6. GAOA Chilao Design Drawings.pdf
PDF 5 MB Posted
- Solicitation number
- 127EAW25R0028
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a set of design drawings for the Chilao Campground Complex Water System Rehabilitation project in the Angeles National Forest, prepared by the United States Department of Agriculture Forest Service. The 15-sheet drawing set provides detailed technical specifications for water infrastructure improvements, including water pipeline installations, road and stream crossings, valve box configurations, well rehabilitation, and tank repairs across multiple locations like the Station Tank, Manzanita Tanks, and ALPS Wells.
Key technical components include replacing existing 2" galvanized steel pipes, road pulverization and paving, stream crossing pipe installations, valve box replacements, well rehabilitation for five different wells (ALPS Wells 001-005), tank coating and crack rehabilitation, and various infrastructure connections. The project covers approximately 9,250 linear feet of water pipeline, involves road work, and includes specific rehabilitation tasks for tanks, valves, and wells. The design drawings are dated 2/28/25 and provide precise engineering details for contractors, including trench bedding specifications, road cross-sections, and valve configuration diagrams.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOREST LOCATION MAP
PROJECT LOCATION MAP
TRAVEL DIRECTIONS:
SHEET OF
United States Department of Agriculture
Forest Service
CHIALO CAMPGROUND COMPLEX
DIRECTIONS FROM NEAREST FOREST SERVICE OFFICE:
FROM ARCADIA SUPERVISOR'S OFFICE, TRAVEL ON I-210 WEST FOR ~12 MILES TAKING EXIT 20 FOR
CA-2/ANGELES CREST HWY TOWARDS LA CANADA FLINTRIDGE. PROCEED ~26 MILES ON
CA-2/ANGELES CREST HWY/ANGELES SCENIC BYWY UNTIL YOU REACH THE CHILAO CAMPGROUND
AREA ON THE LEFT HAND SIDE. 34.326768, -118.005877
GREAT DIVIDE DISTRICT OFFICE
22223 STATE HIGHWAY 13
GLIDDEN, WI 54527
WATER SYSTEM REHABILITATION
RECOMMENDED BY:
APPROVED:
FOREST ENGINEER
DISTRICT RANGER DATE
DATE
DIRECTOR OF ENGINEERING
DATE
FOREST SUPERVISOR
DATE
RO FACILITIES PROGRAM MANAGER
DATE
2/2 8/2
5 1 1:
Z
AC
HA
RY
BI
NV
ER
SI
E
C:
\U
SE
RS
\Z
AC
HA
RY
BI
NV
ER
SI
E\
ON
ED
RI
VE
US
DA
\C
HI
LA
O
GA
OA
\C
HI
LA
O_
CO
NT
OU
RS
_E
XP
OR
TC
AD
V2
.D W
G;
CALIFORNIA
LOS ANGELES
(R05) PACIFIC SOUTHWEST REGION
ANGELES NATIONAL FOREST
SAN GABRIEL MOUNTAINS NATIONAL MONUMENT
INDEX OF SHEETS
SHEET
SHEET TITLE DATE
AutoCAD SHX Text G-01
AutoCAD SHX Text
COVERSHEET
AutoCAD SHX Text 2/28/25
AutoCAD SHX Text G-02
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text 2/28/25
AutoCAD SHX Text G-03
AutoCAD SHX Text
OVERALL LAYOUT
AutoCAD SHX Text 2/28/25
AutoCAD SHX Text C-01
AutoCAD SHX Text
BASE BID ITEMS
AutoCAD SHX Text 2/28/25
AutoCAD SHX Text C-02
AutoCAD SHX Text
STATION CONNECTION OPTION ITEMS
AutoCAD SHX Text 2/28/25
AutoCAD SHX Text C-03
AutoCAD SHX Text
MANZANITA CONNECTION OPTION ITEMS
AutoCAD SHX Text 2/28/252/28/25
AutoCAD SHX Text C-04
AutoCAD SHX Text
STATION TANK REHAB OPTION ITEMS
AutoCAD SHX Text 2/28/25
AutoCAD SHX Text C-05
AutoCAD SHX Text
MANZANITA TANK REHAB OPTION ITEMS
AutoCAD SHX Text 2/28/252/28/25
AutoCAD SHX Text C-06
AutoCAD SHX Text
WELL REHAB OPTION ITEMS
AutoCAD SHX Text 2/28/25
AutoCAD SHX Text D-01
AutoCAD SHX Text
PIPE DETAILS
AutoCAD SHX Text 2/28/25
AutoCAD SHX Text D-02
AutoCAD SHX Text
STREAM CROSSING DETAILS
AutoCAD SHX Text 2/28/25
AutoCAD SHX Text D-03
AutoCAD SHX Text
TYPICAL ROAD DETAILS 1
AutoCAD SHX Text 2/28/25
AutoCAD SHX Text D-04
AutoCAD SHX Text
TYPICAL ROAD DETAILS 2
AutoCAD SHX Text 2/28/25
AutoCAD SHX Text D-05
AutoCAD SHX Text
WELL REHAB DETAILS
AutoCAD SHX Text 2/28/25
AutoCAD SHX Text D-06
AutoCAD SHX Text
VALVE BOX DETAILS
AutoCAD SHX Text 2/28/25
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
2/2 8/2
5 1 1:
Z
AC
HA
RY
BI
NV
ER
SI
E
C:
\U
SE
RS
\Z
AC
HA
RY
BI
NV
ER
SI
E\
ON
ED
RI
VE
US
DA
\C
HI
LA
O
GA
OA
\C
HI
LA
O_
CO
NT
OU
RS
_E
XP
OR
TC
AD
V2
.D W
G;
(R5)
PACIFIC SOUTHWEST REGION
CHILAO GAOA
ANGELES NATIONAL
FOREST
SAN GABRIEL MOUNTAINS
NATIONAL MONUMENT
GENERAL NOTES
02/28/2025
K. HERNANDEZ
Z. BINVERSIE
R. LOPEZ
G-02 002 15
AutoCAD SHX Text General Notes: 1. The contractor shall at once report to the Contracting Officer (CO) any The contractor shall at once report to the Contracting Officer (CO) any errors, inconsistencies or omissions discovered in the contract documents and with information furnished by the U.S. Forest Service. If the contractor performs any construction activity knowing it involved a recognized error, without such notice to the CO, the contractor shall assume appropriate responsibility for such performance and shall bear an appropriate amount of the attributable costs for correction. 2. All sections mentioned below refer to "Standard Specifications for All sections mentioned below refer to "Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects", FP-14 latest edition, Federal Highways Administration. Specifications are in US customary units. 3. All instances in contracting documents which refer to "Plans" or "Project All instances in contracting documents which refer to "Plans" or "Project Plans", "Drawings" or "Project Drawings" refer to this set of drawings. 4. It is highly recommended that contractor visit the site to clarify site It is highly recommended that contractor visit the site to clarify site access for all equipment and material deliveries. All existing site features are approximate and shall be verified by the contractor. 5. Water availability for the contractor use from Forest Service Water availability for the contractor use from Forest Service Infrastructure cannot be guaranteed. All water is considered incidental to individual work items. Contractor shall secure their own water source and water secured shall be free of all deleterious material. 6. Prior to construction COR and Contractor will flag appropriate areas for Prior to construction COR and Contractor will flag appropriate areas for parking, storing and material stockpile areas. 7. No telephone will be available for contractor use and there is no network No telephone will be available for contractor use and there is no network connectivity in remote areas. Contractor is permitted to use sanitary facilities at the Picnic Area. 8. All Staging areas, bypass locations and other areas disturbed by All Staging areas, bypass locations and other areas disturbed by construction activities shall be restored to previous condition as approved by CO. 9. Clean up and jobsite safety: Contractor shall clean up all debris on a Clean up and jobsite safety: Contractor shall clean up all debris on a daily basis. Contractor shall at all times secure and cover all tools, building materials, shoring and scaffolding in such a manner that persons cannot climb on them or have access to them. 10. Contractor shall remove from Forest Service land all material generated Contractor shall remove from Forest Service land all material generated by on-site activities and not used in the final product. 11. Contractor shall submit a schedule of work for approval at least 10 Contractor shall submit a schedule of work for approval at least 10 business days prior to start of work. 12. The General Contractor shall control and supervise the performance of The General Contractor shall control and supervise the performance of the work of various disciplines prior to and during respective performance of work. 13. All construction activities shall be in accordance with caltrans storm All construction activities shall be in accordance with caltrans storm water pollution control best management practices and Forest Service provided BMP's. Contractor shall submit to the COR a written storm water management plan at least 5 business days prior to beginning work. In the event of inclement weather, this plan shall include actions to provide protective covering for excavated or soil stockpile areas and all work in progress. 14. Caltrans storm water quality handbook, Construction Site Best Management Caltrans storm water quality handbook, Construction Site Best Management Practices Manual can be purchased from the California Department of Transportation, Publications Distribution Unit, (916) 445-3520. Caltrans Best Management Practices, WM-8 Waste Management, procedures shall be followed for all construction activities where slurries containing asphalt concrete or portland cement concrete are generated, such as from saw cutting, grinding, and grooving, and where concrete trucks and other concrete coated equipment are washed on site. 15. Soil erosion and storm water pollution control measures shall be in Soil erosion and storm water pollution control measures shall be in accordance with Section 157 Soil Erosion Control and Caltrans Best Management Practices (BMP) SC-5 fiber roll. Only temporary fiber roll materials as listed in Caltrans BMP SC-5 are approved for use on this project. All applicable material shall be certified weed and seed free. 16. Control points for project are established by the Forest Service and will Control points for project are established by the Forest Service and will be provided at pre-construction conference. Contractor to be responsible for staking in accordance with Section 152 Construction Survey and Staking. All construction staking for elevation control, grade control, site layout, structure components and roadway shall be the responsibility of the contractor. Contractor shall stake location of all structure components for CO approval before any installation takes place. Approval of the construction staking will not relieve the contractor of the responsibility for maintaining the survey work and correcting errors, whether the errors are discovered during the actual survey work or in subsequent phases of the contract. Tie all new contours to existing. 17. It is the responsibility of the Contractor to ensure proper clearance for It is the responsibility of the Contractor to ensure proper clearance for their equipment. All Clearing and Grubbing shall be in accordance with Section 201 Clearing and Grubbing. All brush, stumps and trees within project limits that interfere with construction activities may be removed only with prior approval of COR. Contractor should notify the COR of any necessary Clearing and Grubbing at least 5 working days prior to the start of work. Construction slash shall be removed and disposed of off National Forest Land at a suitable disposal site or chipped in suitable locations determined by the Forest Service. Care shall be taken to avoid damaging all live trees. 18. All roadway pulverization and compaction shall be in accordance with All roadway pulverization and compaction shall be in accordance with Section 304 Full Depth Reclamation and Section 204.11 Compaction in the FP-14. All unsuitable or excess excavated material shall be placed in areas within project limits or as designated by the CO. Any imported material used in the project shall by from a commercial source and the contractor shall furnish a material certificate of compliance that meets all requirement and is clean and does not contain any noxious weeds or seeds. Imported materials shall be subject to approval by the CO 19. Written dimensions shall take precedence over scaled dimensions. Written dimensions shall take precedence over scaled dimensions. 20. All work shall be performed in accordance with applicable safety standards. All work shall be performed in accordance with applicable safety standards. 21. Asphalt concrete shall be hot bituminous plant mix (commercial source) per Asphalt concrete shall be hot bituminous plant mix (commercial source) per Caltrans inch Maximum (medium). Bituminous binder shall be PG 64-10, 4% to 12 inch Maximum (medium). Bituminous binder shall be PG 64-10, 4% to 6% by weight of dry mineral aggregate, Two (2) inch compacted thickness, in accordance with Section 418 Asphalt Pavement Full Depth Patch, Type 2. Asphalt tack coat to be furnished and carefully applied to surfaces where old and new asphalt meet and in accordance with Section 412 Asphalt Tack Coat. Asphalt tack coat is incidental to asphalt paving work. Only release agents approved by the contracting officer shall be used on this project. Substances used to coat asphalt transport trucks, asphalt trucks and asphalt spreading equipment shall not contain soap and shall be non-foaming and non-toxic. No diesel fuels or kerosene shall be used for cleaning tools or equipment at any time on this project. All areas where new asphalt ties to old asphalt shall be sealed with SS1H and sand after new asphalt has cured. The SS1H shall be placed to completely cover the seam and six (6) inches beyond the seam on both sides where the new asphalt ties to the existing asphalt.
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
E
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
CHILAO VISITOR CENTER ENTRANCE
CHILAO CAMPGROUND
ACCESS
STATE HIGHWAY 2
(CALTRANS)
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
2/2 8/2
5 1 1:
Z
AC
HA
RY
BI
NV
ER
SI
E
C:
\U
SE
RS
\Z
AC
HA
RY
BI
NV
ER
SI
E\
ON
ED
RI
VE
US
DA
\C
HI
LA
O
GA
OA
\C
HI
LA
O_
CO
NT
OU
RS
_E
XP
OR
TC
AD
V2
.D W
G;
(R5)
PACIFIC SOUTHWEST REGION
CHILAO GAOA
ANGELES NATIONAL
FOREST
SAN GABRIEL MOUNTAINS
NATIONAL MONUMENT
OVERALL LAYOUT
02/28/2025
K. HERNANDEZ
Z. BINVERSIE
R. LOPEZ
G-03 03 15
Feet
AutoCAD SHX Text
EXISTING STATION WATER TANK
AutoCAD SHX Text
EXISTING FIREBOX
AutoCAD SHX Text
EXISTING FIREBOX
AutoCAD SHX Text
EXISTING FIREBOX
AutoCAD SHX Text
10,000 GAL CAPACITY
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text
VISITOR CENTER LINE TO STATION TANK
AutoCAD SHX Text
STATION TANK TO STATION LINE
AutoCAD SHX Text
CREEK CROSSING TO MANZANITA TANKS
AutoCAD SHX Text
ROAD AND PIPELINE INFORMATION
AutoCAD SHX Text
NAME
AutoCAD SHX Text
LENGTH (FT)
AutoCAD SHX Text
3N21 VISITOR CENTER TO STATION TANK ROAD
AutoCAD SHX Text
AutoCAD SHX Text
VISITOR CENTER TO STATION TANK PIPELINE
AutoCAD SHX Text
AutoCAD SHX Text
3N14A1 FIRE STATION, BARRACKS, HELISPOT ROAD
AutoCAD SHX Text
AutoCAD SHX Text
STATION TANK TO FIRESTATION PIPELINE
AutoCAD SHX Text
AutoCAD SHX Text
3N21 CREEK CROSSING TO MANZANITA LOOP ROAD
AutoCAD SHX Text
AutoCAD SHX Text
CREEK CROSSING TO MANZANITA TANK PIPELINE
AutoCAD SHX Text
AutoCAD SHX Text NOTES: 1. REPLACE EXISTING 2 " GALVANIZED STEEL PIPE WITH 2 " REPLACE EXISTING 2 " GALVANIZED STEEL PIPE WITH 2 " 12" GALVANIZED STEEL PIPE WITH 2 " 12" HDPE PIPE UNLESS EXPOSED, WHERE NEW 2 " GALVANIZED 12" GALVANIZED STEEL WILL BE USED. 2. PIPELINE WILL USE ALIGNMENT OF EXISTING PIPELINE AND PIPELINE WILL USE ALIGNMENT OF EXISTING PIPELINE AND VALVE BOXES BEING PLACED ALONGSIDE EXISTING PIPE THAT WILL BE LEFT IN PLACE. ALL COMPONENTS WITHIN VALVE BOXES WILL BE REPLACED IN KIND. 3. EXISTING CREEK CROSSING VALVE BOX WILL BE ABANDONED EXISTING CREEK CROSSING VALVE BOX WILL BE ABANDONED AND RELOCATED TO NEW SPOT WITH SAME PIPING CONFIGURATION AS EXISTING. 4. 2" WOODFORD STAND PIPES WILL BE USED FOR MARKED 2" WOODFORD STAND PIPES WILL BE USED FOR MARKED HYDRANT LOCATIONS AS LISTED IN SPECIFICATIONS.
AutoCAD SHX Text
SILVER MOCCASIN TRAIL
EXISINTG LINE TO BE ABANDONED IN PALCE
CHILAO VISITOR CENTER ENTRANCE
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
2/2 8/2
5 1 1:
Z
AC
HA
RY
BI
NV
ER
SI
E
C:
\U
SE
RS
\Z
AC
HA
RY
BI
NV
ER
SI
E\
ON
ED
RI
VE
US
DA
\C
HI
LA
O
GA
OA
\C
HI
LA
O_
CO
NT
OU
RS
_E
XP
OR
TC
AD
V2
.D W
G;
(R5)
PACIFIC SOUTHWEST REGION
CHILAO GAOA
ANGELES NATIONAL
FOREST
SAN GABRIEL MOUNTAINS
NATIONAL MONUMENT
BASE BID ITEMS
02/28/2025
K. HERNANDEZ
Z. BINVERSIE
R. LOPEZ
C-01 4 15Feet
AutoCAD SHX Text
EXISTING STATION WATER TANK
AutoCAD SHX Text
EXISTING FIREBOX
AutoCAD SHX Text
EXISTING FIREBOX
AutoCAD SHX Text
EXISTING FIREBOX
AutoCAD SHX Text
10,000 GAL CAPACITY
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text
WORK ITEMS
AutoCAD SHX Text
ITEM NUMBER
AutoCAD SHX Text
SPEC NUMBER AND SOURCE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
PAY UNIT
AutoCAD SHX Text
QUANTITY
AutoCAD SHX Text
AutoCAD SHX Text 02318 & 02511
AutoCAD SHX Text
WATER PIELINE INSTALLATION
AutoCAD SHX Text
LF
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
304.05 FP-14
AutoCAD SHX Text
ROAD PULVERIZATION
AutoCAD SHX Text
SY
AutoCAD SHX Text 17775
AutoCAD SHX Text
AutoCAD SHX Text
403.04 FP-14
AutoCAD SHX Text
PAVING HMA 2"
AutoCAD SHX Text
TON
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
634.05 FP-14
AutoCAD SHX Text
STRIPING AND DIRECTIONAL ARROWS
AutoCAD SHX Text
LS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 02511
AutoCAD SHX Text
EX. VISITOR CENTER TRAIL PRV VALVE BOX REPLACEMENT
AutoCAD SHX Text
EA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 02511
AutoCAD SHX Text
EX. VALVE BOX REPLACEMENT
AutoCAD SHX Text
EA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 02511
AutoCAD SHX Text
NEW CREEK CROSSING VALVE BOX INSTALLATION
AutoCAD SHX Text
EA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 02511
AutoCAD SHX Text
NEW STANDPIPE INSTALLATION
AutoCAD SHX Text
EA
AutoCAD SHX Text
AutoCAD SHX Text
CONCRETE LOW WATER CROSSINGS TO REMAIN, NO ASPHALT WORK PERFORMED ON THESE AREAS
ROAD AREAS OUTSIDE CONTRACT SCOPE AND WORK TO BE PERFORMED
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
2/2 8/2
5 1 1:
Z
AC
HA
RY
BI
NV
ER
SI
E
C:
\U
SE
RS
\Z
AC
HA
RY
BI
NV
ER
SI
E\
ON
ED
RI
VE
US
DA
\C
HI
LA
O
GA
OA
\C
HI
LA
O_
CO
NT
OU
RS
_E
XP
OR
TC
AD
V2
.D W
G;
(R5)
PACIFIC SOUTHWEST REGION
CHILAO GAOA
ANGELES NATIONAL
FOREST
SAN GABRIEL MOUNTAINS
NATIONAL MONUMENT
STATION CONNECTION
OPTION ITEMS
02/28/2025
K. HERNANDEZ
Z. BINVERSIE
R. LOPEZ
C-02 5 15
Feet
AutoCAD SHX Text
EXISTING STATION WATER TANK
AutoCAD SHX Text
EXISTING FIREBOX
AutoCAD SHX Text
EXISTING FIREBOX
AutoCAD SHX Text
EXISTING FIREBOX
AutoCAD SHX Text
10,000 GAL CAPACITY
AutoCAD SHX Text
EXISTING STATION WATER TANK
AutoCAD SHX Text
EXISTING FIREBOX
AutoCAD SHX Text
EXISTING FIREBOX
AutoCAD SHX Text
EXISTING FIREBOX
AutoCAD SHX Text
10,000 GAL CAPACITY
AutoCAD SHX Text
EXISTING STATION WATER TANK
AutoCAD SHX Text
10,000 GAL CAPACITY
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text
WORK ITEMS
AutoCAD SHX Text
ITEM NUMBER
AutoCAD SHX Text
SPEC NUMBER AND SOURCE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
PAY UNIT
AutoCAD SHX Text
QUANTITY
AutoCAD SHX Text
AutoCAD SHX Text 02318 & 02511
AutoCAD SHX Text
WATERLINE INSTALLATION
AutoCAD SHX Text
FT
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
304.05 FP-14
AutoCAD SHX Text
ROAD PULVERIZATION
AutoCAD SHX Text
SY
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
403.04 FP-14
AutoCAD SHX Text
ROAD PAVING 2"HMA
AutoCAD SHX Text
TON
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 02511
AutoCAD SHX Text
EX. FIREBOX / STANDPIPE REHABILITATION
AutoCAD SHX Text
EA
AutoCAD SHX Text
*CONTRACTOR IS RESPONSIBLE FOR RETURNING SERVICE TO ALL EXISTING CONNECTIONS
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
2/2 8/2
5 1 1:
Z
AC
HA
RY
BI
NV
ER
SI
E
C:
\U
SE
RS
\Z
AC
HA
RY
BI
NV
ER
SI
E\
ON
ED
RI
VE
US
DA
\C
HI
LA
O
GA
OA
\C
HI
LA
O_
CO
NT
OU
RS
_E
XP
OR
TC
AD
V2
.D W
G;
(R5)
PACIFIC SOUTHWEST REGION
CHILAO GAOA
ANGELES NATIONAL
FOREST
SAN GABRIEL MOUNTAINS
NATIONAL MONUMENT
MANZANITA
CONNECTION OPTION
ITEMS
02/28/2025
K. HERNANDEZ
Z. BINVERSIE
R. LOPEZ
C-03 6 15
Feet
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text
WORK ITEMS
AutoCAD SHX Text
ITEM NUMBER
AutoCAD SHX Text
SPEC NUMBER AND SOURCE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
PAY UNIT
AutoCAD SHX Text
QUANTITY
AutoCAD SHX Text
AutoCAD SHX Text 02318 & 02511
AutoCAD SHX Text
WATERLINE INSTALLATION
AutoCAD SHX Text
LF
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
304.05 FP-14
AutoCAD SHX Text
ROAD PULVERIZATION
AutoCAD SHX Text
SY
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
403.04 FP-14
AutoCAD SHX Text
ROAD PAVING HMA 2"
AutoCAD SHX Text
TON
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 02511
AutoCAD SHX Text
EX. VALVE BOX REPLACEMENT
AutoCAD SHX Text
EA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 02511
AutoCAD SHX Text
NEW STANDPIPE INSTALLATION
AutoCAD SHX Text
EA
AutoCAD SHX Text
AutoCAD SHX Text
NEW LINE TO BE PLACED UNDER ROAD
EXISINTG LINE TO BE ABANDONED IN PALCE UNTIL IT REACHES THE ROAD
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
2/2 8/2
5 1 1:
Z
AC
HA
RY
BI
NV
ER
SI
E
C:
\U
SE
RS
\Z
AC
HA
RY
BI
NV
ER
SI
E\
ON
ED
RI
VE
US
DA
\C
HI
LA
O
GA
OA
\C
HI
LA
O_
CO
NT
OU
RS
_E
XP
OR
TC
AD
V2
.D W
G;
(R5)
PACIFIC SOUTHWEST REGION
CHILAO GAOA
ANGELES NATIONAL
FOREST
SAN GABRIEL MOUNTAINS
NATIONAL MONUMENT
STATION TANK REHAB
OPTION ITEMS
02/28/2025
K. HERNANDEZ
Z. BINVERSIE
R. LOPEZ
C-04 7 15
Feet
AutoCAD SHX Text
EXISTING STATION WATER TANK
AutoCAD SHX Text
EXISTING FIREBOX
AutoCAD SHX Text
EXISTING FIREBOX
AutoCAD SHX Text
10,000 GAL CAPACITY
AutoCAD SHX Text
EXISTING STATION WATER TANK
AutoCAD SHX Text
EXISTING FIREBOX
AutoCAD SHX Text
EXISTING FIREBOX
AutoCAD SHX Text
10,000 GAL CAPACITY
AutoCAD SHX Text
EXISTING STATION WATER TANK
AutoCAD SHX Text
10,000 GAL CAPACITY
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text
WORK ITEMS
AutoCAD SHX Text
ITEM NUMBER
AutoCAD SHX Text
SPEC NUMBER AND SOURCE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
PAY UNIT
AutoCAD SHX Text
QUANTITY
AutoCAD SHX Text
AutoCAD SHX Text 09960
AutoCAD SHX Text
STATION TANK COATING
AutoCAD SHX Text
EA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 03400
AutoCAD SHX Text
CRACK REHAB
AutoCAD SHX Text
EA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 15010
AutoCAD SHX Text
REHAB VALVE AND LADDER
AutoCAD SHX Text
EA
AutoCAD SHX Text
AutoCAD SHX Text
*CONTRACTOR IS RESPONSIBLE FOR RETURNING SERVICE TO ALL EXISTING CONNECTIONS
NOTES: 1. CONTRACTOR WILL DRAIN TANK, FIX CRACKS, AND APPLY COATING TO THE TWO CONTRACTOR WILL DRAIN TANK, FIX CRACKS, AND APPLY COATING TO THE TWO MANZANITA TANKS. 2. CONTRACTOR WILL INSTALL A LADDER, NEW FLOAT VALVE, AND LEVEL INDICATOR.CONTRACTOR WILL INSTALL A LADDER, NEW FLOAT VALVE, AND LEVEL INDICATOR.
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
2/2 8/2
5 1 1:
Z
AC
HA
RY
BI
NV
ER
SI
E
C:
\U
SE
RS
\Z
AC
HA
RY
BI
NV
ER
SI
E\
ON
ED
RI
VE
US
DA
\C
HI
LA
O
GA
OA
\C
HI
LA
O_
CO
NT
OU
RS
_E
XP
OR
TC
AD
V2
.D W
G;
(R5)
PACIFIC SOUTHWEST REGION
CHILAO GAOA
ANGELES NATIONAL
FOREST
SAN GABRIEL MOUNTAINS
NATIONAL MONUMENT
MANZANITA TANK
REHAB OPTION ITEMS
02/27/2025
K. HERNANDEZ
Z. BINVERSIE
R. LOPEZ
C-05 8 15
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text
WORK ITEMS
AutoCAD SHX Text
ITEM NUMBER
AutoCAD SHX Text
SPEC NUMBER AND SOURCE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
PAY UNIT
AutoCAD SHX Text
QUANTITY
AutoCAD SHX Text
AutoCAD SHX Text 09960
AutoCAD SHX Text
MANZANITA TANKS CCOATING
AutoCAD SHX Text
EA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 03400
AutoCAD SHX Text
TANKS CRACK REHABILITATION
AutoCAD SHX Text
EA
AutoCAD SHX Text
AutoCAD SHX Text NOTES: 1. CONTRACTOR WILL DRAIN TANK, FIX CRACKS, AND APPLY COATING TO THE TWO CONTRACTOR WILL DRAIN TANK, FIX CRACKS, AND APPLY COATING TO THE TWO MANZANITA TANKS. 2. CONTRACTOR WILL PAINT OUTSIDE OF TANK TO REMOVE GRAFFITI FROM THE CONTRACTOR WILL PAINT OUTSIDE OF TANK TO REMOVE GRAFFITI FROM THE MANZANITA TANKS.
AutoCAD SHX Text
USFS MANZANITA TANKS 25,000 GAL CAPACITY EACH
CALTRANS TANKS (NOT IN SCOPE OF WORK)
STATE HIGHWAY 2
(CALTRANS)
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
2/2 8/2
5 1 0:
K
EV
IN
HE
RN
AN
DE
Z C:
\U
SE
RS
\K
EV
IN
HE
RN
AN
DE
Z\
ON
ED
RI
VE
US
DA
\C
HI
LA
O
GA
OA
\C
HI
LA
O_
CO
NT
OU
RS
_E
XP
OR
TC
AD
V2
.D W
G;
(R5)
PACIFIC SOUTHWEST REGION
CHILAO GAOA
ANGELES NATIONAL
FOREST
SAN GABRIEL MOUNTAINS
NATIONAL MONUMENT
WELL REHAB OPTION
ITEMS
02/28/2025
K. HERNANDEZ
Z. BINVERSIE
R. LOPEZ
C-06 9 15
Feet
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text
WORK ITEMS
AutoCAD SHX Text
ITEM NUMBER
AutoCAD SHX Text
SPEC NUMBER AND SOURCE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
PAY UNIT
AutoCAD SHX Text
QUANTITY
AutoCAD SHX Text
AutoCAD SHX Text 02511
AutoCAD SHX Text
ALPS WELL 001 REHAB
AutoCAD SHX Text
EA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 02511
AutoCAD SHX Text
ALPS WELL 002 REHAB
AutoCAD SHX Text
EA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 02511
AutoCAD SHX Text
ALPS WELL 003 REHAB
AutoCAD SHX Text
EA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 02511
AutoCAD SHX Text
ALPS WELL 004 REHAB
AutoCAD SHX Text
EA
AutoCAD SHX Text
AutoCAD SHX Text NOTES: 1. WELL 001 TO HAVE TO HAVE LID REPLACED AND PIPING REHABILITATED. WELL 001 TO HAVE TO HAVE LID REPLACED AND PIPING REHABILITATED. 2. WELL 002 TO HAVE PIPING REHABILITATED. WELL 002 TO HAVE PIPING REHABILITATED. 3. WELL 004 TO HAVE TOP REATTACHED TO ENCLOSURE AND PIPING REHABILITATED. WELL 004 TO HAVE TOP REATTACHED TO ENCLOSURE AND PIPING REHABILITATED. 4. WELL 005 TO HAVE PIPING REHABILITATED. WELL 005 TO HAVE PIPING REHABILITATED. 5. ALL WELL LOCATIONS WILL BE SECURED BY A FOREST SERVICE LOCK UPON ALL WELL LOCATIONS WILL BE SECURED BY A FOREST SERVICE LOCK UPON COMPLETION OF WORK. CONTRACTOR WILL CLEAR MATERIAL AROUND WELL SO IT CLOSES AND PROPERLY FUNCTIONS. 6. WELLS CAN BE ACCESSED BY FOOT VIA THE PACIFIC CREST TRAIL. BICYCLES AND WELLS CAN BE ACCESSED BY FOOT VIA THE PACIFIC CREST TRAIL. BICYCLES AND MOTORIZED VEHICLES ARE NOT ALLOWED.
AutoCAD SHX Text
PACIFIC CREST TRAIL (SEE NOTES AND MINIMIZATION MEASURES)
ACCESS TO PACIFIC CREST TRAIL FROM ROAD INTERSECTION
B
D D
I N
G I N
I T
I A
L
B
A C
K F
I L L
P
I P
E
D
I A
M
I N
M
I N
I N
I T
I A
L
B
A C
K F
I L L
B E
D D
I N
G
P
I P
E
D
I A
M
I N
M
I N
WARNING TAPE
& TRACER WIRE
PIPE
TYPICAL TRENCH BEDDING SECTION VIEW
N.T.S.
EXISTING
SURFACE
M
I N
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
2/2 8/2
5 1 1:
Z
AC
HA
RY
BI
NV
ER
SI
E
C:
\U
SE
RS
\Z
AC
HA
RY
BI
NV
ER
SI
E\
ON
ED
RI
VE
US
DA
\C
HI
LA
O
GA
OA
\C
HI
LA
O_
CO
NT
OU
RS
_E
XP
OR
TC
AD
V2
.D W
G;
(R5)
PACIFIC SOUTHWEST REGION
CHILAO GAOA
ANGELES NATIONAL
FOREST
SAN GABRIEL MOUNTAINS
NATIONAL MONUMENT
PIPE DETAILS
02/28/2025
K. HERNANDEZ
Z. BINVERSIE
R. LOPEZ
D-01 10 15
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
2/2 8/2
5 1 1:
Z
AC
HA
RY
BI
NV
ER
SI
E
C:
\U
SE
RS
\Z
AC
HA
RY
BI
NV
ER
SI
E\
ON
ED
RI
VE
US
DA
\C
HI
LA
O
GA
OA
\C
HI
LA
O_
CO
NT
OU
RS
_E
XP
OR
TC
AD
V2
.D W
G;
(R5)
PACIFIC SOUTHWEST REGION
CHILAO GAOA
ANGELES NATIONAL
FOREST
SAN GABRIEL MOUNTAINS
NATIONAL MONUMENT
STREAM CROSSING
DETAILS
02/28/2025
K. HERNANDEZ
Z. BINVERSIE
R. LOPEZ
D-02 11 15
AutoCAD SHX Text
EXISTING GROUND
AutoCAD SHX Text
2-1/2" HDPE PIPE
AutoCAD SHX Text
30" DEPTH
AutoCAD SHX Text
CONCRETE ROADWAY
AutoCAD SHX Text
ENCASE EXPOSED 2-1/2" G.S. PIPE IN
AutoCAD SHX Text
AT STREAM CROSSING
AutoCAD SHX Text
EXISTING CULVERT
AutoCAD SHX Text
2-1/2" HDPE PIPE
AutoCAD SHX Text
2-1/2" GALVINIZED STEEL PIPE
AutoCAD SHX Text
2-1/2" GALVINIZED STEEL PIPE
AutoCAD SHX Text
3" G.S. SLEEVE.
AutoCAD SHX Text
SECURE TO CONCRETE USING
AutoCAD SHX Text
STAINLESS STEEL STRUTS
AutoCAD SHX Text N.T.S.
AutoCAD SHX Text
PIPE LINE DETAIL AT STREAM CROSSING SECTION VIEW
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
18' TYP. WIDTH
EXISTING PAVED SURFACE AVERAGE 2"
EXISTING SLOPE VARIABLE
CONSTRUCTION LIMITS IF DITCH RECONSTRUCTION REQUIRED
TYPICAL EXISTING SECTION (N.T.S.)
VARIES
MAINTAIN EXISTING
CONFIGURATION
EXISTING SLOPE VARIES
CONSTRUCTION LIMITS TYP.
NEW ASPHALT OVERLAY 2"
TYPICAL SECTION
EXISTING DITCH
(N.T.S.)
CROSS SLOPE VARIES
EXISTING BASE VARIES 0 - 4"
EXISTING SLOPE VARIABLE
EXISTING SLOPE VARIABLE
COMPACT PULVERIZED ASPHALT BASE
OR EXISTING SUBGRADE TO 95% MAX
DENSITY
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
2/2 8/2
5 1 1:
Z
AC
HA
RY
BI
NV
ER
SI
E
C:
\U
SE
RS
\Z
AC
HA
RY
BI
NV
ER
SI
E\
ON
ED
RI
VE
US
DA
\C
HI
LA
O
GA
OA
\C
HI
LA
O_
CO
NT
OU
RS
_E
XP
OR
TC
AD
V2
.D W
G;
(R5)
PACIFIC SOUTHWEST REGION
CHILAO GAOA
ANGELES NATIONAL
FOREST
SAN GABRIEL MOUNTAINS
NATIONAL MONUMENT
TYPICAL ROAD DETAILS
02/28/2025
K. HERNANDEZ
Z. BINVERSIE
R. LOPEZ
D-03 12 15
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
ALL EXISTING ROAD DRAINAGE AND INFRASTRUCTURE SHALL REMAIN IN PLACE, FOR MORE DETAILS SEE ROAD MINIMIZATION MEASURES
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
2/2 8/2
5 1 1:
Z
AC
HA
RY
BI
NV
ER
SI
E
C:
\U
SE
RS
\Z
AC
HA
RY
BI
NV
ER
SI
E\
ON
ED
RI
VE
US
DA
\C
HI
LA
O
GA
OA
\C
HI
LA
O_
CO
NT
OU
RS
_E
XP
OR
TC
AD
V2
.D W
G;
(R5)
PACIFIC SOUTHWEST REGION
CHILAO GAOA
ANGELES NATIONAL
FOREST
SAN GABRIEL MOUNTAINS
NATIONAL MONUMENT
TYPICAL ROAD DETAILS
02/28/2025
K. HERNANDEZ
Z. BINVERSIE
R. LOPEZ
D-04 13 15
AutoCAD SHX Text
ADJACENT ROADBED.
AutoCAD SHX Text (2)
AutoCAD SHX Text
BERM NOT REQUIRED WHEN DIP EMPTIES ONTO
AutoCAD SHX Text
NATURAL GROUND OR IN INSLOPED ROADS.
AutoCAD SHX Text B
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text
(SEE SCHEDULE)
AutoCAD SHX Text
SKEWED
AutoCAD SHX Text
AS STAKED
AutoCAD SHX Text
DOWN GRADE BREAK WITH
AutoCAD SHX Text
GRADE CROSS SLOPE
AutoCAD SHX Text
CROSS SLOPE
AutoCAD SHX Text
BERM OR DIKE
AutoCAD SHX Text
12" MIN. HEIGHT
AutoCAD SHX Text
%%U PLAN VIEW
AutoCAD SHX Text
% OF GRADE
AutoCAD SHX Text
UNDER 5
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
"A" LENGTH
AutoCAD SHX Text 45'
AutoCAD SHX Text 50'
AutoCAD SHX Text 55'
AutoCAD SHX Text 60'
AutoCAD SHX Text 65'
AutoCAD SHX Text 70'
AutoCAD SHX Text
AutoCAD SHX Text 2.8'
AutoCAD SHX Text 3.0'
AutoCAD SHX Text 2.6'
AutoCAD SHX Text 2.5'
AutoCAD SHX Text 2.3'
AutoCAD SHX Text 2.2'
AutoCAD SHX Text 2.1'
AutoCAD SHX Text
"D" DEPTH
AutoCAD SHX Text
%%U DIMENSION SCHEDULE
AutoCAD SHX Text
%%U PROFILE B.C.E.
AutoCAD SHX Text
%%U PROFILE F.G.H
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text (1)
AutoCAD SHX Text
MATERIAL EXCAVATED SHALL BE PLACED
AutoCAD SHX Text
BY COMPACTION METHOD SPECIFIED FOR
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text H
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text D
AutoCAD SHX Text 1/2"/D
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text
10' MIN. VERT. CURVES
AutoCAD SHX Text
(SEE SCHEDULE)
AutoCAD SHX Text F
AutoCAD SHX Text C
AutoCAD SHX Text G
AutoCAD SHX Text
DOWN GRADE
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text
ORIGINAL SLOPE LINE
AutoCAD SHX Text
ORIGINAL
AutoCAD SHX Text
GRADE LINE
AutoCAD SHX Text B
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text H
AutoCAD SHX Text
20' MIN
AutoCAD SHX Text 10'
AutoCAD SHX Text
(MIN)
AutoCAD SHX Text
%%UPERSPECTIVE VIEW
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
FLOW
FLOW
FLOW TO ALPS
WELLS BOX
FLOW
FLOW TO ALPS
WELLS BOX
HOSE BIB
FLOW
HB
HB
FILTERS
FLOW
FLOW TO ALPS WELLS BOX
FLOW TO ALPS WELLS BOX
FLOW TO ALPS
WELLS BOX
FLOW
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
2/2 8/2
5 1 1:
Z
AC
HA
RY
BI
NV
ER
SI
E
C:
\U
SE
RS
\Z
AC
HA
RY
BI
NV
ER
SI
E\
ON
ED
RI
VE
US
DA
\C
HI
LA
O
GA
OA
\C
HI
LA
O_
CO
NT
OU
RS
_E
XP
OR
TC
AD
V2
.D W
G;
(R5)
PACIFIC SOUTHWEST REGION
CHILAO GAOA
ANGELES NATIONAL
FOREST
SAN GABRIEL MOUNTAINS
NATIONAL MONUMENT
WELL REHAB DETAILS
02/28/2025
K. HERNANDEZ /
Z. BINVERSIE
R. LOPEZ
D-05 14 15
AutoCAD SHX Text
LEGEND CHECK VALVE GATE VALVE CAPPED END FLOW METER SAMPLE TAP BALL VALVE
AutoCAD SHX Text
%%UWELL 001
AutoCAD SHX Text
%%UWELL 002
AutoCAD SHX Text
%%UWELL 004
AutoCAD SHX Text
%%UWELL 005
AutoCAD SHX Text
%%UALPS WELLS
AutoCAD SHX Text
%%UALPS WELLS BOX
AutoCAD SHX Text N.T.S.
AutoCAD SHX Text
%%UPROPOSED WELL CONFIGURATION
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
NOTES: 1. WELLS WILL BE REPIPED SO SOURCE WATER CAN BE SAMPLED, FLOW WELLS WILL BE REPIPED SO SOURCE WATER CAN BE SAMPLED, FLOW MEASUREMENTS TAKEN, AND FLOW CAN BE SHUT OFF AT THE SOURCE. 2. WELLS PROCEED TO ALPS WELL BOX BEFORE HEADING DOWN HIGHWAY 2 TO REACH WELLS PROCEED TO ALPS WELL BOX BEFORE HEADING DOWN HIGHWAY 2 TO REACH CHILAO SYSTEM.
MANZANITA
TANKS
TO CHILAO STATION &
MEADOWS CG
FLOW FROM
VISITOR CENTER
HB
Y-STRAINER
HB
PRESSURE
REDUCING
VALVE
PRESSURE GAUGE
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
2/2 8/2
5 1 1:
Z
AC
HA
RY
BI
NV
ER
SI
E
C:
\U
SE
RS
\Z
AC
HA
RY
BI
NV
ER
SI
E\
ON
ED
RI
VE
US
DA
\C
HI
LA
O
GA
OA
\C
HI
LA
O_
CO
NT
OU
RS
_E
XP
OR
TC
AD
V2
.D W
G;
(R5)
PACIFIC SOUTHWEST REGION
CHILAO GAOA
ANGELES NATIONAL
FOREST
SAN GABRIEL MOUNTAINS
NATIONAL MONUMENT
VALVE BOX DETAILS
02/28/2025
K. HERNANDEZ /
Z. BINVERSIE
R. LOPEZ
D-06 15 15
AutoCAD SHX Text
%%UCREEK CROSSING
AutoCAD SHX Text
%%UVISITOR CENTER TRAIL
AutoCAD SHX Text
%%UPRV VALVE BOX
AutoCAD SHX Text
%%UVALVE BOX
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
| Sheets and Views |
| Chilao_Contours_ExportCADv2-COVERSHEET |
| Chilao_Contours_ExportCADv2-NOTES |
| Chilao_Contours_ExportCADv2-OVERALL LAYOUT |
| Chilao_Contours_ExportCADv2-BASE BID OPTION |
| Chilao_Contours_ExportCADv2-OP STATION CONN |
| Chilao_Contours_ExportCADv2-OP MANZANITA CONN |
| Chilao_Contours_ExportCADv2-OP STATION TANK |
| Chilao_Contours_ExportCADv2-OP MANZANITA TANK |
| Chilao_Contours_ExportCADv2-OP WELL REHAB |
| Chilao_Contours_ExportCADv2-PIPE DETAIL |
| Chilao_Contours_ExportCADv2-STREAM CROSSING DETAIL |
| Chilao_Contours_ExportCADv2-TYPICAL ROAD DETAILS 1 |
| Chilao_Contours_ExportCADv2-TYPICAL ROAD DETAILS 2 |
| Chilao_Contours_ExportCADv2-WELL REHAB DETAIL |
| Chilao_Contours_ExportCADv2-VALVE BOX DETAILS |
File details come from the government source that posted it. Updated .