copies: Unless additional copies are required for final submittal, and unless CO observes noncompliance with provisions of the Contract Documents, initial submittal may serve as final submittal.
Use for Construction: Use only final submittals with mark indicating action taken by CO in connection with construction.
MEASUREMENT AND PAYMENT
No separate measurement and/or payment will be made for this section. Payment shall be included with work shown in the schedule of items.
PRODUCTS
ACTION SUBMITTALS – (Submittals requiring CO approval) General: Prepare and submit Action Submittals required by individual Specification Sections.
9. Number of Copies: Submit three copies of each submittal, unless otherwise indicated. CO will return two copies. Mark up and retain one returned copy as a Project Record Document.
Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.
10. If information must be specially prepared for submittal because standard printed data are not suitable for use, submit as Shop Drawings, not as Product Data.
11. Mark each copy of each submittal to show which products and options are applicable.
12. Include the following information, as applicable:
Manufacturer's written recommendations.
Manufacturer's product specifications.
Manufacturer's installation instructions.
Manufacturer's catalog cuts.
Wiring diagrams showing factory-installed wiring.
Compliance with recognized trade association standards.
Compliance with recognized testing agency standards.
Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data.
13. Preparation: Include the following information, as applicable:
Dimensions.
Identification of products.
Fabrication and installation drawings.
Roughing-in and setting diagrams.
Wiring diagrams showing field-installed wiring, including power, signal, and control wiring.
Notation of dimensions established by field measurement.
14. Wiring Diagrams: Differentiate between manufacturer-installed and field-installed wiring.
Contractor's Construction Schedule: The contractor shall submit a Construction Schedule, for approval by CO, in accordance with the contract provisions within 5 day of commencement of work.
Samples: Prepare physical units of materials or products, including the following:
15. Samples for Initial Selection: Submit manufacturer's color charts consisting of units or sections of units showing the full range of colors, textures, and patterns available.
INFORMATIONAL SUBMITTALS – (Submittals NOT requiring CO approval) General: Prepare and submit Informational Submittals required by other Specification Sections.
16. Number of Copies: Submit three copies of each submittal, unless otherwise indicated. CO will not return copies.
17. Certificates and Certifications: Certificates and certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity.
18. Test and Inspection Reports: Comply with requirements in Section 014100 "Quality Control."
Material Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting test results of material for compliance with requirements.
Field Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of field tests performed either during installation of product or after product is installed in its final location, for compliance with requirements.
Maintenance Data: Prepare written and graphic instructions and procedures for operation and normal maintenance of products and equipment.
Manufacturer's Instructions: Prepare written or published information that documents manufacturer's recommendations, guidelines, and procedures for installing or operating a product or equipment. Include name of product and name, address, and telephone number of manufacturer.
EXECUTION
GENERAL
Review each submittal and check for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to CO.
Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents.
CO will not review submittals that do not bear Contractor's approval stamp and will return them without action.
Submittals not required by the Contract Documents will not be reviewed and may be discarded.
Substitutions – Whenever materials, products, and equipment are listed by name or brand in the specifications and/or on the drawings, it is used as a measure of quality, utility, or standard. If the Contractor prefers to use any other brand or manufacturer of same quality, appearance and utility to that specified, he shall request substitution as provided below, not less than 30 days before the planned installation of the item. The Contracting Officer will approve or disapprove the request for substitution.
Requests for substitutions will only be considered if contractor submits the following:
19. Complete technical data including drawings, complete performance specifications, test data, samples and performance tests of the article proposed for substitution. Submit additional information if required by Contracting Officer. All items in the above information shall be circled, tagged, or marked in some way to indicate all deviations or differences which the proposed item differs from the originally specified item.
20. Similar data as above for item originally specified. All items shall be marked to identify where/how the proposed substitution will differ.
21. A statement by the Contractor that the proposed substitution is in full compliance with the contract documents, applicable codes, and laws.
22. The Contractor shall be responsible for any effect upon related work in the project for any substitution and shall pay any additional costs generated by any substitutions.
SUBMITTAL SCHEDULE – Submittals shall be made as required by and called for in the drawings and specifications. The following table is a summary of the required submittals for the project - the table is to assist the Contractor and may not be all inclusive – additional submittals may be required by specific specifications:
TABLE 013000-1
| Spec. Section |
| Section Title |
| Subsection |
| Required Submittal |
| C |
| General Specifications |
| 1.3A |
| Stream Protection Plan |
| C |
| General Specifications |
| 1.4A |
| Traffic Control Plan |
| 013300 |
| Submittal Procedures |
| 2.1D |
| Construction Schedule |
| 014100 |
| Quality Control |
| 1.3 A |
| Contractor quality control plan |
| 014100 |
| Quality Control |
| 1.3 B |
| Permits, Licenses, and Certificates |
| 014100 |
| Quality Control |
| 1.3 C |
| Test and inspection reports |
| 014100 |
| Quality Control |
| 1.3 D |
| As-Built drawings |
| 023701 |
| Sediment & Erosion Control Measures |
| 1.2A |
| Sediment & Erosion Control Plan |
| 033000 |
| Cast-in-Place Concrete |
| 1.3A |
| Product Data |
| 033000 |
| Cast-in-Place Concrete |
| 1.3B |
| Design Mix |
| 033000 |
| Cast-in-Place Concrete |
| 1.3C |
| Shop Drawings |
| 033000 |
| Cast-in-Place Concrete |
| 1.3D |
| Samples |
| 033540 |
| Concrete Sidewalk and Stairs |
| 1.2A |
| Product Data |
| 033540 |
| Concrete Sidewalk and Stairs |
| 1.2B |
| Design Mixtures |
| 033540 |
| Concrete Sidewalk and Stairs |
| 1.2C |
| Reinforcement |
| 033540 |
| Concrete Sidewalk and Stairs |
| 1.2D |
| Material Test Reports |
| 055210 |
| Pipe and Guard Rail Railings |
| 1.3A |
| Product Data |
| 055210 |
| Pipe and Guard Rail Railings |
| 1.3B |
| Shop Drawings |
| 099100 |
| Paint |
| 1.4A |
| Color Selection Sheets |
| 101110 |
| Three Panel Bulletin Board |
| 1.2A |
| Manufacturer’s Literature |
| 101400 |
| Signs |
| 1.2A |
| Sign List Submittal |
| 101415 |
| Site Identification Sign (HDPE) |
| 1.3A |
| Sample Sign Mockup |
| 129400 |
| Family Units |
| 1.2A |
| Product Data |
| 129400 |
| Family Units |
| 1.2B |
| Color Samples |
| 136000 |
| Pre-Manufactured Shelter |
| 1.2A |
| Shop Drawings |
| 221105 |
| Water Hydrants |
| 1.3A |
| Manufacturer’s Literature and Maintenance Data |
| 221105 |
| Water Hydrants |
| 1.3B |
| Washed Rock Certification |
| 221105 |
| Water Hydrants |
| 1.3C |
| Maintenance Data |
| 221105 |
| Water Hydrants |
| 1.3D |
| Color Sample |
| 312000 |
| Earthwork |
| 1.3A |
| Bedding and Backfill Certification |
| 312000 |
| Earthwork |
| 1.3A |
| Sieve Analysis |
| 312000 |
| Earthwork |
| 1.3B |
| Product Data |
| 312225 |
| Excavation and Embankment |
| 1.3A |
| Density Test Results |
| 321204 |
| Crushed Aggregate Base or Surface Course |
| 1.2A |
| Aggregate Base – Source, Gradation, Material Properties |
| 321204 |
| Crushed Aggregate Base or Surface Course |
| 1.2B |
| Compaction Test Results and Proctor |
| 329206 |
| Seeding |
| 1.4A |
| Seed Certification |
| 332228 |
| Culvert Pipe and Pipe Arches |
| 1.3A |
| Shop Drawings |
| 332228 |
| Culvert Pipe and Pipe Arches |
| 1.3B |
| Fabricator’s Certification |
| 332228 |
| Culvert Pipe and Pipe Arches |
| 1.4A |
| Culvert Locations and Lengths |
END OF SECTION 013300
SUBMITTAL PROCEDURES 013300-6
Kent's Lake Campground Road Reconstruction Project
SECTION 014100 - QUALITY CONTROL
1. GENERAL
This work shall consist of providing quality control in conformance with the inspection, testing, and product certification requirements of this contract to ensure compliance with the drawings and specifications. The Contractor shall provide all personnel, equipment, tests, and reports necessary to meet the requirements of the contract.
QUALITY CONTROL
The Contractor shall provide and maintain a quality control system that will ensure all services, supplies, and construction work required under this contract conforms to the contract requirements. The Contractor shall perform, or cause to be performed, the sampling, inspection, and testing required to substantiate that all services, supplies, and construction conform to the contract requirements.
Special Tests and Inspections: Contractor will engage a testing agency to conduct required special tests and inspections. The Contractor shall authorize the testing agency to perform the required testing and inspections on the work completed. The authority shall include:
1. Testing agency will interpret tests and inspections and state in each report whether tested and inspected work complies with or deviates from the Contract Documents.
2. Testing agency will re-test and re-inspect corrected work.
Retesting/Reinspecting: Contractor shall provide quality-control services for retesting and reinspection for replaced construction work or for work that failed to comply with the requirements under the contract.
SUBMITTALS
Contractor Quality Control Plan Permits, Licenses, and Certificates Test and Inspection Reports As-Built Drawings
MEASUREMENT AND PAYMENT
No separate payment will be made for the work included under this section; rather payment shall be considered to be included in the items of work listed in the Schedule of Items.
PRODUCTS (Not Applicable)
EXECUTION
QUALITY CONTROL SYSTEM
General: Perform required testing, inspections, sampling, and similar services per direction specified in the contract drawings and specifications and in accordance with established industry standards.
CONTRACTOR QUALITY CONTROL PLAN
At the time of the preconstruction conference, the Contractor shall submit for approval a written Contractor Quality Control Plan.
3. If the plan requires any revisions or corrections, the Contractor shall resubmit the plan within 10 days.
4. The Government reserves the right to require changes in the plan during the contract period as necessary.
5. No change in the approved plan may be made without written concurrence by the Contracting Officer.
6. At a minimum, the plan shall include the following:
A list of personnel responsible for quality control and assigned duties. Include each person's qualifications.
A copy of a letter of direction to the Contractor's Quality Control Supervisor outlining assigned duties.
Names, qualifications, and descriptions of laboratories to perform sampling and testing, and samples of proposed report forms.
Methods of performing, documenting, and enforcing quality control of all work.
Methods of monitoring and controlling environmental pollution and contamination as required by all applicable regulations and laws.
TEST AND INSPECTION REPORTS
Submit three copies of complete test results no later than three calendar days after the test was performed.
Submit failing test results and proposed remedial actions within four hours of noted deficiency.
Testing and Inspection Reports shall include the following:
7. Date of issue.
8. Project title and number.
9. Name, address, and telephone number of testing agency.
10. Dates and locations of samples, tests, or inspections.
11. Names of individuals performing tests and inspections.
12. Reference Specification Section(s).
13. Complete test or inspection data.
14. Test and inspection results and an interpretation of test results.
15. Ambient conditions at time sample was taken, tested, or inspected.
16. Comments or professional opinion on whether tested or inspected work complies with the Contract Document requirements.
17. Name and signature of laboratory inspector.
18. Recommendations on retesting and reinspecting.
PERMITS, LICENSES, AND CERTIFICATES
For Contracting Officer’s records, submit copies of permits, licenses, certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee payments, judgments, correspondence, records, and similar documents, established for compliance with standards and regulations relevant to the on performance of the work.
AS-BUILT DRAWINGS
The Contractor shall maintain a set of the contract drawings depicting as-built conditions. These drawings shall be maintained in a current condition and shall be available for review. All variations from the original contract drawings shall be indicated in red on the drawings. Upon completion of the contract work, as-built drawings shall be submitted to the Contracting Officer.
SAMPLING, TESTING, AND CERTIFICATION REQUIREMENTS
Sampling, testing, and Certification requirements and frequency for specific items shall be as specified in the drawings and specification. The following table is a summary of the required sampling, testing, and certification for the project - the table is to assist the Contractor, but may not be all inclusive – additional submittals may be required by specific specification section:
TABLE 014100-1
Item
Subsection Certification or Test Required
Frequency
| 033000 |
| 2.13 |
| Mixing and Delivery |
| Each Truck |
| 033000 |
| 3.13 |
| Concrete – Slump, Air, Temperature |
| 1 composite per truck load delivered |
| 033000 |
| 3.13 |
| Concrete - Compression Test Specimens |
| at 7 days and 28 days (see spec) |
| 312000 |
| 3.13C |
| Compaction Test – at Pipe Zone |
| One per 600 Feet of Trench |
| 312000 |
| 3.13C |
| Compaction Test – at Pipe Zone |
| One test – at each road crossing |
| 312000 |
| 3.13D |
| Compaction Test – above Pipe Zone |
| One per 600 Feet of Trench |
| 312000 |
| 3.13D |
| Compaction Test – above Pipe Zone |
| One test every other lift – at each road crossing |
| 312000 |
| 3.13I |
| Tracer Wire Conductivity Test |
| Until Passing |
| 312000 |
| 3.16A |
| Compaction Test – Backfill/Fills |
| One per Tank, Utility Building or Utility Box |
| 312000 |
| 3.18A |
| Compaction Test - Subsurface Drainage Material |
| One per Tank |
| 312000 |
| 3.18B |
| Compaction Test – Drainage Backfill |
| One per Tank |
| 312000 |
| 3.19D |
| Compaction Test – Backfill/Fills under Buildings |
| One test every 600 S.F. area per lift, minimum of one test per building |
| 312000 |
| 3.19D |
| Compaction Test – Exterior Concrete Slabs |
| 1 per slab |
| 312000 |
| 3.19D |
| Compaction Test – Backfill/Fills and Subgrade under Buildings and Driveways |
| One test every 150 sq. yd. area per lift and at Subgrade |
| 312000 |
| 3.19D |
| Compaction Test – Backfill/Fills Foundation Walls |
| One test for each 100 feet of wall length |
| 312225 |
| 3.12B |
| Moisture-Density Relationship |
| One Test for Each Soil Type Encountered |
| 312225 |
| 3.12B |
| Compaction – Road Embankment (Method 4) |
| One test every 300 sq. yd. of embankment per lift |
| 312225 |
| 3.12B |
| Compaction – Subgrade |
| One test every 1000 sq. yd. of subgrade |
| 321204 |
| 3.4A |
| Compaction Tests – Road Base and Surface Course |
| One test for every 300 sq. yd. of |
aggregate
| 321204 |
| 3.4A |
| Compaction Tests – Aggregate Base for Concrete Slabs |
| One test for each family unit or group area |
| 321204 |
| 3.4A |
| Compaction Tests – Aggregate Base for Concrete Slabs |
| One test for each prefabricated building pad |
END OF SECTION 014100
USDA FOREST SERVICE, R4
Kent's Lake Campground Road Reconstruction Project
SECTION 023701 - SEDIMENT AND EROSION CONTROL MEASURES
1. GENERAL
The work under this section consists of furnishing all necessary labor, equipment, materials, and performing all operations in connection with construction sediment and control measures.
General
1. All erosion and sediment control measures are to be placed prior to any disturbance caused by grading and or excavation and shall conform to the requirements of the appropriate regulatory agency for the State.
2. The Contractor shall be solely responsible for ensuring that erosion and sediment control measures are implemented and maintained at the site.
3. Soil disturbing activities include but are not limited to: Clearing and grubbing, excavation for utilities and foundations, roadway and parking lot construction, construction or modification of site drainage, grading, and preparation for final seeding.
SUBMITTALS
The Contractor shall be required to submit a sediment and erosion control plan in accordance with this specification for approval by the Contracting Officer 2 weeks prior to start of work.
PERMITS
The Contractor shall apply for and pay for a National Pollutant Discharge Elimination System (NPDES) permit from the state the project resides in.
MEASUREMENT AND PAYMENT
No separate measurement and/or payment will be made for this section. Payment shall be included with work shown in the schedule of items.
PRODUCTS
SYNTHETIC FILTER FABRIC FOR SILT FENCES.
Pervious sheet of polypropylene, nylon, or polyethylene fabric conforming to the following physical and hydraulic characteristics:
| · Physical Properties (Min.) |
| Requirement |
| Test Method |
| · Grab Tensile, lbs. |
| W120/F100 |
| ASTM-D-4632 |
| · Grab Elongation, % |
| 15 |
| ASTM-D-4632 |
| · Mullen Burst, psi |
| 275 |
| ASTM-D-3786 |
| · Puncture, lbs. |
| 65 |
| ASTM-D-4833 |
| · Trapezoidal Tear, lbs. |
| 50 |
| ASTM-D-4533 |
| · UV Resistance, % |
| 80 |
| ASTM-D-4355 |
| · AOS, US Sieve # |
| 30/40 |
| ASTM-D-4751 |
| · Permittivity gal/min-sq. ft. |
| 90 |
| ASTM-D-4491 |
Filter fabric should contain ultraviolet ray inhibitors and stabilizers to provide a minimum of 6 months of expected usable construction life at a temperature range of 0 to 120 F.
Support Posts: 4 foot - 2 x 2 wood.
STRAW BALES
Oat or wheat straw, free from weeds, viable weed seeds, foreign matter detrimental to plant life, and dry.
4. Grass hay bales are not acceptable.
5. In order to prevent deterioration of the bindings, all bales shall be either wire-bound or string-tied so that bindings are oriented around the sides rather than along the tops and bottoms of the bales.
STRAW WATTLES OR ROLLS
Furnish straw wattles or rolls that are manufactured from weed free straw and wrapped in a tubular photodegradable plastic netting made from 85% high density polyethylene, 14% ethyl vinyl acetate and 1% color for UV inhibition. Conform to the following:
| 6. Diameter | 9 inches min. | |||
| 7. Netting strand thickness | 0.030 inches | |||
| 8. Netting knot thickness | 0.055 inches | |||
| 9. Mass of netting | 0.315 to 0.385 ounces per foot |
EXECUTION
CONSTRUCTION
Install straw bales at local drainage ways to prevent silt intrusion upon adjacent drainage courses. Remove straw bales following establishment of vegetation cover and utilize as mulch at swales or on steep slopes.
Prior to construction, install silt fence along the downhill construction limits to prevent silt intrusion upon adjacent land.
Install sediment and erosion control measures on the down slope toe of all topsoil stockpiles.
Maintain and remove all erosion controls as specified.
Temporary seeding shall be placed on exposed surfaces that will not be brought to final grading or permanent cover treatment within 30 days of the exposure to reduce erosion and sedimentation by stabilizing exposed soils. Seeded areas shall be checked regularly for bare spots, washouts, and healthy growth to assure that a good stand of grass is being maintained. Reseed areas that fail to establish vegetation cover as soon as such areas are identified.
DUST CONTROL
In areas subject to surface and air movement of dust, where on-site or off-site damage is likely to occur, one or more of the following preventive measures shall be taken for dust control:
10. Minimize the period of soil exposure through the use of temporary ground cover and other temporary stabilization practices.
11. Sprinkle the site with water until surface is wet. Repeat as needed.
SILT FENCE
Silt fences are appropriate for the following general locations:
12. Immediately upstream of the point(s) of runoff discharge from a site before flow becomes concentrated. Below disturbed areas where runoff may occur in the form of overland flow.
13. Along the down slope toe of all topsoil stockpiles.
Materials.
14. Utilize standard strength synthetic filter fabric for sediment barriers. The filter fabric shall be purchased in a continuous roll cut to the length of the barrier to avoid the use of joints. When joints are necessary, filter cloth shall be spliced together only at a support post, with a minimum 6-inch overlap, and securely sealed.
15. The standard strength filter fabric shall be stapled or wired to the fence and 6 inches of the fabric shall be extended into the ground. Filter fabric shall not be stapled to existing trees.
16. Support posts shall be spaced at a maximum 6 feet and driven securely into the ground a minimum of 24 inches.
17. Filter fabric shall be buried a minimum of 12 inches.
18. The height of a silt fence shall not exceed 36 inches. Higher fences may impound volumes of water sufficient to cause failure of the structure.
Maintenance.
19. Silt fences and filter barriers shall be inspected immediately after each rainfall and at least daily during prolonged rainfall.
20. Silt fences shall be inspected for depth of sediment, tears, and to see if the fabric is securely attached to the fence posts, and to see that the fence posts are firmly in the ground. Any deficiencies shall be repaired immediately.
21. Should the fabric on a silt fence of filter barrier decompose or become ineffective prior to the end of the expected usable life and the barrier still be necessary, the fabric shall be replaced promptly.
22. Sediment deposits should be removed after each storm event and/or when deposits reach approximately 1/3 the height of the barrier or when the sediments limit or prevent the flow of water through the fabric hydraulic.
23. Any sediment deposits remaining in place after the silt fence or filter barrier is no longer required shall be dressed to conform with the existing grade, prepared, and seeded.
STRAW BALE EROSION CONTROL FENCE
Straw bale erosion control fences are appropriate for the following general locations:
24. Sheet flow applications: Straw bales shall be placed in a single row, lengthwise on the contour with ends of adjacent bales tightly abutting one another.
25. Channel flow applications: Straw bales shall be placed in a single row, lengthwise and oriented perpendicular to the direction of flow with ends of adjacent bales tightly abutting one another. The barrier shall be extended to such a length that the bottoms of the end bales are higher in elevation than the top of the lowest middle bale to assure that sediment laden runoff will flow either through or over the barrier but not around it.
The barrier shall be entrenched and backfilled. A trench shall be excavated the width of a bale and the length of the proposed barrier to a minimum depth of 4 inches. After the bales are staked and chinked, the excavated soil shall be backfilled against the barrier. Backfill shall conform to the ground level of the downhill side and shall be built up to 4 inches against the uphill side of the barrier.
Each bale shall be securely anchored by at least 2 stakes or rebar driven through the bale. The first stake in each bale shall be driven toward the previously laid bale to force the bales together. Stakes or rebar shall be driven a minimum of 12 inches into the ground or deep enough into the ground to securely anchor the bales, whichever is greater.
The gaps between bales shall be chinked (filled by wedging with straw to prevent water from escaping between the bales). Loose straw scattered over the area immediately uphill from a straw bale barrier tends to increase barrier efficiency.
STRAW WATTLE OR ROLL
Straw wattles shall be installed in accordance to manufacturer’s installation guidelines.
At a minimum:
26. The wattle shall be entrenched and backfilled. A trench shall be excavated the width of the straw waddle and the length of the proposed barrier to a depth of 2-3 inches.
27. Each wattle shall be securely anchored by at least one 18-24 inch stake every 3-4 feet and with a stake on each end. Stakes shall be driven perpendicular to slope face through the middle of the wattle until 2-3 inches remains exposed above the waddle.
28. After the wattles are staked, compact excavated soil against the uphill side of the barrier.
29. Adjacent wattles should tightly abut.
MAINTENANCE
Inspection shall be frequent and repair or replacement shall be made promptly as needed. Straw bale carriers shall be removed when they have served their usefulness, but not before the upslope areas have been permanently stabilized.
END OF SECTION 023701
SEDIMENT AND EROSION CONTROL MEASURES 023701-1
Kent's Lake Campground Road Reconstruction Project
SECTION 024100 - WASTE MATERIAL DISPOSAL
1. GENERAL
SUMMARY
This Section includes the loading, handling, hauling, and placing of excess excavation material, unsuitable excavation material, clearing and grubbing debris, and construction and demolition debris.
MEASUREMENT AND PAYMENT
There will be no separate measurement or payment for work in this Section. Waste material disposal is considered incidental to other items of work shown in the Schedule of Items.
PRODUCTS – NOT APPLICABLE
EXECUTION
WASTE MATERIAL TO BE HAULED TO A DISPOSAL AREA
All excavated material not used in the construction of embankments or backfilling of trenches, or other excess material resulting from the excavation and embankment operation shall be hauled to a disposal area.
All unsuitable excavated material and oversize boulders shall be hauled to a disposal area.
1. Oversized boulders may be used as barrier rocks according to Section 322205 “Barrier Rocks.”
All stumps, slash and other clearing and grubbing debris shall be hauled to a disposal area.
Disposal Area: All waste material above shall be hauled to the nearest commercial dump site.
WASTE MATERIAL TO BE HAULED TO A LANDFILL
All demolition materials (including concrete), garbage, and other refuse generated shall be removed from the project site and legally disposed off of Government property in an approved landfill.
The contractor is responsible for all costs and permits associated with landfill disposal.
The Government is not responsible for waste material upon its departure from the project site.
END OF SECTION 024100
WASTE MATERIAL DISPOSAL 024100-2
Kent's Lake Campground Road Reconstruction Project
SECTION 024102 - REMOVAL AND DISPOSAL OF STRUCTURES AND OBSTRUCTIONS
1. GENERAL
SUMMARY
Includes removal disposal, and backfilling of existing concrete pads and walkways, site furnishings, and all other items to the extent shown on the Drawings. This item also includes scarifying and regrading the area around features and structures removed.
Related Sections Include the Following:
1. Section 024100 “Waste Material Disposal.”
MEASUREMENT AND PAYMENT
Payment will be lump sum for removal and disposal of structures and obstructions, including demolition, excavation, backfill, removal, hauling and all incidentals and work required to complete this item.
PRODUCTS
SELECT BACKFILL
Select backfill shall be native or imported soil, sand, or granular soil free of stones larger than 6 inches in greatest dimension.
EXECUTION
SALVAGE
Items to be salvaged include:
2. Barrier Rocks.
GENERAL
Topsoil stripping and storage, if required, shall comply with the applicable specification.
The Contractor may use any means to remove the structures or items shown on the Drawings to be removed, as long as the safety of the public is provided and the surrounding site and structures are preserved All of a substructure shall be demolished to a depth of 1 foot below the present ground level. All wood, concrete, and metal materials to be removed shall be broken into sufficiently small pieces to enable handling and disposal. All other structures shall be backfilled and the surrounding ground restored to as near normal conditions as practicable in accordance with these specifications.
Backfill for removed items may be excess material from other excavation or borrow from an approved source.
3.…