Flood Control, Amite River and Tributaries, LA Comite River Basin, Comite River Diversional Project, Comite River Diversion Channel Reach 2A.
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W912P821B0042
- Agency
-
ENDIST New Orleans
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- Baton Rouge, Louisiana 70810, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks excavation and construction services along a segment of the Comite River Diversion Channel Reach 2A in Louisiana. The U.S. Army Corps of Engineers, New Orleans District is procuring excavation of the channel segment, stockpiling of excavated materials, placement of bedding material and channel riprap, clearing and grubbing, utility relocation, construction of an access road and drainage features, installation of culverts, dewatering activities, and traffic control coordination. The period of performance is 578 calendar days from notice to proceed. The cutoff for questions was July 16, 2021 and bids are due by September 17, 2021. Evaluation will be based on price.
This is a 100% small business set-aside. The primary NAICS code is 237990 and PSC code is C111. The government estimate is $63.8 million. The scope requires excavation of a river channel segment in Baton Rouge, Louisiana over 578 days. Eleven contractors submitted bids ranging from $20.9 million to $63.8 million. The apparent low bid was $20.9 million from Triumph Five S JV.
Notice text
12 versions
Update #12 · Latest ·
Revised Bid Abstract has been added to this record.
__________________________________
Bid Abstract has been added to this record.
__________________________________
Amendment 0007
This amendment extends the date for receipt of bids to 08:30am local time and virtual bid opening to 09:00am local time, Friday, 17 September 2021.
__________________________________
Under "General Information" tab, Date Offers Due was changed from 10/01/2021 to 09/10/2021. No other changes have been made.
__________________________________
Amendment 0006
Please see amendment.
__________________________________
Amendment 0004
The Bid Opening date has been changed from 30 August 2021 at 11:00am Local Time to 01 September 2021 at 11:00am Local Time. There are no changes to the plans and specifications.
**************************
Amendment 0003
Bidder question and Government response and a clarification on the bid opening date and time are included. There are no changes to the plans and specifications.
**************************
Amendment 0002
Bidder questions and Government responses and other contract changes are included. There are no changes to the plans and specifications.
**************************
Uploaded plans for Amendment 1.
**************************
Amendment 1
This Amendment contains the point of contact for a site visit, extends the Contractor question cutoff date to 06 August 2021 and drawing and bid schedule changes.
**************************
The finalized solicitation and plans have been added and the cut off date for Contractor questions has been extended to 20 July 2021 at 11:00 AM CST.
**************************
Please see the fully executed modification on the above reference task order.
Flood Control, Amite River and Tributaries, LA Comite River Basin, Comite River Diversional Project, Comite River DIversion Channel Reach 2A.
This procurement is a 100% Small Business Set-Aside.
The cut off date for Contractor questions is 16 July 2021 at 11:00 AM CST.
The work consists of excavation of a segment of the Comite River Diversion channel, stockpiling of excavated earthen materials, placement of bedding material and channel riprap, clearing and grubbing, utility relocation, construction of access road, drainage, culverts, construction unw atering, and traff ic control and coordination.
The estimated time of completion is 578 calendar days after receipt of Notice to Proceed.
Update #11 ·
Bid Abstract has been added to this record.
__________________________________
Amendment 0007
This amendment extends the date for receipt of bids to 08:30am local time and virtual bid opening to 09:00am local time, Friday, 17 September 2021.
__________________________________
Under "General Information" tab, Date Offers Due was changed from 10/01/2021 to 09/10/2021. No other changes have been made.
__________________________________
Amendment 0006
Please see amendment.
__________________________________
Amendment 0004
The Bid Opening date has been changed from 30 August 2021 at 11:00am Local Time to 01 September 2021 at 11:00am Local Time. There are no changes to the plans and specifications.
**************************
Amendment 0003
Bidder question and Government response and a clarification on the bid opening date and time are included. There are no changes to the plans and specifications.
**************************
Amendment 0002
Bidder questions and Government responses and other contract changes are included. There are no changes to the plans and specifications.
**************************
Uploaded plans for Amendment 1.
**************************
Amendment 1
This Amendment contains the point of contact for a site visit, extends the Contractor question cutoff date to 06 August 2021 and drawing and bid schedule changes.
**************************
The finalized solicitation and plans have been added and the cut off date for Contractor questions has been extended to 20 July 2021 at 11:00 AM CST.
**************************
Please see the fully executed modification on the above reference task order.
Flood Control, Amite River and Tributaries, LA Comite River Basin, Comite River Diversional Project, Comite River DIversion Channel Reach 2A.
This procurement is a 100% Small Business Set-Aside.
The cut off date for Contractor questions is 16 July 2021 at 11:00 AM CST.
The work consists of excavation of a segment of the Comite River Diversion channel, stockpiling of excavated earthen materials, placement of bedding material and channel riprap, clearing and grubbing, utility relocation, construction of access road, drainage, culverts, construction unw atering, and traff ic control and coordination.
The estimated time of completion is 578 calendar days after receipt of Notice to Proceed.
Update #10 ·
Amendment 0007
This amendment extends the date for receipt of bids to 08:30am local time and virtual bid opening to 09:00am local time, Friday, 17 September 2021.
__________________________________
Under "General Information" tab, Date Offers Due was changed from 10/01/2021 to 09/10/2021. No other changes have been made.
__________________________________
Amendment 0006
Please see amendment.
__________________________________
Amendment 0004
The Bid Opening date has been changed from 30 August 2021 at 11:00am Local Time to 01 September 2021 at 11:00am Local Time. There are no changes to the plans and specifications.
**************************
Amendment 0003
Bidder question and Government response and a clarification on the bid opening date and time are included. There are no changes to the plans and specifications.
**************************
Amendment 0002
Bidder questions and Government responses and other contract changes are included. There are no changes to the plans and specifications.
**************************
Uploaded plans for Amendment 1.
**************************
Amendment 1
This Amendment contains the point of contact for a site visit, extends the Contractor question cutoff date to 06 August 2021 and drawing and bid schedule changes.
**************************
The finalized solicitation and plans have been added and the cut off date for Contractor questions has been extended to 20 July 2021 at 11:00 AM CST.
**************************
Please see the fully executed modification on the above reference task order.
Flood Control, Amite River and Tributaries, LA Comite River Basin, Comite River Diversional Project, Comite River DIversion Channel Reach 2A.
This procurement is a 100% Small Business Set-Aside.
The cut off date for Contractor questions is 16 July 2021 at 11:00 AM CST.
The work consists of excavation of a segment of the Comite River Diversion channel, stockpiling of excavated earthen materials, placement of bedding material and channel riprap, clearing and grubbing, utility relocation, construction of access road, drainage, culverts, construction unw atering, and traff ic control and coordination.
The estimated time of completion is 578 calendar days after receipt of Notice to Proceed.
Update #9 ·
Under "General Information" tab, Date Offers Due was changed from 10/01/2021 to 09/10/2021. No other changes have been made.
__________________________________
Amendment 0006
Please see amendment.
__________________________________
Amendment 0004
The Bid Opening date has been changed from 30 August 2021 at 11:00am Local Time to 01 September 2021 at 11:00am Local Time. There are no changes to the plans and specifications.
**************************
Amendment 0003
Bidder question and Government response and a clarification on the bid opening date and time are included. There are no changes to the plans and specifications.
**************************
Amendment 0002
Bidder questions and Government responses and other contract changes are included. There are no changes to the plans and specifications.
**************************
Uploaded plans for Amendment 1.
**************************
Amendment 1
This Amendment contains the point of contact for a site visit, extends the Contractor question cutoff date to 06 August 2021 and drawing and bid schedule changes.
**************************
The finalized solicitation and plans have been added and the cut off date for Contractor questions has been extended to 20 July 2021 at 11:00 AM CST.
**************************
Please see the fully executed modification on the above reference task order.
Flood Control, Amite River and Tributaries, LA Comite River Basin, Comite River Diversional Project, Comite River DIversion Channel Reach 2A.
This procurement is a 100% Small Business Set-Aside.
The cut off date for Contractor questions is 16 July 2021 at 11:00 AM CST.
The work consists of excavation of a segment of the Comite River Diversion channel, stockpiling of excavated earthen materials, placement of bedding material and channel riprap, clearing and grubbing, utility relocation, construction of access road, drainage, culverts, construction unw atering, and traff ic control and coordination.
The estimated time of completion is 578 calendar days after receipt of Notice to Proceed.
Update #8 ·
Amendment 0006
Please see amendment.
__________________________________
Amendment 0004
The Bid Opening date has been changed from 30 August 2021 at 11:00am Local Time to 01 September 2021 at 11:00am Local Time. There are no changes to the plans and specifications.
**************************
Amendment 0003
Bidder question and Government response and a clarification on the bid opening date and time are included. There are no changes to the plans and specifications.
**************************
Amendment 0002
Bidder questions and Government responses and other contract changes are included. There are no changes to the plans and specifications.
**************************
Uploaded plans for Amendment 1.
**************************
Amendment 1
This Amendment contains the point of contact for a site visit, extends the Contractor question cutoff date to 06 August 2021 and drawing and bid schedule changes.
**************************
The finalized solicitation and plans have been added and the cut off date for Contractor questions has been extended to 20 July 2021 at 11:00 AM CST.
**************************
Please see the fully executed modification on the above reference task order.
Flood Control, Amite River and Tributaries, LA Comite River Basin, Comite River Diversional Project, Comite River DIversion Channel Reach 2A.
This procurement is a 100% Small Business Set-Aside.
The cut off date for Contractor questions is 16 July 2021 at 11:00 AM CST.
The work consists of excavation of a segment of the Comite River Diversion channel, stockpiling of excavated earthen materials, placement of bedding material and channel riprap, clearing and grubbing, utility relocation, construction of access road, drainage, culverts, construction unw atering, and traff ic control and coordination.
The estimated time of completion is 578 calendar days after receipt of Notice to Proceed.
Update #7 ·
Amendment 0004
The Bid Opening date has been changed from 30 August 2021 at 11:00am Local Time to 01 September 2021 at 11:00am Local Time. There are no changes to the plans and specifications.
**************************
Amendment 0003
Bidder question and Government response and a clarification on the bid opening date and time are included. There are no changes to the plans and specifications.
**************************
Amendment 0002
Bidder questions and Government responses and other contract changes are included. There are no changes to the plans and specifications.
**************************
Uploaded plans for Amendment 1.
**************************
Amendment 1
This Amendment contains the point of contact for a site visit, extends the Contractor question cutoff date to 06 August 2021 and drawing and bid schedule changes.
**************************
The finalized solicitation and plans have been added and the cut off date for Contractor questions has been extended to 20 July 2021 at 11:00 AM CST.
**************************
Please see the fully executed modification on the above reference task order.
Flood Control, Amite River and Tributaries, LA Comite River Basin, Comite River Diversional Project, Comite River DIversion Channel Reach 2A.
This procurement is a 100% Small Business Set-Aside.
The cut off date for Contractor questions is 16 July 2021 at 11:00 AM CST.
The work consists of excavation of a segment of the Comite River Diversion channel, stockpiling of excavated earthen materials, placement of bedding material and channel riprap, clearing and grubbing, utility relocation, construction of access road, drainage, culverts, construction unw atering, and traff ic control and coordination.
The estimated time of completion is 578 calendar days after receipt of Notice to Proceed.
Update #6 ·
Amendment 0003
Bidder question and Government response and a clarification on the bid opening date and time are included. There are no changes to the plans and specifications.
**************************
Amendment 0002
Bidder questions and Government responses and other contract changes are included. There are no changes to the plans and specifications.
**************************
Uploaded plans for Amendment 1.
**************************
Amendment 1
This Amendment contains the point of contact for a site visit, extends the Contractor question cutoff date to 06 August 2021 and drawing and bid schedule changes.
**************************
The finalized solicitation and plans have been added and the cut off date for Contractor questions has been extended to 20 July 2021 at 11:00 AM CST.
**************************
Please see the fully executed modification on the above reference task order.
Flood Control, Amite River and Tributaries, LA Comite River Basin, Comite River Diversional Project, Comite River DIversion Channel Reach 2A.
This procurement is a 100% Small Business Set-Aside.
The cut off date for Contractor questions is 16 July 2021 at 11:00 AM CST.
The work consists of excavation of a segment of the Comite River Diversion channel, stockpiling of excavated earthen materials, placement of bedding material and channel riprap, clearing and grubbing, utility relocation, construction of access road, drainage, culverts, construction unw atering, and traff ic control and coordination.
The estimated time of completion is 578 calendar days after receipt of Notice to Proceed.
Update #5 ·
Amendment 0002
Bidder questions and Government responses and other contract changes are included. There are no changes to the plans and specifications.
**************************
Uploaded plans for Amendment 1.
**************************
Amendment 1
This Amendment contains the point of contact for a site visit, extends the Contractor question cutoff date to 06 August 2021 and drawing and bid schedule changes.
**************************
The finalized solicitation and plans have been added and the cut off date for Contractor questions has been extended to 20 July 2021 at 11:00 AM CST.
**************************
Please see the fully executed modification on the above reference task order.
Flood Control, Amite River and Tributaries, LA Comite River Basin, Comite River Diversional Project, Comite River DIversion Channel Reach 2A.
This procurement is a 100% Small Business Set-Aside.
The cut off date for Contractor questions is 16 July 2021 at 11:00 AM CST.
The work consists of excavation of a segment of the Comite River Diversion channel, stockpiling of excavated earthen materials, placement of bedding material and channel riprap, clearing and grubbing, utility relocation, construction of access road, drainage, culverts, construction unw atering, and traff ic control and coordination.
The estimated time of completion is 578 calendar days after receipt of Notice to Proceed.
Update #4 ·
Amendment 1
This Amendment contains the point of contact for a site visit, extends the Contractor question cutoff date to 06 August 2021 and drawing and bid schedule changes.
**************************
The finalized solicitation and plans have been added and the cut off date for Contractor questions has been extended to 20 July 2021 at 11:00 AM CST.
**************************
Please see the fully executed modification on the above reference task order.
Flood Control, Amite River and Tributaries, LA Comite River Basin, Comite River Diversional Project, Comite River DIversion Channel Reach 2A.
This procurement is a 100% Small Business Set-Aside.
The cut off date for Contractor questions is 16 July 2021 at 11:00 AM CST.
The work consists of excavation of a segment of the Comite River Diversion channel, stockpiling of excavated earthen materials, placement of bedding material and channel riprap, clearing and grubbing, utility relocation, construction of access road, drainage, culverts, construction unw atering, and traff ic control and coordination.
The estimated time of completion is 578 calendar days after receipt of Notice to Proceed.
Update #3 ·
The finalized solicitation and plans have been added and the cut off date for Contractor questions has been extended to 20 July 2021 at 11:00 AM CST.
**************************
Please see the fully executed modification on the above reference task order.
Flood Control, Amite River and Tributaries, LA Comite River Basin, Comite River Diversional Project, Comite River DIversion Channel Reach 2A.
This procurement is a 100% Small Business Set-Aside.
The cut off date for Contractor questions is 16 July 2021 at 11:00 AM CST.
The work consists of excavation of a segment of the Comite River Diversion channel, stockpiling of excavated earthen materials, placement of bedding material and channel riprap, clearing and grubbing, utility relocation, construction of access road, drainage, culverts, construction unw atering, and traff ic control and coordination.
The estimated time of completion is 578 calendar days after receipt of Notice to Proceed.
Update #2 ·
Flood Control, Amite River and Tributaries, LA Comite River Basin, Comite River Diversional Project, Comite River DIversion Channel Reach 2A.
This procurement is a 100% Small Business Set-Aside.
The cut off date for Contractor questions is 16 July 2021 at 11:00 AM CST.
The work consists of excavation of a segment of the Comite River Diversion channel, stockpiling of excavated earthen materials, placement of bedding material and channel riprap, clearing and grubbing, utility relocation, construction of access road, drainage, culverts, construction unw atering, and traff ic control and coordination.
The estimated time of completion is 578 calendar days after receipt of Notice to Proceed.
*********************************************
The cut off date for Contractor questions has been extended to 18 July 2021 at 11:00 AM CST. Plans have been added for this solicitation.
Update #1 ·
Flood Control, Amite River and Tributaries, LA Comite River Basin, Comite River Diversional Project, Comite River DIversion Channel Reach 2A.
This procurement is a 100% Small Business Set-Aside.
The cut off date for Contractor questions is 16 July 2021 at 11:00 AM CST.
The work consists of excavation of a segment of the Comite River Diversion channel, stockpiling of excavated earthen materials, placement of bedding material and channel riprap, clearing and grubbing, utility relocation, construction of access road, drainage, culverts, construction unw atering, and traff ic control and coordination.
The estimated time of completion is 578 calendar days after receipt of Notice to Proceed.
Files
Show all 14
Notice history
Similar open opportunities
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity