21B0042 Bid Abstract Rev. 2.pdf
PDF 305 KB Posted
- Solicitation number
- W912P821B0042
About this file
This abstract of offers summarizes bids received in response to a solicitation for flood control work along the Comite River in Louisiana. Eleven contractors submitted bids for the project, which includes excavation of a diversion channel segment, placement of bedding material and riprap, clearing and grubbing, utility relocation, construction of access roads and drainage structures. The government estimate for the work was $63.8 million. Bid amounts ranged from $20.9 million to $38.7 million. The small business set-aside requires the work to be performed by a small business. The apparent low bidder is Triumph Five S JV at $20.9 million, while Cycle Construction Company submitted the highest bid of $38.7 million. All bids included the required bid bonds except for Next Generation Logistics, which did not submit bond information.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2. DATE ISSUED 3. DATE OPENED
17-Sep-21 17-Sep-21
DATE SIGNED
17-Sep-21
7A. ITEM 7C. EST. D. UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED
NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
0001 Mobilization and Demobilization 1 JOB $ 854,000.00 $ 854,000.00 $ 1,800,000.00 $ 1,800,000.00 $ 275,000.00 $ 275,000.00 $ 1,000,000.00 $ 1,000,000.00 $ 6,500,000.00 $ 6,500,000.00 $ 2,316,140.69 $ 2,316,140.69 $ 3,400,000.00 $ 3,400,000.00 $ 3,999,000.00 $ 3,999,000.00 $ 4,221,355.65 $ 4,221,355.65 $ 1,352,941.18 $ 1,352,941.18 $ 600,000.00 $ 600,000.00 $ 214,000.00 $ 214,000.00 0002 Safety Fence 1 JOB $ 192,000.00 $ 192,000.00 $ 120,000.00 $ 120,000.00 $ 40,000.00 $ 40,000.00 $ 97,515.00 $ 97,515.00 $ 100,000.00 $ 100,000.00 $ 27,000.00 $ 27,000.00 $ 84,500.00 $ 84,500.00 $ 116,000.00 $ 116,000.00 $ 39,444.00 $ 39,444.00 $ 101,470.59 $ 101,470.59 $ 100,000.00 $ 100,000.00 $ 62,500.00 $ 62,500.00 0003 Video and Photographic Documentation 1 JOB $ 95,000.00 $ 95,000.00 $ 15,000.00 $ 15,000.00 $ 10,000.00 $ 10,000.00 $ 7,600.00 $ 7,600.00 $ 50,000.00 $ 50,000.00 $ 250,000.00 $ 250,000.00 $ 21,000.00 $ 21,000.00 $ 58,000.00 $ 58,000.00 $ 61,452.00 $ 61,452.00 $ 33,823.53 $ 33,823.53 $ 45,000.00 $ 45,000.00 $ 5,770.00 $ 5,770.00 0004 Traffic Control 1 JOB $ 61,000.00 $ 61,000.00 $ 30,000.00 $ 30,000.00 $ 10,000.00 $ 10,000.00 $ 62,600.00 $ 62,600.00 $ 1,625,000.00 $ 1,625,000.00 $ 185,000.00 $ 185,000.00 $ 54,500.00 $ 54,500.00 $ 45,000.00 $ 45,000.00 $ 6,417.90 $ 6,417.90 $ 67,647.06 $ 67,647.06 $ 800,000.00 $ 800,000.00 $ 21,920.00 $ 21,920.00 0005 Silt Fences 7,665 LF $ 6.40 $ 49,056.00 $ 6.50 $ 49,822.50 $ 7.00 $ 53,655.00 $ 2.60 $ 19,929.00 $ 12.00 $ 91,980.00 $ 4.50 $ 34,492.50 $ 5.00 $ 38,325.00 $ 14.00 $ 107,310.00 $ 3.56 $ 27,287.40 $ 3.39 $ 25,984.35 $ 7.00 $ 53,655.00 $ 3.40 $ 26,061.00 0006 Straw Bales 475 LF $ 32.00 $ 15,200.00 $ 31.00 $ 14,725.00 $ 15.00 $ 7,125.00 $ 20.00 $ 9,500.00 $ 75.00 $ 35,625.00 $ 12.00 $ 5,700.00 $ 19.65 $ 9,333.75 $ 10.00 $ 4,750.00 $ 5.72 $ 2,717.00 $ 27.06 $ 12,853.50 $ 65.00 $ 30,875.00 $ 5.50 $ 2,612.50 0007 Truck Wash-Down Rack 1 JOB $ 158,000.00 $ 158,000.00 $ 82,000.00 $ 82,000.00 $ 80,000.00 $ 80,000.00 $ 38,000.00 $ 38,000.00 $ 1,000,000.00 $ 1,000,000.00 $ 75,000.00 $ 75,000.00 $ 117,500.00 $ 117,500.00 $ 175,000.00 $ 175,000.00 $ 131,935.08 $ 131,935.08 $ 33,823.53 $ 33,823.53 $ 30,000.00 $ 30,000.00 $ 146,000.00 $ 146,000.00 0008 Channel Excavation 1,418,000 CY $ 6.20 $ 8,791,600.00 $ 4.00 $ 5,672,000.00 $ 3.80 $ 5,388,400.00 $ 4.09 $ 5,799,620.00 $ 15.00 $ 21,270,000.00 $ 4.15 $ 5,884,700.00 $ 4.50 $ 6,381,000.00 $ 4.00 $ 5,672,000.00 $ 4.99 $ 7,075,820.00 $ 5.55 $ 7,869,900.00 $ 4.00 $ 5,672,000.00 $ 4.96 $ 7,033,280.00 0009 Drainage Ditch 30,675 CY $ 6.40 $ 196,320.00 $ 4.00 $ 122,700.00 $ 5.00 $ 153,375.00 $ 4.00 $ 122,700.00 $ 15.00 $ 460,125.00 $ 6.72 $ 206,136.00 $ 5.20 $ 159,510.00 $ 4.50 $ 138,037.50 $ 2.41 $ 73,926.75 $ 6.76 $ 207,363.00 $ 5.00 $ 153,375.00 $ 5.00 $ 153,375.00 0010 Compacted Fill 186,525 CY $ 7.00 $ 1,305,675.00 $ 4.75 $ 885,993.75 $ 1.00 $ 186,525.00 $ 1.40 $ 261,135.00 $ 25.00 $ 4,663,125.00 $ 11.50 $ 2,145,037.50 $ 4.60 $ 858,015.00 $ 0.35 $ 65,283.75 $ 1.28 $ 238,752.00 $ 2.04 $ 380,511.00 $ 2.00 $ 373,050.00 $ 3.50 $ 652,837.50 0011 Separator Geotextile 252,825 SY $ 5.60 $ 1,415,820.00 $ 5.00 $ 1,264,125.00 $ 3.30 $ 834,322.50 $ 2.60 $ 657,345.00 $ 3.00 $ 758,475.00 $ 21.90 $ 5,536,867.50 $ 5.05 $ 1,276,766.25 $ 4.00 $ 1,011,300.00 $ 2.66 $ 672,514.50 $ 3.39 $ 857,076.75 $ 1.20 $ 303,390.00 $ 4.25 $ 1,074,506.25 0012 Drainage Ditch Separator Geotextile 153 SY $ 6.00 $ 918.00 $ 15.00 $ 2,295.00 $ 3.30 $ 504.90 $ 7.00 $ 1,071.00 $ 3.00 $ 459.00 $ 100.35 $ 15,353.55 $ 5.00 $ 765.00 $ 6.00 $ 918.00 $ 5.20 $ 795.60 $ 3.39 $ 518.67 $ 2.00 $ 306.00 $ 4.25 $ 650.25 0013 Clearing Areas 1 JOB $ 1,201,000.00 $ 1,201,000.00 $ 683,000.00 $ 683,000.00 $ 113,000.00 $ 113,000.00 $ 198,640.00 $ 198,640.00 $ 1,560,000.00 $ 1,560,000.00 $ 550,000.00 $ 550,000.00 $ 182,500.00 $ 182,500.00 $ 575,000.00 $ 575,000.00 $ 316,398.16 $ 316,398.16 $ 270,588.24 $ 270,588.24 $ 105,000.00 $ 105,000.00 $ 2,714,500.00 $ 2,714,500.00 0014 Clearing and Grubbing Areas 1 JOB $ 679,000.00 $ 679,000.00 $ 553,000.00 $ 553,000.00 $ 225,000.00 $ 225,000.00 $ 35,640.00 $ 35,640.00 $ 1,375,000.00 $ 1,375,000.00 $ 275,000.00 $ 275,000.00 $ 93,000.00 $ 93,000.00 $ 200,000.00 $ 200,000.00 $ 298,274.98 $ 298,274.98 $ 169,117.65 $ 169,117.65 $ 90,000.00 $ 90,000.00 $ 81,000.00 $ 81,000.00 0015 Construction Unwatering 1 JOB $ 412,000.00 $ 412,000.00 $ 228,000.00 $ 228,000.00 $ 135,000.00 $ 135,000.00 $ 41,195.00 $ 41,195.00 $ 2,400,000.00 $ 2,400,000.00 $ 675,000.00 $ 675,000.00 $ 535,000.00 $ 535,000.00 $ 1,190,000.00 $ 1,190,000.00 $ 556,533.41 $ 556,533.41 $ 676,470.59 $ 676,470.59 $ 1,200,000.00 $ 1,200,000.00 $ 500,000.00 $ 500,000.00 0016 Grouted RipRap 9,300 CY $ 176.00 $ 1,636,800.00 $ 340.00 $ 3,162,000.00 $ 300.00 $ 2,790,000.00 $ 149.00 $ 1,385,700.00 $ 625.00 $ 5,812,500.00 $ 213.32 $ 1,983,876.00 $ 235.75 $ 2,192,475.00 $ 279.00 $ 2,594,700.00 $ 164.15 $ 1,526,595.00 $ 250.29 $ 2,327,697.00 $ 310.00 $ 2,883,000.00 $ 230.00 $ 2,139,000.00 0017 Access Roads/Staging Areas 1 JOB $ 813,000.00 $ 813,000.00 $ 195,000.00 $ 195,000.00 $ 2,700,000.00 $ 2,700,000.00 $ 1,504,000.00 $ 1,504,000.00 $ 1,200,000.00 $ 1,200,000.00 $ 900,000.00 $ 900,000.00 $ 399,300.00 $ 399,300.00 $ 4,600,000.00 $ 4,600,000.00 $ 1,003,653.80 $ 1,003,653.80 $ 385,588.24 $ 385,588.24 $ 2,500,000.00 $ 2,500,000.00 $ 3,532,800.00 $ 3,532,800.00 0018 Turf Establishment and Maintenance 108 AC $ 4,700.00 $ 507,600.00 $ 6,800.00 $ 734,400.00 $ 3,800.00 $ 410,400.00 $ 2,200.00 $ 237,600.00 $ 4,000.00 $ 432,000.00 $ 3,475.00 $ 375,300.00 $ 3,650.00 $ 394,200.00 $ 8,500.00 $ 918,000.00 $ 3,180.00 $ 343,440.00 $ 3,247.06 $ 350,682.48 $ 6,500.00 $ 702,000.00 $ 9,115.00 $ 984,420.00 0019 48' Reinforced Concrete Pipes 504 LF $ 490.00 $ 246,960.00 $ 290.00 $ 146,160.00 $ 180.00 $ 90,720.00 $ 290.00 $ 146,160.00 $ 150.00 $ 75,600.00 $ 140.00 $ 70,560.00 $ 253.00 $ 127,512.00 $ 230.00 $ 115,920.00 $ 167.76 $ 84,551.04 $ 405.88 $ 204,563.52 $ 200.00 $ 100,800.00 $ 192.00 $ 96,768.00 0020 48' Concrete Headwall 2 EA $ 47,000.00 $ 94,000.00 $ 12,200.00 $ 24,400.00 $ 15,000.00 $ 30,000.00 $ 14,500.00 $ 29,000.00 $ 12,000.00 $ 24,000.00 $ 9,000.00 $ 18,000.00 $ 22,770.00 $ 45,540.00 $ 13,800.00 $ 27,600.00 $ 25,657.86 $ 51,315.72 $ 94,705.88 $ 189,411.76 $ 30,000.00 $ 60,000.00 $ 22,135.00 $ 44,270.00 0021 48-Inch Corrugated Metal Pipes 1 JOB $ 38,000.00 $ 38,000.00 $ 80,000.00 $ 80,000.00 $ 900,000.00 $ 900,000.00 $ 69,600.00 $ 69,600.00 $ 40,000.00 $ 40,000.00 $ 20,000.00 $ 20,000.00 $ 57,700.00 $ 57,700.00 $ 63,000.00 $ 63,000.00 $ 58,339.79 $ 58,339.79 $ 78,470.59 $ 78,470.59 $ 80,000.00 $ 80,000.00 $ 49,720.00 $ 49,720.00 0022 48' Aluminum Flap Gate 4 EA $ 22,500.00 $ 90,000.00 $ 11,400.00 $ 45,600.00 $ 20,000.00 $ 80,000.00 $ 7,400.00 $ 29,600.00 $ 9,600.00 $ 38,400.00 $ 5,000.00 $ 20,000.00 $ 16,420.00 $ 65,680.00 $ 8,000.00 $ 32,000.00 $ 7,007.75 $ 28,031.00 $ 6,764.71 $ 27,058.84 $ 5,000.00 $ 20,000.00 $ 10,000.00 $ 40,000.00 0023 Bedding 63,000 TON $ 66.00 $ 4,158,000.00 $ 63.00 $ 3,969,000.00 $ 48.36 $ 3,046,680.00 $ 39.00 $ 2,457,000.00 $ 70.00 $ 4,410,000.00 $ 35.04 $ 2,207,520.00 $ 55.25 $ 3,480,750.00 $ 65.00 $ 4,095,000.00 $ 54.17 $ 3,412,710.00 $ 87.94 $ 5,540,220.00 $ 76.00 $ 4,788,000.00 $ 52.00 $ 3,276,000.00 0024 Channel RipRap R-90 123,000 TON $ 71.00 $ 8,733,000.00 $ 68.50 $ 8,425,500.00 $ 54.59 $ 6,714,570.00 $ 55.00 $ 6,765,000.00 $ 80.00 $ 9,840,000.00 $ 43.25 $ 5,319,750.00 $ 65.20 $ 8,019,600.00 $ 105.00 $ 12,915,000.00 $ 62.99 $ 7,747,770.00 $ 87.94 $ 10,816,620.00 $ 82.00 $ 10,086,000.00 $ 55.01 $ 6,766,230.00 0025 Drainage Ditch RipRap R-90 70 TON $ 70.00 $ 4,900.00 $ 136.00 $ 9,520.00 $ 54.59 $ 3,821.30 $ 55.00 $ 3,850.00 $ 80.00 $ 5,600.00 $ 43.95 $ 3,076.50 $ 65.20 $ 4,564.00 $ 75.00 $ 5,250.00 $ 82.64 $ 5,784.80 $ 87.94 $ 6,155.80 $ 150.00 $ 10,500.00 $ 65.00 $ 4,550.00
TOTAL WORK $ 31,748,849.00 $ 28,314,241.25 $ 24,278,098.70 $ 20,980,000.00 $ 63,767,889.00 $ 29,099,510.24 $ 27,999,036.00 $ 38,724,069.25 $ 27,985,815.58 $ 31,986,557.87 $ 30,786,951.00 $ 29,622,770.50
B. OFFEROR: Maloney Odin Joint Venture
B. BID SECURITY (Type and amount)
Bid Bond $6,157,390.20
C. AMENDMENTS ACKNOWLEDGED:
YES
NO. 10
B. OFFEROR: Triumph Five S JV
B. BID SECURITY (Type and amount)
Bid Bond $3,000,000.00
C. AMENDMENTS ACKNOWLEDGED:
NO
NO. 9
B. OFFEROR: Young's General Contracting, Inc.
B. BID SECURITY (Type and amount)
Bid Bond NO
C. AMENDMENTS ACKNOWLEDGED:
YES
NO. 8
NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88) Prescribed by GSA - FAR (48 CFR) 53.236-1
ABSTRACT OF OFFERS
1. SOLICITATION NUMBER
W912P821B0042
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
SIGNATURE
4. ISSUING OFFICE
US ARMY ENGINEER DISTRICT, NOD
5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS
B. BID SECURITY (Type and amount)
Bid Bond $3,000,000.00 B. BID SECURITY (Type and amount)
Bid Bond $4,855,619.74
(Check A, B or C and complete D, E, and F) NO. 1 NO. 2
7B. DESCRIPTION OF OFFERED ITEM
C. REASONABLE CONTRACT
(Including Profit)
B. REASONABLE CONTRACT
(Without Profit)
NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)
6. NUMBER OF AMENDMENTS ISSUED
7400 Leake Avenue
New Orleans, LA 70118
A. HIRED LABOR A. OFFEROR: Cycle Construction Company, LLC
B. OFFEROR: Anderson Contracting, LLC
Dorothy Pitre Contract Specialist
Charles R. Zammit, Jr.
Contracting Officer
Flood Control, Amite River and Tributaries, LA Comite River Basin, Comite River Diversional
Project, Comite River Diversion Channel Segment 2A
C. AMENDMENTS ACKNOWLEDGED:
YES
C. AMENDMENTS ACKNOWLEDGED:
YES
C. AMENDMENTS ACKNOWLEDGED:
YES
NO. 4
B. OFFEROR: Herve Cody Contractors, LLC
B. BID SECURITY (Type and amount)
Bid Bond $3,000,000.00
C. AMENDMENTS ACKNOWLEDGED:
YES
NO. 6 NO. 7NO. 5 NO. 11
B. OFFEROR: Lemoine-Fraxier JV
LLC
B. BID SECURITY (Type and amount)
Bid Bond $3,000,000.00
C. AMENDMENTS ACKNOWLEDGED:
YES
NO. 3
B. OFFEROR: Rigid Constructors, LLC
B. BID SECURITY (Type and amount)
Bid Bond $3,000,000.00
C. AMENDMENTS ACKNOWLEDGED:
YES
B. OFFEROR: Onshore Materials, LLC
B. BID SECURITY (Type and amount)
Bid Bond $3,000,000.00
C. AMENDMENTS ACKNOWLEDGED:
YES
B. OFFEROR: Applachian Pipeline Contractors, LLC
B. BID SECURITY (Type and amount)
Bid Bond $3,000,000.00
C. AMENDMENTS ACKNOWLEDGED:
YES
B. OFFEROR: Next Generation Logistics, LLC
B. BID SECURITY (Type and amount)
Bid Bond NO
| 2021-09-24T13:28:25-0500 | |
| ZAMMIT.CHARLES.RAYMOND.JR.1230832656 |
File details come from the government source that posted it. Updated .