Fort Peck Butterfly Valve Rehabilitation Powerhouse 2

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W9128F23R0009
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Fort Peck, Montana 59223, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks proposals to refurbish eighteen foot diameter spiral case inlet butterfly valves and associated systems for two generator units at Fort Peck Dam in Montana. The U.S. Army Corps of Engineers, Omaha District intends to award a contract to improve internal bypass leakage, address end of life components, conduct non-destructive testing, replace seals and bearings, and refurbish coatings. Proposals will be evaluated based on past performance, technical approach, personnel qualifications, and extent of small business participation. The deadline for responses is April 13, 2023.

The solicitation carries no set-aside designations. The primary NAICS code is 237990 and work must be performed at Fort Peck Dam in Montana. Optional bid items include exterior penstock repairs and valve disc welding work valued under $10 million to refurbish eighteen valves and systems. The selected contractor must complete work by 2024 while ensuring at least 15% of costs are performed by small business subcontractors, excluding materials.

Notice text

11 versions

Update #11 · Latest ·

***NOTE*** AMD0003 has been uploaded to the Attachments to change the NTP date from 31 May 2023 to 8 June 2023. Please be sure to acknowledge all amendments when providing your proposal this wee on or before 13 April 2023 by 1400 CT.

***********************************************************************************************************************

Four (4) Zip files with Pictures of the Project site have been upload in response to a bidder nquiry

***********************************************************************************************************************

***NOTE: Second Site Visit Sign-In Sheet is posted under attachments.

W9128F23R0009 Amendment 0002 has been issued.  See attached Amendment for new CLOSE Date and for details of a second site visit date.

**********************************************************************************************************************

***NOTE - Requested Reference documents have been attached. There are four (4) files - see REF File 1 through 4 below.

***Site Visit Sign In Sheet included in the Attachment folder.

***Notice - Amendment 0001 has been posted to the attachments along with the updated 01 33 00 Am0001. Please review AM0001 and upon sending in the offer, please acknowledge any and all amendments.

***Notice - Reference Drawings have been posted.  See below. ***

***Notice - Document Files issues have been resolved. Please reach out to me if there is still having issues opening the documents - thank you Lynne***

***Notice ~ there is a known issues with the uploaded Specification and Drawing documents. We are working to resolve the issues.  No need to send me an email. will provide an update as soon as we have the documents. Thank you Lynne Reed***

On 27 February 2023, the U.S. Army Corps of Engineers (USACE), Omaha District (NWO), is pursuing to award a contract to refurbish the eighteen (18} foot diameter spiral case inlet butterfly valves (BFVs) and associated systems for the two (2) generator units for Powerhouse 2 at Fort Peck Dam located near Glasgow, MT. This includes associated equipment such as valve operators (hydraulic cylinder), bypass piping and valves, spiral case and tunnel drain valves, valve access hatches and maintenance platforms, hydraulic power units (HPUs} and BFV controls. Non­destructive examination (NDE) of the penstock tunnels will also be required to assess tunnel wall corrosion. 

The BFVs will be refurbished in-place to improve internal bypass leakage on units 4 and 5 valve discs and address component end of life and system reliability. Refurbish existing bronze disc seals with new stainless steel mounting/adjusting hardware and o-rings, address coating deterioration and corrosion by sand blasting and recoating, perform non-destructive examination (NDE) of discs after blast and prior to re-coating, and replace BFV shaft and thrust bearings. Refurbished penstock BFV systems should be functional with limited maintenance required for a 50-year life. This contract may also include optional bid items to conduct paint repairs on the exterior of the penstocks and weld repairs on the valve discs. 

The contractor will be required to provide and implement proper PPE as necessary throughout the duration of the project. Contractor will be required to provide all equipment and certifications / licensure necessary to complete this project. 
Small Businesses are reminded under FAR 52.219-14, Limitations on Subcontracting that they must perform at least 15% of the cost of the contract, not including cost of materials, with their own employees for general construction-type procurement. 

**NOTE** Bidder Inquiry is open when the Solicitation is posted.** 

Update #10 ·

Four (4) Zip files with Pictures of the Project site have been upload in response to a bidder nquiry

***********************************************************************************************************************

***NOTE: Second Site Visit Sign-In Sheet is posted under attachments.

W9128F23R0009 Amendment 0002 has been issued.  See attached Amendment for new CLOSE Date and for details of a second site visit date.

**********************************************************************************************************************

***NOTE - Requested Reference documents have been attached. There are four (4) files - see REF File 1 through 4 below.

***Site Visit Sign In Sheet included in the Attachment folder.

***Notice - Amendment 0001 has been posted to the attachments along with the updated 01 33 00 Am0001. Please review AM0001 and upon sending in the offer, please acknowledge any and all amendments.

***Notice - Reference Drawings have been posted.  See below. ***

***Notice - Document Files issues have been resolved. Please reach out to me if there is still having issues opening the documents - thank you Lynne***

***Notice ~ there is a known issues with the uploaded Specification and Drawing documents. We are working to resolve the issues.  No need to send me an email. will provide an update as soon as we have the documents. Thank you Lynne Reed***

On 27 February 2023, the U.S. Army Corps of Engineers (USACE), Omaha District (NWO), is pursuing to award a contract to refurbish the eighteen (18} foot diameter spiral case inlet butterfly valves (BFVs) and associated systems for the two (2) generator units for Powerhouse 2 at Fort Peck Dam located near Glasgow, MT. This includes associated equipment such as valve operators (hydraulic cylinder), bypass piping and valves, spiral case and tunnel drain valves, valve access hatches and maintenance platforms, hydraulic power units (HPUs} and BFV controls. Non­destructive examination (NDE) of the penstock tunnels will also be required to assess tunnel wall corrosion. 

The BFVs will be refurbished in-place to improve internal bypass leakage on units 4 and 5 valve discs and address component end of life and system reliability. Refurbish existing bronze disc seals with new stainless steel mounting/adjusting hardware and o-rings, address coating deterioration and corrosion by sand blasting and recoating, perform non-destructive examination (NDE) of discs after blast and prior to re-coating, and replace BFV shaft and thrust bearings. Refurbished penstock BFV systems should be functional with limited maintenance required for a 50-year life. This contract may also include optional bid items to conduct paint repairs on the exterior of the penstocks and weld repairs on the valve discs. 

The contractor will be required to provide and implement proper PPE as necessary throughout the duration of the project. Contractor will be required to provide all equipment and certifications / licensure necessary to complete this project. 
Small Businesses are reminded under FAR 52.219-14, Limitations on Subcontracting that they must perform at least 15% of the cost of the contract, not including cost of materials, with their own employees for general construction-type procurement. 

**NOTE** Bidder Inquiry is open when the Solicitation is posted.** 

Update #9 ·

***NOTE: Second Site Visit Sign-In Sheet is posted under attachments.

W9128F23R0009 Amendment 0002 has been issued.  See attached Amendment for new CLOSE Date and for details of a second site visit date.

**********************************************************************************************************************

***NOTE - Requested Reference documents have been attached. There are four (4) files - see REF File 1 through 4 below.

***Site Visit Sign In Sheet included in the Attachment folder.

***Notice - Amendment 0001 has been posted to the attachments along with the updated 01 33 00 Am0001. Please review AM0001 and upon sending in the offer, please acknowledge any and all amendments.

***Notice - Reference Drawings have been posted.  See below. ***

***Notice - Document Files issues have been resolved. Please reach out to me if there is still having issues opening the documents - thank you Lynne***

***Notice ~ there is a known issues with the uploaded Specification and Drawing documents. We are working to resolve the issues.  No need to send me an email. will provide an update as soon as we have the documents. Thank you Lynne Reed***

On 27 February 2023, the U.S. Army Corps of Engineers (USACE), Omaha District (NWO), is pursuing to award a contract to refurbish the eighteen (18} foot diameter spiral case inlet butterfly valves (BFVs) and associated systems for the two (2) generator units for Powerhouse 2 at Fort Peck Dam located near Glasgow, MT. This includes associated equipment such as valve operators (hydraulic cylinder), bypass piping and valves, spiral case and tunnel drain valves, valve access hatches and maintenance platforms, hydraulic power units (HPUs} and BFV controls. Non­destructive examination (NDE) of the penstock tunnels will also be required to assess tunnel wall corrosion. 

The BFVs will be refurbished in-place to improve internal bypass leakage on units 4 and 5 valve discs and address component end of life and system reliability. Refurbish existing bronze disc seals with new stainless steel mounting/adjusting hardware and o-rings, address coating deterioration and corrosion by sand blasting and recoating, perform non-destructive examination (NDE) of discs after blast and prior to re-coating, and replace BFV shaft and thrust bearings. Refurbished penstock BFV systems should be functional with limited maintenance required for a 50-year life. This contract may also include optional bid items to conduct paint repairs on the exterior of the penstocks and weld repairs on the valve discs. 

The contractor will be required to provide and implement proper PPE as necessary throughout the duration of the project. Contractor will be required to provide all equipment and certifications / licensure necessary to complete this project. 
Small Businesses are reminded under FAR 52.219-14, Limitations on Subcontracting that they must perform at least 15% of the cost of the contract, not including cost of materials, with their own employees for general construction-type procurement. 

**NOTE** Bidder Inquiry is open when the Solicitation is posted.** 

Update #8 ·

W9128F23R0009 Amendment 0002 has been issued.  See attached Amendment for new CLOSE Date and for details of a second site visit date.

**********************************************************************************************************************

***NOTE - Requested Reference documents have been attached. There are four (4) files - see REF File 1 through 4 below.

***Site Visit Sign In Sheet included in the Attachment folder.

***Notice - Amendment 0001 has been posted to the attachments along with the updated 01 33 00 Am0001. Please review AM0001 and upon sending in the offer, please acknowledge any and all amendments.

***Notice - Reference Drawings have been posted.  See below. ***

***Notice - Document Files issues have been resolved. Please reach out to me if there is still having issues opening the documents - thank you Lynne***

***Notice ~ there is a known issues with the uploaded Specification and Drawing documents. We are working to resolve the issues.  No need to send me an email. will provide an update as soon as we have the documents. Thank you Lynne Reed***

On 27 February 2023, the U.S. Army Corps of Engineers (USACE), Omaha District (NWO), is pursuing to award a contract to refurbish the eighteen (18} foot diameter spiral case inlet butterfly valves (BFVs) and associated systems for the two (2) generator units for Powerhouse 2 at Fort Peck Dam located near Glasgow, MT. This includes associated equipment such as valve operators (hydraulic cylinder), bypass piping and valves, spiral case and tunnel drain valves, valve access hatches and maintenance platforms, hydraulic power units (HPUs} and BFV controls. Non­destructive examination (NDE) of the penstock tunnels will also be required to assess tunnel wall corrosion. 

The BFVs will be refurbished in-place to improve internal bypass leakage on units 4 and 5 valve discs and address component end of life and system reliability. Refurbish existing bronze disc seals with new stainless steel mounting/adjusting hardware and o-rings, address coating deterioration and corrosion by sand blasting and recoating, perform non-destructive examination (NDE) of discs after blast and prior to re-coating, and replace BFV shaft and thrust bearings. Refurbished penstock BFV systems should be functional with limited maintenance required for a 50-year life. This contract may also include optional bid items to conduct paint repairs on the exterior of the penstocks and weld repairs on the valve discs. 

The contractor will be required to provide and implement proper PPE as necessary throughout the duration of the project. Contractor will be required to provide all equipment and certifications / licensure necessary to complete this project. 
Small Businesses are reminded under FAR 52.219-14, Limitations on Subcontracting that they must perform at least 15% of the cost of the contract, not including cost of materials, with their own employees for general construction-type procurement. 

**NOTE** Bidder Inquiry is open when the Solicitation is posted.** 

Update #7 ·

***NOTE - Requested Reference documents have been attached. There are four (4) files - see REF File 1 through 4 below.

***Site Visit Sign In Sheet included in the Attachment folder.

***Notice - Amendment 0001 has been posted to the attachments along with the updated 01 33 00 Am0001. Please review AM0001 and upon sending in the offer, please acknowledge any and all amendments.

***Notice - Reference Drawings have been posted.  See below. ***

***Notice - Document Files issues have been resolved. Please reach out to me if there is still having issues opening the documents - thank you Lynne***

***Notice ~ there is a known issues with the uploaded Specification and Drawing documents. We are working to resolve the issues.  No need to send me an email. will provide an update as soon as we have the documents. Thank you Lynne Reed***

On 27 February 2023, the U.S. Army Corps of Engineers (USACE), Omaha District (NWO), is pursuing to award a contract to refurbish the eighteen (18} foot diameter spiral case inlet butterfly valves (BFVs) and associated systems for the two (2) generator units for Powerhouse 2 at Fort Peck Dam located near Glasgow, MT. This includes associated equipment such as valve operators (hydraulic cylinder), bypass piping and valves, spiral case and tunnel drain valves, valve access hatches and maintenance platforms, hydraulic power units (HPUs} and BFV controls. Non­destructive examination (NDE) of the penstock tunnels will also be required to assess tunnel wall corrosion. 

The BFVs will be refurbished in-place to improve internal bypass leakage on units 4 and 5 valve discs and address component end of life and system reliability. Refurbish existing bronze disc seals with new stainless steel mounting/adjusting hardware and o-rings, address coating deterioration and corrosion by sand blasting and recoating, perform non-destructive examination (NDE) of discs after blast and prior to re-coating, and replace BFV shaft and thrust bearings. Refurbished penstock BFV systems should be functional with limited maintenance required for a 50-year life. This contract may also include optional bid items to conduct paint repairs on the exterior of the penstocks and weld repairs on the valve discs. 

The contractor will be required to provide and implement proper PPE as necessary throughout the duration of the project. Contractor will be required to provide all equipment and certifications / licensure necessary to complete this project. 
Small Businesses are reminded under FAR 52.219-14, Limitations on Subcontracting that they must perform at least 15% of the cost of the contract, not including cost of materials, with their own employees for general construction-type procurement. 

**NOTE** Bidder Inquiry is open when the Solicitation is posted.** 

Update #6 ·

***Site Visit Sign In Sheet included in the Attachment folder.

***Notice - Amendment 0001 has been posted to the attachments along with the updated 01 33 00 Am0001. Please review AM0001 and upon sending in the offer, please acknowledge any and all amendments.

***Notice - Reference Drawings have been posted.  See below. ***

***Notice - Document Files issues have been resolved. Please reach out to me if there is still having issues opening the documents - thank you Lynne***

***Notice ~ there is a known issues with the uploaded Specification and Drawing documents. We are working to resolve the issues.  No need to send me an email. will provide an update as soon as we have the documents. Thank you Lynne Reed***

On 27 February 2023, the U.S. Army Corps of Engineers (USACE), Omaha District (NWO), is pursuing to award a contract to refurbish the eighteen (18} foot diameter spiral case inlet butterfly valves (BFVs) and associated systems for the two (2) generator units for Powerhouse 2 at Fort Peck Dam located near Glasgow, MT. This includes associated equipment such as valve operators (hydraulic cylinder), bypass piping and valves, spiral case and tunnel drain valves, valve access hatches and maintenance platforms, hydraulic power units (HPUs} and BFV controls. Non­destructive examination (NDE) of the penstock tunnels will also be required to assess tunnel wall corrosion. 

The BFVs will be refurbished in-place to improve internal bypass leakage on units 4 and 5 valve discs and address component end of life and system reliability. Refurbish existing bronze disc seals with new stainless steel mounting/adjusting hardware and o-rings, address coating deterioration and corrosion by sand blasting and recoating, perform non-destructive examination (NDE) of discs after blast and prior to re-coating, and replace BFV shaft and thrust bearings. Refurbished penstock BFV systems should be functional with limited maintenance required for a 50-year life. This contract may also include optional bid items to conduct paint repairs on the exterior of the penstocks and weld repairs on the valve discs. 

The contractor will be required to provide and implement proper PPE as necessary throughout the duration of the project. Contractor will be required to provide all equipment and certifications / licensure necessary to complete this project. 
Small Businesses are reminded under FAR 52.219-14, Limitations on Subcontracting that they must perform at least 15% of the cost of the contract, not including cost of materials, with their own employees for general construction-type procurement. 

**NOTE** Bidder Inquiry is open when the Solicitation is posted.** 

Update #5 ·

***Notice - Amendment 0001 has been posted to the attachments along with the updated 01 33 00 Am0001. Please review AM0001 and upon sending in the offer, please acknowledge any and all amendments.

***Notice - Reference Drawings have been posted.  See below. ***

***Notice - Document Files issues have been resolved. Please reach out to me if there is still having issues opening the documents - thank you Lynne***

***Notice ~ there is a known issues with the uploaded Specification and Drawing documents. We are working to resolve the issues.  No need to send me an email. will provide an update as soon as we have the documents. Thank you Lynne Reed***

On 27 February 2023, the U.S. Army Corps of Engineers (USACE), Omaha District (NWO), is pursuing to award a contract to refurbish the eighteen (18} foot diameter spiral case inlet butterfly valves (BFVs) and associated systems for the two (2) generator units for Powerhouse 2 at Fort Peck Dam located near Glasgow, MT. This includes associated equipment such as valve operators (hydraulic cylinder), bypass piping and valves, spiral case and tunnel drain valves, valve access hatches and maintenance platforms, hydraulic power units (HPUs} and BFV controls. Non­destructive examination (NDE) of the penstock tunnels will also be required to assess tunnel wall corrosion. 

The BFVs will be refurbished in-place to improve internal bypass leakage on units 4 and 5 valve discs and address component end of life and system reliability. Refurbish existing bronze disc seals with new stainless steel mounting/adjusting hardware and o-rings, address coating deterioration and corrosion by sand blasting and recoating, perform non-destructive examination (NDE) of discs after blast and prior to re-coating, and replace BFV shaft and thrust bearings. Refurbished penstock BFV systems should be functional with limited maintenance required for a 50-year life. This contract may also include optional bid items to conduct paint repairs on the exterior of the penstocks and weld repairs on the valve discs. 

The contractor will be required to provide and implement proper PPE as necessary throughout the duration of the project. Contractor will be required to provide all equipment and certifications / licensure necessary to complete this project. 
Small Businesses are reminded under FAR 52.219-14, Limitations on Subcontracting that they must perform at least 15% of the cost of the contract, not including cost of materials, with their own employees for general construction-type procurement. 

**NOTE** Bidder Inquiry is open when the Solicitation is posted.** 

Update #4 ·

***Notice - Reference Drawings have been posted.  See below. ***

***Notice - Document Files issues have been resolved. Please reach out to me if there is still having issues opening the documents - thank you Lynne***

***Notice ~ there is a known issues with the uploaded Specification and Drawing documents. We are working to resolve the issues.  No need to send me an email. will provide an update as soon as we have the documents. Thank you Lynne Reed***

On 27 February 2023, the U.S. Army Corps of Engineers (USACE), Omaha District (NWO), is pursuing to award a contract to refurbish the eighteen (18} foot diameter spiral case inlet butterfly valves (BFVs) and associated systems for the two (2) generator units for Powerhouse 2 at Fort Peck Dam located near Glasgow, MT. This includes associated equipment such as valve operators (hydraulic cylinder), bypass piping and valves, spiral case and tunnel drain valves, valve access hatches and maintenance platforms, hydraulic power units (HPUs} and BFV controls. Non­destructive examination (NDE) of the penstock tunnels will also be required to assess tunnel wall corrosion. 

The BFVs will be refurbished in-place to improve internal bypass leakage on units 4 and 5 valve discs and address component end of life and system reliability. Refurbish existing bronze disc seals with new stainless steel mounting/adjusting hardware and o-rings, address coating deterioration and corrosion by sand blasting and recoating, perform non-destructive examination (NDE) of discs after blast and prior to re-coating, and replace BFV shaft and thrust bearings. Refurbished penstock BFV systems should be functional with limited maintenance required for a 50-year life. This contract may also include optional bid items to conduct paint repairs on the exterior of the penstocks and weld repairs on the valve discs. 

The contractor will be required to provide and implement proper PPE as necessary throughout the duration of the project. Contractor will be required to provide all equipment and certifications / licensure necessary to complete this project. 
Small Businesses are reminded under FAR 52.219-14, Limitations on Subcontracting that they must perform at least 15% of the cost of the contract, not including cost of materials, with their own employees for general construction-type procurement. 

**NOTE** Bidder Inquiry is open when the Solicitation is posted.** 

Update #3 ·

***Notice - Document Files issues have been resolved. Please reach out to me if there is still having issues opening the documents - thank you Lynne***

***Notice ~ there is a known issues with the uploaded Specification and Drawing documents. We are working to resolve the issues.  No need to send me an email. will provide an update as soon as we have the documents. Thank you Lynne Reed***

On 27 February 2023, the U.S. Army Corps of Engineers (USACE), Omaha District (NWO), is pursuing to award a contract to refurbish the eighteen (18} foot diameter spiral case inlet butterfly valves (BFVs) and associated systems for the two (2) generator units for Powerhouse 2 at Fort Peck Dam located near Glasgow, MT. This includes associated equipment such as valve operators (hydraulic cylinder), bypass piping and valves, spiral case and tunnel drain valves, valve access hatches and maintenance platforms, hydraulic power units (HPUs} and BFV controls. Non­destructive examination (NDE) of the penstock tunnels will also be required to assess tunnel wall corrosion. 

The BFVs will be refurbished in-place to improve internal bypass leakage on units 4 and 5 valve discs and address component end of life and system reliability. Refurbish existing bronze disc seals with new stainless steel mounting/adjusting hardware and o-rings, address coating deterioration and corrosion by sand blasting and recoating, perform non-destructive examination (NDE) of discs after blast and prior to re-coating, and replace BFV shaft and thrust bearings. Refurbished penstock BFV systems should be functional with limited maintenance required for a 50-year life. This contract may also include optional bid items to conduct paint repairs on the exterior of the penstocks and weld repairs on the valve discs. 

The contractor will be required to provide and implement proper PPE as necessary throughout the duration of the project. Contractor will be required to provide all equipment and certifications / licensure necessary to complete this project. 
Small Businesses are reminded under FAR 52.219-14, Limitations on Subcontracting that they must perform at least 15% of the cost of the contract, not including cost of materials, with their own employees for general construction-type procurement. 

**NOTE** Bidder Inquiry is open when the Solicitation is posted.** 

Update #2 ·

***Notice ~ there is a known issues with the uploaded Specification and Drawing documents. We are working to resolve the issues.  No need to send me an email. will provide an update as soon as we have the documents. Thank you Lynne Reed***

On 27 February 2023, the U.S. Army Corps of Engineers (USACE), Omaha District (NWO), is pursuing to award a contract to refurbish the eighteen (18} foot diameter spiral case inlet butterfly valves (BFVs) and associated systems for the two (2) generator units for Powerhouse 2 at Fort Peck Dam located near Glasgow, MT. This includes associated equipment such as valve operators (hydraulic cylinder), bypass piping and valves, spiral case and tunnel drain valves, valve access hatches and maintenance platforms, hydraulic power units (HPUs} and BFV controls. Non­destructive examination (NDE) of the penstock tunnels will also be required to assess tunnel wall corrosion. 

The BFVs will be refurbished in-place to improve internal bypass leakage on units 4 and 5 valve discs and address component end of life and system reliability. Refurbish existing bronze disc seals with new stainless steel mounting/adjusting hardware and o-rings, address coating deterioration and corrosion by sand blasting and recoating, perform non-destructive examination (NDE) of discs after blast and prior to re-coating, and replace BFV shaft and thrust bearings. Refurbished penstock BFV systems should be functional with limited maintenance required for a 50-year life. This contract may also include optional bid items to conduct paint repairs on the exterior of the penstocks and weld repairs on the valve discs. 

The contractor will be required to provide and implement proper PPE as necessary throughout the duration of the project. Contractor will be required to provide all equipment and certifications / licensure necessary to complete this project. 
Small Businesses are reminded under FAR 52.219-14, Limitations on Subcontracting that they must perform at least 15% of the cost of the contract, not including cost of materials, with their own employees for general construction-type procurement. 

**NOTE** Bidder Inquiry is open when the Solicitation is posted.** 

Update #1 ·

On 27 February 2023, the U.S. Army Corps of Engineers (USACE), Omaha District (NWO), is pursuing to award a contract to refurbish the eighteen (18} foot diameter spiral case inlet butterfly valves (BFVs) and associated systems for the two (2) generator units for Powerhouse 2 at Fort Peck Dam located near Glasgow, MT. This includes associated equipment such as valve operators (hydraulic cylinder), bypass piping and valves, spiral case and tunnel drain valves, valve access hatches and maintenance platforms, hydraulic power units (HPUs} and BFV controls. Non­destructive examination (NDE) of the penstock tunnels will also be required to assess tunnel wall corrosion. 

The BFVs will be refurbished in-place to improve internal bypass leakage on units 4 and 5 valve discs and address component end of life and system reliability. Refurbish existing bronze disc seals with new stainless steel mounting/adjusting hardware and o-rings, address coating deterioration and corrosion by sand blasting and recoating, perform non-destructive examination (NDE) of discs after blast and prior to re-coating, and replace BFV shaft and thrust bearings. Refurbished penstock BFV systems should be functional with limited maintenance required for a 50-year life. This contract may also include optional bid items to conduct paint repairs on the exterior of the penstocks and weld repairs on the valve discs. 

The contractor will be required to provide and implement proper PPE as necessary throughout the duration of the project. Contractor will be required to provide all equipment and certifications / licensure necessary to complete this project. 
Small Businesses are reminded under FAR 52.219-14, Limitations on Subcontracting that they must perform at least 15% of the cost of the contract, not including cost of materials, with their own employees for general construction-type procurement. 

**NOTE** Bidder Inquiry is open when the Solicitation is posted.** 

Files

File Type Posted
W9128F23R0009 AMD 00003.pdf PDF
W9128F23R0009 Unit 4 pics 1 of 2.zip ZIP file
W9128F23R0009 Unit 4 pics 2 of 2.zip ZIP file
W9128F23R0009 Unit 5 pics 1 of 2.zip ZIP file
17Nov22 FP BFV Industry Day Presentation .pdf PDF
W9128F23R0009 Unit 5 pics 2 of 2.zip ZIP file
W9128F23R0009 30MAR2023 Site Visit Roster.pdf PDF
W9128F23R0009 AMD 00002.pdf PDF
Ref File PP2 3-4 - 18ft_BFV__Manual_1960.pdf PDF
Ref File 1-4 5Dec19 NDT Report FP BFV Unit 4.pdf PDF
Ref File 2-4 5May20 NDT Report FP BFV Unit 5.pdf PDF
Ref File PP2 4-4 - 18Ft_BFV_Design-Specs_1959.pdf PDF
W9128F23R0009 - 3_9_2023 Site Visit Sign in.pdf PDF
W9128F23R0009 AM0001.pdf PDF
01 33 00 AM0001.pdf PDF
FPP_PENSTOCK BUTTERFLY VALVE REHAB VOL2 (PH2)_REFERENCE_BCOES_4-4-22_Part6.pdf PDF
FPP_PENSTOCK BUTTERFLY VALVE REHAB VOL2 (PH2)_REFERENCE_BCOES_4-4-22_Part10.pdf PDF
FPP_PENSTOCK BUTTERFLY VALVE REHAB VOL2 (PH2)_REFERENCE_BCOES_4-4-22_Part8.pdf PDF
FPP_PENSTOCK BUTTERFLY VALVE REHAB VOL2 (PH2)_REFERENCE_BCOES_4-4-22_Part11.pdf PDF
FPP_PENSTOCK BUTTERFLY VALVE REHAB VOL2 (PH2)_REFERENCE_BCOES_4-4-22_Part1.pdf PDF
FPP_PENSTOCK BUTTERFLY VALVE REHAB VOL2 (PH2)_REFERENCE_BCOES_4-4-22_Part2.pdf PDF
FPP_PENSTOCK BUTTERFLY VALVE REHAB VOL2 (PH2)_REFERENCE_BCOES_4-4-22_Part4.pdf PDF
FPP_PENSTOCK BUTTERFLY VALVE REHAB VOL2 (PH2)_REFERENCE_BCOES_4-4-22_Part7.pdf PDF
FPP_PENSTOCK BUTTERFLY VALVE REHAB VOL2 (PH2)_REFERENCE_BCOES_4-4-22_Part9.pdf PDF
FPP_PENSTOCK BUTTERFLY VALVE REHAB VOL2 (PH2)_REFERENCE_BCOES_4-4-22_Part3.pdf PDF
FPP_PENSTOCK BUTTERFLY VALVE REHAB VOL2 (PH2)_REFERENCE_BCOES_4-4-22_Part5.pdf PDF
W9128F23R0009 FP BDFV Sol DWGs Complete 3 of 3.pdf PDF
W9128F23R0009 FP Butterfly valve Rehab Specs 2 of 3.pdf PDF
W9128F23R0009 FP Butterfly Valve Advertisement 1 of 3.pdf PDF
W9128F23R0009 Butterfly Valve Drawings 1_23 3 of 3.pdf PDF
W9128F23R0009 FP Butterfly valve Rehab Specs 2 of 3.pdf PDF
Show all 31

Notice history

Notice Type Posted
Fort Peck Butterfly Valve Rehabilitation Powerhouse 2 Award Award Notice
This notice Latest solicitation Solicitation
Fort Peck Butterfly Valve Rehabilitation Powerhouse 2 Pre-Solicitation
Fort Peck Butterfly Valves Virtual Industry Day Original Special Notice

Similar open opportunities

Opportunity Agency Set-aside Responses due
Denison Valve Replacement NAICS 237990 ENDIST Tulsa No set-aside
Bonneville Powerhouse II Unwatering Pump Replacement United States · NAICS 237990 ENDIST Portland Total Small Business
John day DAM navigation lock tainter valve (TV) repairs TV3 and TV4 Location and Access Details. Oregon Side Physical Access, Near Rufus, OR 97050 accessible via I-84, Exit 109. Washington Side (Closest Town), Goldendale, WA 98620 approximately 20 miles north across the river. River Location, Mile 216.6 on the Columbia River, joining Sherman County, Oregon, and Klickitat County, Washington. 98628 · NAICS 237990 ENDIST Portland No set-aside
Valve, btfly NAICS 332919 Land and Maritime No set-aside
Navigation lock tainter valve (TV) repair, TV1 The Dalles Dam (Washington side), Lyle, WA 98635. 98635 · NAICS 237990 ENDIST Portland No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors