About this file
This document is a Forest Service Supplemental Specifications (FSSS) for the FY25 GAOA Horseshoe Creek Trail Bridge project, located in the Custer-Gallatin National Forest's Beartooth Ranger District in Stillwater, Montana. The specifications provide detailed technical requirements for bridge construction, focusing on excavation, backfill, material control, work acceptance, and contractor quality control standards. Key technical specifications cover areas such as structure excavation, foundation preparation, bedding, backfilling, and compaction methods, with precise requirements for material types, layering, moisture content, and density testing.
The supplemental specifications complement the related federal contract opportunity (Solicitation 1240LU25Q0013), which involves installing a new trail bridge. The base contract requires the contractor to provide sills and 20 diaphragms, remove existing sills, and install stringers, sills, diaphragms, and associated fasteners. The government will provide most bridge materials, including stringers, decking, curb, and hardware, which will be available at the Meyers Creek Administration site. Optional items include complete bridge installation, deck installation, approach work with trail construction, and gabion basket placement, with approach grades limited to 30%. The project is being executed by the USDA Forest Service, Region 1.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation 1240LU25Q0013 Attachment 3
FOREST SERVICE
SUPPLEMENTAL SPECIFICATIONS
(FSSS Updated March 25, 2025)
FOR
FY25 GAOA HORSESHOE CREEK TRAIL BRIDGE
USDA Forest Service, Region 1 Custer-Gallatin National Forest Beartooth Ranger District Stillwater, Montana
April 2025
Table of Contents
| Preface | 2 |
| 101 - Terms¸ Format¸ and Definitions | 3 |
| 101.01 Meaning of Terms. | 3 |
| 101.03 Abbreviations. | 3 |
| 101.04 Definitions. | 3 |
| 102 - Bid¸ Award¸ and Execution of Contract | 8 |
| Delete Section 102. | 8 |
| 103 - Scope of Work | 9 |
| Delete Subsections 103.02, 103.03, 103.04, 103.05. | 9 |
| 104 - Control of Work | 10 |
| Delete Subsections 104.01, 104.02, 104.04. | 10 |
| 104.06 Use of Roads by Contractor. | 10 |
| 105 - Control of Material | 11 |
| 105.05 Use of Material Found in the Work. | 11 |
| 106 - Acceptance of Work | 12 |
| 106.01 Conformity with Contract Requirements. | 12 |
| 106.02 Visual Inspection. | 13 |
| 107 - Legal Relations and Responsibility to the Public | 15 |
| Delete Subsection 107.05. | 15 |
| 108 - Prosecution and Progress | 16 |
| Delete Section 108. | 16 |
| 109 - Measurement and Payment | 17 |
| Delete Subsections 109.06, 109.07, 109.08, 109.09. | 17 |
| 109.01 Measurement of Work. | 17 |
| 109.02 Measurement Terms and Definitions. | 18 |
| 153 - Contractor Quality Control | 19 |
| 155 - Schedules for Construction Contracts | 20 |
| Delete Section 155. | 20 |
| 209 - Structure Excavation and Backfill | 21 |
Preface Preface_wo_04_06_2023
Delete all but the first paragraph and add the following:
The Forest Service, US Department of Agriculture has adopted FP-14 for construction of National Forest System Roads.
101 - Terms¸ Format¸ and Definitions 101.01_National_11_9_2016 Add the following paragraph to Subsection 101.01:
101.01 Meaning of Terms.
Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.
101.03_National_11_9_2016 Add the following to Subsection 101.03:
101.03 Abbreviations.
(a) Acronyms.
AGAR — Agriculture Acquisition Regulations AFPA — American Forest and Paper Association FSAR — Forest Service Acquisition Regulations MSHA — Mine Safety and Health Administration NESC — National Electrical Safety Code WCLIB — West Coast Lumber Inspection Bureau
(f) Miscellaneous unit abbreviations.
| MP | — | milepost | location | ||
| ppm | — | parts per million | volume | ||
| STA | station | location |
101.04_National_1_22_2020 Make the following changes to Subsection 101.04:
101.04 Definitions.
Delete these definitions and replace the following:
Bid Schedule — The Schedule of Items.
Bridge — A structure, including supports, erected over a depression or an obstruction such as water along a road, a trail, or a railway and having a deck for carrying traffic or other loads.
Contractor — The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “Purchaser”.
Culvert — Any structure with a bottom, regardless of fill depth, depth of invert burial, or presence of horizontal driving surface, or any bottomless (natural channel) structure with footings that will not have wheel loads in direct contact with the top of the structure.
Drawings — (Public Works Contracts) Design sheets or fabrication, erection, or construction details submitted to the CO by the Contractor according to FAR Clause 52.236-21 Specifications and Drawings for Construction. Also refers to submissions and submittals.
Notice to Proceed — (Public Works Contracts) Written notice to the Contractor to begin the contract work.
Right-of-Way — A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
Solicitation— (Public Works Contracts) The complete assembly of documents (whether attached or incorporated by reference) furnished to prospective bidders.
Add the following definitions:
Adjustment in Contract Price — “Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.
Change — “Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.
Forest Service — The United States of America, acting through the Forest Service, U.S. Department of Agriculture.
Neat Line — A line defining the proposed or specified limits of an excavation or structure.
Pioneer Road — Temporary construction access built along the route of the project.
Purchaser — The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.
Protected Streamcourse — A drainage shown on the plans or timber sale area map that requires designated mitigation measures.
Road Order — An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.
Shop Drawings — (Timber and Stewardship Contracts) Referred to as “Drawings” in FP-14, include drawings, diagrams, layouts, schematics, descriptive literature, illustrations, lists or tables, performance and test data, and similar materials furnished by Purchaser to explain in detail specific portions of the work required by the contract.
Utilization Standards — The minimum size and percent soundness of trees described in Public Works contract specifications or Timber Sale and IRTC contract provisions to determine merchantable timber.
Add Figure 101-1—Illustration of road structure terms:
Figure 101-1—Illustration of road structure terms.
102 - Bid¸ Award¸ and Execution of Contract 102.00_National_11_9_2016
Delete Section 102 in its entirety.
Delete Section 102.
103 - Scope of Work 103.00_National_11_9_2016 Delete all of Section 103 except Subsection 103.01 Intent of Contract.
Delete Subsections 103.02, 103.03, 103.04, 103.05.
104 - Control of Work 104.00_National_11_9_2016 Delete Subsections 104.01, 104.02, and 104.04.
Delete Subsections 104.01, 104.02, 104.04.
104.06_National_11_9_2016 Add the following to Subsection 104.06:
104.06 Use of Roads by Contractor.
The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
105 - Control of Material 105.05_National_6_29_2020
105.05 Use of Material Found in the Work.
Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:
Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. Place excess material safely at government-approved location, at no additional cost to government.
106 - Acceptance of Work 106.01_National_7_18_2017 Delete Subsection 106.01 and replace with the following:
106.01 Conformity with Contract Requirements.
Follow the requirements of FAR Clause 52.246-12 Inspection of Construction.
References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.
Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.
Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is more strict.
Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.
When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.
The Government may inspect, sample, or test all work at any time before final acceptance of the project. When the Government tests work, copies of test reports are furnished to the Contractor upon request. Government tests may or may not be performed at the work site. If Contractor testing and inspection is verified by the Government, the Contractor’s results may be used by the Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.
Acceptable work conforming to the contract will be paid for at the contract unit bid price. Four methods of determining conformity and accepting work are described in Subsections 106.02 to 106.05 inclusive. The primary method of acceptance is specified in each Section of work. However, work may be rejected at any time it is found by any of the methods not to comply with the contract.
Remove, repair, or replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted. Removing, repairing, or replacing work; providing temporary traffic control; and any other related work to accomplish conformity will be at no cost to the Government.
(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:
Sampling method;
Number of samples;
Sample transport;
Test procedures;
Testing laboratories;
Reporting;
Estimated time and costs; and Validation process.
If the evaluation requires additional sampling or testing be performed, mutually agree with the Government on witnessing procedures and on sampling and testing by a third-party laboratory. Use a third-party laboratory accredited by the AASHTO accreditation program. Provide proof of the laboratory’s accreditation for the test procedures to be used. Do not use the same laboratory that produced the disputed Government test results or that produced the test results used as a basis for the dispute.
The CO will review the proposed resolution protocol and may modify it before final approval and execution.
The Government will use the approved resolution protocol test results to determine the validity of the disputed testing. If the Government test results are validated, the Contractor will be responsible for all costs associated with developing and performing the resolution protocol. If the Government test results are not validated, the Government will be responsible for all costs associated with developing and performing the resolution protocol. If the validity of the Government test results cannot be determined, the Contractor and Government will equally share all costs associated with developing and carrying out the resolution protocol.
(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:
1. Have the work accepted at a reduced price; or
1. Be given permission to perform corrective measures to bring the work into conformity.
The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.
106.02_National_11_9_2016
Delete Subsection 106.02 and replace with the following:
106.02 Visual Inspection.
Acceptance is based on visual inspection of the work for compliance with the specific contract requirements. Use prevailing industry standards in the absence of specific contract requirements or tolerances.
107 - Legal Relations and Responsibility to the Public 107.05_National_7_18_2017 Delete Subsection 107.05.
Delete Subsection 107.05.
108 - Prosecution and Progress 108.00_National_11_9_2016 Delete Section 108 in its entirety.
Delete Section 108.
109 - Measurement and Payment 109.00_National_11_9_2016 Delete Subsections 109.06, 109.07, 109.08, and 109.09:
Delete Subsections 109.06, 109.07, 109.08, 109.09.
109.01_National_2_22_2019 Delete the third paragraph and Table 109-1 of Subsection 109.01 and replace with the following:
109.01 Measurement of Work.
Take measurements as described in Subsection 109.02 unless otherwise modified by the Measurement Subsection of the section controlling the work being performed. Table 109-1 indicates the accuracy required for quantities of the various pay units used in the Schedule of Items. Use this guide to determine the decimal placement in the final payment.
Table 109-1 Decimal Accuracy of Quantities for Final Payment
| Pay Item |
| Level of Precision |
| Linear Foot |
| 1 |
| Exception--Timber, Steel, and concrete Piles |
| 0.1 |
| Station |
| 0.1 |
| Mile |
| 0.01 |
| Square Foot |
| 0.1 |
| Square Yard |
| 0.1 |
| Each |
| 1 |
| Acre |
| 0.01 |
| Gallon |
| 1 |
| M-Gals. |
| 0.1 |
| Cubic Yard | |
| 1 |
Exception--Structure Excavation; Sheathing Materials; Bedding, Bed Course, and Backfill Materials; Gabions;
0.1
| Exception--Concrete; Masonry |
| 0.01 |
| Pound |
| 1 |
| Ton |
| 0.1 |
Exception--Calcium Chloride;
Sodium Chloride; Hydrated Lime;
Bituminous Materials; Pavements;
Bed Course Materials 0.01
| Hour |
| 0.1 |
| MFBM |
| 0.01 |
| Station Yard |
| 1 |
| Cubic Yard Mile |
| 1 |
| Ton Mile |
| 1 |
109.02_National_11_9_2016 Add the following sentence to Subsection 109.02(b):
109.02 Measurement Terms and Definitions.
(b) Contract quantity.
Contract quantities will be adjusted only when there are errors in the original design of 15% or more.
153 – Contractor Quality Control 155.00_National_11_9_2016 Add the following Subsection:
153.04 (2) (a) Submittal Log At a minimum the contractor shall provide project submittals as shown on the Submittal Log below. Submittal requirements are listed in the Standard Specifications, Supplemental Specifications, and Plans.
Submittal Log
| Log No. |
| Incidental to |
Pay Item(s)
| Description of Submittal |
| Type of Submittal |
| Requirement found in |
Specification No.
/Drawings Additional Specification References
| 1 |
| 151 |
| Schedule and Stages of work |
| Plan |
| FSSS 157.04 |
| 2 |
| 151 |
| Proposed Flight Plan |
| Plan |
| FSSS 157.04 |
| 3 |
| 557 |
| Contractor Furnished Bridge Items |
| Shop Drawing |
| Drawings |
Delete Subsection 153.07 and replace with the following:
153.07 Records and control charts.
Maintain complete testing and inspection records by pay item number and make them accessible to the CO.
155 - Schedules for Construction Contracts 155.00_National_11_9_2016 Delete Section 155 in its entirety.
Delete Section 155.
209 - Structure Excavation and Backfill 209.01_Regional_11_17_2022
209.01 This work consists of excavating material for the construction of structures, except those specifically designated under Section 208. This work also includes preserving channels, shoring and bracing, sealing foundations, dewatering, preparing foundations, bedding, and backfilling.
Material
209.02 Conform to the following Sections and Subsections:
| Backfill material | 704.03 | ||
| Bedding material | 704.02 | ||
| Foundation fill | 704.01 | ||
| Lean concrete backfill | 614 | ||
| Structural concrete, Class S (Seal) | 552 | ||
| Unclassified borrow | 704.06 |
Construction Requirements
209.03 General. Clear the area of vegetation and obstructions according to Sections 201 and 203.
Excavate trenches or foundation pits according to Subsection 208.03. Excavate to foundation grade without disturbing the trench or foundation surface. Foundation grade is the elevation at the bottom of the bedding for installing the structure.
209.04 Channel Preservation. Preserve channels according to Subsection 208.04, except excavate inside separations such as dikes or sandbags.
209.05 Foundation Seal. When foundation seals are necessary, construct a foundation seal according to Subsection 208.06.
209.06 Dewatering. When dewatering is necessary, dewater according to Subsection 208.07.
209.07 Foundation Preparation. Excavate unsuitable material when encountered at foundation grade as directed by the CO.
Where a footing is required to be keyed into undisturbed material, prepare foundation and construct footing according to Subsection 208.08(c).
Backfill and compact with foundation fill according to Subsection 208.08(d).
209.08 Bedding. Place bedding as follows:
(a) For box culverts and structures other than pipe culverts. Construct bedding when specified. Place and grade bedding material in compacted layers not exceeding 6 inches (150 millimeters) in depth. Compact each layer according to Subsection 209.10.
(b) For pipe culverts. Level the foundation. Place uncompacted bedding material over the foundation in a layer of uniform thickness. Lay a 4-inch (100-millimeter) thickness of bedding for pipes with diameters of 12 to 54 inches (300 to 1350 millimeters). Lay a 6-inch (150-millimeter) thickness of bedding for pipe with diameters larger than 54 inches (1350 millimeters). Recess the bedding to receive the joints for pipes with belled joints. Place the culvert on the uncompacted bedding layer and backfill according to Subsection 209.09(b).
(c ) For pipe culverts less than 96 inches in diameter. Unless otherwise shown on the plans provide material for bedding consisting of selected 3 inch minus mineral soil that is readily compactible and free of frozen lumps, chunks of highly plastic clay (with a PI greater than 10), or other objectionable material. Bed the pipe according to subsection 209.08(b). Material for bedding shall be evaluated according to Subsection 106.02.
209.09 Backfill. Backfill as follows:
(a) General. Place backfill layers evenly on all sides of the structure. Extend each layer to the limits of the excavation or natural ground.
Place backfill material in compacted layers not exceeding 6 inches (150 millimeters) in depth.
Do not place backfill material against concrete until 80 percent of the design strength is achieved.
Compact each layer according to Subsection 209.10.
Backfill without damaging or displacing the culvert or structural plate structure. Replace any pipe that is distorted by more than 5 percent of nominal dimensions, or that is ruptured or broken.
(b) Pipe culverts. Backfill according to one of the following:
(1) Pipe culverts. Place and compact backfill material in evenly balanced layers on each side of the pipe to a height of 24” inches (300 millimeters) above the top of the pipe culvert. Complete backfilling to the top of the trench. Place and compact backfill material in the trench in layers not exceeding 6 inches (150 millimeters) in depth according to Subsection 209.10.
(2) Pipe culverts with lean concrete backfill. Place and anchor pipe to prevent floating and movement. Backfill using lean concrete according to Section 614.
(3) Pipe culverts less than 96 inches in diameter. Unless otherwise shown on the plans provide material for backfill consisting of selected 3 inch minus mineral soil that is readily compactible and free of frozen lumps, chunks of highly plastic clay (with a PI greater than 10), or other objectionable material. Backfill according to subsection 209.09(b)(1). Material for backfill shall be evaluated according to Subsection 106.02.
Do not place or backfill pipe that meets any of the following conditions until the excavation and foundation have been approved in writing by the CO:
· Embankment height greater than 10 feet at subgrade centerline.
· Installation in a protected stream course.
· Round pipe with a diameter of 48 inches or greater.
· Pipe arches with a span of 50 inches or greater.
· Any box culvert or structure other than pipe culverts.
(c) Structural plate structures. Place and compact backfill material to a height of 12 inches (300 millimeters) above the top of the structural plate structure. When applicable, complete backfilling and compacting according to Subsection 204.10.
(d) Repair existing pavement areas. See Subsection 418.04.
209.10 Compacting. Compact the embankment using one of the following methods as specified.
(a) Compaction Method 1. Use AASHTO T 27 to determine the quantity of material retained on a No. 4 (4.75-millimeter) sieve. Compact as follows:
(1) More than 80 percent retained on a No. 4 (4.75-millimeter) sieve. Adjust the moisture content to a level suitable for compaction. Fill the interstices around rock with earth or other fine material as practical. Use compression-type rollers at speeds less than 6 feet (1.8 meters) per second and vibratory rollers at speeds less than 3 feet (1 meter) per second. Compact each layer of material full width with one of the following and until there is no visible evidence of further consolidation:
(a) Four roller passes of a vibratory roller having a minimum dynamic force of 40,000 pounds (180 kilonewtons) impact per vibration and a minimum frequency of 1000 vibrations per minute;
(b) Eight roller passes of a 20-ton (20-metric ton) compression-type roller; or
(c) Eight roller passes of a vibratory roller having a minimum dynamic force of 30,000 pounds (130 kilonewtons) impact per vibration and a minimum frequency of 1000 vibrations per minute.
Increase the compactive effort for layers deeper than 12 inches (300 millimeters) as follows:
For each additional 6 inches (150 millimeters) or fraction thereof, increase the number of roller passes in Subsection 209.10(a)(1)(a), by four passes; or For each additional 6 inches (150 millimeters) or fraction thereof, increase the number of roller passes in Subsection 209.10(a)(1)(b) and (c), by eight passes.
(2) 50 to 80 percent retained on a No. 4 (4.75-millimeter) sieve. Classify the material according to AASHTO M 145. Adjust the moisture content of material classified A-1 through A-5 to a moisture content suitable for compaction. Adjust the moisture content of material classified A-6 and A-7 to within 2 percent of the optimum moisture content. Use AASHTO T 99 to determine the optimum moisture content of the portion of the material passing a No. 4 (4.75-millimeter) sieve. Multiply this number by the percentage of material passing a No. 4 (4.75-millimeter) sieve and add 2 percent to determine the optimum moisture content of the material.
Use nonvibratory rollers at speeds less than 6 feet (1.8 meters) per second and vibratory rollers at speeds less than 3 feet (1 meter) per second. Compact each layer of material full width according to Subsection 209.10(a)(1).
(3) Less than 50 percent retained on a No. 4 (4.75-millimeter) sieve. Classify the material according to AASHTO M 145. For material classified A-1 or A-2-4, determine the maximum density according to AASHTO T 99, Method C.
Adjust the moisture content of material classified A-1 through A-5 to a moisture content suitable for compaction. Adjust the moisture content of material classified A6 and A-7 to within 2 percent of the optimum moisture content.
Use compression-type or vibratory rollers. Compact each layer of material full width to at least 95 percent of the maximum density. Determine the in-place density and moisture content according to AASHTO T 310 or other approved test procedures. When required, use AASHTO T 224 to correct for coarse particles.
(b) Compaction Method 2. Adjust the moisture content of the material to a moisture content suitable for compaction. Fill the interstices around rock with earth or other fine material as practical. Operate roller compaction equipment over the full width of each layer until there is no visible evidence of further consolidation or, if when a sheepsfoot roller is used, the roller “walks out” of the layer. Make at least three complete passes. Use compression-type rollers at speeds less than 6 feet (1.8 meters) per second and vibratory rollers at speeds less than 3 feet (1 meter) per second. Ensure rollers meet the following requirements:
(1) Steel wheeled rollers, other than vibratory, capable of exerting a force of not less than 250 pounds per inch (4.5 kilogram/millimeter) of width of the compression roll or rolls.
(2) Vibratory steel wheeled rollers equipped with amplitude and frequency controls with a minimum dynamic force of 30,000 pounds (130 kilonewtons) impact per vibration, specifically designed to compact the material on which it is used.
(3) Pneumatic-tired rollers with smooth tread tires of equal size that will provide a uniform compacting pressure for the full width of the roller and capable of exerting a ground pressure of at least 80 psi (550 Kilopascals).
(4) Sheepsfoot, tamping, or grid rollers capable of exerting a force of 250 pounds per inch (4.5 kilogram/millimeter) of width of roller drum.
(c) Compaction Method 3. Adjust the moisture content of the material to a moisture content suitable for compaction. Fill the interstices around rock with earth or other fine material as practical. Operate hauling and spreading equipment uniformly over the full width of each layer until there is no visible evidence of further consolidation. Make at least three complete passes.
(d) Compaction Method 4. Adjust the moisture content of the material to a moisture content suitable for compaction. Fill the interstices around rock with earth or other fine material as practical. Operate hauling and spreading equipment uniformly over the full width of each layer.
(e) Compaction Method 5. Adjust the moisture content of the material to a moisture content suitable for compaction. Compact the complete surface with a bucket of an excavator larger than 39,000 pounds (18 metric ton) Gross Vehicle Weight using a minimum of three blows. Overlap compaction by ½ width of bucket.
(f) Compaction Method 6. Adjust the moisture content of the material to a moisture content suitable for compaction. Compact using an approved mechanical tamper for a minimum of three complete passes.
When compacting with rollers or hauling and spreading equipment is not practical, use approved mechanical tampers for a minimum of three complete passes
209.11 Acceptance. See Table 209-1 for sampling, testing, and acceptance requirements.
Material for backfill, bedding, and foundation fill will be evaluated under Subsections 106.02 and 106.04, except lean concrete for bedding or backfill will be evaluated according to Section 614.
Structural excavation and backfill work will be evaluated under Subsections 106.02 and 106.04.
Shoring and bracing will be evaluated under Subsections 106.02 and 106.04.
Clearing and removal of obstructions will be evaluated under Sections 201 and 203.
Seal concrete will be evaluated under Section 552.
Measurement and Payment
209.12 Do not measure structure excavation and backfill for payment. See Subsection 109.05.
Measure foundation fill under Section 208.
Do not measure excavation and concrete for cofferdam seals for payment.
| Material or Product (Subsection) |
| Type of Acceptance (Subsection) |
| Characteristic |
| Category |
| Test Methods Specifications |
| Sampling Frequency |
| Point of Sampling |
| Split Sample |
| Reporting Time |
Source
| Backfill material(1) (704.03) |
| Measured and tested for conformance (106.04 & 105) |
| Classification |
| − |
| AASHTO M 145 |
| 1 per soil type |
| Source of material |
| Yes |
| Before using in work |
| Gradation |
| − |
| AASHTO T 27 & T 11 |
| " |
| " |
| " |
| " |
| Bedding material(1) (704.02) |
| " |
| " |
| − |
| " |
| " |
| " |
| " |
| " |
| Foundation fill(1) (704.01) |
| " |
| Classification |
| − |
| AASHTO M 145 |
| " |
| " |
| " |
| " |
| Gradation |
| − |
| AASHTO T 27 & T 11 |
| " |
| " |
| " |
| " |
| Unclassified borrow(1) (704.06) |
| " |
| Classification |
| − |
| AASHTO M 145 |
| " |
| " |
| " |
| " |
Table 209-1 Sampling, Testing, and Acceptance Requirement
Table 209-1 (continued) Sampling, Testing, and Acceptance Requirements
| Material or Product (Subsection) |
| Type of Acceptance (Subsection) |
| Characteristic |
| Category |
| Test Methods Specifications |
| Sampling Frequency |
| Point of Sampling |
| Split Sample |
| Reporting Time |
Production
| Backfill material (704.03) |
| Measured and tested for conformance (106.04) |
| Moisture- density |
| − |
| AASHTO T 99, |
Method C(2)
| 1 per soil type |
| Source of material |
| Yes |
| Before using in work |
| Density |
| − |
| AASHTO |
T 310 or other approved procedures
| 2 per lift |
| In-place |
| No |
| Before placing next layer |
| Bedding material (704.02) |
| " |
| Moisture- density |
| − |
| AASHTO T 99, |
Method C(2)
| 1 per soil type |
| Source of material |
| Yes |
| Before using in work |
| Density |
| − |
| AASHTO |
T 310 or other approved procedures
| 2 per lift |
| In-place |
| No |
| Before placing next layer |
| Foundation fill (704.01) |
| " |
| Moisture- density |
| − |
| AASHTO T 99, |
Method C(2)
| 1 per soil type |
| Source of material |
| Yes |
| Before using in work |
| Density |
| − |
| AASHTO |
T 310 or other approved procedures
| 2 per lift |
| In-place |
| No |
| Before placing next layer |
| Unclassified borrow (704.06) |
| " |
| Moisture- density |
| − |
| AASHTO T 99, |
Method C(2)
| 1 per soil type |
| Source of material |
| Yes |
| Before using in work |
| Density |
| − |
| AASHTO |
T 310 or other approved procedures
| 2 per lift |
| In-place |
| No |
| Before placing next layer |
| (1) Not required when using Government-provided source. |
| (2) Minimum of 5 points per proctor. |