About this opportunity

The U.S. Department of Agriculture Forest Service is seeking a contractor to install a new trail bridge at Horseshoe Creek in the Custer Gallatin National Forest's Beartooth Ranger District. The base contract requires the contractor to provide and install 2 sills and 20 diaphragms, remove existing sills, and install stringers with associated fasteners, while the government will furnish most bridge materials including stringers, decking, curb, and hardware. Optional items include complete bridge installation, deck and hardware installation, approach work, and new trail construction with approach grades no steeper than 30%. The government will evaluate offers based on best value, considering non-price factors equally important to price, including past performance information, experience in similar geographical conditions, and technical approach. Offers are due by 5:00 PM EDT on June 30, 2025, with questions accepted until June 20, 2025.

This procurement is designated as a total small business set-aside with an estimated project value between $100,000 and $250,000. The performance period spans from August 1, 2025, to September 15, 2026, allowing contractors over a year to complete the work in this remote wilderness location. The project is located approximately 16.2 miles from the Main Stillwater Trailhead in the Absaroka Beartooth Wilderness, requiring aviation support for material delivery due to the remote location. Contractors must have active SAM.gov registration and may be required to provide performance and payment bonds if the contract exceeds $150,000. The base items include 7 helicopter flight hours, and the bridge specifications call for a 49-foot span length with 36-inch overall width designed to support pedestrian and equipment loads.

Notice text

2 versions

Update #2 · Latest ·

The scope of this project is to deliver the bridge items needed to install a new trail bridge, Horseshoe Creek, on the Custer Gallatin National Forest on the Beartooth Ranger District.

BASE ITEMS:  Contractor shall provide both sills and all (20) diaphragms, (See attached drawings for dimensions), remove and dispose of the old existing sills, and install the stringers, sills, diaphragms and all fasteners for these items.

This contract includes delivering other Government furnished material to bridge location, which includes stringers, decking, curb, wearing surface material, and other applicable hardware.  The Government will provide all material except Sills and Diaphragms.  Government furnished material will be available at the Meyers Creek Administration site upon request.

OPTION ITEMS:  Option items will be for complete bridge installation to be able to open the bridge up to the public. These optional items include deck, curb, running planks, and applicable hardware installation, approach work, and new trail construction to tie the trail into the new bridge approaches. Approach grades shall be no steeper than 30%.  Approach work does include gabion basket installation on the North approach. Gabion baskets are available onsite to aid in approach construction and minimize embankment.  Gabion baskets not used in the approach work shall be returned to Meyers Creek Site.

Update #1 ·

The scope of this project is to deliver the bridge items needed to install a new trail bridge, Horseshoe Creek, on the Custer Gallatin National Forest on the Beartooth Ranger District.

BASE ITEMS:  Contractor shall provide both sills and all (20) diaphragms, (See attached drawings for dimensions), remove and dispose of the old existing sills, and install the stringers, sills, diaphragms and all fasteners for these items.

This contract includes delivering other Government furnished material to bridge location, which includes stringers, decking, curb, wearing surface material, and other applicable hardware.  The Government will provide all material except Sills and Diaphragms.    Government furnished material will be available at the Meyers Creek Administration site upon request.

OPTION ITEMS:  Option items will be for complete bridge installation to be able to open the bridge up to the public. These optional items include deck, curb, running planks, and applicable hardware installation, approach work, and new trail construction to tie the trail into the new bridge approaches. Approach grades shall be no steeper than 30%.  Approach work does include gabion basket installation on the North approach. Gabion baskets are available onsite to aid in approach construction and minimize embankment.  Gabion baskets not used in the approach work shall be returned to Meyers Creek Site.

Files

Show all 11

Notice history

Notice Type Posted
FY25 gaoa horseshoe creek trail bridge install. Award Award Notice
This notice Latest solicitation Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Humbolt pacific crest trail bridge replacement Bridgeport, California 93517, United States · NAICS 237310 Forest Service No set-aside
Purchase of 2 or 3 Temporary Road Bridges Duluth, Minnesota 55808, United States · NAICS 332312 Forest Service No set-aside
GRSM 321788 - Oconaluftee River Trail NAICS 237310 — No set-aside
Custer Gallatin National Forest Ashland and Sioux Road Maintenance Billings, Montana, United States · NAICS 237310 Region 6 - Pacific Northwest Region Total Small Business
YELL 338223 - Bridge Preservation NAICS 237310 National Office No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors