B08_Attachment_No__3_Bid_Schedule.pdf

PDF 86 KB Posted

Attached to
GAOA BISHOP CAMPGROUND WATERLINE REPAIRS
Solicitation number
140L1225Q0010
Issued by

About this file

The document is a Price Schedule for the GAOA Bishop Campground Waterline Repairs project. The pricing schedule lists seven line items related to waterline repair and modifications across three campgrounds: Tuttle Creek, Horton Creek, and Crowley Lake. Each line item is designated as a Lump Sum, including mobilization to the campground, tank drain line work, and pipeline modifications for each specific campground location. The document provides a structured breakdown of the required work items, allowing for precise cost estimation and bidding for the waterline repair project at these campground sites.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Schedule – GAOA BISHOP CAMPGROUND WATERLINE REPAIRS

Item Description of Work Quantity Unit Unit Cost Cost

1 Mobilization To Campground (CG) 1 Lump Sum

2 Tuttle Creek CG Tank Drain Line 1 Lump Sum

3 Tuttle Creek CG Pipeline Modifications 1 Lump Sum

4 Horton Creek CG Tank Drain Line 1 Lump Sum

Horton Creek CG Pipeline Modifications 1 Lump Sum

6 Crowley Lake CG Tank Drain Line 1 Lump Sum

7 Crowley Lake CG Pipeline Modifications 1 Lump Sum

TOTAL

File details come from the government source that posted it. Updated .