B08_Attachment_No__3_Bid_Schedule.pdf
PDF 86 KB Posted
- Attached to
- GAOA BISHOP CAMPGROUND WATERLINE REPAIRS Federal contract opportunity
- Solicitation number
- 140L1225Q0010
About this file
The document is a Price Schedule for the GAOA Bishop Campground Waterline Repairs project. The pricing schedule lists seven line items related to waterline repair and modifications across three campgrounds: Tuttle Creek, Horton Creek, and Crowley Lake. Each line item is designated as a Lump Sum, including mobilization to the campground, tank drain line work, and pipeline modifications for each specific campground location. The document provides a structured breakdown of the required work items, allowing for precise cost estimation and bidding for the waterline repair project at these campground sites.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B09_Attach_1_Statement_of_Work_20250429_AMENDED_0001.pdf | ||
| B09_Prebid_Site_Visit_Questions_and_Answers_0001.pdf | ||
| Sol_140L1225Q0010_Amd_0001.pdf | ||
| Sol_140L1225Q0010.pdf | ||
| B08_Attachment_No__2_WD.pdf | ||
| B08_Attach_1_Statement_of_Work_20250402.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule – GAOA BISHOP CAMPGROUND WATERLINE REPAIRS
Item Description of Work Quantity Unit Unit Cost Cost
1 Mobilization To Campground (CG) 1 Lump Sum
2 Tuttle Creek CG Tank Drain Line 1 Lump Sum
3 Tuttle Creek CG Pipeline Modifications 1 Lump Sum
4 Horton Creek CG Tank Drain Line 1 Lump Sum
Horton Creek CG Pipeline Modifications 1 Lump Sum
6 Crowley Lake CG Tank Drain Line 1 Lump Sum
7 Crowley Lake CG Pipeline Modifications 1 Lump Sum
TOTAL