B08_Attachment_No__3_Bid_Schedule.pdf

PDF 86 KB Posted

Attached to
GAOA BISHOP CAMPGROUND WATERLINE REPAIRS Federal contract opportunity
Solicitation number
140L1225Q0010
Issued by
Department of the Interior Bureau of Land Management California Region

About this file

The document is a Price Schedule for the GAOA Bishop Campground Waterline Repairs project. The pricing schedule lists seven line items related to waterline repair and modifications across three campgrounds: Tuttle Creek, Horton Creek, and Crowley Lake. Each line item is designated as a Lump Sum, including mobilization to the campground, tank drain line work, and pipeline modifications for each specific campground location. The document provides a structured breakdown of the required work items, allowing for precise cost estimation and bidding for the waterline repair project at these campground sites.

View the file

Other files for this federal contract opportunity

Other files attached to GAOA BISHOP CAMPGROUND WATERLINE REPAIRS, newest first.
File Type Posted
B09_Attach_1_Statement_of_Work_20250429_AMENDED_0001.pdf PDF
B09_Prebid_Site_Visit_Questions_and_Answers_0001.pdf PDF
Sol_140L1225Q0010_Amd_0001.pdf PDF
Sol_140L1225Q0010.pdf PDF
B08_Attachment_No__2_WD.pdf PDF
B08_Attach_1_Statement_of_Work_20250402.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Schedule – GAOA BISHOP CAMPGROUND WATERLINE REPAIRS

Item Description of Work Quantity Unit Unit Cost Cost

1 Mobilization To Campground (CG) 1 Lump Sum

2 Tuttle Creek CG Tank Drain Line 1 Lump Sum

3 Tuttle Creek CG Pipeline Modifications 1 Lump Sum

4 Horton Creek CG Tank Drain Line 1 Lump Sum

Horton Creek CG Pipeline Modifications 1 Lump Sum

6 Crowley Lake CG Tank Drain Line 1 Lump Sum

7 Crowley Lake CG Pipeline Modifications 1 Lump Sum

TOTAL