Amendment A00001 - 127EAW25R0028 - Chilao Campground Complex - Water System Rehabilitation.pdf
PDF 424 KB Posted
- Solicitation number
- 127EAW25R0028
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for the Chilao Campground Complex - Water System Rehabilitation project in the Angeles National Forest, issued by the USDA Forest Service. The amendment (A00001) provides responses to 14 Request for Information (RFI) queries from potential contractors, covering key project details such as personnel requirements, project phasing, water sources, site access, surveying, testing, and environmental compliance.
Key project specifics include a desired start date in Fall 2025, the option for one person to serve as Superintendent, SSHO, and QC Manager, and use of the Chilao Picnic Day Use Area for staging. Contractors will need to coordinate with the Contracting Officer (CO) and Contracting Officer's Representative (COR) for site access, potential road closures, and emergency service considerations. Environmental requirements include submitting a Stormwater Multiple Application and Reporting Tracking System (SMARTS) application, implementing sediment control practices, and conducting necessary surveying and testing per contract specifications.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
15C. DATE SIGNED 16C. DATE SIGNED
PAGE OF PAGES
CODE
(X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
2. AMENDMENT/MODIFICATION NUMBER
A00001
6. ISSUED BY
USDA FOREST SERVICE
FIELD PROCUREMENT OPERATIONS (FPO)
PROCUREMENT & PROPERTY SERVICES (PPS)
CONTRACT SERVICE AREA (CSA) 6 – CONSTRUCTION
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code)
Company Name:
SAM UEI:
Address:
9A. AMENDMENT OF SOLICITATION NUMBER
127EAW25R0028
1 3
08/14/2025
9B. DATED (SEE ITEM 11)
07/18/2025
1150161
7EAWAW
X 1
X
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Reference Solicitation No: 127EAW25R0028 PROJECT: Chilao Campground Complex - Water System Rehabilitation (GAOA) Angeles National Forest A00001
The purpose of solicitation amendment A00001 is to provide Request For Information (RFI) Responses.
See page 2 and 3 for additional information.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
JEREMY B. BEDNER
TanyaTorres Highlight
TanyaTorres Highlight
TanyaTorres Highlight
TanyaTorres Highlight
Project: Chilao Campground Complex - Water System Rehabilitation (GAOA) Angeles National Forest Solicitation 127EAW25R0028 Amendment A00001
RFI #1 – Do the Superintendent, SSHO and QC Manager need to be 3 separate individuals?
Response: No. One person may serve as the Superintendent, SSHO and QC Manager, provided that the individual possesses the requisite qualifications and competencies for each position.
RFI #2 – Can the period of performance be extended after award once the material/equipment lead times are confirmed due to current market conditions for the equipment for this project?
Response: Please review the information in the SOW. The desired start date for the project is Fall 2025, with the aim of completing the majority of the work before winter conditions potentially impact access.
RFI #3 – Please provide the site visit sign in sheet.
Response: The sign-in sheet from the site visit will remain confidential and will not be shared with the public.
RFI #4 – Is there a bulk water fill i.e. a hydrant or water source we can pump from for grading operations in close proximity?
Response: Contractor will be able to use water from the Chilao water system during construction.
Contractor can pull from the system and tanks when connected or further north during the construction.
RFI #5 - Does this project require phasing?
Response: Yes phasing of the project is covered under Factor 4 of the technical proposal. Minimizing impact to the fire station personnel in terms of water and road access is a component of this item.
RFI #6 - Please provide a lay down/staging area for construction.
Response: Contractor may use areas within the Chilao Picnic Day Use Area (34.32639912550798, - 118.00748115789897). Contractor will need to propose/request any additional space to the CO/COR.
RFI #7 - Can we shut down roadway access or do we need to maintain one lane for travel?
Response: Contractor shall submit request to CO and COR to request site be closed to public for duration of project if desired. District Ranger approval will be required. There may also be a need to allow emergency services to respond to the general area, the Chilao Fire Station is typically staffed until December. The selected contractor will need to communicate needs and coordinate through the COR.
RFI #8 - Is there an anticipated start date?
Response: Please review the information in the SOW. The desired start date for the project is Fall 2025.
RFI #9 - Is testing required?
Response: Testing is required per the attachment 5 Chilao Campground Complex – Water System Rehabilitation Contract Specifications and per FP-14 for road work items.
RFI #10 - Is surveying required?
Response: Contractor surveying may be needed for contractor to stake waterline and road work items such as the rolling dips to ensure proper drainage to existing features. Contractor surveying is required as needed in FP-14 specs for road work items. Contractor should be aware of FP-14 Line items and their reference to Section 152 Construction Survey and Staking.
RFI #11 - Are inspections to be provided by the contractor (for silt fencing)?
Response: Per the mitigation measures (Attachment 8), contractor is responsible to implement sediment control practices for this project. Contractor needs to maintain these sediment control practices and inspect as needed to ensure proper functionality.
Project: Chilao Campground Complex - Water System Rehabilitation (GAOA) Angeles National Forest Solicitation 127EAW25R0028 Amendment A00001
RFI #12 - Is an SWPPP required?
Response: Yes contractor should coordinate with the Forest Service as the owner to submit required information to Stormwater Multiple Application and Reporting Tracking System (SMARTS). Application fees will be paid by the contractor.
RFI #13 - Is silt fencing required on both sides of the roadway for the entirety of the scope?
Response: Silt fence or other sediment control devices shall be used when there is material exposed that could present erosional issues. If there are hard surfaces still in-tact sediment control is not required.
RFI #14 – Can you share the plan holders list?
Response: The Forest Service does not maintain a plan holders list for this project.
| A00001 - 127EAW24R0017 - Crestline Group CG Renovation |
| Amendment - A00001 - 127EAW23R0011 - Sky Ranch Road |
| SF 30 Continuation Page |
| Amendment A00001 - 127EAW25R0028 - Chilao Campground Complex - Water System Rehabilitation (GAOA).pdf |
| A00001 - 127EAW24R0017 - Crestline Group CG Renovation |
| Amendment - A00001 - 127EAW23R0011 - Sky Ranch Road |
SF 30 Continuation Page
File details come from the government source that posted it. Updated .