Gaoa bishop campground waterline repairs

Closed Solicitation Posted

Solicitation number
140L1225Q0010
Agency
California Region Bureau of Land Management, Department of the Interior
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
237110 Water and Sewer Line and Related Structures Construction
PSC
Y1PD Construction Of Waste Treatment And Storage Facilities
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Interior's Bureau of Land Management California Region is seeking a small business contractor to perform waterline repairs at three campgrounds in Inyo County: Crowley Lake, Horton Creek, and Tuttle Creek. The project involves installing approximately 580-840 linear feet of 4-inch buried tank drain lines, adding tank outflow meters, implementing distribution system isolation valves, and replacing existing backflow prevention devices. Contractors must meet specific technical requirements, including NSF61 certification for drinking water-related equipment and materials, and demonstrate the ability to maintain public access during construction. The contract will be awarded using a Lowest Price Technically Acceptable (LPPF) evaluation method, assessing technical acceptability across four factors: experience and capability, schedule, proposed construction plan, and proposed equipment and materials. Key dates include a mandatory site visit on April 24, 2025, at 12:00 PM Pacific Time, with questions due by April 30, 2025, and quotes due by May 9, 2025.

The contract is set aside exclusively for small businesses and falls under NAICS category 237110 for Water and Sewer Line and Related Structures Construction. The project is funded through the Great American Outdoor Act (GAOA) with a project magnitude between $25,000 and $100,000. The period of performance is from June 1, 2025, to September 30, 2025, with a requirement to complete the project within 90 calendar days of the notice to proceed. Contractors must adhere to specific technical standards, including using materials that meet ANSI/NSF Standard 61 and AWWA standards, and provide a one-year warranty for all materials and workmanship. The work will be performed at three specific campground locations in California, with minimal surface disturbance and a focus on maintaining proper drainage, erosion control, and pipe stability. Contractors will be required to submit comprehensive documentation, including site photographs and as-built drawings upon project completion.

Notice text

GAOA BISHOP CAMPGROUND WATERLINE REPAIRS

Attachments

Files attached to this notice, newest first
File Type Posted
B09_Prebid_Site_Visit_Questions_and_Answers_0001.pdf PDF
B09_Attach_1_Statement_of_Work_20250429_AMENDED_0001.pdf PDF
Sol_140L1225Q0010_Amd_0001.pdf PDF
Sol_140L1225Q0010.pdf PDF
B08_Attachment_No__2_WD.pdf PDF
B08_Attach_1_Statement_of_Work_20250402.pdf PDF
B08_Attachment_No__3_Bid_Schedule.pdf PDF

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity