Flathead NF, Hungry Horse RD, Lions Lake Dam Rehab

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
1240LU21R0002
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Hungry Horse MT 59919, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks rehabilitation of Lions Lake Dam located on the Flathead National Forest in Hungry Horse, Montana. Work includes rehabilitating the south and north dam embankments, modifying the outlet structures, replacing downstream piping, installing erosion controls, and repairing parking areas. The U.S. Department of Agriculture Forest Service will evaluate proposals based on capability, technical approach, past performance, and price. The performance period is 100 calendar days, and the pre-proposal meeting was held on May 11, 2021. Proposals are due by the specified date in Section L.

This is a total small business set-aside, with an estimated price range between $500,000 to $1,000,000. The NAICS code is 237990 and PSC code is R499. The place of performance is Hungry Horse, Montana. Key details include recontouring and adding riprap to the south dam, raising the north dam embankment to match, and replacing over 500 linear feet of outlet piping. The period of performance is 100 calendar days starting July 15, 2021.

Notice text

3 versions

Update #3 · Latest ·

Amendment No 2, Notes from Preproposal meeting attached. 

Amendment No 1, Preproposal meeting scheduled at the project site, May 11, 2021, noon (mountain).

Preproposal meeting scheduled at the project site, see Section L for date and time.

Flathead NF, Hungry Horse Ranger District, Lions Lake Dam Rehabilitation involves rehabilitation of the Lion Lake south dam and raising the embankment on the north dam. Work at the south dam includes rehabilitation of the upstream embankment slope to re-contour and smooth the grading and adding riprap for wave action erosion protection. The outlet shaft/spillway structure will be modified to core a weir into the wall, replace vertical slide gate, add new upstream vertical slide gate, rehabilitate exposed concrete surfaces, and rehabilitate existing handrail. Work at the Outlet Pipe requires replacement of the downstream outlet pipe, removal and disposing of concrete retaining structure at the downstream end of the outlet pipe, adding rock riprap erosion control downstream of the outlet pipe, and slipline the interior upstream outlet pipe. The Contractor will need to raise the embankment crest of the dam, shifting the centerline of the embankment crest downstream. The Downstream Embankment will be rebuilt with a flatter embankment fill slope and have toe drains and chimney drains installed. The Parking Lot will have existing damaged areas patched and repaired, and a slurry seal coat will be added. The north will be rehabilitated by raising the embankment crest to same elevation as south dam. Project is located 1.5 miles south of Hungry Horse, Montana. The project site can be reached by turning south off or US Hwy 2 on to MT State RTE 15516 (the paved road to Hungry Horse Dam) for 1.5 miles. The road is also known locally as Forest Service primary road no. 895 and is named the Westside Reservoir Road. Period of Performance 100 calendar days. Estimated price range between $500,000 - $1,000,000

Update #2 ·

Amendment No 1, Preproposal meeting scheduled at the project site, May 11, 2021, noon (mountain).

Preproposal meeting scheduled at the project site, see Section L for date and time.

Flathead NF, Hungry Horse Ranger District, Lions Lake Dam Rehabilitation involves rehabilitation of the Lion Lake south dam and raising the embankment on the north dam. Work at the south dam includes rehabilitation of the upstream embankment slope to re-contour and smooth the grading and adding riprap for wave action erosion protection. The outlet shaft/spillway structure will be modified to core a weir into the wall, replace vertical slide gate, add new upstream vertical slide gate, rehabilitate exposed concrete surfaces, and rehabilitate existing handrail. Work at the Outlet Pipe requires replacement of the downstream outlet pipe, removal and disposing of concrete retaining structure at the downstream end of the outlet pipe, adding rock riprap erosion control downstream of the outlet pipe, and slipline the interior upstream outlet pipe. The Contractor will need to raise the embankment crest of the dam, shifting the centerline of the embankment crest downstream. The Downstream Embankment will be rebuilt with a flatter embankment fill slope and have toe drains and chimney drains installed. The Parking Lot will have existing damaged areas patched and repaired, and a slurry seal coat will be added. The north will be rehabilitated by raising the embankment crest to same elevation as south dam. Project is located 1.5 miles south of Hungry Horse, Montana. The project site can be reached by turning south off or US Hwy 2 on to MT State RTE 15516 (the paved road to Hungry Horse Dam) for 1.5 miles. The road is also known locally as Forest Service primary road no. 895 and is named the Westside Reservoir Road. Period of Performance 100 calendar days. Estimated price range between $500,000 - $1,000,000

Update #1 ·

Preproposal meeting scheduled at the project site, see Section L for date and time.

Flathead NF, Hungry Horse Ranger District, Lions Lake Dam Rehabilitation involves rehabilitation of the Lion Lake south dam and raising the embankment on the north dam. Work at the south dam includes rehabilitation of the upstream embankment slope to re-contour and smooth the grading and adding riprap for wave action erosion protection. The outlet shaft/spillway structure will be modified to core a weir into the wall, replace vertical slide gate, add new upstream vertical slide gate, rehabilitate exposed concrete surfaces, and rehabilitate existing handrail. Work at the Outlet Pipe requires replacement of the downstream outlet pipe, removal and disposing of concrete retaining structure at the downstream end of the outlet pipe, adding rock riprap erosion control downstream of the outlet pipe, and slipline the interior upstream outlet pipe. The Contractor will need to raise the embankment crest of the dam, shifting the centerline of the embankment crest downstream. The Downstream Embankment will be rebuilt with a flatter embankment fill slope and have toe drains and chimney drains installed. The Parking Lot will have existing damaged areas patched and repaired, and a slurry seal coat will be added. The north will be rehabilitated by raising the embankment crest to same elevation as south dam. Project is located 1.5 miles south of Hungry Horse, Montana. The project site can be reached by turning south off or US Hwy 2 on to MT State RTE 15516 (the paved road to Hungry Horse Dam) for 1.5 miles. The road is also known locally as Forest Service primary road no. 895 and is named the Westside Reservoir Road. Period of Performance 100 calendar days. Estimated price range between $500,000 - $1,000,000

Files

File Type Posted
Amend2_SF30_1240LU21R0002.pdf PDF
Amend2_VolumeEstimation.xlsx XLSX spreadsheet
Amend 2_LionLakeContours.png PNG image
Amend2_ Notes_PreProposal Mtg_v2.pdf PDF
Amend1_1240LU21R0002.pdf PDF
SF1442_1240LU21R0002.pdf PDF
Past Performance evaluation (optional).docx DOCX document
WageDecisionMT20210079.pdf PDF
FoodStorageOrderNorthernCDEcosystemCG Btrt Fltd BD Koot HLF.pdf PDF
LionsLake_RFP.docx DOCX document
Lion Lake Dam and Platform Plans.pdf PDF
Lion Lake Dam and PlaformFSSS.pdf PDF
Show all 12

Notice history

Notice Type Posted
Flathead NF, Hungry Horse RD, Lions Lake Dam Rehab Award Award Notice
This notice Latest solicitation Solicitation
Flathead NF, Hungry Horse RD, Lions Lake Dam Rehab Original Pre-Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors