This solicitation document requests proposals for the rehabilitation of butterfly valves and associated systems at Fort Peck Dam in Montana. Key details include refurbishing eighteen-foot diameter spiral case inlet butterfly valves for two generator units, performing nondestructive testing of penstock tunnels, and conducting optional paint repairs and weld repairs. Proposals are due by March 30, 2023 with contract award by late 2023 or early 2024. The pricing schedule includes line items for mobilization, testing, new components, and a lump sum for remaining work. At least 20% of contract dollars must be subcontracted to small businesses. The U.S. Army Corps of Engineers Omaha District will evaluate proposals on factors such as past performance, technical approach, personnel qualifications, and small business participation.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fort Peck Butterfly Valve Replacement, Fort Peck Dam, Montana
RETURN WITH OFFER: INFORMATION REQUIRED BY SECTIONS 00 10 00 (SF1442); SECTION 00 22 00 AND 00 45 00.
THIS SOLICITATION IS FULL AND OPEN, UNRESTRICTED
LYNNE D REED 402-995-2039
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
27-Feb-2023
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________635 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________30 Mar 2023 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
U.S. ARMY CORPS OF ENGINEERS, OMAHA DIST
CONTRACTING OFFICE
1616 CAPITOL AVENUE
OMAHA NE 68102-4901
W9128F
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
W9128F23R0009 123
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W9128F23R0009
Section 00 10 00 - Solicitation, Contract Line Item Number (CLIN) Schedule
PRICE SCHEDULE
Ft Peck Butterfly Valve Rehab, Ft Peck, MT FP79
SECTION 00 10 00
Pricing Schedule
CLIN Description Quantity Unit
Measure Unit Price Amount
BASE ITEMS
0001 Mobilization and Demobilization 1 JOB $______________ $______________
Tunnel 2, Unit 4 and Unit 5 Penstock Ultrasonic Testing
1 JOB $______________ $______________
0003 Provide New Tunnel 2 Drain Valves 1 JOB $______________ $______________
0004 Refurbish Penstock Butterfly Valves – 2 Units 1 JOB $______________ $______________
Provide New Penstock Butterfly Valve Grease Lubrication System – 2 Units
1 JOB $______________ $______________
Provide New Penstock Butterfly Valve Operator, HPU and Controls – 2 Units
1 JOB $______________ $______________
Provide New Penstock Butterfly Valve Bypass System and Spiral Case Drain Valve – 2 Units
1 JOB $______________ $______________
Provide New Penstock Butterfly Valve Maintenance Platforms, Access Ladders, Hatches, and Guardrails
- 2 units
1 JOB $______________ $______________
0009 All Remaining Work 1 Job $______________ $______________
SUB-TOTAL BASE (Items 0001 thru 0009) $______________
OPTIONAL ITEMS
0010 Penstock Paint Repairs - 10 Locations 1 Job $______________ $______________
0011 Penstock Butterfly Valve Weld Repairs Est. 300 In $______________ $______________
TOTAL BASE + OPTIONS (Items 0001 thru 0011) $______________
NOTES:
1 Prices must be entered for all items of the schedule. Total amounts submitted without prices being entered on individual items will be rejected. Additions will be subject to verification by the Government. In case of variation between the Job (lump sum) prices and the total amount, the lump sum prices will be considered the price submitted.
2 A modification to a proposal which provides for a single adjustment to the total amount submitted, should state the application of the adjustment to each respective lump sum price affected. If the modification is not so apportioned, the single adjustment will be applied to CLINs 0001 thru 0009.
3 See SECTION 00 21 00, INSTRUCTIONS TO OFFERORS (RFP) for evaluation of options. The Government may exercise an option by written notice to the Contractor commencing from the date of contract award thru the date the contract is closed, unless otherwise specified herein.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Mobilization and Demobilization
FFP
Mobilization and Demoblization
FFP
a. Measurement: Measurement will be made as a job for mobilizing and demobilizing all plant, equipment, fuel, supplies, materials, and personnel to and from Fort Peck Powerhouse. This CLIN applies to the Prime Contractor and all subcontractor mobilization and demobilization.
b. Payment: Payment will be made in the Contract amount under CLIN 0001 at a rate of 60 percent for mobilization and 40 percent for demobilization as defined in Contract Clause 252.236-7004, PAYMENT FOR MOBILIZATION AND DEMOBILIZATION (DEC 1991). Submit a schedule of mobilization and demobilization costs prior to submitting the first request for payment.
FOB: Destination
MILSTRIP: W59XQG02807711
PSC CD: Z1KA
NET AMT
0002 1 Job Tunnel 2, Unit 4 and Unit 5 Penstock
FFP
Tunnel 2, Unit 4 and Unit 5 Penstock Ultrasonic Testing
a. Measurement: Measurement will be made as a job item for providing all equipment, operations, labor, and materials required to perform inspections of tunnel 2, unit 4, and unit 5 penstocks, as described in these specifications, as shown, and in accordance with all Federal, State, and local laws and regulations.
b. Payment: Payment will be made in the Contract amount under CLIN 0002, "Tunnel 2, Unit 4, and Unit 5 Penstock Ultrasonic Testing."
FOB: Destination
0003 1 Job New Tunnel 2 Drain Valve
FFP
Provide New Tunnel 2 Drain Valve
a. Measurement: Measurement will be made as a job item for providing all equipment, operations, labor, materials, and incidental design engineering required to remove and dispose of the existing manual operated gate valve and piping, heating cable and thermostat at the Tunnel 2 location upstream of the bifurcation as shown; and installation and testing of provided new manually operated tunnel drain valves, piping and insulation, heating cable and thermostat, and associated systems and components, as described in these specifications, as shown, and in accordance with all Federal, State, and local laws and regulations.
b. Payment: Payment will be made in the Contract amount under CLIN 0003, "Provide New Tunnel 2 Drain Valves."
FOB: Destination
0004 1 Job Refurbish Penstock Butterfly Valves – 2
FFP
Refurbish Penstock Butterfly Valves – 2 Units
a. Measurement: Measurement will be made as a job item for providing all plant, labor, materials, equipment, operations, incidentals, and supervision associated with the design engineering, manufacture, shipping, demolition, installation, and painting required to refurbish and test the Unit 4 and Unit 5 Penstock Butterfly Valves as described in these specifications and in ccordance with all Federal, State, and local laws and regulations. Includes but not limited to the refurbishment of existing penstock butterfly valve bronze disc seals, installation of new stainless steel mounting/adjusting hardware, o-rings, address coating deterioration and corrosion by sand blasting and re-coating, perform non-destructive examination (NDE) of butterfly valves after blast and prior to re-coating; new bearing carrier seals, bronze shaft bearings, thrust bearing, and associated systems as described in these specifications, as shown, and in accordance with all Federal, State, and local laws and regulations.
b. Payment: Payment will be made in the Contract amount under CLIN 0004, "Refurbish Penstock Butterfly Valves - 2 Units."
FOB: Destination
0005 1 Job Provide New Penstock BV Grease
FFP
Provide New Penstock Butterfly Valve Grease Lubrication System – 2 Units
a. Measurement: Measurement will be made as a job item for providing all equipment, operations, labor, materials, and incidental design engineering required to remove and dispose of the existing grease lubrication system and provide new penstock butterfly valve grease lubrication system for Unit 4 and Unit 5 as described in these specifications, as shown, and in accordance with all Federal, State, and local laws and regulations.
b. Payment: Payment will be made in the Contract amount under CLIN 0005, "Provide New Penstock Butterfly Valve Grease Lubrication System Units."
FOB: Destination
0006 1 Job Provide New Penstock BV Operator, HPU
FFP
Provide New Penstock Butterfly Valve Operator, HPU and Controls – 2 Units
a. Measurement: Measurement will be made as a job item for providing all plant, labor, materials, equipment, operations, incidentals, and supervision associated with the design engineering, manufacture, shop assembly, factory testing, delivery to site, demolition of existing, installation and field testing of provided new Unit 4 and Unit 5 penstock butterfly valve operator, HPU and controls, as described in these specifications and in accordance with all Federal, State, and local laws and regulations. Includes but not limited to the new butterfly valve operator (quarter-turn hydraulic cylinder actuator) with integral mechanical locking device, hydraulic power unit (HPU) with offline oil filtering system, electrical panels, butterfly valve controls, and associated systems as described in these specifications, as shown, and in accordance with all Federal, State, and local laws and regulations.
b. Payment will be made in the Contract amount under CLIN 0006, "Provide New Penstock Butterfly Valve Operator, HPU and Controls - 2 Units."
FOB: Destination
0007 1 Job Bypass System and Spiral Case Drain
FFP
Provide New Penstock Butterfly Valve Bypass System and Spiral Case Drain Valve – 2 Units
a. Measurement: Measurement will be made as a job item for providing all equipment, operations, labor, materials, and incidental design engineering required to remove and dispose of the existing motorized gate valve and bypass piping, and spiral case drain valve for Unit 4 and Unit 5; and installation and testing of provided new butterfly valve bypass system (motorized gate valve, manual isolation valve, bypass piping, absolute pressure switch, equalizing line pressure monitoring system, and bypass system controls), new manual operated spiral case drain valve, piping insulation, and associated systems and components for Unit 4 and Unit 5, as described in these specifications, as shown, and in accordance with all Federal, State, and local laws and regulations.
b. Payment: Payment will be made in the Contract amount under CLIN 0007, "Provide New Penstock Butterfly Valve Bypass System and Spiral n Valve - 2 Units."
FOB: Destination
0008 1 Job New Penstock Maintenance Platform
FFP
Provide New Penstock Butterfly Valve Maintenance Platforms, Access Ladders, Hatches, and Guardrails - 2 units
a. Measurement: Measurement will be made as a job item for providing all equipment, operations, labor, materials, parts, and incidentals for designing, fabricating, delivery to site, removal of existing platforms and ladders, and installation of new butterfly valve maintenance platforms, access ladders, and access hatch modifications, and new guardrails for butterfly valve hatches, for Unit 4 and Unit 5 penstock butterfly valves, as described in these specifications, as shown, and in accordance with all Federal, State, and local laws and regulations.
b. Payment: Payment will be made in the Contract amount under CLIN 0008, "Provide New Penstock Butterfly Valve Maintenance Platforms, Hatches, and Guardrails - 2 Units."
FOB: Destination
0009 1 Job All Remaining Work
FFP
a. Payment:
paid for under CLIN 0009 "All Remaining Work" on the bidding schedule, made on a progressive basis, based on the percentage of work completed. Price and payment shall constitute full compensation for all work and fees including but not be limited to labor, materials, mobilization, permits, associated and incidental to the completion of the required work according to the plans and specifications not covered on the Bidding Schedule in bid items number 0001 through number 0008.
FOB: Destination
0010 1 Job OPTION Penstock Paint Repairs - 10 Locations
FFP
Penstock Paint Repairs - 10 Locationsa. Measurement: Measurement will be made as a job item for providing all equipment, operations, labor, and materials required to perform paint repairs of the tunnel 2, unit 4, and unit 5 penstock exteriors, as described in these specifications, as shown, and in accordance with all Federal, State, and local laws and regulations.
b. Payment: Payment will be made in the Contract amount under CLIN 0010, "Penstock Paint Repairs - 10 Locations (Optional)."
FOB: Destination
0011 300 Inch OPTION Penstock Butterfly Valve Weld Repairs
FFP
Penstock Butterfly Valve Weld Repairs - a. Measurement: Measurement will be made on a per linear inch of weld repair basis for providing all equipment, operations, labor, and materials required to perform weld metal excavation to sound base metal, non-destructive examination (NDE) to confirm indication removal, welding to original designed weld profile, pre and post heating requirements, and post weld NDE of repaired welds of the penstock butterfly valves, as described in these specifications and in accordance with all Federal, State, and local laws and regulations.
b. Payment: Payment will be made on a per linear inch of weld repair basis under CLIN 0011, "Penstock Butterfly Valve Weld Repairs (Optional)."
FOB: Destination
Section 00 20 00 - Instructions for Procurement
SPECIFICATION AND DRAWINGS
Fort Peck Butterfly Valve Replacement Specification and Drawings will be an attachment in SAM.GOV.
Section 00 21 00 - Instructions
INSTRUCTION FOR PROCUREMENT
SECTION 00 21 00
INSTRUCTIONS TO OFFERORS (RFP)
1. SOLICITATION RESTRICTIONS
1.1. GENERAL CONTRACTOR
This solicitation is full and open to all businesses.
1.2. ESTIMATED CONSTRUCTION COST
The estimated construction cost of this project is between $5,000,000 and $10,000,000.
1.3. SUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF PROPOSALS
See FAR 52.215-1 INSTRUCTIONS TO OFFERORS-COMPETITIVE ACQUISTION, subparagraph "(c) Submission, modification, revision, and withdrawal of proposals." below for acceptable methods.
1.4. SUBMISSION DEADLINE
Contractors shall submit their proposals via email to the following individuals by no later than the date and time established in Block 13 of the Standard Form (SF) 1442, or Block 14 of the most recently issued SF 30 as applicable:
Daniel Monahan, Contract Officer: Daniel.D.Monahan@usace.army.mil Lynne Reed, Contract Specialist: Lynne.d.Reed@usace.army.mil Each email shall contain the following solicitation number in the subject line: W912823R0009
Files over 20 megabytes (MB) shall be separated into smaller file sizes and sent via separate emails with each email marked to identify which number the email is relative to the total number of emails submitted (i.e., "email one of four"). Once all the emails submitted have been received the Government will confirm receipt via responsive email.
Proposals received after the date and time stated within Block 13 of the SF1442, or Block 14 of the most recently issued SF 30 as applicable, will be considered late and will not be considered for award. To avoid rejection of a proposal, the offeror must make every effort to ensure its electronic submission is virus-free. Proposals, or portions thereof, submitted with the presence of a virus.
Do not assume submission will be instantaneous. File size and number of files submitted shall be considered. Contractor/Teammate/Subcontractors should allow adequate time for submission completion because the entire proposal (i.e., Contractor's submission and all teammate/subcontractor(s) independent submissions) must be received by the due date and time specified in Block 13 of SF 1442, or SF 30 as applicable.
2. COPIES OF SOLICITATION DOCUMENT AND AMENDMENTS
Copies of the solicitation and amendments are available by INTERNET ACCESS ONLY. All solicitation documents will be posted to the U.S. General Services Administration website at:
https://sam.gov/
It shall be the Offeror’s responsibility to check the website for any amendments. The Offeror shall submit in the proposal all requested information specified in this solicitation. There will be no public opening of the proposals received as a result of this solicitation.
A list of interested vendors (potential offerors and subcontractors) is available on the sam.gov web site listed above (registration required).
3. OFFEROR'S QUESTIONS AND COMMENTS
3.1. SITE VISIT
The clauses at 52.236-2, Differing Site Conditions, and 52.236-3,Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
A site visit is scheduled for Thursday, 9 March 2023 09:00 AM MT. Contractors interested in seeing the site need to make a reservation with Tom Grant by telephone (406) 526-3411 X4801 or by e-mail at thomas.d.grant@usace.army.mil.
3.2. BIDDER INQUIRY
Solicitation questions and/or comments must be submitted via Bidder Inquiry in ProjNet at:
https://www.projnet.org/projnet/. All Bidder Inquiries must be submitted no later than ten (10) calendar days before the proposal due date in order for inquiries to be given consideration or actions taken prior to the receipt of offers. All timely questions and approved answers will be made available through ProjNet.
The Bidder Inquiry system is to be used to ask and receive answers to all non-proprietary questions. In the event the Bidder Inquiry method is unavailable and issue resolution is unsuccessful, inquiries may be submitted via email to the Contract Specialist listed below.
Inquiries considered proprietary by the prospective vendor may also be submitted via email.
Contract Specialist – Primary POC: Lynne Reed lynne.d.reed@usace.army.mil 402-995-2039 (Telephone)
To submit and review Bidder Inquiries, prospective offerors will need to use the Bidder Inquiry Key and instructions listed below. A prospective offeror who submits a comment /question will receive an acknowledgement of their comment/question via ProjNet email notification after an answer to the comment/question has been processed by the Government technical team.
Solicitation Number is: W912823R0009 Bidder Inquiry Key is: C5VGHP-TEYRNC
a. Registration for ProjNet Bidder Inquiry Access
If you are already registered, go to (b) Entering Bidder Inquiries in ProjNet Bidder Inquiry System below.
1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
2. Identify the Agency: This should be marked as USACE.
3. Key: Enter the Bidder Inquiry Key listed above.
4. Email: Enter the email address you would like to use for communication.
5. Click Continue
A page will then open saying that a user account was not found and will ask you to create one using the provided form.
6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone.
Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
7. Click Add User.
Once this is completed you are now registered within ProjNet and are currently logged into the system.
b. Entering Bidder Inquiries in ProjNet Bidder Inquiry System
1. For future access to ProjNet, you will not be emailed any type of password. You will utilize your Secret Question and Secret Answer to log in.
2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
3. Identify the Agency: This should be marked as USACE.
4. Key: Enter the Bidder Inquiry Key listed above.
5. Email: Enter the email address you used to register previously in ProjNet.
6. Click Continue. A page will then open asking you to enter the answer to your Secret
Question.
7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.
8. Follow online screen instructions to enter specific bidder inquiries for the project.
c. Offerors are requested to review the specification in its entirety and review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
d. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
4. PLAN HOLDERS LIST
For viewing a list of interested vendors (i.e. Plan Holders List) and receiving notifications or email of changes regarding a solicitation, U.S. General Services Administration has these features available (https:// sam.gov/). For this solicitation, go to https://sam.gov/ and register as a vendor or enter username and password to login.
If you wish for General Contractors, Subcontractors, Suppliers, Plan Rooms or Print Shops to have the ability to contact you, click on "Add me to Interested Vendors" for the solicitation.
5. GENERAL DESCRIPTION OF WORK
Scope of project includes all work required for the Butterfly Valves Rehabilitation at Fort Peck Dam, MT.
Work shall be in accordance with Request for Proposal documents issued with this solicitation.
6. PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION, AND CONTRACT AWARD
The Contracting Officer has established a Source Selection Board to conduct an evaluation of each proposal received in response to this Solicitation. The evaluation will be based exclusively on the merits and content of the proposal and any subsequent discussion required. The identities of the SSB personnel are confidential, and any attempt by the proposers to contact these individuals is prohibited.
See Section 00 22 00, SUPPLEMENTARY INSTRUCTIONS, PROPOSAL SUBMISSION, AND EVALUATION.
7. FEDERAL, STATE AND LOCAL TAXES
It is the Contractor's responsibility to investigate applicable federal, state, and local taxes as well as any specific exemptions that may exist. This includes any applicable Value-Added Taxes (VAT), sales, use, and excise taxes. See General Conditions (Contract Clause) 52.229-3
FEDERAL, STATE, AND LOCAL TAXES.
(1) Subcontracting plans are required to be approved prior to Contract Award. The approved subcontracting plan (to include goals) will become a material part of the contract.
e. Failing to Submit an Acceptable Subcontracting Plan. An apparent successful offeror failing to submit a subcontracting plan which demonstrates a reasonable effort to meet the goals listed above or provide an explanation why lesser goals are proposed (upon request), will be considered as non-responsive and not considered eligible for award of the contract.
f. Questions or Assistance Needed in Developing Subcontracting Plan. For any questions or assistance needed in developing the subcontracting plan, contact the Contract Specialist or District's Deputy for Small Business (See paragraph: OFFEROR'S QUESTIONS AND COMMENTS. Please contact the Contract Specialist listed or the District's Deputy for Small Business your inquiries to 402-995-2919).
-- End of Section --
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management OCT 2018 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-22 Alternative Line Item Proposal JAN 2017 52.207-1 Notice Of Standard Competition MAY 2006 52.211-2 Availability of Specifications, Standards, and Data Item
Descriptions Listed in the Acquisition Streamlining and Standardization Information System (ASSIST)
JUL 2021
52.215-1 Instructions to Offerors--Competitive Acquisition NOV 2021 52.215-20 Requirements for Certified Cost or Pricing Data and Data
Other Than Certified Cost or Pricing Data
NOV 2021
52.222-5 Construction Wage Rate Requirements--Secondary Site of the Work
MAY 2014
52.222-56 Certification Regarding Trafficking in Persons Compliance Plan.
OCT 2020
52.225-10 Notice of Buy American Requirement--Construction Materials
MAY 2014
52.232-38 Submission of Electronic Funds Transfer Information with Offer
JUL 2013
252.204-7019 Notice of NIST SP 800-171 DoD Assessment Requirements MAR 2022 252.215-7008 Only One Offer JUL 2019 252.215-7010 Requirements for Certified Cost or Pricing Data and Data
Other Than Certified Cost or Pricing Data
JUL 2019
CLAUSES INCORPORATED BY FULL TEXT
52.204-20 Predecessor of Offeror (AUG 2020)
(a) Definitions. As used in this provision--
Commercial and Government Entity (CAGE) code means--
(1) An identifier assigned to entities located in the United States or its outlying areas by the Defense Logistics Agency (DLA) Commercial and Government Entity (CAGE) Branch to identify a commercial or government entity by unique location; or
(2) An identifier assigned by a member of the North Atlantic Treaty Organization (NATO) or by the NATO Support and Procurement Agency (NSPA) to entities located outside the United States and its outlying areas that the DLA Commercial and Government Entity (CAGE) Branch records and maintains in the CAGE master file. This type of code is known as a NATO CAGE (NCAGE) code.
Predecessor means an entity that is replaced by a successor and includes any predecessors of the predecessor.
Successor means an entity that has replaced a predecessor by acquiring the assets and carrying out the affairs of the predecessor under a new name (often through acquisition or merger). The term “successor” does not include new offices/divisions of the same company or a company that only changes its name. The extent of the responsibility of the successor for the liabilities of the predecessor may vary, depending on State law and specific circumstances.
(b) The Offeror represents that it [____] is or [____] is not a successor to a predecessor that held a Federal contract or grant within the last three years.
(c) If the Offeror has indicated “is” in paragraph (b) of this provision, enter the following information for all predecessors that held a Federal contract or grant within the last three years (if more than one predecessor, list in reverse chronological order):
Predecessor CAGE code: ____ (or mark “Unknown”).
Predecessor legal name: ____.
(Do not use a “doing business as” name).
(End of provision)
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm Fixed Price contract resulting from this solicitation.
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from Daniel D. Monahan, C/O USACE Omaha Contracting Office, 1616 Capitol Ave., Omaha, NE 68102
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) Site visits may be arranged during normal duty hours by contacting:
Name: Tom Grant
Email: thomas.d.grant@usace.army.mil Address: 301 East Kansas St; Fort Peck MT 59223 Telephone: (406) 526-3411 X 4801 Date: Thursday, 9 March 2023 Time: 09:00 AM MT
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
www.Acquisition.Gov
52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)
Portions of this solicitation are altered as follows:
N/A
52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)
(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the provision.
(b) The use in this solicitation of any DFARS (48 CFR Chapter 2 ) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
252.211-7002 AVAILABILITY FOR EXAMINATION OF SPECIFICATIONS, STANDARDS, PLANS,
DRAWINGS, DATA ITEM DESCRIPTIONS, AND OTHER PERTINENT DOCUMENTS (DEC. 1991)
The specifications, standards, plans, drawings, data item descriptions, and other pertinent documents cited in this solicitation are not available for distribution but may be examined at the following location:
www.SAM.GOV
Section 00 22 00 - Supplementary Instructions
00 22 00 EVALUATION FACTORS
SECTION 00 22 00
PROPOSAL INSTRUCTIONS,
SUBMISSION REQUIREMENTS AND EVALUATION
1. WHO MAY SUBMIT
This solicitation is for Full and Open competition.
All Offerors, including joint ventures, must be registered in the System for Award Management (SAM).
There will be no public opening. All proposals submitted will become, upon receipt, the property of the U.S.
Government and will not be returned. After evaluation of proposals, the original will be retained for the official contract file. Electronic copies of the awardees’ proposal will be submitted to the Field and Area Offices in support of their contract administration functions.
2. GENERAL REQUIREMENTS
In order to effectively and equitably evaluate all proposals, the Contracting Officer must receive information sufficiently detailed to clearly indicate compliance with the proposal submission requirements.
3. BIDDER INQUIRY
Reference Section 00 21 00, BIDDER INQUIRY, for bidder question instructions and procedures.
4. FORMAT SIZE OF SUBMISSIONS
All portions (other than an organization chart, Gantt charts or drawings (if provided)) shall be in 8-1/2" x 11" format.
5. PROPOSAL SUBMITTAL INSTRUCTIONS
In an effort to reduce paperwork and cost, all proposals shall be submitted electronically via email directly to:
Lynne Reed: Lynne.R.Reed@usace.army.mil
Daniel Monahan: Daniel.D.Monahan@usace.army.mil All submissions shall be in Adobe PDF format with Optical Character Recognition (OCR) applied to all documents that will enable word searches to be conducted using Adobe-compatible PDF software. The two (2) volumes listed below shall be submitted as “SEPARATE” single files. Offerors may use compression utilities such as 7-Zip, WinZip or PKZip to reduce file size and facilitate transmission. Offerors are encouraged to send both files in the same email, if possible.
5.1. Proposal Submittals
Each submittal must contain Volume 1 and Volume 2 files named and structured as outlined below. Note the company name may be abbreviated.
5.1.1 Volume 1: Technical Proposal and Past Performance Information FILE NAME: W9128F22R0049_Company Name_Volume_1_Technical_Proposal
CONTENTS:
Table 1- Proposal Submittals
Location Description Vol. 1. TAB A Factor 1 – PAST PERFORMANCE
Vol. 1. TAB B Factor 2 – TECHNICAL APPROACH -
WORK PLAN
Vol. 1. TAB C Factor 3 – PERSONNEL QUALIFICATIONS
AND EXPERIENCE
Vol. 1. TAB D Factor 4 – SMALL BUSINESS
PARTICIPATION
5.1.2 Volume 2: Price Proposal, Cost Information and Representations, Certifications, and Other Statements of Offerors
FILE NAME: W9128F22R0049_Company Name_Volume_2_Price_Proposal
CONTENTS:
Table 2: Price Proposal Requirements
Location Description Vol. 2 TAB A Factor 5 - PRICE (Standard Form
1442, Proposal Data Sheet And Contract Line Item Schedule)
Vol. 2 TAB B Evidence of Bondability
Vol. 2 TAB C Required Pre-Award Information
5.2. Late Submissions
For the purposes of determining whether the proposal was received “late”, in accordance with FAR 15.208, the date and time the file(s) are received via email by the Contract Specialist(s) will be the time and date the Government received the proposal.
6. SUBMISSION DEADLINE
Electronic proposals shall be received by the USACE Contracting Activity no later than the time and date specified in Block 13 of Standard Form 1442. Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.
7. PROPOSAL CRITERIA
Offerors shall submit a proposal that meets or exceeds the minimum requirements of these Specifications through the replacement, modification or refurbishment of components identified in 00 10 00, PRICING SCHEDULE, of this solicitation.
8. EVALUATION OF PROPOSALS
8.1. Basis for Evaluation
All proposals and documentation which have been properly submitted will be evaluated. Proposals will be evaluated on the basis of the factors stated in the solicitation to select the responsible Offeror whose proposal is most advantageous to the Government. Because of the number of proposals anticipated, uniformity of all proposals is essential to assure fair and accurate evaluation. All proposals must comply with the instructions in the solicitation.
Proposals that do not generally conform to the RFP requirements may be considered to have a “deficiency”, i.e., a defect that cannot be remedied by exchanges and/or permitted proposal revisions. If a proposal is suspected of having a deficiency, it will be brought to the immediate attention of the appropriate authority who will determine if there is a deficiency. If the determination is made that a deficiency exists, the proposal will not be evaluated further and will be eliminated from further consideration. The affected Offeror shall be promptly notified of the decision. Properly conforming proposals will be forwarded to the Source Selection Evaluation Board (SSEB) for evaluation. If, after award, the key personnel or subcontractors identified in the proposal are replaced, replacement personnel or sub-contractors with similar skills and experience equal to those presented in the proposal shall be presented to the Contracting Officer for approval. The Contractor shall obtain the Contracting Officer’s written consent before making any substitutions for these designated personnel or subcontractors.
Information obtained from owners, contract administrators, or other points of contact provided by the Offeror may affect the evaluation rating given for the factors related to the information provided.
Evaluations will be conducted in accordance with the Tradeoff Process, FAR 15.101-1. Volume 1, Factor 1 will be rated in accordance with paragraph 8.3 (Past Performance Rating) of this section, and Factors 2, 3, and 4 will be rated in accordance with paragraph 8.4 (Combined Technical/Risk Rating) of this section using a color and adjectival methodology with a narrative assessment. Volume 2 (Factor 5 - Price) will be evaluated after consensus scoring Factors 1 through 4. Proposal evaluation is an assessment of the proposal and the Offeror's ability to perform the resultant contract successfully. Proposals will be evaluated to determine ratings supported by narratives, and to identify strengths, weaknesses, and deficiencies of the proposed approach in each proposal.
8.2. Evaluation Definitions
8.2.1 Strength
A substantive aspect, attribute, or specific item in the proposal that exceeds the solicitation requirements and enhances the probability of successful contract performance.
8.2.2 Significant Strength
An aspect of the proposal that has appreciable merit or appreciably exceeds specified performance or capability requirements in a way that will be appreciably advantageous to the Government during contract performance.
8.2.3 Weakness
A flaw in the proposal that increases the risk of unsuccessful contract performance.
8.2.4 Significant Weakness
A significant weakness in the proposal is a flaw that appreciably increases the risk.
8.2.5 Deficiency
A material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level.
8.2.6 Omission
A failure to provide information required by the solicitation and depending on the nature and extent of the omission it may be evaluated as a weakness, a significant weakness or a deficiency.
8.2.7 Clarification
Clarifications are limited exchanges between the Government and Offerors that may occur when award without discussions is contemplated. If award without discussions is anticipated, Offerors may be given the opportunity to clarify certain aspects of their proposals or to resolve minor or clerical errors.
8.2.8 Communications
Communications are exchanges between the Government and Offerors after receipt of proposals, leading to establishment of the competitive range.
8.2.9 Discussions
Discussions are negotiations conducted in a competitive acquisition and take place after establishment of the competitive range. Discussions are tailored to each Offeror's proposal and shall be conducted by the Contracting Officer with each Offeror within the competitive range.
8.3. Past Performance Rating
The past performance evaluation results in an assessment of the Offeror’s probability of meeting the solicitation requirements. The past performance evaluations result in two (2) ratings: relevancy and overall confidence. The past performance evaluation considers each offeror’s demonstrated recent and relevant record of performance in design, manufacturing, and installation/construction activities that are needed to meet the contract’s requirements. The Past Performance factor submission requirements and the method that the Government will use to evaluate the Offeror’s past performance is detailed in Factor 1 -Past Performance description below.
There are three (3) aspects to past performance: recency, relevancy (including context of data), and quality (including general trends in contractor performance and source of information). While relevancy is also evaluated individually, all past performance aspects will be used to develop an overall confidence assessment rating for the Past Performance factor.
As an example of a past performance rating, a proposal evaluated as meeting the solicitation past performance criteria may be assessed ratings of “Relevant” and “Satisfactory Confidence.”
8.3.1 Recency
The first aspect is to evaluate the recency of the Offeror’s past performance. With respect to recency, more recent past performance will typically be a stronger predictor of future success and have more influence on the past performance confidence assessment than less recently completed projects. Recency criteria related to this solicitation is outlined in the Past Performance Submission Requirements section.
8.3.2 Relevancy
The second aspect is to determine how relevant a recent effort accomplished by the Offeror is to the work required by this solicitation. The relevancy aspect focuses on evaluating the applicability of the Offeror’s previous work in relation to the solicitation requirements. Consideration shall be given to the features of an Offeror’s contract history that best demonstrates the Offeror’s ability to satisfy the current procurement requirements. Common aspects of relevancy include similarity of service/support, complexity, dollar value, contract type, and degree of subcontract/teaming. There are four (4) levels of relevancy as shown in the Table below.
Rating Definition Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
8.3.3 Quality
The third past performance aspect is quality. The Quality evaluation will examine how well Offerors have performed on previous projects considering such criteria as workmanship, timeliness, safety, customer service, adherence to budget, subcontractor management (timely payment to subs or suppliers), relations between owner and contractor, as well as the level of support provided for As-built documentation, O&M manuals, training, correcting construction errors, and warranty work. The Government will consider the currency and relevance of the information, source of the information, context of the data, and general trends in contractor performance. The Offeror will be rated on its own performance. The Government may ask for Owners/References.
The past performance information required in this solicitation shall be provided by the Offeror. Past performance information may also be obtained from questionnaires. At the Government’s discretion, past performance information shall be obtained from any other sources available to the Government, to include, but not limited to, the Contractors Performance Assessment Reporting System (CPARS), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), or other databases; interviews with Program Managers, Contracting Officers, and Fee Determining Officials; and the Defense Contract Management Agency.
8.3.4 Performance Confidence Assessment
A final performance confidence assessment rating will be based on the evaluation of recent and relevant past performance information and the assessment of the quality of past performance on prior contract efforts. The Government will review the past performance information to determine the quality and usefulness as it applies to the performance confidence assessment. In conducting a performance confidence assessment, each offeror shall be assigned one of the ratings using the Table below.
Rating Description Substantial Confidence Based on the Offeror’s recent/relevant performance record, the Government has a high expectation that the Offeror will successfully perform the required effort.
Satisfactory Confidence Based on the Offeror’s recent/relevant performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort.
Neutral Confidence No recent/relevant performance record is available, or the Offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The Offeror may not be evaluated favorably or unfavorably on the factor of past performance.
Limited Confidence Based on the Offeror’s recent/relevant performance record, the Government has a low expectation that the Offeror will be able to successfully perform the required effort.
No Confidence Based on the Offeror’s recent/relevant performance record, the Government has no expectation that the Offeror will be able to successfully perform the required effort.
For Past Performance, an Unknown Confidence (Neutral) rating will be awarded when no past performance records are available. Per Federal Acquisition Regulation (FAR) 15.305(a)(2)(iv), “In the case of an Offeror without a record of relevant past performance or for whom information on past performance is not available, the Offeror may not be evaluated either favorably or unfavorably on past performance." On the recommendation of the Source Selection Advisory Council, the Source Selection Authority may determine that a “Substantial Confidence” or “Satisfactory Confidence” past performance rating is rated more favorably than a “Neutral Confidence” past performance rating in a best value tradeoff as long as the determination is consistent with stated solicitation criteria.
8.4. Combined Technical/Risk Rating
The application of a scale of colors and adjectival description will be used in conjunction with narrative to denote the degree to which the proposal has met the standard for a non-cost factor. Ratings will be applied at the factor and subfactor level, as appropriate for this solicitation. If, at any factor or subfactor level, an Offeror’s proposal is evaluated as not meeting a minimum requirement (that is, below the level of “Marginal”), this fact must be included in the rating and narrative assessment at that level and at the factor level. Therefore, an unacceptable rating at any level may be carried to the factor level. The following ratings will be used to evaluate Factors 2, 3, and 4:
Combined Technical/Risk Ratings
Color Rating Description Blue Outstanding Proposal demonstrates an exceptional approach and understanding of the requirements and contains multiple strengths, and/or at least one significant strength, and risk of unsuccessful performance is low.
Purple Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, or significant strength, and risk of unsuccessful performance is low to moderate.
Green Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
Yellow Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.
Red Unacceptable Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies and is unawardable, and/or risk of unsuccessful performance is unacceptably high.
9. EVALUATION FACTORS FOR AWARD
Evaluation of the factors listed below will be basis for award. The requirements specified in the solicitation are considered minimum requirements. A more favorable evaluation rating may be given for exceeding the minimum requirements. Note: Volume 1 Factors level of importance are noted below. Volume 2 (Price) is significantly less important to all of the combined Factor elements contained in Volume 1.
Basis for Award – See table below for relative importance of selection factors.
VOLUME 1 – TECHNICAL FACTORS
Factor/ Subfactor Location Description Relative Importance FACTOR 1 Vol. 1. TAB A PAST PERFORMANCE Most Important Factor
FACTOR 2 Vol. 1. TAB B TECHNICAL APPROACH -
WORK PLAN
2nd Most Important Factor (less important than Factor 1)
FACTOR 3 Vol. 1. TAB C PERSONNEL QUALIFICATIONS
AND EXPERIENCE
Equal to Factor 2
FACTOR 4 Vol. 1. TAB D SMALL BUSINESS
PARTICIPATION
Significantly less important than Factors 1-3
VOLUME 2 – PRICE AND PRO FORMA INFORMATION
Factor/Subfactor Location Description Relative Importance FACTOR 5 Vol.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .