Forest Service - 3N17. 4 ERFO Road Repairs
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 127EAW25R0027
- Agency
-
Forest Service
Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- California, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The USDA Forest Service is procuring road repair services for Forest Service Road 3N17.4 (Santa Clara Divide Road) in the Angeles National Forest through solicitation 127EAW25R0027. The project involves comprehensive road repairs including pulverizing and repaving approximately 3 inches of asphalt, installing new drainage features, implementing erosion control measures, and reconstructing downslope embankments at five specific sites damaged by atmospheric rivers in 2022-2023. Contractors must possess California state licensure, provide clean equipment to prevent invasive weed spread, and adhere to strict fire safety restrictions during the California fire precautionary period. The evaluation will use a tradeoff source selection method considering technical factors such as past performance, work plan, key personnel, and performance schedule alongside price. Critical dates include a mandatory site visit on July 21, 2025 at 0900 AM PDT, a deadline for submitting Requests for Information to Contract Specialist Tanya Torres by August 1, 2025 at 1000 AM PDT, and proposal submissions due by August 11, 2025.
This opportunity is designated as a Total Small Business Set Aside with an estimated project value between $250,000 and $500,000, requiring bid bonds for proposals exceeding $150,000. The work encompasses five sites across the Los Angeles Gateway Ranger Districts in varied terrain ranging from flat to moderately hilly and steep areas within Los Angeles County, California. The contractor will have a 120-calendar day performance period and must begin work within 10 calendar days of award, with work restricted to non-holiday weekdays from 0700-1900 hours. Specific construction activities include mobilization, excavation, embankment construction, rip rap installation, full depth reclamation, asphalt paving, drainage structure installation, and erosion control across all sites. The project is scheduled to begin in September 2025 and represents emergency relief work for federally owned roads damaged by severe weather events.
Notice text
2 versions
Update #2 · Latest ·
Date: August 4, 2025
Subject: Solicitation Amendment A00001
The purpose of this amendment is to disseminate responses to the Request for Information (RFI). For further details, please refer to the attached amendment documentation.
-------------------------------------------------------------------------------------------------------------------------------------------------------
127EAW25R0027 - 3N17.4 ERFO Road Repairs
Angeles National Forest
FAR 32.204 Disclosure of Magnitude of the Construction Project: Between $250,000 and $500,000
Set Aside: Total Small Business Set Aside
IMPORTANT NOTES:
Refer to Section L, Paragraph L.2, on Page 34 for detailed instructions regarding the submission of proposals, including the required documents and information to be provided.
All Requests for Information (RFI's) shall be submitted to the Contract Specialist, Tanya Torres on the attached RFI form not later than 1000 AM hours PDT, August 1st, 2025.
An organized site visit is scheduled for July 21, 2025 at 0900 AM hours PDT; please refer to page 38 for detailed information regarding the site visit.
In no event shall failure to inspect the site constitute grounds for a claim after contract award.
Update #1 ·
127EAW25R0027 - 3N17.4 ERFO Road Repairs
Angeles National Forest
FAR 32.204 Disclosure of Magnitude of the Construction Project: Between $250,000 and $500,000
Set Aside: Total Small Business Set Aside
IMPORTANT NOTES:
Refer to Section L, Paragraph L.2, on Page 34 for detailed instructions regarding the submission of proposals, including the required documents and information to be provided.
All Requests for Information (RFI's) shall be submitted to the Contract Specialist, Tanya Torres on the attached RFI form not later than 1000 AM hours PDT, August 1st, 2025.
An organized site visit is scheduled for July 21, 2025 at 0900 AM hours PDT; please refer to page 38 for detailed information regarding the site visit.
In no event shall failure to inspect the site constitute grounds for a claim after contract award.
Files
Notice history
| Notice | Type | Posted |
|---|---|---|
| Forest Service - 3N17. 4 ERFO Road Repairs | Award Notice | |
| This notice | Solicitation | |
| Forest Service - 3N17. 4 ERFO Road Repairs | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| GAOA Facilities, Barracks Inyo NF | Forest Service | Total Small Business | |
| Jake Rocks Road Reconstruction | Forest Service | Total Small Business | |
| GOGA 336173 - Repair Conzelman Road | National Office | No set-aside | |
| Administrative Parking Lot Repairs | Forest Service | Total Small Business | |
| Humbolt pacific crest trail bridge replacement | Forest Service | No set-aside |