2. Schedule Of Items.docx

DOCX document 27 KB Posted

Attached to
Forest Service - GAOA - Chilao Campground Complex - Water System Rehabilitation
Solicitation number
127EAW25R0028
Issued by

About this file

The document is a Schedule of Items for the Chilao Campground Complex Water System Rehabilitation project in Angeles National Forest. The solicitation (127EAW25R0028) is a total small business set-aside construction project valued between $1,000,000 and $5,000,000, issued by the Department of Agriculture Forest Service. The project includes a base bid and five optional work packages covering water system infrastructure improvements:

Base bid and options include pipeline installations, road pulverization and paving, valve box replacements, and rehabilitation of various water system components such as station tanks, wells, and standpipes. Key project dates include an organized site visit on August 5th, 2025 at 10:00 AM PDT, with all Request for Information (RFI) submissions due by August 8th, 2025 at 10:00 AM PDT. Contractors are required to submit pricing for all items, with a single award anticipated. The project involves infrastructure work across multiple locations including Visitor Center, Station Tank, Fire Station, Creek Crossing, Manzanita Tanks, and Alps Wells, with specific technical specifications for each work segment.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF ITEMS

Chilao Campground Complex - Water System Rehabilitation (GAOA) Angeles National Forest

Base Bid: Visitor Center to Station Tank

ITEM NUMBER
SPEC # AND SOURCE
BID ITEM
PAY UNIT
EST QTY
PRICE
TOTAL
0001
151.01 FP-14
Mobilization
LS
1
0002
02318 & 02511
Visitor Center to Station Tank Pipeline Installation
LF
9250
0003
304.05 FP-14
Road 3N21 Pulverization
SY
17775
0004
403.04 FP-14
Road 3N21 Paving 2" (HMA Caltrans 1/2in TYPE A, PG (64-16)
Ton
1956.814
0005
634.05 FP-14
Repaint Existing Pavement Striping and Directional Arrows
LS
1
0006
02511
Existing Visitor Center Trail PRV Valve Box Replacement
EA
1
0007
02511
Existing Valve Box Replacement
EA
3
0008
02511
New Creek Crossing Valve Box Installation
EA
1
0009
02511
New Standpipe Installation
EA
1
Base Bid Total:
$

Option 1: Chilao Fire Station Connections

ITEM NUMBER
SPEC # AND SOURCE
BID ITEM
PAY UNIT
EST QTY
PRICE
TOTAL
1001
151.01 FP- 14
Mobilization
LS
1
1002
02318 & 02511
Station Tank to Fire Station Pipeline Installation
LF
1650
1003
304.05 FP- 14
Road 3N14A1 Station Helispot Barracks Pulverization
SY
6000
1004
403.04 FP- 14
Road 3N14A2Station Helispot Barracks Asphalt 2" (HMA Caltrans 1/2in TYPE A, PG (64-16)
Ton
660.528
1005
02511
Existing Firebox/Standpipe Rehabilitation
EA
4
Option 1 Total:
$

Option 2: Creek Crossing to Manzanita Tanks

ITEM NUMBER
SPEC # AND SOURCE
BID ITEM
PAY UNIT
EST QTY
PRICE
TOTAL
2001
151.01 FP-14
Mobilization
LS
1
2002
02318 & 02511
Creek Crossing to Manzanita Tanks Pipeline Installation
LF
3975
2003
304.05 FP-14
Road 3N21 Creek Crossing to Manzanita Loop Pulverization
SY
4320
2004
403.04 FP-14
Road 3N21 Creek Crossing to Manzanita Loop Asphalt 2" (HMA

Caltrans 1/2in TYPE A, PG (64-16)

Ton
475.5802
2005
02511
Existing Valve Box Replacement
EA
2
2006
02511
New Standpipe Installation
EA
1
Option 2 Total:
$

Option 3: Station Tank Rehabilitation

ITEM NUMBER
SPEC # AND SOURCE
BID ITEM
PAY UNIT
EST QTY
PRICE
TOTAL
3001
01200
Mobilization
LS
1
3002
09960
Station Tank Coating
EA
1
3003
03400
Station Tank Rehabilitation (Cracks)
EA
1
3004
15010
Station Tank Rehabilitation (Valve, Ladder)
EA
1
Option 3 Total:
$

Option 4: Manzanita Tanks Rehabilitation

ITEM NUMBER
SPEC # AND SOURCE
BID ITEM
PAY UNIT
EST QTY
PRICE
TOTAL
4001
01200
Mobilization
LS
1
4002
09960
Manzanita Tanks Coating
EA
2
4003
03400
Manzanita Tanks Rehabilitation (Cracks)
EA
2
Option 4 Total:
$

Option 5: Alps Wells Rehabilitation

ITEM NUMBER
SPEC # AND SOURCE
BID ITEM
PAY UNIT
EST QTY
PRICE
TOTAL
5001
01200
Mobilization
LS
1
5002
02511
Alps Well 001 Rehabilitation
EA
1
5003
02511
Alps Well 002 Rehabilitation
EA
1
5004
02511
Alps Well 004 Rehabilitation
EA
1
5005
02511
Alps Well 005 Rehabilitation
EA
1
Option 5 Total:
$
Base Plus Options 1 Through 5 Total:
$

B.2 SCHEDULE NOTES

* QUANITIES ARE ESTIMATED, CONTRACTOR SHALL FIELD VERIFY TO SATISFY ALL REQUIREMENTS OF THE DRAWINGS, STATEMENT OF WORK, AND SPECIFICATIONS.

* One award will be made from this solicitation, contractors must submit pricing for all items.

* Items labeled as optional are not required to be exercised by the government. If exercised, the contractor will be required to perform the optional work in accordance with the terms and conditions of this contract.

* Bid Bond/Guarantee. REQUIRED for proposals exceeding $150,000 IAW FAR 52.228-1 Bid Guarantee.

NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price.

The contractor shall complete the table below and include the information with their proposal.

Company Name:
POC & Title:
Email:
Phone Number:
UEI Number:
Tax ID: