Forest Service - GAOA - Chilao Campground Complex - Water System Rehabilitation
Closed Solicitation Posted
Not the latest version. See the latest special notice from .
- Solicitation number
- 127EAW25R0028
- Agency
-
Forest Service
Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237110 Water and Sewer Line and Related Structures Construction
- PSC
- S114 Utilities- Water
- Place of performance
- California, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The USDA Forest Service is seeking contractors for the comprehensive rehabilitation of the water system at Chilao Campground Complex in Angeles National Forest, California. The project involves water utility and road work including installing and rerouting approximately 9,250 linear feet of water pipeline, replacing infrastructure in valve boxes and fire boxes, rehabilitating three existing tanks, and replacing appurtenances at four well locations. Contractors must hold a C-57 license and maintain water service to critical facilities throughout the 150-calendar-day performance period. Evaluation will be based on past performance, technical approach, key personnel, performance schedule, and price. Critical dates include an organized site visit on August 5, 2025 at 10:00 AM PDT, a deadline for Request for Information submissions by August 8, 2025 at 10:00 AM PDT, and proposal submissions due by August 19, 2025.
This opportunity is designated as a Total Small Business Set Aside with an estimated contract value between $1,000,000 and $5,000,000. The project is funded through the Great American Outdoors Act (GAOA) and scheduled to begin in Fall 2025, specifically designed to avoid summer months and potential winter access challenges. The work will be performed around the Chilao Campground complex including the Visitor Center, Fire Station, picnic area, and campground loops, with four wells located approximately two miles north of the main project site. The contract includes a base bid and five optional work packages covering pipeline installations, road pulverization and paving, valve box replacements, and rehabilitation of various water system components. No incumbent contractors are identified in the solicitation materials.
Notice text
2 versions
Update #2 · Latest ·
Date 8/14/20525
PROJECT: Chilao Campground Complex - Water System Rehabilitation (GAOA)
Amendment A00001
The purpose of solicitation amendment A00001 is to provide Request For Information (RFI) Responses.
See attachment for additional information.
====================
====================-
127EAW25R0028 - Chilao Campground Complex - Water System Rehabilitation (GAOA)
Angeles National Forest
FAR 32.204 Disclosure of Magnitude of the Construction Project: Between $1,000,000 and $5,000,000.
Set Aside: Total Small Business Set Aside
IMPORTANT NOTES:
Refer to Section L, Paragraph L.2, on Page 36 for detailed instructions regarding the submission of proposals, including the required documents and information to be provided.
All Requests for Information (RFI's) shall be submitted to the Contract Specialist, Tanya Torres on the attached RFI form not later than 1000 AM hours PDT, August 8th, 2025.
An organized site visit is scheduled for 5 August, 2025 at 1000 AM hours PDT; please refer to page 40 for detailed information regarding the site visit.
In no event shall failure to inspect the site constitute grounds for a claim after contract award.
Update #1 ·
127EAW25R0028 - Chilao Campground Complex - Water System Rehabilitation (GAOA)
Angeles National Forest
FAR 32.204 Disclosure of Magnitude of the Construction Project: Between $1,000,000 and $5,000,000.
Set Aside: Total Small Business Set Aside
IMPORTANT NOTES:
Refer to Section L, Paragraph L.2, on Page 36 for detailed instructions regarding the submission of proposals, including the required documents and information to be provided.
All Requests for Information (RFI's) shall be submitted to the Contract Specialist, Tanya Torres on the attached RFI form not later than 1000 AM hours PDT, August 8th, 2025.
An organized site visit is scheduled for 5 August, 2025 at 1000 AM hours PDT; please refer to page 40 for detailed information regarding the site visit.
In no event shall failure to inspect the site constitute grounds for a claim after contract award.
Files
Show all 14
Notice history
| Notice | Type | Posted |
|---|---|---|
| Forest Service - GAOA - Chilao Campground Complex - Water System Rehabilitation | Special Notice | |
| This notice | Solicitation | |
| Forest Service - GAOA - Chilao Campground Complex - Water System Rehabilitation | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| YOSE 22866 Rehabilitate Hodgdon Meadows Water System and YOSE 196755 Extend Hod | — | No set-aside | |
| HAVO 326181 Rehabilitate Rainshed&Water Treatment | National Office | No set-aside | |
| Oconaluftee Waterline Replacement | Forest Service | Total Small Business | |
| GAOA Grizzly Bear Campground | Region 2 - Rocky Mountain Region | Total Small Business | |
| Brine pipeline access improvements | ENDIST Los Angeles | Total Small Business |