GAOA Brainard Lake Rec Area Deferred Maintenance
Closed Solicitation Posted
- Solicitation number
- 1240LT24R0059
- Agency
-
Region 2 - Rocky Mountain Region
Forest Service, Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- Ward, Colorado, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Agriculture Forest Service R2-Rocky Mountain Region is seeking small business contractors to perform deferred maintenance and recreation site improvements at the Brainard Lake Recreation Area in the Arapaho-Roosevelt National Forest, Indian Peak Wilderness Area on the Boulder Range District. The project includes renovating one trailhead and two picnic grounds, with work such as replacing vault toilets, constructing a new parking area, and improving accessibility. The project magnitude is estimated between $500,000 and $1,000,000, and the evaluation will focus on technical capability, past performance, and price. All questions are due by August 23, 2024 at 12:00 MT.
This requirement is being set aside 100% for small businesses. The period of performance is from the notice to proceed through November 15, 2025, with no work allowed on weekends or federal holidays. The applicable NAICS code is 237990 - Other Heavy and Civil Engineering Construction, and the project location is in Ward, Colorado.
Notice text
3 versions
Update #3 · Latest ·
Project Location: Arapaho-Roosevelt National Forest, Indian Peak Wilderness Area on the Boulder Range District
Project Magnitued: Between $500,000 and $1,000,000
This requirement is being set-aside 100% Small Business in accordance with FAR 19.5.
All questions are due no later than 23 August 2024 at 12:00MT.
1 Aug 24 11:28MT: Correct solicitation documents uploaded.
29 August 24 Extend due date and incorporate questions and answers.
Update #2 ·
Project Location: Arapaho-Roosevelt National Forest, Indian Peak Wilderness Area on the Boulder Range District
Project Magnitued: Between $500,000 and $1,000,000
This requirement is being set-aside 100% Small Business in accordance with FAR 19.5.
All questions are due no later than 23 August 2024 at 12:00MT.
1 Aug 24 11:28MT: Correct solicitation documents uploaded.
Update #1 ·
Project Location: Arapaho-Roosevelt National Forest, Indian Peak Wilderness Area on the Boulder Range District
Project Magnitued: Between $500,000 and $1,000,000
This requirement is being set-aside 100% Small Business in accordance with FAR 19.5.
All questions are due no later than 23 August 2024 at 12:00MT.
Files
| File | Type | Posted |
|---|---|---|
| Amendment 1 1240LT24R0059.pdf | ||
| Attachment 2 Statement of Work.pdf | ||
| 1240LT24R0059 Solicitation.pdf | ||
| Attachment 1 Schedule of Items.pdf | ||
| Attachment 6 Wage Determination.pdf | ||
| Attachment 7 Project Map.jpg | JPG image | |
| Attachment 3 Drawings.pdf | ||
| Attachment 4 Specifications.pdf | ||
| Attachment 5 FSSS.pdf | ||
| Attachment 8 Past_Performance_Questionnaire.doc | DOC document |
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| GAOA Brainard Lake Rec Area Deferred Maintenance | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Administrative Parking Lot Repairs | Forest Service | Total Small Business | |
| Picnic Tables & Bear Lockers with Install | Forest Service | Total Small Business | |
| Stove Prairie Campground Gate Replacement | Forest Service | Total Small Business | |
| GAOA Grizzly Bear Campground | Region 2 - Rocky Mountain Region | Total Small Business | |
| GAOA Kents Lk. CG Reconstruction, Fishlake NF, Utah | Forest Service | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity