Amendment - 003 - FY26 OTS Rappel Tower Demolition Service

Closed Solicitation Posted

Solicitation number
FA3300FY26OTS091462
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
238910 Site Preparation Contractors
Place of performance
Montgomery, Alabama 36112, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Air Force Air Education and Training Command seeks demolition of the Blue Thunder Rappel Tower at Officer Training School, Maxwell Air Force Base, Alabama, with quotes due September 10 at 5:00 PM EDT. The procurement is a Total Small Business set-aside.

Place of performance is Maxwell AFB, Building 1487, Alabama. The contractor must assess and safely dismantle the 60-foot wooden rappel tower structure, perform subsurface support removal to a minimum 4 inches below final grade, haul all debris (treated wood, metal fasteners, guy wires, and concrete footings) to an approved Construction and Demolition landfill per Alabama Department of Environmental Management regulations, and restore the site to pre-demolition condition including backfilling, re-grading, and sand pit restoration. All work must occur during normal working hours (7:00 AM to 4:00 PM) and be completed within 30 calendar days following a pre-performance conference. The contractor must supply all personnel, equipment, fuel, tools, materials, transportation, supervision, and disposal costs.

Base access requires REAL ID or valid U.S. Passport and notification to the 42d Air Base Wing Information Protection Office 30 days prior to performance through the DISS system. The contractor must obtain AF Form 103 excavation permits from 42 CES/CE and coordinate with underground facilities. A mandatory site visit is scheduled August 25 at 9:00 AM CDT; notification of attendance is required by August 23. No on-site power or water will be provided by the Government. A 140-foot ceiling height restriction applies to cranes due to adjacent airfield operations. Quotes must be firm for 60 calendar days and submitted via email. Award will be made to the lowest-priced contractor meeting minimum technical and security conformance criteria. NAICS 238910 (Site Preparation Contractors); PSC P400 (Salvage—Demolition of Buildings).

Notice text

3 versions

Update #3 · Latest ·

The OTS Blue Thunder training ground requires a contract to assess and safely remove the Blue Thunder Rappel Tower, perform subsurface support removal, properly dispose of debris, and restore the site. The contractor shall provide all necessary personnel, equipment, fuel, tools, materials, transportation, supervision, and any other necessary items for the professional demolition of the rappel tower. Please review the attached "Draft" SOW for further instruction on what is required to complete this requirement. Review the attached Request For Quote for instructions on how to submit your quotes as well as any supporting documents. 

Amendment 002 - The period of performance for this requirement is 30-days. The previous 60-day requirement was added in error. 

Amendment 003 - Questions have been added to this amendment to include an updated response date of 10 September 2026 at 05:00 PM EDT.

Update #2 ·

The OTS Blue Thunder training ground requires a contract to assess and safely remove the Blue Thunder Rappel Tower, perform subsurface support removal, properly dispose of debris, and restore the site. The contractor shall provide all necessary personnel, equipment, fuel, tools, materials, transportation, supervision, and any other necessary items for the professional demolition of the rappel tower. Please review the attached "Draft" SOW for further instruction on what is required to complete this requirement. Review the attached Request For Quote for instructions on how to submit your quotes as well as any supporting documents. 

Amendment 002 - The period of performance for this requirement is 30-days. The previous 60-day requirement was added in error. 

Update #1 ·

The OTS Blue Thunder training ground requires a contract to assess and safely remove the Blue Thunder Rappel Tower, perform subsurface support removal, properly dispose of debris, and restore the site. The contractor shall provide all necessary personnel, equipment, fuel, tools, materials, transportation, supervision, and any other necessary items for the professional demolition of the rappel tower. Please review the attached "Draft" SOW for further instruction on what is required to complete this requirement. Review the attached Request For Quote for instructions on how to submit your quotes as well as any supporting documents. 

Files

File Type Posted
RFQ OTS Rappel Tower Demo - Amended - 003.docx DOCX document
OTS Rappel Tower Demolition Answers.docx DOCX document
Attachment 2 - Provisions and Clauses - Amended.pdf PDF
RFQ OTS Rappel Tower Demo - Amended - 002.docx DOCX document
RFQ OTS Rappel Tower Demo - Amended.docx DOCX document
SOW - Rappel Tower.docx DOCX document
Attachment 2 - Provisions and Clauses.pdf PDF
RFQ OTS Rappel Tower Demo.docx DOCX document

Similar open opportunities

Opportunity Agency Set-aside Responses due
FY27 42SFS CATM Range Cleaning Montgomery, Alabama 36112, United States · NAICS 562910 Air Education and Training Command Total Small Business
Site Visit - Removal of Old Fluid Cell Warner Robins, Georgia 31098, United States Air Force Sustainment Center No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity